Concrete tower drum of wind generating set

Through the stacking and splicing of multiple precast concrete cylinder sections and the combination of double-sided hanging pads and locking sleeve guide sleeves, the problems of stress concentration and poor waterproof performance at the connection of concrete towers of wind turbines are solved, and the structural High reliability and simplicity of construction.

CN221973704UActive Publication Date: 2024-11-08CRRC ZHUZHOU ELECTRIC LOCOMOTIVE RESEARCH INSTITUTE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420070598.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-11
Publication Date
2024-11-08
Estimated Expiration
2034-01-11

Smart Images

  • Figure CN221973704U_ABST
    Figure CN221973704U_ABST
Patent Text Reader

Abstract

The utility model discloses a concrete tower drum of a wind generating set, which is formed by laminating and splicing a plurality of precast concrete drum sections, a double-sided rubber-coated gasket is fixed between the contact end surfaces of two adjacent precast concrete drum sections, and the double-sided rubber-coated gasket is used for realizing low-stress self-sealing connection between the adjacent precast concrete drum sections. The low-stress self-sealing connection structure has the advantages of being compact in structure, convenient to disassemble and assemble, reliable in connection, good in anti-leakage effect and the like, low-stress self-sealing connection between the concrete shell sections is achieved through the double-face rubber hanging gaskets, the load dispersion effect is improved, stress concentration at the connecting positions of the concrete shell sections is effectively relieved, and the shell section connection reliability is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of wind power generation, in particular to a concrete tower of a wind power generator set, which is mainly used for a high-power wind power generator set. Background Art

[0002] With the development of wind power industry, wind power has become an advanced energy production method with great technical and economic competitiveness. At present, the market demand for large megawatt power and high towers of wind turbines is increasing. With the increase of wind turbine load, traditional steel towers can no longer meet the design requirements. In addition, the domestic wind power industry is becoming more and more competitive, and the price per kilowatt is constantly falling. Steel-concrete composite towers are becoming a new type of high tower with good economy and safety.

[0003] The lower part of the steel-concrete combined tower is a precast concrete tower, the middle is a steel transition section, and the upper part is a traditional steel tower. The steel tower and the transition section are connected by high-strength bolts, and the transition section, concrete tower and foundation are connected as a whole by prestressed steel strands. This solution comprehensively utilizes the rigidity advantages of the concrete tower and the rapid construction advantages of the steel tower. The structure is safe and reliable, the construction period is short, and the economy is good.

[0004] Concrete towers are made of reinforced concrete. Compared with steel towers, they have obvious advantages in stiffness and cost. Although this structure can meet current needs, it still has the following main problems:

[0005] First, concrete is a brittle and crack-prone material with severe stress concentration at local joints, which makes cracks prone to occur. Investigations and studies have shown that cracks in the structure are the root cause of reduced durability of large-volume concrete structures and reinforced concrete structures and even major safety accidents.

[0006] Second, in the actual operation process of the prefabricated segmented tower, it is inevitable that there will be horizontal and vertical joints in the segment tower sections. Due to reasons such as product size accuracy, there are many cases of leakage and seepage at the joints of the mixed tower segments, and the waterproof reliability of the joints is low.

[0007] Third, the connection of the mixed tower segments is more troublesome. When using a crane to lift the tower for combined installation, it is not convenient to align the two towers. It requires multiple adjustments to place the upper tower on the lower tower, which makes the construction difficult. Utility Model Content

[0008] The technical problem to be solved by the utility model is to overcome the deficiencies of the prior art and provide a wind turbine generator concrete tower with compact structure, convenient assembly and disassembly, reliable connection and good anti-leakage effect.

[0009] In order to solve the above technical problems, the utility model adopts the following technical solutions:

[0010] A concrete tower of a wind turbine generator set, wherein the concrete tower of the wind turbine generator set is formed by stacking and splicing a plurality of precast concrete cylinder sections, and a double-sided rubber pad is fixed between the contact end surfaces of two adjacent precast concrete cylinder sections, and the double-sided rubber pad is used to achieve a low-stress self-sealing connection between adjacent precast concrete cylinder sections.

[0011] As a further improvement of the present invention, a plurality of locking sleeves are evenly distributed on the top contact end surface of the precast concrete cylinder segment, and a plurality of mounting holes corresponding to the locking sleeves are evenly distributed on the double-sided rubber gasket. By installing locking pieces in the mounting holes and the locking sleeves, the double-sided rubber gasket is fixed to the contact end surface of the top of the precast concrete cylinder segment and is located between the contact end surfaces of two adjacent precast concrete cylinder segments.

[0012] As a further improvement of the present invention, a plurality of guide sleeves are evenly distributed on the bottom contact end surface of the precast concrete cylinder section, and the guide sleeves correspond to the locking sleeves and the mounting holes. When two adjacent precast concrete cylinder sections are stacked and spliced, the top of the locking piece is nested in the guide sleeve.

[0013] As a further improvement of the utility model, the locking sleeve is a stainless steel threaded sleeve, and the locking sleeve is pre-buried in the top of the precast concrete cylinder section.

