Novel furnace pressure tapping pipeline for float glass melting furnace
By using time relay to control the regular purge and water storage tank structure in the float glass melting kiln pressure pipeline, the problem of blockage of pressure pipe and manual control is solved, and the accuracy and stability of kiln pressure measurement is achieved. Simplified operation process.
Patent Information
- Application Number
- CN202323520547.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2033-12-22
AI Technical Summary
During the kiln pressure process of floating glass melting kiln, the pressure pipe line is easily blocked, resulting in the measurement accuracy and stability of the kiln pressure transmitter being affected, and manual control and purge are cumbersome, affecting the stability control of the melting kiln.
Design a new type of kiln pressure-taking pipe for floating glass melting kiln, using a time relay to control the regular purge pipe, using a water storage tank and cooling sleeve structure, the purge valve is opened regularly by high-pressure gas erosion and regular opening to clean the pipe Moisture and dirt ensure accurate and stable kiln pressure measurement.
It realizes regular cleaning of internal organs of pipelines, avoids kiln pressure fluctuations caused by manual control, ensures long-term stable control of the melting kiln and the sensitivity of kiln pressure measurement, and simplifies the operation process.
Smart Images

Figure CN221988397U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pressure-taking pipes, in particular to a new type of kiln pressure-taking pipe for a float glass melting furnace. Background Art
[0002] At present, the kiln pressure of float glass melting furnace is monitored by kiln pressure transmitter. However, during the monitoring process, moisture and other dirt in the flue gas in the melting furnace will enter the pressure taking pipe, causing the kiln pressure taking pipe to be blocked, thereby affecting the measurement accuracy and stability of the kiln pressure transmitter. Therefore, the pressure taking pipeline needs to be regularly drained and the pressure taking pipe needs to be purged. During the drainage process, the kiln pressure control mode needs to be switched to manual control, which is not conducive to the stability control of the kiln pressure of the melting furnace and affects the stability of the melting process control. When purging the pipe, the purge pipe needs to be temporarily connected, which is cumbersome and takes a long time, and the kiln pressure measurement sensitivity is affected. Summary of the invention
[0003] The technical problem to be solved by the utility model is that the manual control of the pressure taking pipe pipeline purging has complicated operation and poor control stability.
[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is: a new type of kiln pressure taking pipe pipeline for a float glass melting furnace, including a right pressure taking pipe and a left pressure taking pipe connected to both sides of the melting furnace, a connecting pipe is connected between the right pressure taking pipe and the left pressure taking pipe, a pressure transmitter and a measuring device are arranged on the connecting pipe, the right pressure taking pipe and the left pressure taking pipe are arranged vertically, and the bottom ends are connected to water storage tanks, and the right pressure taking pipe and the left pressure taking pipe are respectively connected to a right purge pipe and a left purge pipe.
[0005] Preferably, water outlet valves are arranged on the pipelines of the right pressure-taking pipe and the left pressure-taking pipe located below the connecting pipe, and cooling sleeves are sleeved on the pipelines of the right pressure-taking pipe and the left pressure-taking pipe located above the connecting pipe.
[0006] Preferably, the stop valves on the right purge pipe and the left purge pipe are both equipped with time relays for control.
[0007] Preferably, the connecting pipe section upstream of the pressure transmitter is arranged vertically, and the bottom end of the vertical pipe section is connected to the water storage tank.
[0008] 1. The utility model provides a float glass melting furnace pressure taking pipe pipeline. By modifying the original pressure taking pipe, controlling each water outlet valve and the stop valve on the purge pipe, and controlling the right pressure taking pipe and the left pressure taking pipe to be purged regularly by a time relay, the coke in the pipe is cleaned and the water is drained, thereby ensuring the sensitivity of the melting furnace pressure measurement.
[0009] 2. Use time relay to control regular purge, the pressure taking pipe and purge pipe are fixedly connected, and the dirt in the pipeline is discharged regularly. There is no need to switch the melting furnace control mode to manual control during the process, so as to avoid fluctuations in the furnace pressure caused by manual control and fluctuations in the melting furnace working conditions. At the same time, it also ensures the long-term stable control of the melting furnace.
[0010] 3. The device has a reasonable structural design. Through the transformation design of the pipeline and the opening and closing of the valve, the variable factors of the dry kiln pressure measurement in the pipeline can be eliminated, so as to achieve the purpose of accurately, stably and sensitively controlling the melting furnace pressure. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] The utility model is further described below in conjunction with the accompanying drawings and embodiments:
[0012] Figure 1 It is a structural schematic diagram of an embodiment of the utility model.
[0013] In the figure: 1. melting furnace; 2. right pressure taking pipe; 3. left pressure taking pipe; 4. connecting pipe; 5. measuring device; 6. pressure transmitter; 7. water storage tank; 8. right purge pipe; 9. left purge pipe; 10. cooling jacket. DETAILED DESCRIPTION
[0014] like Figure 1 As shown, the utility model provides a new type of kiln pressure taking pipe pipeline for a float glass melting furnace, including a right pressure taking pipe 2 and a left pressure taking pipe 3 connected to both sides of a melting furnace 1, a connecting pipe 4 is connected between the right pressure taking pipe 2 and the left pressure taking pipe 3, a pressure transmitter 6 and a measuring device 5 are arranged on the connecting pipe 4, the right pressure taking pipe 2 and the left pressure taking pipe 3 are both arranged vertically, and the bottom ends are both connected to a water storage tank 7, and the right pressure taking pipe 2 and the left pressure taking pipe 3 are respectively connected to a right purge pipe 8 and a left purge pipe 9.
