Wallboard

Through the use of chain structure, the difficulties in removing prefabricated wall panel formwork are solved, and the close combination of on-site cast concrete and wall panels are achieved, and the construction efficiency and wall quality are improved.

CN221989700UActive Publication Date: 2024-11-12MEISHI CONSTR TECH (SHANGHAI) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420258245.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-01
Publication Date
2024-11-12
Estimated Expiration
2034-02-01

AI Technical Summary

Technical Problem

During the production and installation of existing prefabricated wall panels, there are difficulties in removing formwork and gaps between on-site cast concrete and prefabricated walls, and the traditional dry hanging method has poor safety and cannot guarantee the positioning accuracy.

Method used

A chain frame structure is adopted, including a chain shaft and a steel mesh. The end of the chain shaft has grooves for fixing the steel mesh. The cement-based formwork has a swallow tenon to enhance the bite between the concrete and the formwork, and achieve rapid fixation through pins and connectors. and position to avoid template removal and gap creation.

Benefits of technology

Improve production efficiency, eliminate gaps between on-site poured concrete and wall panels, improve dry hanging quality and overall quality of the wall, and simplify the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989700U_ABST
    Figure CN221989700U_ABST
Patent Text Reader

Abstract

The utility model provides a wallboard which comprises a lock chain framework, the lock chain framework comprises a plurality of lock chain shafts and reinforcing meshes fixed on the lock chain shafts, a pair of grooves are formed in the end portions of the lock chain shafts, the reinforcing meshes are fixed in the pair of grooves, the grooves extend in the axial direction of the lock chain shafts, and the lock chain shafts and the reinforcing meshes are fixed on the lock chain shafts. The pair of grooves are symmetrically distributed in the axial direction of the chain shaft; the cement-based template is at least connected with one end of the chain shaft, the cement-based template is located on the surface of the reinforcing mesh, and the surface, facing the reinforcing mesh, of the cement-based template is provided with a plurality of swallow tenons; according to the cement-based template, the template is not required to be disassembled, meanwhile, a gap between the prefabricated wallboard and cast-in-place concrete is eliminated, and a subsequently formed concrete layer can be tightly clamped by the dovetail tenon, so that the connection strength between the cement-based template and the concrete layer is improved, and the cement-based template has a wider application range.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of construction, in particular to a wall panel. Background Art

[0002] Reinforced concrete panel components processed in prefabrication plants or construction sites for building assembly are referred to as prefabricated wall panels or prefabricated siding panels. Using prefabricated wall panels to build assembled large-panel buildings can improve the degree of factory-based and mechanized construction, reduce on-site wet operations, save on-site labor, overcome seasonal influences, and shorten the construction period. At present, the forming mold used in the production of prefabricated wall panels is a forming groove structure with an upper end open surrounded by each side mold and the bottom mold. In order to ensure that the joints between the side molds do not leak when pouring concrete, the adjacent side mold joints are close together, which brings great inconvenience to the removal of the side molds after the prefabricated wall panels are hardened.

[0003] In addition, the coefficients of thermal expansion and contraction between the cast-in-place concrete and the prefabricated walls are inconsistent, resulting in gaps between the cast-in-place concrete and the prefabricated walls. At the same time, traditional dry hanging is connected through slotted dovetail grooves. On the one hand, this dry hanging method has poor safety, and on the other hand, the positioning accuracy and installation accuracy cannot be guaranteed.

[0004] Therefore, how to eliminate the gap between the cast-in-place concrete and the prefabricated wall without removing the formwork and improving the quality of dry hanging is a technical problem that urgently needs to be solved. Utility Model Content

[0005] The problem solved by the utility model is to provide a wall panel, which can realize the non-disassembly of formwork and eliminate the gap between the prefabricated wall panel and the on-site cast concrete, and has a wider application range.