[0014] As a further improvement of the present invention, the locking member is a stainless steel screw.

[0015] As a further improvement of the utility model, the guide sleeve is made of stainless steel material, and the guide sleeve is embedded in the bottom of the precast concrete cylinder section.

[0016] As a further improvement of the utility model, the inner core of the double-sided rubber-covered gasket is a stainless steel gasket, and anti-aging rubber is embedded on both sides of the stainless steel gasket.

[0017] Compared with the prior art, the advantages of the utility model are:

[0018] 1. The concrete tower of the wind turbine generator set of the utility model is composed of a main structure of the concrete tower by stacking and splicing a plurality of precast concrete cylinder sections, and a double-sided rubber pad is fixed between the contact end faces of two adjacent precast concrete cylinder sections. The double-sided rubber pad is used to achieve a low-stress self-sealing connection between the concrete cylinder sections, thereby improving the load dispersion effect, effectively alleviating the stress concentration at the connection of the concrete cylinder sections, and improving the reliability of the cylinder section connection; at the same time, the self-sealing connection is achieved by adding a rubber pad at the joint of the concrete cylinder section, thereby eliminating the cumbersome process of applying sealant, achieving a good waterproof effect, and saving labor and time.

[0019] 2. The utility model of the concrete tower of the wind turbine generator set has a plurality of locking sleeves evenly distributed on the top contact end surface of the precast concrete cylinder segment, and a double-sided rubber pad is fixed between the contact end surfaces of two adjacent precast concrete cylinder segments through a locking piece. A plurality of guide sleeves are evenly distributed on the bottom contact end surface of the precast concrete cylinder segment, and the guide sleeves and the locking piece form a guiding and positioning fit, which effectively improves the installation accuracy and efficiency between the two precast concrete cylinder segments, avoids the occurrence of splicing misalignment or dislocation, and ensures the accurate installation of the concrete tower. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 The utility model is a schematic diagram of the cross-sectional structure principle of the concrete tower of the wind turbine generator set.

[0021] Figure 2 It is a schematic diagram of the structural principle of the tower tube in the utility model.

[0022] Legend: 1. Precast concrete cylinder section; 2. Guide sleeve; 3. Locking piece; 4. Double-sided rubber gasket; 41. Stainless steel gasket; 42. Rubber; 5. Locking sleeve; 6. Mounting hole. DETAILED DESCRIPTION

[0023] The present invention is further described below in conjunction with the accompanying drawings and specific preferred embodiments, but the protection scope of the present invention is not limited thereby.

[0024] Example

[0025] like Figure 1 and Figure 2 As shown, the concrete tower of the wind turbine generator set of the utility model is suitable for the application scenarios of large-power wind turbine generator sets (5.xMW~8.xMW), and is mainly composed of multiple precast concrete cylinder sections 1 stacked and spliced, and a double-sided rubber pad 4 is fixed between the contact end surfaces of two adjacent precast concrete cylinder sections 1, and the double-sided rubber pad 4 is used to achieve low-stress self-sealing connection between adjacent precast concrete cylinder sections 1.

[0026] In this embodiment, the main structure of the concrete tower is formed by stacking and splicing multiple precast concrete cylinder segments 1, and a double-sided rubber pad 4 is fixed between the contact end faces of two adjacent precast concrete cylinder segments 1. The double-sided rubber pad 4 is used to achieve a low-stress self-sealing connection between the concrete cylinder segments 1, thereby improving the load dispersion effect, effectively alleviating the stress concentration at the connection of the concrete cylinder segments 1, and improving the reliability of the cylinder segment connection. At the same time, a self-sealing connection is achieved by adding a rubber pad at the joints of the concrete cylinder segments, thereby eliminating the cumbersome process of applying sealant, achieving a good waterproof effect, and saving labor and time.

[0027] like Figure 2As shown, in this embodiment, a plurality of locking sleeves 5 are evenly distributed on the top contact end surface of the precast concrete cylinder segment 1, and a plurality of mounting holes 6 corresponding to the locking sleeves 5 are evenly distributed on the double-sided rubber gasket 4. By installing the locking member 3 in the mounting hole 6 and the locking sleeve 5, the double-sided rubber gasket 4 is fixed to the contact end surface of the top of the precast concrete cylinder segment 1 and is located between the contact end surfaces of two adjacent precast concrete cylinder segments 1.

[0028] Furthermore, a plurality of guide sleeves 2 are evenly distributed on the bottom contact end surface of the precast concrete cylinder section 1 , and the guide sleeves 2 correspond to the locking sleeves 5 and the mounting holes 6 . When two adjacent precast concrete cylinder sections 1 are stacked and spliced, the top of the locking piece 3 is nested in the guide sleeves 2 .

