Subway temporary concrete stand column and steel support combined comprehensive supporting structure
By adopting a grid-like structure combining temporary concrete columns and steel support in the construction of deep foundation pits of subways, and using preset anchor plates and steel beef legs, the stability of temporary concrete columns withstand loads is solved, and construction safety is improved and efficiency avoid safety risks caused by bending steel support and plant reinforcement connection errors.
Patent Information
- Application Number
- CN202420622609.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-28
AI Technical Summary
During the construction of a deep foundation pit in the subway, the temporary concrete columns bear the load of the cover plate and vehicle, which leads to high construction difficulty and high safety risks. In the existing technology, the steel support length is too long or the plant reinforcement connection process requirements are high, which can easily lead to support. Poor results and safety accidents.
A grid-shaped comprehensive support structure combining subway temporary concrete columns and steel support is adopted to form a stable support system through preset anchor plates, steel beef legs, longitudinal connecting beams and transverse steel support to ensure the columns and steel support. Stability and reduce the risk of error in plant reinforcement connection through the design of preset anchor plates.
It enhances the stability of columns and steel support, ensures safety of foundation pit construction, reduces the deflection of steel support, improves construction efficiency and safety, and avoids unnecessary safety accidents and cost increase.
Smart Images

Figure CN221989344U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of temporary subway support, in particular to a comprehensive support structure combining temporary subway concrete columns with steel supports. Background Art
[0002] The retaining pile plus internal support support type is widely used in the construction of deep foundation pits in industries such as subways and municipal engineering. However, since subway stations are generally arranged along the main traffic corridors of the city, the construction period is long and the area occupied is large. While ensuring the construction of rail transit, it is also necessary to ensure the safe passage of urban road traffic. Generally, the needs of urban road traffic within the construction scope of the subway station are solved by adding temporary concrete column piles and cover plates in the foundation pit. The temporary concrete columns have to bear the loads of the cover plate and the upper vehicles and pedestrians. The force they bear is relatively large, which makes the construction of the deep foundation pit of the subway with a cover plate on the upper part difficult and the safety risk is high; therefore, some effective measures need to be taken to enhance the stability of the columns. It is necessary to develop a comprehensive support structure that combines temporary concrete column piles with steel supports to improve the safety and stability of the foundation pit and the cover plate. Utility Model Content
[0003] The utility model aims to solve the deficiencies of the prior art and to provide a comprehensive support structure combining temporary concrete columns and steel supports for subways. By adopting this scheme, a grid-like support structure composed of a plurality of temporary columns, a plurality of longitudinal connecting beams and a plurality of transverse steel supports is formed to form a comprehensive support structure system, thereby ensuring the upper traffic of the foundation pit and the construction safety of the deep foundation pit during the construction of covered or semi-covered deep foundation pits.
[0004] The utility model is realized by the following technical solutions:
[0005] A comprehensive support structure combining temporary concrete columns and steel supports for subways, wherein the support structure is in a grid shape and comprises a plurality of vertical temporary columns, a plurality of longitudinal connecting beams erected on the temporary columns, and a plurality of transverse steel supports erected on the longitudinal connecting beams;
[0006] The temporary column is fixed with a preset anchor plate arranged along its own circumferential direction, and the side wall of the preset anchor plate is welded with a rigid bull leg, and the rigid bull leg is used to support the longitudinal connecting beam.
[0007] Compared with the prior art, the demand for urban road traffic within the construction scope of the subway station is generally solved by adding temporary concrete columns and cover plates in the foundation pit. The temporary concrete columns have to bear the cover plates and the upper vehicle and pedestrian loads, and the force they bear is relatively large, which makes the construction of the subway deep foundation pit with the upper cover plate difficult and the safety risk high; if the steel support is too long and there are many installation nodes in the specific design, it may cause the support to bend or deform, affecting the support effect, and then causing excessive horizontal displacement of the foundation pit, or the temporary columns and the longitudinal connecting beams are connected by post-embedded reinforcement. The rebar embedding has high requirements for the construction process and no mistakes can be made, otherwise, it will affect the structural effect and even cause unnecessary safety accidents, low efficiency, and increased costs. The utility model provides a comprehensive support structure combining temporary concrete columns and steel supports for subways. By adopting this scheme, a grid-shaped support structure composed of a number of temporary columns, a number of longitudinal connecting beams and a number of transverse steel supports is formed to form a comprehensive support structure system, which ensures the upper traffic of the foundation pit and the construction safety of the deep foundation pit in the construction of the covered or semi-covered deep foundation pit.