[0006] In order to solve the above problems, the utility model provides a wall panel, comprising: a chain frame, the chain frame comprising a plurality of chain shafts and a steel mesh fixed on the chain shafts, the end of the chain shaft having a pair of grooves, the steel mesh being fixed in the pair of grooves, the grooves extending along the axial direction of the chain shaft, and the pair of grooves being symmetrically distributed with respect to the axial direction of the chain shaft; a cement-based formwork connected to at least one end of the chain shaft, the cement-based formwork being located on the surface of the steel mesh, and the surface of the cement-based formwork facing the steel mesh having a plurality of dovetail joints.

[0007] Optionally, it also includes: a first connecting piece connecting the cement-based formwork and the chain shaft, and the first connecting piece is detachably connected to the end of the chain shaft.

[0008] Optionally, the inner wall of the end of the chain shaft has a thread.

[0009] Optionally, it also includes: a second connecting member connected to the end of the chain shaft, and the second connecting member is detachably connected to the end of the chain shaft.

[0010] Optionally, it also includes a through hole that passes through the end of the chain shaft along an axial direction perpendicular to the chain shaft, and the through hole is located between a pair of the grooves.

[0011] Optionally, a latch is also included in the through hole.

[0012] Optionally, the chain shaft is a tubular structure.

[0013] Optionally, the angle formed between the side wall of the dovetail joint and the surface of the cement-based formwork is an acute angle.

[0014] Optionally, when the number of the cement-based templates is two, the two cement-based templates are respectively connected to opposite ends of the chain shaft.

[0015] Optionally, it also includes a composite plate connected to the other end of the chain shaft, the composite plate is located on the surface of the steel mesh, and the composite plate is detachably connected to the end of the chain shaft.

[0016] Optionally, the composite panel includes an outer panel and a functional panel connected to the outer panel, and the functional panel is located between the steel mesh and the outer panel.

[0017] Optionally, the functional panel includes a thermal insulation panel and an insulating panel; and the outer layer includes a polycarbonate panel.

[0018] Optionally, it also includes a third connecting member located inside the outer plate and the functional plate, one end of the third connecting member protrudes from the surface of the functional plate, and the third connecting member is detachably connected to the end of the chain shaft.

[0019] Optionally, it also includes a concrete layer, which fills the hollow layer between the cement-based formwork and the steel mesh, and the hollow layer between adjacent steel meshes.

[0020] Optionally, it also includes a concrete layer, which fills the hollow layer between the cement-based formwork and the steel mesh, the hollow layer between adjacent steel meshes, and the hollow layer between the steel mesh and the composite board.

[0021] Optionally, the cross-sectional shape of the chain axis perpendicular to the axial direction of the chain axis includes a hollow circle, an outer octagonal hollow circle, and an outer rounded hollow circle.

[0022] Compared with the prior art, the technical solution of the utility model has the following advantages:

[0023] In the technical solution of the wall panel of the utility model, a pair of grooves are provided at the end of the chain shaft, and the steel mesh is fixed in the pair of grooves, the grooves extend along the axial direction of the chain shaft and are symmetrically distributed, at least one end of the chain shaft is connected to a cement-based template, the cement-based template is located on the surface of the steel mesh, and the surface of the cement-based template facing the steel mesh has a plurality of dovetails, on the one hand, the grooves are used to quickly fix the steel mesh and the chain shaft, avoiding the traditional need to insert steel bars into the chain shaft one by one to achieve fixation between the steel mesh and the chain shaft, thereby improving production efficiency; on the other hand, in the subsequent process of pouring concrete, since the surface of the cement-based template has dovetails, the bite force between the concrete and the cement-based template is enhanced, and there is no need to remove the template additionally, which greatly improves production efficiency. At the same time, there will be no difference in thermal expansion and contraction coefficients when pouring concrete as a whole on site, and the gap between the concrete poured on site and the wall panel is eliminated, which has a wider range of uses.

[0024] Furthermore, it also includes a through hole that passes through the end of the chain shaft along an axial direction perpendicular to the chain shaft, and a pin is provided in the through hole. After the steel mesh is placed in the groove, the pin is inserted into the through hole to achieve effective fixation between the steel mesh and the chain shaft, thereby preventing the steel mesh from shifting and scattering.