[0029] In this embodiment, multiple locking sleeves 5 are evenly distributed on the top contact end surface of the precast concrete cylinder segment 1, and the double-sided rubber pad 4 is fixed between the contact end surfaces of two adjacent precast concrete cylinder segments 1 through the locking member 3. Multiple guide sleeves 2 are evenly distributed on the bottom contact end surface of the precast concrete cylinder segment 1, and the guide sleeves 2 and the locking member 3 form a guiding and positioning fit, which effectively improves the installation accuracy and efficiency between the two precast concrete cylinder segments 1, avoids the occurrence of splicing misalignment or dislocation, and ensures the accurate installation of the concrete tower.

[0030] In this embodiment, the guide sleeve 2 is made of stainless steel material and is embedded in the bottom of the precast concrete cylinder section 1; the locking sleeve 5 is made of a stainless steel threaded sleeve and is embedded in the top of the precast concrete cylinder section 1; the locking piece 3 is made of a stainless steel screw, which has the advantages of simple structure, convenient disassembly and assembly, and reliable connection.

[0031] like Figure 2 As shown, in this embodiment, the inner core of the double-sided rubber-coated gasket 4 is a thin stainless steel gasket 41, and the double-sided anti-aging rubber 42 is embedded in the stainless steel gasket 41. The load dispersion effect is improved by connecting the thin steel gasket, and the cushioning, vibration reduction and sealing effects of the rubber are utilized, and finally a soft connection between the two precast concrete cylinder sections 1 is achieved.

[0032] When installing the concrete tower, first assemble the precast concrete cylinder section 1 at the bottom and then hoist it into place. After leveling, place the double-sided rubber pad 4 on the top contact surface of the precast concrete cylinder section 1, and tighten the locking piece 3 into the locking sleeve 5 of the precast concrete cylinder section 1 to assemble the double-sided rubber pad 4. Then hoist the precast concrete cylinder section 1 at the top. Since a guide sleeve 2 is buried at the bottom of the precast concrete cylinder section 1, the guide sleeve 2 and the exposed cylindrical head of the locking piece 3 are used to automatically position the upper and lower precast concrete cylinder sections 1 to ensure accurate installation of the concrete tower. This process is simple to operate and easy to install.

[0033] In this embodiment, a low-stress, self-sealing and self-positioning connection is achieved between the precast concrete cylinder segments 1, which not only improves the connection reliability between the cylinder segments, but also effectively improves the installation accuracy and anti-leakage requirements between the cylinder segments, while also meeting the requirements of simple manufacturing process, convenient installation and low cost.

[0034] Although the utility model is disclosed as above with preferred embodiments, it is not intended to limit the utility model. Any technician familiar with the art can use the above disclosed methods and technical contents to make many possible changes and modifications to the technical solution of the utility model without departing from the spirit and technical solution of the utility model, or modify it into an equivalent embodiment with equivalent changes. Therefore, any simple modification, equivalent replacement, equivalent change and modification made to the above embodiments according to the technical essence of the utility model without departing from the content of the technical solution of the utility model still falls within the scope of protection of the technical solution of the utility model.

Claims

1. A concrete tower of a wind turbine generator set, characterized in that: The concrete tower of the wind turbine generator set is formed by stacking and splicing a plurality of precast concrete cylinder sections (1), and a double-sided rubber gasket (4) is fixed between the contact end surfaces of two adjacent precast concrete cylinder sections (1), and the double-sided rubber gasket (4) is used to achieve a low-stress self-sealing connection between adjacent precast concrete cylinder sections (1).

2. The concrete tower of a wind turbine generator set according to claim 1, characterized in that: A plurality of locking sleeves (5) are evenly distributed on the top contact end surface of the precast concrete cylinder section (1), and a plurality of mounting holes (6) corresponding to the locking sleeves (5) are evenly distributed on the double-sided rubber-hanging gasket (4). By installing locking members (3) in the mounting holes (6) and the locking sleeves (5), the double-sided rubber-hanging gasket (4) is fixed to the top contact end surface of the precast concrete cylinder section (1) and is located between the contact end surfaces of two adjacent precast concrete cylinder sections (1).

3. The concrete tower of a wind turbine generator set according to claim 2, characterized in that: A plurality of guide sleeves (2) are evenly distributed on the bottom contact end surface of the precast concrete cylinder section (1); the guide sleeves (2) correspond to the locking sleeves (5) and the mounting holes (6); and when two adjacent precast concrete cylinder sections (1) are stacked and spliced, the top of the locking member (3) is nested in the guide sleeves (2).

4. The concrete tower of a wind turbine generator set according to claim 2, characterized in that: The locking sleeve (5) is a stainless steel threaded sleeve, and the locking sleeve (5) is pre-buried in the top of the precast concrete cylinder section (1).

5. The concrete tower of a wind turbine generator set according to claim 4, characterized in that: The locking member (3) is a stainless steel screw.

6. The concrete tower of a wind turbine generator set according to claim 3, characterized in that: The guide sleeve (2) is made of stainless steel material, and is pre-buried in the bottom of the precast concrete cylinder section (1).

7. The concrete tower of a wind turbine generator set according to any one of claims 1 to 6, characterized in that: The inner core of the double-sided rubber-coated gasket (4) is a stainless steel gasket (41), and anti-aging rubber (42) is embedded on both sides of the stainless steel gasket (41).