Test operation frame for FRP (Fiber Reinforce Plastic) rib sleeve
By designing a test operation frame for FRP bars, and using a main frame and centering device, accurate centering of the FRP bars with sleeves was achieved, solving the problems of uneven sleeves and operation difficulties, and improving the accuracy of the test and the convenience of operation.
Patent Information
- Application Number
- CN202323066411.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-14
- Publication Date
- 2024-11-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In existing technologies, FRP rib sleeves are uneven and difficult to operate individually, resulting in large experimental errors and affecting the accuracy of test results.
A test operation frame including a main frame, a centering device, and a clamping device was designed. The FRP reinforcement is accurately centered through the reinforcement centering device, and the operation process is simplified by combining electric control.
It achieves accurate centering of FRP reinforcement sleeves, reduces the influence of gravity during static placement, improves the accuracy of test data, and can be operated independently by a single person, simplifying pull-out tests of FRP reinforced concrete members.
Smart Images

Figure CN221976587U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of machinery, and relates to an experimental operation device, and specifically to an experimental operation frame for FRP bar casing. The operation frame can not only realize the accurate casing of FRP bars, reduce the experimental error caused by uneven glue injection, but also simplify the casing operation, and can be operated independently by one person. Background Art
[0002] In coastal projects, the corrosion of building materials such as concrete and steel structures by harsh environmental factors is the main reason for the premature failure of their structures. Based on the advantages of fiber reinforced composite bars (FRP bars) such as high tensile strength, corrosion resistance, low modulus, and light weight, FRP reinforced concrete components have gradually become a hot topic in the civil engineering community. The mechanical properties of FRP reinforced concrete components depend not only on the characteristics of the FRP bars and concrete, but also on the bonding performance between the two. Bond slip is one of the basic problems of FRP reinforced concrete components, and a large number of pull-out tests are required to study this issue.
[0003] However, the thermosetting nature of fiber-reinforced composite materials causes the FRP bars to have shortcomings such as brittleness and insufficient transverse shear strength. Therefore, when testing the tensile strength of the bars and applying prestress, it is often easy to damage the FRP bars due to the stress concentration generated by the clamp, which in turn affects the anchoring efficiency, making it impossible to conduct subsequent tests. In order to solve this problem, researchers have proposed a variety of solutions, mainly focusing on the design of anchor locking devices. Utility model patent 202121553395.X discloses "an anchor based on FRP bars". Several FRP bars are inserted into the cylinder of the anchor, an anchor plate is fixed at the end of the cylinder, and an adjustment locking assembly is provided on the side of the anchor plate away from the cylinder. A movable disk parallel to the anchor plate is installed on the adjustment locking mechanism, and a through hole for the FRP bars to pass through is opened on the anchor plate. A conical cylinder is provided in the through hole, and a fastening assembly for clamping the FRP bars is installed on the conical cylinder, which effectively improves the firmness of the anchor.
[0004] In addition, casing the FRP bars is a new idea to solve this problem. However, the inventors found that the casing method currently used cannot ensure that every FRP bar is casing evenly, and it is difficult to complete the casing operation alone; at the same time, during the static process after casing, the gravity of the steel pipe when placed horizontally will cause the FRP bars to bend toward the center of the earth, causing a certain error in the test and affecting the accuracy of the results. Utility Model Content
[0005] In view of the problems existing in the FRP reinforcement sleeve in the prior art, the utility model provides a test operation frame for the FRP reinforcement sleeve. The utility model realizes the accurate centering of the sleeve on the FRP reinforcement, and minimizes the influence of gravity when static; and it is easy to operate and can be operated independently, solving the operational difficulties in the pull-out test of FRP reinforcement concrete components.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A test operation frame for FRP reinforcement sleeves, comprising a main frame 1 and a centering device and a clamping device installed on the main frame 1. The centering device is composed of a reinforcement centering device 2 and a fixing groove 7, and the reinforcement centering device 2, the clamping device and the fixing groove 7 are arranged in sequence from top to bottom and vertically centered. The reinforcement centering device 2 is located on the upper end surface of the main frame 1, and the fixing groove 7 is a circular groove located on the bottom surface of the main frame 1. The main frame 1 is also provided with a power supply 4, a clamping device control switch 5 and a reinforcement centering device control switch 6, and the power supply 4 is connected to the centering device and the clamping device respectively to provide power. First, the utility model realizes the centering of the steel pipe through the clamping device and the fixing groove 7, and realizes the centering of the FRP reinforcement through the reinforcement centering device 2, thereby ensuring the accuracy of the test. Secondly, the main frame 1, the centering device and the clamping device of the utility model are all made of iron materials, which enhances stability and durability, and at the same time will not affect the handling due to being too heavy. In addition, concrete can be placed on the upper end surface of the main frame to facilitate the concrete-FRP tendon pull-out test.