[0008] In the specific plan, several temporary columns are made of C30 underwater concrete with a diameter of 1.2m and a steel cage inside. The holes are drilled by rotary drilling and poured with underwater concrete conduits. When several temporary columns are completed, several longitudinal connecting beams are set along the longitudinal direction and the longitudinal connecting beams are erected on several temporary columns. After erection, several transverse steel supports are erected on the longitudinal connecting beams, thereby forming a grid-like support structure composed of several temporary columns, several longitudinal connecting beams and several transverse steel supports; wherein, in order to erect the longitudinal connecting beams on the temporary columns, several circumferentially arranged preset anchor plates are also arranged on the temporary columns, and rigid bull legs are welded on the side walls of the preset anchor plates, so that the longitudinal connecting beams are stably supported by the rigid bull legs, thereby forming a stable support structure.
[0009] A further solution is that in order to improve the connection strength of the preset anchor plate, the temporary column is provided with a steel cage, and the preset anchor plate is circumferentially welded along the outer ring of the spiral stirrups of the steel cage. Since the temporary column and the longitudinal connecting beam are usually connected by post-embedded reinforcement in the prior art, the embedding of reinforcement has high requirements on the construction process and no mistakes can be made, otherwise, it will affect the structural effect and even cause unnecessary safety accidents, resulting in low efficiency and increased costs. In this solution, a preset anchor plate can be set on the lower steel cage before the temporary column is cast. The preset anchor plate is made of Q235 steel plate with a size of 2.2m×3.768m thick, processed into a barrel shape with a diameter of 1.2m, and welded in an annular manner along the outer ring of the spiral stirrups of the steel cage of the temporary column pile to achieve fixation, thereby forming a stable overall structure.
[0010] A further solution is that in order to improve the connection strength of the preset anchor plate, a plurality of straight anchor bars are provided on the inner side of the preset anchor plate, one end of the straight anchor bar is welded to the inner side of the preset anchor plate, and the other end of the straight anchor bar extends toward the inside of the temporary column. In this solution, after the outer ring of the spiral stirrups along the reinforcement cage of the temporary column pile is annularly welded, straight anchor bars with a diameter of 16 mm and a length of 25 cm can be provided on the preset anchor plate at intervals of 50 cm into the pile, and then poured.
[0011] A further solution is a specific implementation structure as a longitudinal connecting beam, in which both sides of the preset anchor plate are welded with rigid bull legs, and the longitudinal connecting beam includes channel steels respectively mounted on the two rigid bull legs, and the two channel steels clamp a plurality of the temporary columns in the longitudinal direction. In this solution, along the length direction of the longitudinal connecting beam, a plurality of channel steels can be welded end to end in sequence for connection, the channels of the channel steels on both sides are arranged oppositely, and the bottom edges of the channel steels are welded to the rigid bull legs, so that the temporary columns are clamped in by the channel steels on both sides, and at this time, the transverse steel support can be mounted on the channel steels.
[0012] A further solution is that in order to block and support the channel steel, a first angle steel is welded on the rigid corbel, one side of the first angle steel is placed parallel to the upper surface of the rigid corbel, and the side of the channel steel welded on the rigid corbel is located between one side of the first angle steel and the preset anchor plate. In this solution, by welding the first angle steel on the rigid corbel, the first angle steel is buckled at the outer end of the rigid corbel, and one side of the first angle steel is placed parallel to the rigid corbel, thereby forming a step, limiting the channel steel inside the step, and improving the connection strength.