[0025] Furthermore, it also includes a first connecting piece connecting the cement-based board and the chain shaft. The first connecting piece is detachably connected to the end of the chain shaft. The cement-based board and the chain shaft are effectively fixed by using the first connecting piece, so that concrete can be poured directly between the cement-based board and the steel mesh on site; at the same time, the first connecting piece can be left intact after pouring the concrete and can be directly used as a dry hanging piece, thereby improving the quality of the dry hanging.

[0026] Furthermore, it also includes a second connecting piece connected to the end of the chain shaft. The second connecting piece is located at the end of the chain shaft on one side of the cement base formwork. During the subsequent pouring of concrete between the steel meshes and between the steel meshes and the cement base formwork, the second connecting piece can play a positioning role, and can effectively and accurately prefabricate the height of the poured concrete, thereby improving the pouring efficiency.

[0027] Furthermore, it also includes a composite plate connected to the other end of the chain shaft, the composite plate is located on the surface of the steel mesh, the composite plate and the cement-based formwork are respectively located at the two ends of the chain shaft, and the wall of this structure is used as an exterior wall. In the subsequent process of pouring concrete between the composite plate, the steel mesh and the cement-based formwork, the entire wall is poured together, and no concrete is poured in the wall in advance. This will avoid problems such as gaps caused by different coefficients of thermal expansion and contraction between the cast-in-place concrete and the wall, which greatly improves the quality of the final wall and has a wider range of applications. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1This is a schematic diagram of the structure of the chain shaft in one embodiment of the utility model;

[0029] Figure 2 for Figure 1 Left view of

[0030] Figure 3 This is a schematic structural diagram of a chain shaft in another embodiment of the utility model;

[0031] Figure 4 This is a schematic structural diagram of a chain shaft in yet another embodiment of the utility model;

[0032] Figure 5 This is a structural schematic diagram of a chain frame in one embodiment of the utility model;

[0033] Figure 6 It is a schematic diagram of the structure of a chain shaft and steel bars in a steel mesh in one embodiment of the utility model;

[0034] Figure 7 It is a cross-sectional view of a cement-based formwork in one embodiment of the utility model;

[0035] Figure 8 It is a cross-sectional view of a wall panel in one embodiment of the utility model;

[0036] Fig. 9 for Figure 8 Cross-section after pouring concrete;

[0037] Fig.10 It is a cross-sectional view of a wall panel in another embodiment of the utility model;

[0038] Fig.11 for Fig.10 Cross-section after pouring concrete;

[0039] Fig.12 This is a cross-sectional view of a wall panel in yet another embodiment of the present utility model;

[0040] Fig.13 for Fig.12 Cross-section of the structure after pouring concrete. DETAILED DESCRIPTION

[0041] At present, there are usually some wall panels on construction sites that are prefabricated in factories, transported to the site, and then poured with concrete.

[0042] After analysis, the utility model inventor found that, on the one hand, traditional prefabricated wall panels need to be dismantled during the production process, and on the other hand, traditional prefabricated wall panels will leave some gaps after pouring part of the concrete for subsequent on-site pouring of concrete. This leads to the problem of inconsistent thermal expansion and contraction coefficients between the on-site poured concrete and the prefabricated wall panels, resulting in gaps between the on-site poured concrete and the prefabricated wall panels, affecting the quality of the final formed wall and greatly reducing the quality of the building.

[0043] Through research, the inventor of the utility model discovered that, on the one hand, the groove is used to fix the steel mesh and the chain shaft, avoiding the traditional need to insert the steel bars into the chain shaft one by one to fix the steel mesh and the chain shaft, thereby improving production efficiency; on the other hand, in the subsequent process of pouring concrete, since the surface of the cement-based formwork has dovetails, the bite force between the concrete and the cement-based formwork is enhanced, and there is no need to remove the formwork additionally, which greatly improves production efficiency. At the same time, there will be no difference in the thermal expansion and contraction coefficients when the concrete is poured as a whole on site, and the gap between the concrete poured on site and the wall panels is eliminated, which has a wider range of uses.

