Special curing box for roadbed stabilized soil unconfined test piece
By designing a special maintenance box for unlimited test pieces for roadbed stable soil, the automatic treatment of steam maintenance and constant temperature soaking is realized, and the problems of insufficient humidity caused by manual negligence in the existing technology affecting the test results, and the test is improved The accuracy and automation of the results.
Patent Information
- Application Number
- CN202323503093.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-12-21
AI Technical Summary
In highway projects, during the steam maintenance process of unlimited test pieces of roadbed stable soil, it is easy to cause insufficient humidity or transfer of test pieces to affect the accuracy of the test results due to manual negligence, which increases unnecessary workload.
A special maintenance box for roadbed stable soil without side limit specimens is designed, with steam maintenance and constant temperature soaking functions. It realizes an automated constant temperature and humidity environment through humidity control unit, temperature control unit and controller, without the need for specimen transfer, and reduces manual intervention. .
It improves the automation of test piece maintenance, ensures the accuracy and consistency of test results, and reduces the impact of test piece movement on the results.
Smart Images

Figure CN221976562U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of maintenance of unconfined test pieces of stabilized soil on roadbed, in particular to a special maintenance box for unconfined test pieces of stabilized soil on roadbed. Background Art
[0002] In highway engineering, it is usually necessary to test the stability, bearing capacity and drainage performance of the roadbed to ensure the stability and safety of the road. The unconfined strength of the roadbed is one of the important indicators reflecting its stability and bearing capacity. During the test, the specimen is first made according to the standard and then cured. The curing of the specimen is mainly divided into two steps: the first step is steam curing, and then immersion curing. At present, the steam curing of the specimen is to place the specimen in a relatively closed curing box and use a humidifier to cure the specimen. The steam curing requires manual regular water addition. However, the test personnel often forget to add water, which may lead to insufficient water in the humidifier water tank, resulting in the humidity in the box being unable to meet the constant humidity curing requirements of the specimen; in addition, after steam curing, the specimen needs to be transferred to another immersion box for immersion. The transfer of the specimen will have a certain impact on the test results, thereby affecting the accuracy of the test results, and the transfer of the specimen also adds unnecessary work. The entire immersion requires the test personnel to record the time, which is easy to cause the immersion time to be too long due to forgetfulness, affecting the uniformity of the test process. Summary of the invention
[0003] In view of this, the utility model proposes a special curing box for unconfined test pieces of roadbed stabilized soil, which can not only realize steam curing of the test pieces, but also be used for constant temperature immersion of the test pieces without transfer.
[0004] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0005] The utility model discloses a special curing box for unconfined test pieces of stabilized soil on roadbed, comprising a curing box body and a cover arranged on the box opening of the curing box body, and also comprises a
[0006] A specimen support, which is horizontally arranged in the curing box and has a plurality of through holes, and the specimen support separates the curing box into an upper chamber and a lower chamber that are interconnected;
[0007] A water supply unit, the water supply unit having a first water supply pipe and a second water supply pipe, wherein the water outlet of the first water supply pipe is located in the lower chamber;
[0008] a humidity control unit, comprising a humidifier connected to the second water supply pipe and a humidity sensor disposed in the upper chamber, wherein the moisture outlet of the humidifier is located in the upper chamber;
[0009] A temperature control unit, comprising a temperature detection member, an electric heating wire and a cooling tube arranged in the lower chamber, and also comprising a steam temperature sensor arranged in the upper part of the upper chamber;
[0010] The controller, the signal output end of the humidity sensor, the signal output end of the temperature detection element and the signal output end of the steam temperature sensor are connected to the signal input end of the controller, and the control output end of the controller is connected to the control input end of the electric heating wire, the cooling tube and the humidifier.
[0011] The beneficial effects are: the utility model can not only realize steam curing of the test piece, but also realize constant temperature immersion of the test piece. The test piece does not need to be moved during the whole process, which reduces the influence of the movement of the test piece on the test result and improves the accuracy of the test result. In addition, the whole test process reduces manual intervention and has a high degree of automation.