[0008] The reinforcement centering device 2 is composed of a circular chassis 12, a blade 11, a rotating column 10 and a slider 9 arranged on the chassis 12. The rotating column 10 is evenly arranged on the circumference near the outer edge of the chassis 12, the slider 9 is evenly arranged on the circumference near the inner edge of the chassis 12, and a slide rail 8 matching the slider 9 is arranged on the blade 11. One end of the blade 11 is rotatably connected to the chassis 12 through the rotating column 10, and the other end is slidably connected to the chassis 12 through the slider 9-slide rail 8. The clamping device is an openable and closable butterfly clamp 3, which is fixedly arranged on the main frame 1. When the power is turned on, the blade 11 moves under the drive of the chassis 12. On the one hand, the rotating block 10 drives the blade 11 to rotate, and at the same time, the bronze drum slider 9 moves the blade 11 along the direction of the blade slide rail 8. Finally, by moving all the blades 11 toward the center at the same time, the circular hole is always kept in the center and reduced, and finally shrinks to bite the reinforcement to form a centering hole.
[0009] Preferably, the blades 11 are irregular fan-shaped blades, and the number of the blades is 6-7.
[0010] Preferably, the number of the openable and closable butterfly clips is 1-3 pairs.
[0011] Beneficial effects of the utility model:
[0012] (1) The utility model innovatively proposes a test operation frame for FRP reinforcement sleeves, which realizes accurate centering of the FRP reinforcement sleeves, minimizes the influence of gravity when static, and improves the accuracy of test data.
[0013] (2) The utility model adopts an integral structure combined with electric control. It is not only small in size and easy to store, but also easy to operate. It can be operated independently by one person, solving the operational difficulties in the pull-out test of FRP reinforced concrete components, and has broad practical application prospects. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The following drawings are merely embodiments of the present utility model. A person skilled in the art can obtain other relevant drawings based on the drawings without creative work.
[0015] Figure 1 This is one of the structural schematic diagrams of the test operation frame of the utility model;
[0016] Figure 2 This is the second structural schematic diagram of the test operation frame of the utility model;
[0017] Figure 3 Schematic diagram of the blade of the reinforcement centering device of the utility model in the open (a) and closed (b) states;
[0018] Figure 4 This is a schematic diagram of the operation steps in the first specific embodiment of the utility model;
[0019] Figure 5 This is a schematic diagram of the operation steps in the second specific embodiment of the present utility model;
[0020] In the figure: 1. Main frame, 2. Reinforcement centering device, 3. Clamping device, 4. Power supply, 5. Clamping device button, 6. Reinforcement centering device button, 7. Fixing groove, 8. Blade slide rail, 9. Blade slider, 10. Rotating block, 11. Blade, 12. Chassis. DETAILED DESCRIPTION
[0021] The following is a clear and complete description of the technical solution of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, other embodiments obtained by ordinary technicians in this field without creative work are all within the scope of protection of the present invention.
[0022] Example 1: Test operation stand for FRP reinforcement sleeve
[0023] A test operation frame for FRP reinforcement sleeves, comprising a main frame 1 and a centering device and a clamping device 3 installed on the main frame 1. The centering device is composed of a reinforcement centering device 2 and a fixing groove 7, and the reinforcement centering device 2, the clamping device 3 and the fixing groove 7 are arranged in sequence from top to bottom and vertically centered. The reinforcement centering device 2 is located on the upper end surface of the main frame 1, and the fixing groove 7 is a circular groove located on the bottom surface of the main frame 1. A power supply 4, a clamping device control switch 5 and a reinforcement centering device control switch 6 are also provided on the main frame 1, and the power supply 4 is connected to the centering device and the clamping device 3 respectively to provide power.
[0024] The reinforcement centering device 2 is composed of a circular chassis 12 and blades 11, a rotating column 10 and a slider 9 arranged on the chassis 12. The blades 11 are irregular fan-shaped blades, the rotating columns 10 are evenly arranged on the circumference near the outer edge of the chassis 12, the sliders 9 are evenly arranged on the circumference near the inner edge of the chassis 12, and a slide rail 8 matching the slider 9 is arranged on the blade 11. One end of the blade 11 is rotatably connected to the chassis 12 through the rotating column 10, and the other end is slidably connected to the chassis 12 through the slider 9-slide rail 8. The clamping device 3 is an openable and closable butterfly clamp, which is fixedly arranged on the main frame 1. The number of the blades is 6 and the number of the openable and closable butterfly clamps is 2 pairs.
[0025] When the power is turned on, the blade 11 moves under the drive of the chassis 12. On the one hand, the rotating block 10 drives the blade 11 to rotate, and at the same time, the bronze drum slider 9 moves the blade 11 along the direction of the blade slide rail 8. Finally, by moving all the blades 11 toward the center at the same time, the circular hole always keeps shrinking in the center, and finally shrinks to bite the reinforcement to form a centering hole.