[0044] The inventor of the utility model also discovered through research that the cement-based plate and the chain shaft can be fixedly connected by the first connecting piece, and the cement-based plate and the chain shaft can be effectively fixed by the first connecting piece, so that concrete can be poured directly between the cement-based plate and the steel mesh on site; at the same time, the first connecting piece can be left intact before pouring concrete and can be directly used as a dry hanging piece, thereby improving the quality of the dry hanging.

[0045] Through research, the utility model inventor also found that the other end of the chain shaft is connected to a composite plate, the composite plate is located on the surface of the steel mesh, the composite plate and the cement-based formwork are respectively located at both ends of the chain shaft, and the wall panel of this structure is used as an exterior wall. In the subsequent process of pouring concrete between the composite plate, the steel mesh and the cement-based formwork, the entire wall panel is poured together, and no concrete is pre-poured in the wall panel. This will avoid problems such as gaps caused by different coefficients of thermal expansion and contraction between the cast-in-place concrete and the prefabricated wall, greatly improving the quality of the final wall and having a wider range of applications.

[0046] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0047] First, please refer to Figure 1 and Figure 2 The chain shaft 100 includes two opposite ends.

[0048] In this embodiment, the chain shaft 100 includes a first end 100a and a second end 100b opposite to each other.

[0049] The end of the chain shaft 100 has a pair of grooves 101, and the grooves 101 provide space for the subsequent fixing of the steel mesh.

[0050] In this embodiment, the first end 100a and the second end 100b respectively have a pair of grooves 101 .

[0051] In this embodiment, the groove 101 is in a "U"-shaped structure.

[0052] In other embodiments, the groove 101 may also be in a “V”-shaped structure, an arc-shaped structure, etc.

[0053] In this embodiment, the depth of the groove 101 is greater than the diameter of the steel bars in the steel mesh.

[0054] In this embodiment, the inner wall of the end of the chain shaft 100 has threads for subsequent detachable connection with a connecting piece.

[0055] In other embodiments, a pair of grooves 101 may be provided on only one end of the chain shaft 100 .

[0056] In this embodiment, a through hole 102 is further included, which passes through the end of the chain shaft 100 along an axial direction perpendicular to the chain shaft 100 , and the through hole 102 is located between the pair of grooves 101 .

[0057] In this embodiment, the through hole 102 provides space for placing the latch.

[0058] In this embodiment, the distance between the center of the through hole 102 and the bottom of the groove 101 is greater than the diameter of the steel bars in the steel mesh, so that after the steel mesh is placed in the groove 101 and the first steel bar or the second steel bar is located in the groove 101, the top surface of the first steel bar or the second steel bar is lower than the through hole 102, so that the pin has enough space to penetrate into the through hole 102.

[0059] In this embodiment, the chain shaft 100 is a tubular structure, that is, it is hollow in the middle.

[0060] In other embodiments, the chain shaft 100 may also be a solid columnar structure.

[0061] In this embodiment, the cross-section of the chain shaft 100 perpendicular to the axial direction of the chain shaft 100 is a hollow circle (the dotted line corresponds to the top view).

[0062] For other embodiments, please refer to Figure 3The cross-sectional shape of the chain shaft 100 perpendicular to the axial direction of the chain shaft 100 is an octagonal outer hollow circle (the dotted line corresponds to the top view).

[0063] In another embodiment, please refer to Figure 4 The cross-sectional shape of the chain shaft 100 perpendicular to the axial direction of the chain shaft 100 is a hollow circle with rounded corners on the outside and a rounded corner on the inside (the top view corresponding to the dotted line).

[0064] In this embodiment, the material of the chain shaft 100 is construction steel.

[0065] In this embodiment, please refer to Figure 6 , further comprising: a second connecting member 103 connected to the end of the chain shaft 100.