[0012] Preferably, a protective net is horizontally arranged below the specimen support; a pair of partitions are also arranged in the upper chamber, and the partitions are spaced apart from the side walls of the curing box. In the utility model, each partition and the side wall adjacent thereto enclose an installation chamber, providing installation space for a water supply pipe, a humidifier, etc.
[0013] Preferably, a water level monitoring device is also provided in the upper chamber, and its signal output end is connected to the signal input of the controller for monitoring the water level information of the curing box to ensure that the water level height can completely submerge the specimen during immersion curing, thereby making the specimen completely immersed in water.
[0014] Preferably, the inlet and outlet of the circulation pump are both provided with connecting pipes, and the inlet and outlet of the circulation pump are both connected to the lower chamber. In actual use, the circulation pump can be used to promote the fluidity of water in the curing box, so that the water temperature at various locations in the curing box is as consistent as possible, thereby improving the temperature accuracy.
[0015] Preferably, the cooling pipe and the electric heating wire are both horizontally arranged serpentine structures. In actual operation, the electric heating wire can quickly raise the water in the curing box, and the cooling pipe can cool the water in the curing box. By controlling the electric heating wire and the cooling pipe, the water in the curing box can quickly reach the set temperature and maintain balance. The refrigerant introduced into the cooling pipe is an environmentally friendly refrigerant, such as cold water below room temperature.
[0016] Preferably, the special curing box for unconfined specimens of stabilized soil on the roadbed described in the utility model further includes a drainage unit, which includes a drainage pipe connected to the lower chamber and a two-position three-way valve and a drainage pump arranged on the drainage pipe, and the two-position three-way valve and the drainage pump are located on the outside of the curing box body; the third water supply pipe of the water supply unit is connected to the third interface of the two-position three-way valve.
[0017] The beneficial effect is: after the soaking curing is finished, the two-position three-way valve is adjusted to connect the drain pipe with the drain pump, and the water in the curing box is pumped out by the drain pump; when the drain pipe is blocked, the two-position three-way valve can be adjusted to connect the drain pipe with the third water supply pipe, and the laboratory tap water can be used to reversely flush the drain pipe to flush the impurities in the drain pipe back to the curing box. In addition, the two-position three-way valve can be a manual valve or an electric control valve, and can also be reversely cleaned regularly in actual use to effectively avoid blockage of the drain pipe.
[0018] Preferably, the water supply unit further comprises a main pipe, and the first water supply pipe, the second water supply pipe and the third water supply pipe are all connected to the main pipe. In practical application, the main pipe can be directly connected to the faucet of the laboratory to supply water to the curing box, the humidifier and the drain pipe using the pressure of the laboratory water.
[0019] Compared with the prior art, the utility model can not only realize steam curing of the test piece, but also realize constant temperature immersion of the test piece. The whole process does not require moving the test piece, which reduces the impact of moving the test piece on the test result and improves the accuracy of the test result. In addition, the whole test process reduces manual intervention and has a high degree of automation. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a structural schematic diagram of the utility model.
[0021] Figure 2 It is an internal schematic diagram of the utility model.
[0022] Figure 3 It is a schematic diagram of the electric heating wire of the utility model.
[0023] Figure 4 It is a schematic diagram of the circulation pipe and the circulation pump described in the utility model.
[0024] Figure 5 It is a schematic diagram of the supporting orifice plate of the utility model.
[0025] Figure 6 It is a schematic diagram of the protective net described in the utility model.
[0026] Figure 7 It is a piping diagram of the water supply unit and the drainage unit described in the utility model.
[0027] Figure 8 It is a circuit principle block diagram of the utility model. DETAILED DESCRIPTION
[0028] The following is a detailed description of an embodiment of the utility model in conjunction with the accompanying drawings. This embodiment is implemented on the premise of the technical solution of the utility model, and a detailed implementation method and a specific operation process are given, but the protection scope of the utility model is not limited to the following embodiment.
