Disqualified C2 recovery system
By setting up the first recovery pipeline in the ethylene device, the demethanizing tower kettle failed carbon 2 is directly sent to the boundary area, and the unqualified ethylene line is solved, and the problems of excessive carbon 2 component of the demethanizing tower and unqualified acetylene index are solved. , shorten the feed time of ethylene tower and energy saving.
Patent Information
- Application Number
- CN202420051685.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-09
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-01-09
AI Technical Summary
In the ethylene device, the carbon dioxide material of the demethane tower is sent to the demethane tower, resulting in the carbon dioxide component exceeding the standard, affecting the feeding time of the ethylene tower, and the demethane tower is subject to secondary contamination when the acetylene index is not qualified. Seriously affects production.
A non-qualified carbon 2 recovery system was designed. By setting up the first recycling pipeline, the non-qualified carbon 2 of the demethane tower kettle was sent directly to the boundary area unqualified ethylene line, avoiding the de-ethane tower and reducing the de-ethane tower. The acetylene index pass time and the unqualified carbon-2 delivery volume.
The ethylene pass time is shortened by 1-2 hours, saving about 100t/h of ethylene materials, reducing energy consumption, avoiding the loss of ethylene torch, and not affecting the product indicators of the demethylation tower product when the demethylation tower product is unqualified.
Smart Images

Figure CN221981598U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of petrochemical industry, and more specifically, to a system for recovering unqualified carbon dioxide. Background Art
[0002] The C2 hydrogenation reactor of the ethylene unit controls the acetylene content in the cracked gas at its outlet through hydrogenation reaction. When acetylene leaks from the reactor, it will cause the acetylene content in the C2 components of the downstream demethanizer and deethanizer to exceed the standard. The unqualified C2 in the demethanizer kettle is sent to the deethanizer through the unqualified line and sent to the unqualified ethylene spherical tank for storage and transportation together with the unqualified C2 materials in the deethanizer. When the acetylene content in the cracked gas at the reactor outlet is qualified, the acetylene index in the deethanizer will be qualified before the demethanizer, and at this time, the unqualified C2 materials in the demethanizer are still sent to the deethanizer, causing secondary pollution of the C2 materials in the deethanizer, which seriously affects the feeding time of the ethylene tower. Utility Model Content
[0003] The purpose of the utility model is to overcome the above-mentioned defects of the prior art and provide a system for recovering unqualified carbon two. By setting a first recovery pipeline, the unqualified carbon two in the demethanizer kettle is directly sent to the unqualified ethylene line in the boundary area by avoiding the deethanizer, thereby reducing the qualified time of the acetylene index of the deethanizer and the amount of unqualified carbon two sent out.
[0004] To achieve the above purpose, the technical solution of the utility model is as follows:
[0005] A system for recovering unqualified carbon two, the unqualified carbon two recovery system is applied to the separation cold zone of an ethylene device; the separation cold zone of the ethylene device comprises a pre-demethanizer, the pre-demethanizer comprises a tower top gas phase outlet of the pre-demethanizer and a tower bottom liquid phase outlet of the pre-demethanizer, the tower top gas phase outlet of the pre-demethanizer is connected with a demethanizer feed cooler, a demethanizer, a demethanizer bottom cooler, a demethanizer bottom subcooler and an ethylene distillation tower in sequence, the tower bottom liquid phase outlet of the pre-demethanizer is connected with a deethanizer, a deethanizer cooler and a deethanizer reflux tank in sequence; a branch of the outlet of the deethanizer reflux tank is connected with unqualified carbon two in sequence; The qualified ethylene aftercooler is connected to the unqualified ethylene spherical tank; the unqualified carbon two recovery system includes: a first recovery pipeline, one end of which is connected to the first regulating valve between the demethanizer kettle cooler and the demethanizer kettle supercooler, and the other end of the first recovery pipeline is connected to the second regulating valve between the unqualified ethylene aftercooler and the unqualified ethylene spherical tank; the unqualified carbon two recovery system also includes: a second recovery pipeline, one end of which is connected to the kettle liquid phase outlet of the demethanizer, and the other end of the second recovery pipeline is connected to the first inlet of the deethanizer.
[0006] Optionally, when the acetylene index in the deethanizer and the acetylene index in the demethanizer are both unqualified, the second recovery pipeline is in working condition; when the acetylene index in the deethanizer is qualified and the acetylene index in the demethanizer is unqualified, the first recovery pipeline is in working condition.
[0007] Optionally, both the first recovery pipeline and the second recovery pipeline are provided with stop valves.
[0008] Optionally, the stop valve is a one-way valve.