[0066] In this embodiment, the second connecting member 103 is a bolt or a stud, and the specific shape of the second connecting member 103 is selected according to actual needs.

[0067] In this embodiment, the second connecting member 103 is threadedly connected to the end of the chain shaft 100 .

[0068] In other embodiments, the second connecting member 103 and the end of the chain shaft 100 may be snap-fitted, etc.

[0069] Please refer to Figures 5 and 6 , a chain frame 104, wherein the chain frame 104 includes a plurality of chain shafts 100 and a steel mesh 105 fixed on the chain shafts 100.

[0070] In this embodiment, the steel mesh 105 includes a plurality of first steel bars 105a arranged along a first direction and a plurality of second steel bars 105b arranged along a second direction. The plurality of first steel bars 105a and the plurality of second steel bars 105b are fixed by welding to form the steel mesh 105.

[0071] In this embodiment, the first direction is perpendicular to the second direction.

[0072] In this embodiment, due to the presence of the groove 101, when connecting the two steel meshes 105, it is only necessary to place the first steel bar 105a or the second steel bar 105b in the steel mesh 105 directly into the groove 101, instead of the traditional method of inserting the first steel bar 105a or the second steel bar 105b one by one into the chain shaft 100 to achieve fixation with the chain shaft 100, which greatly saves labor costs and improves production efficiency.

[0073] In this embodiment, please refer to Figure 6, and also includes a latch pin 106 located in the through hole 102.

[0074] In this embodiment, after the latch 106 is inserted into the through hole 102 , the steel mesh 105 is locked in the groove 101 , thereby achieving effective fixation between the steel mesh 105 and the chain shaft 100 , and preventing the steel mesh 105 from shifting and scattering.

[0075] Please refer to Figure 7 and Figure 8 , a wall panel 107 includes a chain link frame 104 and a cement-based formwork 108.

[0076] In this embodiment, the chain frame 104 includes the chain shaft 100 and the steel mesh 105 fixed on the chain shaft 100, and a pair of grooves 101 on the end of the chain shaft 100 are used, and the pin 106 is inserted into the through hole 102 to achieve rapid fixation of the steel mesh 105 and the chain shaft 100; a cement-based template 108 is connected to at least one end of the chain shaft 100. Specifically, one end of the chain shaft 100 is connected to the cement-based template 108, and the cement-based template 108 is located on the surface of the steel bar, and the surface of the cement-based template 108 facing the steel mesh 105 has a plurality of dovetails 108a.

[0077] In this embodiment, the wall panel 107 is used as a floor decking panel.

[0078] In this embodiment, after the steel meshes 105 are fixed to both ends of the chain shaft 100 , a hollow layer is provided between adjacent steel meshes 105 .

[0079] In this embodiment, a first connecting member 109 is further included. The first connecting member 109 is used to fixedly connect the cement-based template 108 and the chain shaft 100 . The first connecting member 109 and the groove 101 are detachably connected.

[0080] In this embodiment, the first connecting member 109 is a bolt or a stud, and the specific shape of the first connecting member 109 is selected according to actual needs.

[0081] In this embodiment, the angle α formed between the side wall of the dovetail tenon 108a and the surface of the cement-based formwork 108 is an acute angle. The purpose of this is that in the subsequent process of pouring concrete between the cement-based formwork 108 and the steel mesh 105 to form a concrete layer 110, the concrete will flow between the side wall of the dovetail tenon 108a and the surface of the cement-based formwork 108, and then the formed concrete layer 110 will be tightly "bite" by the dovetail tenon 108a, thereby increasing the connection strength between the cement-based formwork 108 and the concrete layer 110.

[0082] In this embodiment, there is a hollow layer between the cement-based template 108 and the steel mesh 105, and there is a hollow layer between adjacent steel meshes 105. Concrete is poured into the hollow layer to form a concrete layer 110 (please refer to Fig. 9 ).