[0029] It should be noted that, in the description of the present utility model, relational terms such as "first" and "second" are merely used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations.
[0030] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected" and "connection" that may appear should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
[0031] like Figure 1-8 As shown, the special curing box for unconfined specimens of stabilized soil of the roadbed described in the utility model comprises a curing box body 1, a cover 2 arranged on the box opening of the curing box body 1, a specimen support, a water supply unit, a humidity control unit, a temperature control unit and a controller; the curing box body 1 is open on the top, the cover 2 is buckled on the top of the curing box body 1, and the cover 2 and the curing box body 1 can be hinged or can be a split structure; a handle is arranged on the cover 2; the specimen support is a supporting orifice plate 3 (i.e., having a plurality of through holes) horizontally arranged in the curing box body 1, and the supporting orifice plate 3 divides the curing box body 1 into an upper chamber and a lower chamber that are interconnected, so as to ensure that the water level can rise to the upper chamber during immersion curing, and further ensure that the specimen is completely immersed in water;
[0032] The water supply unit comprises a main pipe 4.1, a first water supply pipe 4.3 and a second water supply pipe 4.2 connected to the main pipe 4.1, wherein the water outlet of the first water supply pipe 4.3 is located in the lower chamber, and the main pipe 4.1 is connected to the faucet of the laboratory; a water inlet valve 4.5 (the water inlet valve 4.5 adopts an electric control valve) is arranged on the first water supply pipe 4.3, and water can be supplied to the lower chamber through the first water supply pipe 4.3 during immersion curing;
[0033] The humidity control unit has a humidifier 5.1 connected to the second water supply pipe 4.2, a humidity sensor 5.2 and a steam temperature sensor 5.3 arranged in the upper chamber, and the moisture outlet of the humidifier 5.1 is located in the upper chamber. The utility model uses the humidifier 5.1 to provide steam for the curing box 1, thereby realizing steam curing of the test piece;
[0034] The temperature control unit includes a temperature detection element (i.e., a temperature probe 6.1), an electric heating wire 6.2, and a cooling tube 6.4 arranged in the lower chamber. The temperature probe 6.1 is used to monitor the water temperature in the curing box 1. The electric heating wire 6.2 heats the water. The cooling tube 6.4 (with cooling water circulating in the tube) cools the water. The combination of the electric heating wire 6.2, the cooling tube 6.4, and the temperature probe 6.1 can not only ensure that the water in the curing box is in a constant temperature state, but also realize rapid adjustment between different temperatures to meet the constant temperature immersion requirements of the test piece.
[0035] The controller is preferably a PID controller, and the signal input end of the PID controller is respectively connected to the signal output end of the temperature probe 6.1, the signal output end of the humidity sensor 5.2, and the signal output end of the steam temperature sensor 5.3; the control output end of the controller is connected to the control input end of the electric heating wire 6.2, the control input end of the cooling tube 6.4, the control input end of the humidifier 5.1 and the control input end of the water inlet valve 4.5.
[0036] In actual installation, for easy operation, the PID controller and the operation panel F can be integrated together and installed on the outer wall of the curing box 1. Figure 1 .
[0037] During steam curing, the second water supply pipe 4.2 is used to supply water to the humidifier 5.1, and the humidifier 5.1 provides steam required for curing to the curing box 1. The humidity sensor 5.2 and the steam temperature sensor 5.3 are used to monitor the humidity and steam temperature in the curing box 1. The frequency of the humidifier 5.1 is controlled by the PID controller to ensure that the curing box 1 is in a constant temperature and humidity state. Among them, the humidifier 5.1 can provide steam with a temperature of 15 to 35°C, and can work in a variable frequency according to the steam temperature in the curing box 1, ensuring that the steam temperature in the curing box is always within the set range, further ensuring the uniformity of the steam curing conditions of the specimen.