[0013] A further solution is to improve the support rigidity of the channel steel at the position of supporting the transverse steel support. At the position where the longitudinal connecting beam sets up the transverse steel support, a tie plate is welded at the upper and lower ends between the two channel steels, and the transverse steel support is fixed to the upper tie plate. In this solution, the tie plate is arranged at the upper and lower ends of the two channel steels, so that the two channel steels are connected as a whole, which is convenient for stable support through the tie plate; in addition, the tie plate can also be connected between two adjacent channel steels connected end to end to improve the connection strength.
[0014] A further solution is to limit the circular transverse steel support and position it during the initial installation. The said gusset plate is provided with two second angle steels, which are respectively arranged on both sides of the bottom of the said transverse steel support and are arranged opposite to each other; the gap between the bottom of the said transverse steel support and the said second angle steel is filled with wooden strips. In this solution, the transverse steel support is placed between the two second angle steels by means of two second angle steels arranged opposite to each other, so as to position the transverse steel support, and then the gap between the transverse steel support and the second angle steel is filled with wooden strips to prevent it from moving.
[0015] A further solution is that in order to fix the transverse steel support, the longitudinal connecting beam is also provided with a fixing structure for fixing the transverse steel support, and the fixing structure includes angle steel brackets arranged on both sides of the transverse steel support, and the two angle steel brackets clamp the transverse steel support. In this solution, the angle steel bracket can be a vertical angle steel, and two of the four vertical angle steels are distributed on both sides of the transverse steel support, and a bracket is welded between the two vertical angle steels on the same side, so as to clamp through the flat plate of the bracket.
[0016] A further solution is to connect and fix the two angle steel brackets on both sides, and a third angle steel is connected between the tops of the two angle steel brackets.
[0017] In a further solution, both ends of the transverse steel support are placed on the steel purlins of the foundation pit.
[0018] Compared with the prior art, the utility model has the following advantages and beneficial effects:
[0019] 1. The utility model provides a comprehensive support structure combining temporary concrete columns and steel supports for subways. According to this scheme, temporary concrete column piles are used as vertical supports for the upper traffic relief cover plate. By presetting anchor plates + steel brackets + longitudinal connecting beams + transverse steel cross braces, a grid structure is formed, which enhances the stability of the columns and steel cross braces and ensures that the temporary columns can withstand the weight and vibration of the upper cover plate and vehicles passing by. At the same time, they are also combined with the cross braces into a whole, ensuring the safety of foundation pit construction and improving work efficiency.
[0020] 2. The utility model provides a comprehensive support structure combining temporary concrete columns and steel supports for subways. By adopting this solution, the transverse steel supports are connected to the steel purlins through oblique braces and oblique corbels, and are also supported on the longitudinal connecting beams of the temporary concrete columns, thereby improving the stability of the steel pipe supports, reducing the deflection of the steel supports, and avoiding support instability.
[0021] 3. The utility model provides a comprehensive support structure combining temporary concrete columns and steel supports for subways. The temporary columns use preset anchor plates, and the connection method is safer and more reliable than later rebar planting.
[0022] 4. The utility model provides a comprehensive support structure combining temporary concrete columns and steel supports for subways. The temporary columns are connected to the longitudinal connecting beams through preset anchor plates and steel brackets; the steel supports are placed on the longitudinal connecting beams and fixedly connected through angle steels. The method is mainly to connect multiple temporary columns with multiple steel supports through longitudinal connecting beams to form a grid-like structure to withstand multi-directional forces. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The drawings described herein are used to provide a further understanding of the embodiments of the present utility model, constitute a part of this application, and do not constitute a limitation of the embodiments of the present utility model. In the drawings:
[0024] Figure 1 A schematic structural diagram of a comprehensive support structure provided by the utility model in an embodiment;
[0025] Figure 2 A cross-sectional view of a temporary column according to an embodiment of the present invention;
[0026] Figure 3 A distribution diagram of straight anchor bars of a temporary column of an embodiment provided by the utility model;
[0027] Figure 4 A partial side view of a preset anchor plate of an embodiment provided by the utility model;
[0028] Figure 5 A schematic diagram of the structure of a connection node between a temporary column and a longitudinal connecting beam provided by an embodiment of the utility model;
[0029] Figure 6 A cross-sectional view of a longitudinal connecting beam according to an embodiment of the present utility model;
[0030] Figure 7 A position relationship diagram of a longitudinal connecting beam and a transverse steel support provided in an embodiment of the utility model;
[0031] Figure 8 A schematic diagram of the structure of a connection node between a longitudinal connecting beam and a transverse steel support provided in an embodiment of the utility model;
[0032] Fig. 9 This is a cross-sectional view of the AA connection node of a longitudinal connecting beam and a transverse steel support provided in an embodiment of the utility model.