[0083] In this embodiment, the entire wall panel 107 is poured together, and there is no pre-poured concrete in the wall panel 107, so there will be no problem of difference in thermal expansion and contraction coefficients between the currently poured concrete and the concrete of the wall panel 107, thereby avoiding the existence of gaps in the final wall. At the same time, the dovetail tenon 108a is used to tightly lock the concrete layer 110, thereby improving the bite force between the cement-based formwork 108 and the concrete layer 110, thereby enhancing the bending and tensile resistance of the final wall, and the strength of the final wall is enhanced.

[0084] In this embodiment, the second connecting member 103 is located at the end of the chain shaft 100 away from the cement-based template 108, and the second connecting member 103 is detachably connected to the end of the chain shaft 100.

[0085] In this embodiment, the second connecting member 103 serves as a positioning indicator during the concrete pouring process, and can effectively and accurately prefabricate the height of the poured concrete, thereby improving the pouring efficiency.

[0086] In this embodiment, after the concrete layer 110 is formed, the first connecting member 109 is removed or not removed. If it is not removed, the first connecting member 109 can be used as a dry hanging member to improve the quality of dry hanging.

[0087] In another embodiment, please refer to Figure 10 to Figure 11 , a wall panel 111 includes a chain link frame 104 and two cement-based formworks 108.

[0088] In this embodiment, the chain frame 104 includes a plurality of chain shafts 100 and a steel mesh 105 fixed on the chain shaft 100. The end of the chain shaft 100 has a pair of grooves 101. The steel mesh 105 is fixed in the pair of grooves 101. The grooves 101 extend along the axial direction of the chain shaft 100. The pair of grooves 101 are symmetrically distributed along the axial direction of the chain shaft 100.

[0089] Specifically, the number of the cement-based templates 108 is two, and the cement-based templates 108 are respectively connected to the opposite ends of the chain shaft 100. Specifically, the first connecting members 109 are respectively used to fix the cement-based templates 108 and the chain shaft 100.

[0090] In this embodiment, the wall panel 111 is used as an inner wall.

[0091] In this embodiment, there is a hollow layer between the cement-based template 108 and the steel mesh 105, and between adjacent steel meshes 105, and concrete is poured into the hollow layer to form a concrete layer 110 (please refer to Fig.11 ), due to the existence of the dovetail joint 108a, the concrete layer 110 and the cement-based formwork 108 are tightly engaged with each other, thereby enhancing the strength of the final wall and the corresponding bending and tensile strength; and the wall panel 111 does not need to be demolded and can be directly transported to the site for use, which simplifies the production process of the wall panel 111.

[0092] In another embodiment, please refer to Figure 12 to Figure 13 , a wall panel 112 includes a chain link frame 104, a cement-based formwork 108 and a composite panel 113.

[0093] In this embodiment, the wall panel 112 is used as an exterior wall.

[0094] In this embodiment, the composite plate 113 is located on the surface of the steel mesh 105 , and the composite plate 113 is detachably connected to the end of the chain shaft 100 .

[0095] In this embodiment, the composite plate 113 includes an outer plate 113a and a functional plate 113b connected to the outer plate 113a, and the functional plate 113b is located between the steel mesh 105 and the outer plate 113a.

[0096] Specifically, the functional plate 113b is a heat-insulating plate, and the outer plate 113a is a polycarbonate plate (PC plate).

[0097] In other embodiments, the functional board 113b may also be an insulating board or the like.

[0098] In this embodiment, the composite panel 113 is also prefabricated in a factory and then transported to the site for use.

[0099] In this embodiment, a third connecting member 113c is further included, which is located inside the outer plate 113a and the functional plate 113b. One end of the third connecting member 113c protrudes from the surface of the functional plate 113b. The third connecting member 113c is detachably connected to the end of the chain shaft 100.

[0100] In this embodiment, the end of the third connecting member 113 c has a thread, and the third connecting member 113 c is threadedly connected to the end of the chain shaft 100 .