[0015] A left pressure-taking pipe 3 and a right pressure-taking pipe 2 are connected to the left and right sides of the melting furnace 1 , respectively. The left pressure-taking pipe 3 and the right pressure-taking pipe 2 are connected to a pressure transmitter 6 and a measuring device 5 via a connecting pipe 4 , forming a pressure-taking and measuring pipeline of the melting furnace 1 .
[0016] The water and other dirt that enter the left pressure taking pipe 3 and the right pressure taking pipe 2 are discharged into the water storage tank 7 by opening the valves at the connecting ends of the left pressure taking pipe 3 and the right pressure taking pipe 2 with the water storage tank 7 respectively, and finally discharged from the valve at the bottom of the water storage tank 7.
[0017] The left pressure-taking pipe 3 and the right pressure-taking pipe 2 are arranged vertically, and the condensed water and dirt inside flow directly into the bottom of the pipe, so that they can be directly discharged into the water storage tank 7 after the valve is opened, thereby reducing the water and dirt from entering the connecting pipe 4.
[0018] Open the left purge pipe 9 and the right purge pipe 8 regularly, close the valve of the pressure transmitter 6, and use high-pressure gas to flush the left pressure-taking pipe 3, the right pressure-taking pipe 2 and the front section of the connecting pipe 4. The flushed water and dirt directly enter the water storage tank 7 with the gas to clean the pressure-taking pipe pipeline.
[0019] like Figure 1 As shown. A water outlet valve is arranged on the pipeline of the right pressure-taking pipe 2 and the left pressure-taking pipe 3 located below the connecting pipe 4, and a cooling sleeve 10 is installed on the pipeline of the right pressure-taking pipe 2 and the left pressure-taking pipe 3 located above the connecting pipe 4. The cooling sleeve 10 adopts a cooling water jacket, and the cooling sleeve 10 cools the bottom ends of the right pressure-taking pipe 2 and the left pressure-taking pipe 3, so that the water vapor entering the pipeline is quickly cooled and condensed, and the formed moisture is collected upstream of the water outlet valve. When the right purge pipe 8 and the left purge pipe 9 are opened at a fixed time to purge the pipeline, the water outlet valve is opened synchronously to discharge the water.
[0020] As a preferred embodiment of the utility model, in order to realize regular purging and cleaning of the pipeline, the stop valves on the right purge pipe 8 and the left purge pipe 9 are both equipped with a control time relay.
[0021] like Figure 1 As shown, in order to increase the length of pipeline purge, the connecting pipe 4 upstream of the pressure transmitter 6 is arranged vertically, and the bottom end of the vertical pipe section is connected to the water storage tank 7. When purging the pipeline, the valves at both ends of the pressure transmitter 6 are closed, and the right purge pipe 8 and the left purge pipe 9 simultaneously purge the right pressure taking pipe 2, the left pressure taking pipe 3 and the connecting pipe 4, and the dirt and coke inside the pipeline are purged into the three water storage tanks 7 respectively.
Claims
1. A new type of float glass melting furnace pressure taking pipe pipeline, characterized by: The invention comprises a right pressure-taking pipe (2) and a left pressure-taking pipe (3) connected to both sides of a melting furnace (1); a connecting pipe (4) is connected between the right pressure-taking pipe (2) and the left pressure-taking pipe (3); a pressure transmitter (6) and a measuring device (5) are arranged on the connecting pipe (4); the right pressure-taking pipe (2) and the left pressure-taking pipe (3) are arranged vertically, and the bottom ends of the two pressure-taking pipes are connected to a water storage tank (7); the right pressure-taking pipe (2) and the left pressure-taking pipe (3) are respectively connected to a right purge pipe (8) and a left purge pipe (9).
2. The novel furnace pressure taking pipe line of float glass melting furnace as claimed in claim 1, characterized in that: A water outlet valve is arranged on the pipelines of the right pressure-taking pipe (2) and the left pressure-taking pipe (3) located below the connecting pipe (4), and a cooling sleeve (10) is sleeved on the pipelines of the right pressure-taking pipe (2) and the left pressure-taking pipe (3) located above the connecting pipe (4).
3. The novel furnace pressure taking pipe line of float glass melting furnace as claimed in claim 2 is characterized in that: The stop valves on the right purge pipe (8) and the left purge pipe (9) are both equipped with a time relay for control.
4. The novel furnace pressure taking pipe line for float glass melting furnace as claimed in claim 1, characterized in that: The connecting pipe (4) section upstream of the pressure transmitter (6) is arranged vertically, and the bottom end of the vertical pipe section is connected to the water storage tank (7).