[0033] Marks and corresponding parts names in the attached drawings:
[0034] 1-temporary column, 2-preset anchor plate, 3-rigid corbel, 4-longitudinal connecting beam, 401-channel steel, 402-attachment plate, 403-second angle steel, 404-wood strip, 5-transverse steel support, 6-fixed structure, 601-angle steel bracket, 602-third angle steel, 7-spiral stirrups, 8-straight anchor bar, 9-first angle steel, 10-steel purlin, 11-concrete support, 12-retaining wall, 13-crown beam, 14-temporary cover plate. DETAILED DESCRIPTION
[0035] In order to make the purpose, technical solutions and advantages of the utility model more clearly understood, the utility model is further described in detail below in conjunction with embodiments and drawings. The schematic implementation methods of the utility model and their descriptions are only used to explain the utility model and are not intended to limit the utility model.
[0036] Embodiment 1:
[0037] This embodiment provides a comprehensive support structure combining temporary concrete columns and steel supports for subways. Figure 1-Figure 9 As shown, the support structure is in a grid shape, and the support structure includes a plurality of vertical temporary columns 1, a plurality of longitudinal connecting beams 4 erected on the temporary columns 1, and a plurality of transverse steel supports 5 erected on the longitudinal connecting beams 4;
[0038] The temporary column 1 is fixed with a preset anchor plate 2 arranged along its own circumferential direction, and the side wall of the preset anchor plate 2 is welded with a rigid bull leg 3, and the rigid bull leg 3 is used to support the longitudinal connecting beam 4.
[0039] Compared with the prior art, the urban road traffic needs within the construction range of the subway station are generally solved by adding temporary concrete columns 1 and cover plates in the foundation pit. The temporary concrete columns have to bear the cover plates and the upper vehicle and pedestrian loads, and the force they bear is relatively large, resulting in great difficulty in the construction of the subway deep foundation pit with a cover plate on the upper part and high safety risks; if, in the specific design, the steel support length is too long and there are many installation nodes, it may cause the support to bend or deform, affecting the support effect, and further causing excessive horizontal displacement of the foundation pit, or the temporary column 1 and the longitudinal connecting beam 4 are connected by post-embedded reinforcement. Rebar planting has high requirements on construction technology and no mistakes can be made. Otherwise, it will affect the structural effect and even cause unnecessary safety accidents, low efficiency, increased costs and other problems. The utility model provides a comprehensive support structure combining temporary concrete columns and steel supports for subways. By adopting this scheme, a grid-like support structure composed of a plurality of temporary columns 1, a plurality of longitudinal connecting beams 4 and a plurality of transverse steel supports 5 is formed to form a comprehensive support structure system, which ensures the upper traffic of the foundation pit and the construction safety of the deep foundation pit in the construction of covered or semi-covered deep foundation pits.