[0101] In this embodiment, there is a hollow layer between the composite plate 113 and the steel mesh 105, there is also a hollow layer between the cement-based formwork 108 and the steel mesh 105, and there is also a hollow layer between adjacent steel meshes 105. Concrete is poured into the hollow layer to form a concrete layer 110. Due to the presence of the dovetail tenon 108a, the concrete layer 110 and the cement-based formwork 108 are tightly engaged with each other, thereby enhancing the strength, bending resistance and tensile resistance of the formed wall panel 112; and the wall panel 112 does not need to be demolded and can be directly transported to the site for use, thereby simplifying the production process of the wall panel 112.

[0102] In this embodiment, during the process of pouring concrete between the composite plate 113, the steel mesh 105 and the cement-based formwork 108, the entire wall panel 112 is poured together, and no concrete is pre-poured in the wall panel 112. This avoids problems such as gaps caused by different coefficients of thermal expansion and contraction between the concrete cast on site and the wall panel 112, thereby greatly improving the quality of the final wall and having a wider range of applications.

[0103] Although the utility model is disclosed as above, the utility model is not limited thereto. Any person skilled in the art can make various changes and modifications without departing from the spirit and scope of the utility model. Therefore, the protection scope of the utility model shall be subject to the scope defined by the claims.

Claims

1. A wall panel, characterized in that: include: A chain frame, the chain frame comprising a plurality of chain shafts and a steel mesh fixed on the chain shafts, the ends of the chain shafts having a pair of grooves, the steel mesh being fixed in the pair of grooves, the grooves extending along the axial direction of the chain shafts, the pair of grooves being symmetrically distributed along the axial direction of the chain shafts; A cement-based template connected to at least one end of the chain shaft, the cement-based template is located on the surface of the steel mesh, and the surface of the cement-based template facing the steel mesh has a plurality of dovetail joints.

2. The wall panel according to claim 1, characterized in that Also includes: A first connecting piece is provided for connecting the cement-based formwork and the chain shaft, wherein the first connecting piece is detachably connected to the end of the chain shaft.

3. The wall panel according to claim 1, characterized in that The inner wall of the end portion of the chain shaft is provided with threads.

4. The wall panel according to claim 1, characterized in that Also includes: A second connecting piece connected to the end of the chain shaft, wherein the second connecting piece is located at the end of the chain shaft away from the cement-based formwork, and the second connecting piece is detachably connected to the end of the chain shaft.

5. The wall panel according to claim 1, characterized in that The invention also includes a through hole penetrating through the end of the chain shaft along an axial direction perpendicular to the chain shaft, wherein the through hole is located between the pair of grooves.

6. The wall panel according to claim 5, characterized in that Also included is a latch located in the through hole.

7. The wall panel according to claim 1, characterized in that The chain shaft is in a tubular structure.

8. The wall panel according to claim 1, characterized in that The angle formed between the side wall of the dovetail tenon and the surface of the cement-based formwork is an acute angle.

9. The wall panel according to claim 1, characterized in that When the number of the cement-based templates is two, the two cement-based templates are respectively connected to opposite ends of the chain shaft.

10. The wall panel according to claim 1, characterized in that It also includes a composite plate connected to the other end of the chain shaft, the composite plate is located on the surface of the steel mesh, and the composite plate is detachably connected to the end of the chain shaft.

11. The wall panel according to claim 10, characterized in that The composite panel comprises an outer panel and a functional panel connected to the outer panel, wherein the functional panel is located between the steel mesh and the outer panel.

12. The wall panel according to claim 11, characterized in that The functional panels include a heat preservation panel and an insulating panel; The outer panel comprises a polycarbonate panel.

13. The wall panel according to claim 11, characterized in that It also includes a third connecting member located inside the outer plate and the functional plate, one end of the third connecting member protrudes from the surface of the functional plate, and the third connecting member is detachably connected to the end of the chain shaft.

14. The wall panel according to claim 1, wherein The cross-sectional shapes of the chain shaft perpendicular to the axial direction of the chain shaft include a hollow circle, an outer octagonal hollow circle, and an outer rounded hollow circle.