[0009] Optionally, another branch of the outlet of the deethanizer reflux tank is connected to the ethylene distillation tower; another branch of the outlet of the deethanizer reflux tank is connected to the deethanizer via a reflux pump.
[0010] Optionally, the demethanizer feed cooler uses two-stage ethylene cooling.
[0011] Optionally, the demethanizer bottom cooler is cooled by propylene.
[0012] Optionally, the demethanizer kettle cooler is connected to the kettle liquid phase outlet of the demethanizer; the demethanizer also includes an upper feed inlet of the demethanizer and a lower feed inlet of the demethanizer; the lower feed inlet of the demethanizer and the upper feed inlet of the demethanizer are both connected to the demethanizer feed cooler.
[0013] Implementing the embodiments of the present utility model will have the following beneficial effects:
[0014] The utility model arranges a first recovery pipeline to avoid the deethanizer, and directly sends unqualified carbon two in the demethanizer kettle to the unqualified ethylene line in the boundary area, thereby reducing the qualified time of acetylene index of the deethanizer and the amount of unqualified carbon two sent out, and can shorten the qualified time of ethylene by 1-2 hours. A single use can save about 100t / h of ethylene materials, reduce the energy consumption of refining, and avoid the loss of ethylene flaring. It is an energy-saving project with low investment and high benefit, and when the demethanizer product is unqualified, it will not affect the product index of the deethanizer. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 The utility model is a simplified flow chart of the start-up of an ethylene unit to recover unqualified carbon dioxide. DETAILED DESCRIPTION
[0016] The present invention is further described below in conjunction with specific embodiments, but the present invention is not limited in any way.
[0017] The utility model discloses a system for recovering unqualified carbon dioxide, such as Figure 1 As shown, Figure 1The utility model is a simplified flow chart of the start-up of the ethylene device to recover unqualified carbon two, and the unqualified carbon two recovery system is applied to the separation cold zone of the ethylene device; the separation cold zone of the ethylene device includes a pre-demethanizer 5, and the pre-demethanizer 5 includes a tower top gas phase outlet 51 of the pre-demethanizer and a tower bottom liquid phase outlet 52 of the pre-demethanizer, and the tower top gas phase outlet 51 of the pre-demethanizer is connected to the demethanizer feed cooler 7, the demethanizer 6, the demethanizer bottom cooler 8, the demethanizer bottom subcooler 9 and the ethylene distillation tower 10 in sequence, and the tower bottom liquid phase outlet 52 of the pre-demethanizer is connected to the deethanizer 11, the deethanizer cooler 12, and the deethanizer reflux tank 13 in sequence; the outlet of the deethanizer reflux tank 13 A branch of the pipeline is connected to the unqualified ethylene aftercooler 14 and the unqualified ethylene spherical tank 15 in sequence; the unqualified carbon two recovery system includes: a first recovery pipeline 16, one end of the first recovery pipeline 16 is connected to the first regulating valve 17 between the demethanizer kettle cooler 8 and the demethanizer kettle supercooler 9, and the other end of the first recovery pipeline 16 is connected to the second regulating valve 18 between the unqualified ethylene aftercooler 14 and the unqualified ethylene spherical tank 15; the unqualified carbon two recovery system also includes: a second recovery pipeline 19, one end of the second recovery pipeline 19 is connected to the tower bottom liquid phase outlet 63 of the demethanizer, and the other end of the second recovery pipeline 19 is connected to the first inlet 112 of the deethanizer.
[0018] In a specific embodiment, when the acetylene index in the deethanizer 11 and the acetylene index in the demethanizer 6 are both unqualified, the second recovery pipeline 19 is in a working state; when the acetylene index in the deethanizer 11 is qualified and the acetylene index in the demethanizer 6 is unqualified, the first recovery pipeline 16 is in a working state.
[0019] In a specific embodiment, both the first recovery pipeline 16 and the second recovery pipeline 19 are provided with stop valves.
[0020] In a specific embodiment, the stop valve is a one-way valve.
[0021] In a specific embodiment, another branch of the outlet of the deethanizer reflux tank 13 is connected to the ethylene distillation tower 10; another branch of the outlet of the deethanizer reflux tank 13 is connected to the deethanizer 11 through a reflux pump.
[0022] In a specific embodiment, the demethanizer feed cooler 7 is cooled by two-stage ethylene.
[0023] In a specific embodiment, the demethanizer bottom cooler 8 is cooled by propylene.
[0024] In a specific embodiment, the demethanizer bottom cooler 8 is connected to the bottom liquid phase outlet 63 of the demethanizer; the demethanizer 6 also includes an upper feed inlet 61 of the demethanizer and a lower feed inlet 62 of the demethanizer; the lower feed inlet 62 of the demethanizer and the upper feed inlet 61 of the demethanizer are both connected to the demethanizer feed cooler 7.