[0040] In the specific scheme, several temporary columns 1 are made of C30 underwater concrete with a diameter of 1.2m and a steel cage inside. The holes are drilled by rotary drilling and poured with underwater concrete conduits. When several temporary columns 1 are completed, several longitudinal connecting beams 4 are arranged along the longitudinal direction, and the longitudinal connecting beams 4 are erected on several temporary columns 1. After erection, several transversely arranged transverse steel supports 5 are erected on the longitudinal connecting beams 4, thereby forming a grid-like support structure composed of several temporary columns 1, several longitudinal connecting beams 4 and several transverse steel supports 5; wherein, in order to erect the longitudinal connecting beams 4 on the temporary columns 1, several circumferentially arranged preset anchor plates 2 are also arranged on the temporary columns 1, and rigid bull legs 3 are welded on the side walls of the preset anchor plates 2, so that the longitudinal connecting beams 4 are stably supported by the rigid bull legs 3, thereby forming a stable support structure.
[0041] A further solution is that in order to improve the connection strength of the preset anchor plate 2, the temporary column 1 is provided with a steel cage, and the preset anchor plate 2 is circumferentially welded along the outer ring of the spiral stirrups 7 of the steel cage. Since the temporary column 1 and the longitudinal connecting beam 4 are usually connected by post-embedded reinforcement in the prior art, the embedding of reinforcement has high requirements on the construction process and no mistakes can be made, otherwise, it will affect the structural effect and even cause unnecessary safety accidents, resulting in low efficiency and increased costs. In this solution, before the temporary column 1 is cast, the preset anchor plate 2 can be set on the lower steel cage. The preset anchor plate 2 is made of Q235 steel plate with a size of 2.2m×3.768m thick, processed into a barrel shape with a diameter of 1.2m, and annularly welded along the outer ring of the spiral stirrups 7 of the steel cage of the temporary column 1 pile to achieve fixation, thereby forming a stable overall structure.
[0042] In this embodiment, in order to improve the connection strength of the preset anchor plate 2, a plurality of straight anchor bars 8 are provided on the inner side of the preset anchor plate 2, one end of the straight anchor bar 8 is welded to the inner side of the preset anchor plate 2, and the other end of the straight anchor bar 8 extends toward the inside of the temporary column 1. In this solution, after the outer ring of the spiral stirrups 7 of the reinforcement cage along the temporary column 1 pile is annularly welded, straight anchor bars 8 with a diameter of 16 mm and a length of 25 cm can be provided on the preset anchor plate 2 at intervals of 50 cm into the pile, and then poured.
[0043] In this embodiment, as a specific implementation structure of a longitudinal connecting beam 4, a rigid bull leg 3 is welded on both sides of the preset anchor plate 2, and the longitudinal connecting beam 4 includes channel steels 401 respectively mounted on the two rigid bull legs 3, and the two channel steels 401 clamp a plurality of temporary columns 1 in the longitudinal direction. In this solution, along the length direction of the longitudinal connecting beam 4, a plurality of channel steels 401 can be welded end to end in sequence for connection, the channels of the channel steels 401 on both sides are arranged relatively, and the bottom edges of the channel steels 401 are welded on the rigid bull legs 3, so that the temporary columns 1 are clamped in by the channel steels 401 on both sides, and at this time, the transverse steel support 5 can be mounted on the channel steels 401.
[0044] In this embodiment, in order to block and support the channel steel 401, a first angle steel 9 is welded on the rigid corbel 3, one side of the first angle steel 9 is placed parallel to the upper surface of the rigid corbel 3, and the side of the channel steel 401 welded on the rigid corbel 3 is located between one side of the first angle steel 9 and the preset anchor plate 2. In this solution, by welding the first angle steel 9 on the rigid corbel 3, the first angle steel 9 is buckled at the outer end of the rigid corbel 3, and one side thereof is placed parallel to the rigid corbel 3, thereby forming a step, limiting the channel steel 401 inside the step, and improving the connection strength.
[0045] In this embodiment, in order to improve the support rigidity of the channel steel 401 at the position of supporting the transverse steel support 5, at the position where the transverse steel support 5 is erected on the longitudinal connecting beam 4, the upper and lower ends between the two channel steels 401 are welded with a tie plate 402, and the transverse steel support 5 is fixed on the upper tie plate 402. In this solution, the tie plate 402 is arranged at the upper and lower ends of the two channel steels 401, so that the two channel steels 401 are connected as a whole, which is convenient for stable support through the tie plate 402; in addition, the tie plate 402 can also be connected between two adjacent channel steels 401 connected end to end to improve the connection strength.