[0038] During immersion curing, the humidifier 5.1, the humidity sensor 5.2 and the steam temperature sensor 5.3 are turned off; the water inlet valve 4.5 is opened to supply water to the curing box 1, and a water level monitoring component (i.e., an electronic level gauge 6.3) is arranged in the upper chamber above the supporting orifice plate 3, and the signal output end of the electronic level gauge 6.3 is connected to the signal input end of the PID controller. When the water level reaches the upper limit water level, the electronic level gauge 6.3 outputs a signal to the PID controller, and the PID controller controls the water inlet valve 4.5 to close and stop water supply, so as to ensure that the test piece is completely immersed in water; during the immersion curing process, the electric heating wire 6.2 and the cooling tube 6.4 control the water temperature, and the temperature probe 6.1 always monitors the water temperature, thereby realizing constant temperature immersion of the test piece.
[0039] The utility model can not only realize steam curing of the test piece, but also realize constant temperature immersion of the test piece. The test piece does not need to be moved during the whole process, which reduces the influence of moving the test piece on the test result and improves the accuracy of the test result. In addition, the whole test process reduces manual intervention and has a high degree of automation.
[0040] Combination Figure 2 and Figure 6 It can be seen that a horizontally arranged protective net 9 (a grid net is selected) is provided below the supporting orifice plate 3 to prevent debris generated during the curing process from falling to the lower part of the curing box 1 as much as possible, making it easy to clean.
[0041] Combination Figure 2 It can be seen that a pair of vertically arranged partitions 7 are arranged in the upper chamber, and the partitions 7 are spaced apart from the side walls of the curing box 1 to form an installation chamber, providing installation space for the water supply pipe, the humidifier 5.1, etc.
[0042] Combination Figure 2 It can be seen that the temperature control unit also includes a circulation pump 6.5 arranged in the curing box 1. The inlet of the circulation pump 6.5 is provided with a water inlet pipe 6.51, and the outlet thereof is provided with a water outlet pipe 6.52. Both the water inlet pipe 6.51 and the water outlet pipe 6.52 extend into the lower chamber. During immersion curing, the circulation pump 6.5 is used to promote the circulation of water, so that the water in the curing box 1 quickly reaches a constant temperature, thereby making the water temperature in various places in the curing box 1 consistent, thereby improving the temperature accuracy. In addition, the electric heating wire 6.2 and the cooling pipe 6.4 are both horizontally arranged serpentine structures, and the cooling pipe 6.4 is located above the electric heating wire 6.2. When the temperature is higher than the set temperature, the cooling water in the cooling pipe 6.4 performs heat exchange with the water in the curing box to ensure that the water temperature in the curing box remains constant.
[0043] Combination Figure 2 and Figure 7 It can be seen that the utility model also includes a drainage unit, which includes a drainage pipe 8.1 connected to the lower chamber, a two-position three-way valve 8.3 and a drainage pump 8.2 arranged on the drainage pipe; the control input end of the drainage pump 8.2 and the control input end of the two-position three-way valve 8.3 are connected to the control output end of the PID controller; the water supply unit also includes a third water supply pipe 4.4 connected to the main pipe, and the third water supply pipe 4.4 is connected to an interface of the two-position three-way valve 8.3. After the immersion curing is completed, the PID controller controls the two-position three-way valve 8.3 to connect the drainage pipe 8.1 and the drainage pump 8.2, and then turns on the drainage pump 8.2 to discharge the water in the curing box 1, so as to facilitate the curing of the next batch of specimens. When the drainage pipe 8.1 is blocked, the PID controller controls the two-position three-way valve 8.3 to connect the drainage pipe 8.1 and the third water supply pipe 4.4, and uses the tap water in the laboratory to reversely flush the drainage pipe 8.1. Of course, the drainage pipe 8.1 can also be reversely cleaned regularly in actual use.