[0025] Specifically, the working principle of the unqualified carbon two recovery system of the utility model is as follows: the upper feed of the demethanizer 6 is the gas phase from the top of the pre-demethanizer 5, and the gas phase material is cooled by two-stage ethylene refrigerant (C2R at -61°C, C2R at -83°C) and liquid phase material from the tail gas distillation tower 22 in the demethanizer feed cooler 7 and then enters the upper feed port 61 of the demethanizer, and the lower feed of the demethanizer 6 is the liquid phase material from the tail gas distillation tower 22, and the liquid phase material is heated in the demethanizer feed cooler 7 and then enters the lower feed port 62 of the demethanizer. The bottom material of the demethanizer 6 is supercooled by the demethanizer bottom cooler 8 with a propylene refrigerant at -37°C, and then sent to the ethylene distillation tower 10 through the demethanizer bottom supercooler 9. The bottom material of the pre-demethanizer 5 enters the second inlet 113 of the deethanizer through the bottom liquid phase outlet 52 of the pre-demethanizer, and enters the deethanizer cooler 12 from the top gas phase outlet 111 of the deethanizer to be condensed with C3R at -21°C. The condensed material enters the deethanizer reflux tank 13. A part of the condensate in the deethanizer reflux tank 13 is pressurized by a reflux pump and used as the top reflux under flow control. After cooling, the bottom liquid level can be sent to the downstream C3 hydrogenation system under the cascade control of the flow rate; the other part of the condensate is sent to the ethylene rectification tower 10 under the cascade control of the flow rate and the reflux tank liquid level. During the shutdown of the ethylene refrigeration compressor or when the ethylene tower feed is unqualified, the material in the deethanizer reflux tank 13 can be sent to the boundary unqualified ethylene spherical tank 15 through the unqualified ethylene aftercooler 14 as unqualified ethylene storage. During the start-up of the device, when the acetylene index in the deethanizer 11 and the acetylene index in the demethanizer 6 are both unqualified, the second recovery pipeline 19 is in operation, and the unqualified materials in the bottom of the demethanizer 6 will be transported to the deethanizer 11 through the second recovery pipeline 19. Since there is a risk that part of the methane is dissolved in the top reflux liquid of the deethanizer 11 and sent to the ethylene distillation tower 10, it is necessary to carefully monitor the changes in the methane content in the bottom material of the demethanizer 6 to avoid unqualified ethylene products (index <500ppmv). When the acetylene index in the deethanizer 11 is qualified and the acetylene index in the demethanizer 6 is unqualified, the first recovery pipeline 16 is in operation, and the unqualified materials in the bottom of the demethanizer 6 will be transported to the boundary unqualified ethylene spherical tank 15 through the first recovery pipeline 16 as unqualified ethylene storage.
[0026] In a specific embodiment, the working process of the ethylene device separation cold zone also includes: the top gas of the demethanizer 6 can be cooled in a plate-fin heat exchanger (not shown in the figure) through the top gas phase outlet of the demethanizer, and enters the top reflux tank (not shown in the figure) after cooling, and the bottom liquid of the top reflux tank is pressurized by a reflux pump, and a part of it is used as the top reflux under flow control; the other part is recovered by cold capacity under flow control. Such a process layout helps to use the flash temperature of low-temperature liquid methane to cool the cracked gas in a series of heat exchangers. When the expander is stopped or operated inefficiently, this stock of material is usually used, and a small amount of methane is sent to the boundary area as a product after recovering cold capacity. Since the top of the demethanizer 6 is the largest source of ethylene loss, it needs to be strictly controlled to ensure that the concentration of the C2 component in the top gas phase is controlled within the index range.
[0027] In a specific embodiment, the ethylene unit separation cold zone is also provided with a demethanizer kettle reboiler (not shown in the figure), the demethanizer kettle reboiler uses 7°C C3R as a heat source, the sensitive plate temperature is controlled by the C3R flow rate, and is adjusted according to the change of methane content in the kettle material of the demethanizer 6 to ensure that too much methane does not enter the kettle and cause unqualified ethylene products. Methane remaining in the liquid phase will contaminate the ethylene product, but it will not leave the system in the form of non-condensable gas.
[0028] In one embodiment, the bottom of the demethanizer 6 is provided with a low liquid level override control (not shown in the figure) to protect the bottom liquid level. In one embodiment, the bottom side liquid level of the deethanizer cooler 12 is provided with a high liquid level override control (not shown in the figure) to avoid bringing liquid into the C3R second stage suction tank.