[0046] In this embodiment, in order to limit the circular transverse steel support 5 and position it during the initial installation, the gusset plate 402 is provided with two second angle steels 403, which are respectively arranged on both sides of the bottom of the transverse steel support 5 and are arranged opposite to each other; the gap between the bottom of the transverse steel support 5 and the second angle steel 403 is filled with wooden strips 404. In this solution, the transverse steel support 5 is placed between the two second angle steels 403 through the two second angle steels 403 arranged opposite to each other, so as to position the transverse steel support 5, and then the wooden strips 404 are filled in the gap between the transverse steel support 5 and the second angle steel 403 to prevent it from moving.
[0047] In this embodiment, in order to fix the transverse steel support 5, the longitudinal connecting beam 4 is also provided with a fixing structure 6 for fixing the transverse steel support 5, and the fixing structure 6 includes angle steel brackets 601 arranged on both sides of the transverse steel support 5, and the two angle steel brackets 601 clamp the transverse steel support 5. In this solution, the angle steel brackets 601 can be vertical angle steels, and two of the four vertical angle steels are distributed on both sides of the transverse steel support 5, and the brackets are welded between the two vertical angle steels on the same side, so as to be clamped by the flat plate of the brackets.
[0048] In this embodiment, in order to connect and fix the two angle steel brackets 601 on both sides, a third angle steel 602 is connected between the tops of the two angle steel brackets 601 .
[0049] In this embodiment, both ends of the transverse steel support 5 are placed on the foundation pit steel purlin 10 .
[0050] Embodiment 2:
[0051] This embodiment 2 is limited on the basis of embodiment 1, and provides a specific construction step of a supporting structure:
[0052] Step 1: Temporary column 1 is made of C30 underwater concrete, with a diameter of 1.2m, and a steel cage is installed inside. The hole is drilled by rotary drilling and poured with underwater concrete conduit. Before pouring, a preset anchor plate 2 is set on the steel cage. The preset anchor plate 2 is made of Q235 steel plate with a size of 2.2m×3.768m thick, processed into a barrel shape with a diameter of 1.2m. The outer ring of the spiral stirrup 7 of the steel cage of the temporary column 1 pile is welded in an annular manner, and a 16mm diameter steel bar and a length of 25cm are set on the anchor plate at intervals of 50cm into the pile. Figure 2-Figure 4 shown.
[0053] Step 2: Excavate the foundation pit, excavate the temporary concrete column pile to the preset anchor plate 2 position, and weld the steel bracket 2cm thick Q235 steel plate with a size of 1.2m×0.8m to both sides of the preset anchor plate 2 of the excavated temporary concrete column 1 pile. Figure 5 shown.
[0054] Step 3: The longitudinal connecting beam 4 is welded together by two 40C channel steels 401 and a connecting beam plate 402 with a size of 1300mm×280mm and t=10mm. The longitudinal connecting beam 4 is installed on the steel bracket. Figure 6 and Figure 7 shown.
[0055] Step 4: The steel cross brace is supported by a steel pipe with a diameter of φ=609mm and t=16mm. The two ends are placed on the foundation pit steel purlin 10, and the middle is set on the temporary column 1 steel connecting beam. The cross brace and the longitudinal connecting beam 4 fixing structure 6 are installed. The cross brace and the longitudinal connecting beam 4 fixing structure 6 are L80×10m angle steel, and the steel cross brace is fixed on the longitudinal connecting beam. Figure 8 and Fig. 9 shown.
[0056] The temporary concrete column piles are combined with the longitudinal steel connecting beams and steel cross braces to form a Figure 1 The comprehensive support structure system shown.
[0057] The above scheme uses a temporary concrete column 1 pile as the vertical support of the upper traffic relief cover plate, and forms a grid structure by pre-setting anchor plates 2 + steel brackets + longitudinal connecting beams 4 + steel cross braces, which enhances the stability of the columns and steel cross braces and ensures that the temporary column 1 can withstand the weight and vibration of the upper cover plate and vehicles passing by. At the same time, it is also combined with the cross brace to form a whole, ensuring the safety of foundation pit construction and improving work efficiency.