[0026] Example 2: Using the aforementioned test operating frame to perform casing on one end of the FRP reinforced concrete specimen
[0027] (1) Place the main frame 1 on a flat surface.
[0028] (2) Turn on the power switch 4, place the seamless steel pipe in the center of the fixing groove 7, and then turn on the clamping device control switch 5, so that the two pairs of openable and closable butterfly clamps 3 can tighten the seamless steel pipe in the center.
[0029] (3) Use a glue gun to mix epoxy resin AB glue in proportion and inject it to 2 / 3 of the seamless steel pipe.
[0030] (4) The FRP reinforced concrete specimen is passed through the circular hole of the upper iron plate and slowly placed into the seamless steel pipe through the circular hole of the reinforcement centering device 2, and the position is finely adjusted in the center.
[0031] (5) After the epoxy resin glue solidifies, the switch 5 is controlled by the clamping device to loosen the seamless steel pipe with two pairs of openable and closable butterfly clamps 3, and the FRP reinforced concrete specimen is lifted to carry out the center pull-out test.
[0032] Example 3: Using the aforementioned test operation frame to perform sleeves on both ends of the FRP bar
[0033] (1) Place the main frame 1 on a flat surface.
[0034] (2) Turn on the power switch 4, place the seamless steel pipe in the center of the fixing groove 7, and then turn on the clamping device control switch 5, so that the two pairs of openable and closable butterfly clamps 3 can tighten the seamless steel pipe in the center.
[0035] (3) Use a glue gun to mix epoxy resin AB glue in proportion and inject it to 2 / 3 of the seamless steel pipe.
[0036] (4) The FRP reinforcement is passed through the circular hole of the reinforcement centering device 2 and slowly inserted into the seamless steel pipe to the bottom.
[0037] (5) Turn on the control button 6 of the reinforcement centering device, and all the blades 11 move toward the center at the same time, so that the circular hole always remains centered and shrinks, and finally contacts the FRP reinforcement to form a centering hole, so that the FRP reinforcement remains centered.
[0038] (6) After the glue solidifies, turn off the clamping device control switch 5 and the reinforcement centering device control button 6, open the openable and closable butterfly clamp 3, and move the blade 11 of the reinforcement centering device 2 toward the edge until the centering hole gradually returns to its original size. Then, loosen the seamless steel pipe and the reinforcement, and take out the FRP reinforcement of the sleeve at one end.
[0039] (7) Place another seamless steel pipe in the fixing groove 7 and repeat steps (4) to (6) to complete the casing at the other end. The FRP bars of the casing at both ends are obtained and the material performance test can be carried out.
[0040] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, ordinary technicians in the field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the various embodiments of the utility model.
Claims
1. A test operating frame for FRP reinforcement sleeves, comprising a main frame (1) and a centering device and a clamping device mounted on the main frame (1); Features: The centering device is composed of a reinforcement centering device (2) and a fixing groove (7), wherein the reinforcement centering device (2), the clamping device and the fixing groove (7) are arranged in sequence from top to bottom and are vertically centered; the reinforcement centering device (2) is composed of a circular chassis (12) and blades (11), a rotating column (10) and a slider (9) arranged on the chassis (12); the rotating columns (10) are evenly arranged on a circumference close to the outer edge of the chassis (12); the sliders (9) are evenly arranged on a circumference close to the inner edge of the chassis (12); and a slide rail (8) matching the slider (9) is arranged on the blade (11); one end of the blade (11) is rotationally connected to the chassis (12) via the rotating column (10), and the other end is slidably connected to the chassis (12) via the slider (9)-slide rail (8).
2. The test operation stand for FRP reinforcement sleeve according to claim 1, Features: The blades (11) are irregular fan-shaped blades, and the number of the blades is 6-7.
3. The test operation stand for FRP reinforcement sleeve according to claim 1, Features: The clamping device is an openable and closable butterfly clamp, and the openable and closable butterfly clamp is fixedly arranged on the main frame.
4. The test operation stand for FRP reinforcement sleeve according to claim 3, Features: The number of the openable and closable butterfly clips is 1-3.
5. The test operation stand for FRP reinforcement sleeve according to any one of claims 1 to 4, Features: The reinforcement centering device (2) is located on the upper end surface of the main frame (1), and the fixing groove (7) is a circular groove located on the bottom surface of the main frame (1).
6. The test operation stand for FRP reinforcement sleeve according to claim 5, Features: A power source (4), a clamping device control switch (5) and a reinforcing material centering device control switch (6) are also provided on the main frame (1); the power source (4) is respectively connected to the centering device and the clamping device to provide power.