[0029] In a specific embodiment, an online analytical instrument (not shown in the figure) is provided on the top reflux line of the deethanizer 11 to monitor the changes in the contents of methane, acetylene and C3S in the top material.
[0030] In a specific embodiment, the ethylene unit separation cold zone also includes a deethanizer tower kettle reboiler (not shown in the figure), the deethanizer tower kettle reboiler uses quenching water as a heat source, the sensitive plate temperature is controlled by the quenching water flow rate, and the deethanizer tower kettle reboiler heating amount is adjusted according to the C2 component content in the tower kettle material. The high C2 content will directly affect the C3+ material quality and cause the loss of C2. Since the C4 component containing 1-3 butadiene has been removed in the HP depropanizer, the possibility of scaling of the deethanizer tower kettle reboiler is relatively small.
[0031] In summary, the utility model sets the first recovery pipeline 16 to avoid the deethanizer 11, and directly sends the unqualified carbon two from the demethanizer 6 kettle to the unqualified ethylene line in the boundary area, thereby reducing the qualified time of acetylene index and the unqualified carbon two delivered to the deethanizer 11, and can shorten the qualified time of ethylene by 1-2 hours. A single use can save about 100t / h of ethylene materials, reduce the energy consumption of refining, and avoid the loss of ethylene flaring. It is an energy-saving project with low investment and high benefits, and when the product of the demethanizer 6 is unqualified, it will not affect the product index of the deethanizer 11.
[0032] The above-mentioned embodiments only express several implementation methods of the utility model, and the description is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent application. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model. Therefore, the protection scope of the utility model patent shall be based on the attached claims.
Claims
1. A system for recovering unqualified carbon dioxide, characterized in that: The unqualified carbon two recovery system is applied to the separation cold zone of the ethylene device; the separation cold zone of the ethylene device includes a pre-demethanizer, and the pre-demethanizer includes a tower top gas phase outlet of the pre-demethanizer and a tower bottom liquid phase outlet of the pre-demethanizer; the tower top gas phase outlet of the pre-demethanizer is connected with the demethanizer feed cooler, the demethanizer, the demethanizer bottom cooler, the demethanizer bottom subcooler and the ethylene distillation tower in sequence, and the tower bottom liquid phase outlet of the pre-demethanizer is connected with the deethanizer, the deethanizer cooler and the deethanizer reflux tank in sequence; a branch of the outlet of the deethanizer reflux tank is connected with the unqualified ethylene aftercooler and the unqualified ethylene spherical tank in sequence; The unqualified C2 recovery system comprises: a first recovery pipeline, one end of which is connected to a first regulating valve between the demethanizer kettle cooler and the demethanizer kettle supercooler, and the other end of which is connected to a second regulating valve between the unqualified ethylene aftercooler and the unqualified ethylene spherical tank; The unqualified carbon two recovery system also includes: a second recovery pipeline, one end of the second recovery pipeline is connected to the bottom liquid phase outlet of the demethanizer, and the other end of the second recovery pipeline is connected to the first inlet of the deethanizer.
2. The unqualified carbon dioxide recovery system according to claim 1 is characterized in that: When the acetylene index in the deethanizer and the acetylene index in the demethanizer are both unqualified, the second recovery pipeline is in a working state; When the acetylene index in the deethanizer is qualified and the acetylene index in the demethanizer is unqualified, the first recovery pipeline is in working state.
3. The unqualified carbon dioxide recovery system according to claim 2 is characterized in that: The first recovery pipeline and the second recovery pipeline are both provided with a stop valve.
4. The unqualified carbon dioxide recovery system according to claim 3 is characterized in that: The stop valve is a one-way valve.
5. The unqualified carbon dioxide recovery system according to claim 1 is characterized in that: Another branch of the outlet of the deethanizer reflux tank is connected to the ethylene distillation tower; Another branch of the outlet of the deethanizer reflux tank is connected to the deethanizer through a reflux pump.
6. The unqualified carbon dioxide recovery system according to claim 1 is characterized in that: The demethanizer feed cooler adopts two-stage ethylene cooling.
7. The unqualified carbon dioxide recovery system according to claim 1 is characterized in that: The demethanizer kettle cooler is cooled by propylene.
8. The unqualified carbon dioxide recovery system according to claim 1 is characterized in that: The demethanizer bottom cooler is connected to the bottom liquid phase outlet of the demethanizer; The demethanizer also includes an upper feed inlet of the demethanizer and a lower feed inlet of the demethanizer; The lower feed inlet of the demethanizer and the upper feed inlet of the demethanizer are both connected to the demethanizer feed cooler.