[0058] The specific implementation methods described above further illustrate the purpose, technical solutions and beneficial effects of the utility model in detail. It should be understood that the above description is only the specific implementation method of the utility model and is not used to limit the protection scope of the utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the utility model should be included in the protection scope of the utility model.
Claims
1. A comprehensive support structure combining temporary concrete columns and steel supports for subways. It is characterized in that The support structure is in a grid shape, and comprises a plurality of vertical temporary columns (1), a plurality of longitudinal connecting beams (4) erected on the temporary columns (1), and a plurality of transverse steel supports (5) erected on the longitudinal connecting beams (4); A preset anchor plate (2) arranged along the circumferential direction of the temporary column (1) is fixed on the temporary column (1), a rigid bull leg (3) is welded to the side wall of the preset anchor plate (2), and the rigid bull leg (3) is used to support the longitudinal connecting beam (4).
2. According to claim 1, a comprehensive support structure combining temporary concrete columns and steel supports for subways, It is characterized in that The temporary column (1) has a steel cage inside, and the preset anchor plate (2) is circumferentially welded along the outer ring of the spiral stirrups (7) of the steel cage.
3. According to claim 2, a comprehensive support structure combining temporary concrete columns and steel supports for subways, It is characterized in that A plurality of straight anchor bars (8) are arranged on the inner side of the preset anchor plate (2), one end of the straight anchor bar (8) is welded to the inner side of the preset anchor plate (2), and the other end of the straight anchor bar (8) extends toward the inside of the temporary column (1).
4. According to claim 1, a comprehensive support structure combining temporary concrete columns and steel supports for subways, It is characterized in that Both sides of the preset anchor plate (2) are welded with rigid bull legs (3), and the longitudinal connecting beam (4) includes channel steels (401) respectively mounted on the two rigid bull legs (3), and the two channel steels (401) clamp a plurality of temporary columns (1) therein along the longitudinal direction.
5. According to claim 4, a comprehensive support structure combining temporary concrete columns and steel supports for subways, It is characterized in that A first angle steel (9) is welded to the rigid corbel (3), one side of the first angle steel (9) is placed parallel to the upper surface of the rigid corbel (3), and the side of the channel steel (401) welded to the rigid corbel (3) is located between one side of the first angle steel (9) and the preset anchor plate (2).
6. A comprehensive support structure combining temporary concrete columns and steel supports for subways according to claim 4, It is characterized in that At the position where the transverse steel support (5) is erected on the longitudinal connecting beam (4), a tie plate (402) is welded at the upper and lower ends between the two channel steels (401), and the transverse steel support (5) is fixed on the upper tie plate (402).
7. A comprehensive support structure combining temporary concrete columns and steel supports for subways according to claim 6, It is characterized in that The gusset plate (402) is provided with two second angle steels (403), which are arranged on both sides of the bottom of the transverse steel support (5) and are arranged opposite to each other; the gap between the bottom of the transverse steel support (5) and the second angle steels (403) is filled with wooden strips (404).
8. According to claim 1, a comprehensive support structure combining temporary concrete columns and steel supports for subways, It is characterized in that The longitudinal connecting beam (4) is also provided with a fixing structure (6) for fixing the transverse steel support (5), wherein the fixing structure (6) comprises angle steel brackets (601) arranged on both sides of the transverse steel support (5), and the two angle steel brackets (601) clamp the transverse steel support (5) therein.
9. A comprehensive support structure combining temporary concrete columns and steel supports for subways according to claim 8, It is characterized in that A third angle steel (602) is connected between the tops of the two angle steel brackets (601).
10. The comprehensive support structure of a subway temporary concrete column combined with a steel support according to claim 1, It is characterized in that Both ends of the transverse steel support (5) are placed on the foundation pit steel purlin (10).