[0044] The working process and principle of the utility model are as follows: when steam curing is required, the test piece is placed on the supporting plate 3, and the humidifier 5.1 is turned on. The humidifier 5.1 provides steam to the curing box 1, so that the temperature and humidity in the curing box 1 are within the set range. During this process, the humidifier 5.1 works at a variable frequency to ensure that the temperature and humidity of the curing box 1 are always within the set range;
[0045] After the steam curing is finished, the humidifier 5.1 is turned off, and the water inlet valve 4.5 is opened to supply water into the curing box 1 until the highest water level that can be sensed by the electronic liquid level meter 6.3 is reached, ensuring that the water completely submerges the test piece; during the water supply process, the electric heating wire 6.2 and the cooling pipe 6.4 control the water temperature, and the circulating pump 6.5 is in a working state to promote the flow of water, so that the water temperature is quickly stabilized, and the test piece is subjected to constant temperature immersion curing;
[0046] After the immersion curing is completed, the drainage pump 8.2 and the two-position three-way valve 8.3 are turned on to drain the water in the curing box 1 so as to facilitate the curing of the next batch of test pieces.
[0047] Finally, it should be emphasized that the above is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions recorded in the aforementioned embodiments without creative work, or replace some of the technical features therein with equivalents. Therefore, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model should be included in the protection scope of the utility model.
Claims
1. A special curing box for unconfined specimens of stabilized soil on roadbed, comprising a curing box body and a cover arranged on the box opening of the curing box body, characterized in that: Also includes A specimen support, which is horizontally arranged in the curing box and has a plurality of through holes, and the specimen support separates the curing box into an upper chamber and a lower chamber which are interconnected; A water supply unit, the water supply unit having a first water supply pipe and a second water supply pipe, wherein the water outlet of the first water supply pipe is located in the lower chamber; a humidity control unit, comprising a humidifier connected to the second water supply pipe and a humidity sensor disposed in the upper chamber, wherein the moisture outlet of the humidifier is located in the upper chamber; A temperature control unit, comprising a temperature detection member, an electric heating wire and a cooling tube arranged in the lower chamber, and also comprising a steam temperature sensor arranged in the upper part of the upper chamber; The controller, the signal output end of the humidity sensor, the signal output end of the temperature detection element and the signal output end of the steam temperature sensor are connected to the signal input end of the controller, and the control output end of the controller is connected to the control input end of the electric heating wire, the cooling tube and the humidifier.
2. The special curing box for unconfined specimens of stabilized soil on roadbed according to claim 1 is characterized by: A protective net is also horizontally arranged below the specimen support; a pair of partitions are also arranged in the upper chamber, and the partitions are spaced apart from the side walls of the curing box.
3. The special curing box for unconfined specimens of stabilized soil on roadbed according to claim 1 is characterized by: The upper chamber is also provided with a water level monitoring component, whose signal output end is connected to the signal input end of the controller.
4. The special curing box for unconfined specimens of stabilized soil on roadbed according to claim 1 is characterized by: The temperature control unit also includes a circulation pump disposed in the curing box, the inlet and outlet of the circulation pump are both provided with connecting pipes, and the inlet and outlet of the circulation pump are both communicated with the lower chamber.
5. The special curing box for unconfined specimens of stabilized soil on roadbed according to claim 4 is characterized by: The cooling tube and the electric heating wire are both horizontally arranged serpentine structures.
6. The special curing box for unconfined specimens of stabilized soil on roadbed according to claim 1, characterized in that: It also includes a drainage unit, which includes a drainage pipe connected to the lower chamber and a two-position three-way valve and a drainage pump arranged on the drainage pipe, and the two-position three-way valve and the drainage pump are located on the outside of the maintenance box; the third water supply pipe of the water supply unit is connected to the third interface of the two-position three-way valve.
7. The special curing box for unconfined specimens of stabilized soil on roadbed according to claim 6 is characterized by: The water supply unit further includes a main pipe, and the first water supply pipe, the second water supply pipe and the third water supply pipe are all connected to the main pipe.
Citation Information
Cited By
Concrete curing equipment
CN119658824A