Fabricated steel structure floor support plate formwork supporting device
By designing a formwork support device for prefabricated steel structures, and fixing it to the lower part of the steel beam by using a locking mechanism, the problem of too long construction interval in the prior art is solved, and the steel beam, steel column and floor bearing plate are realized At the same time, the construction efficiency is improved and the cost is reduced.
Patent Information
- Application Number
- CN202421119052.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Priority Date
- 2024-01-24
- Filing Date
- 2024-05-22
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-05-22
AI Technical Summary
In the construction of existing prefabricated steel structure high-rise residential buildings, the lack of effective support structures causes the installation of steel structure steel beams and steel columns and the construction of floor bearing plates to be unable to be carried out simultaneously, resulting in too long construction intervals and affecting construction efficiency.
Design a prefabricated steel structure floor bearing plate formwork support device, including steel pipes, hanging plates, movable tongues and tie rods, which are fixed to the lower wing plate of the steel beam through a locking mechanism, providing a stable support structure, allowing the formwork to be adjusted in height, and Simplify the disassembly process.
Continuous construction between the upper floor bearing plate construction and the lower floor bearing plate completion has been achieved, which shortens the construction interval time, improves construction efficiency, reduces construction costs and shortens construction period.
Smart Images

Figure CN221989991U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of steel structure support, in particular to an assembled steel structure floor deck template support device. Background Art
[0002] The existing prefabricated steel structure high-rise residential steel columns are divided into sections every three floors. The construction procedures are as follows: 1. Install the steel columns and steel beams of the first, second and third floors. Carpenters, steel workers and concrete workers stop working and wait. 2. Stop working after the steel structure is installed. Set up the formwork of the first floor slab, tie the steel bars and pour the concrete. 3. Set up the formwork of the second floor slab, tie the steel bars and pour the concrete. 4. Set up the formwork of the third floor slab, tie the steel bars and pour the concrete. 5. After the third floor slab is completed, carpenters, steel workers and concrete workers stop working and wait. The fourth, fifth and sixth floors are Installation of steel columns and steel beams of the steel structure; six, the subsequent four, five and six-story formwork reinforced concrete are constructed in sequence, the steel structure is stopped, and the above procedures are repeated; due to the lack of an effective supporting structure, the existing prefabricated steel structure construction method has the following defects: during the construction of prefabricated steel structure high-rise residential buildings, the installation of steel beams and steel columns of the steel structure and the construction of floor decking cannot be carried out at the same time, so that each team cannot continuously construct and the construction interval is too long; therefore, a prefabricated steel structure floor decking formwork support device is proposed to address the above problems. Utility Model Content
[0003] The technical problem to be solved by the utility model is to overcome the existing defects and provide a prefabricated steel structure floor decking formwork support device. Through the support device, the upper floor decking construction is freed from the constraint of having to wait until the lower floor decking is completed before serving as the upper floor decking formwork support point, which can effectively solve the problems in the background technology.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an assembled steel structure floor deck formwork support device, comprising a steel pipe, a hanging plate, a movable tongue I, a movable tongue II and a pull rod, wherein two steel pipes are provided, and the hanging plates are respectively fixed on the corresponding surfaces of the steel pipes, and the hanging plates are provided with fixing ears, the upper part of the movable tongue I is rotatably connected to the fixing ear of one of the hanging plates, and the upper part of the movable tongue II is rotatably connected to the fixing ear of the other hanging plate, the movable tongue I and the movable tongue II are connected by a pull rod, and the side surfaces of the movable tongue I and the side surfaces of the movable tongue II are respectively provided with tongue portions.
[0005] Furthermore, the pull rod is arranged as a T-shaped structure, one end of the pull rod is rotatably connected to the lower part of the movable tongue I, the lower part of the movable tongue II is arranged with an open groove, a limiting column is passed through the pull rod, the limiting column is clamped on the open groove, a sleeve portion is arranged on the outer side of the limiting column, and the other end of the pull rod is threadedly connected with a nut, which abuts against the sleeve portion.
[0006] Furthermore, the movable tongue I, movable tongue II and the pull rod together form a locking mechanism, and the locking mechanism is symmetrically arranged on both sides of the steel pipe.
[0007] Furthermore, a reinforcing rib is provided between the hanging plate and the steel pipe, and the reinforcing rib is provided as a triangular structure, the vertical surface of the reinforcing rib is welded to the steel pipe, and the horizontal surface of the reinforcing rib is welded to the hanging plate.
[0008] Furthermore, movable ears are arranged at the lower part of the steel pipe, and the movable ears are connected by a connecting plate, and the two ends of the connecting plate are respectively hinged to the movable ears.
[0009] Compared with the prior art, the beneficial effects of the utility model are:
[0010] 1. Utilizing the structure of the steel beam of the steel structure floor, the supporting device is suspended on the wing plate at the bottom of the steel beam, symmetrically on the left and right, the wire support is inserted into the steel pipes on both sides of the support, the main keel of the template is supported on the wire supports on both sides of the support, and the secondary keel frame is set on the main keel. The height of the template can be adjusted by the wire support nut. The supporting device is easy to disassemble and has moderate weight, which is convenient for workers to construct and improve work efficiency.
[0011] 2. By rotating the nut on the pull rod, the nut applies pressure to the sleeve and the limit column to lock the movable tongue I and movable tongue II. At this time, the tongue part is tightly pressed against the lower wing plate of the steel beam, thereby firmly fixing the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the structure of the utility model;
[0013] Figure 2 This is an enlarged structural diagram of the utility model at A;
[0014] Figure 3 This is a schematic diagram of the front view structure of the utility model;
[0015] Figure 4 It is a schematic diagram of the structure of the utility model from top view.
[0016] In the figure: 1 steel pipe, 2 connecting plate, 3 movable ear, 4 pull rod, 5 movable tongue I, 6 fixed ear, 7 hanging plate, 8 reinforcing rib, 9 movable tongue II, 10 tongue part, 11 limiting column, 12 opening groove, 13 sleeve part, 14 nut. DETAILED DESCRIPTION
[0017] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0018] See also Figure 1-4 The utility model provides a technical solution: an assembled steel structure floor deck formwork support device, comprising a steel pipe 1, a hanging plate 7, a movable tongue I 5, a movable tongue II 9 and a pull rod 4, wherein the steel pipe 1 is provided with two, and the hanging plates 7 are respectively fixed on the corresponding surfaces of the steel pipe 1, and the hanging plates 7 are used to hang the support device on the lower wing plate of the steel beam, and the hanging plates 7 are provided with fixing ears 6, and the upper part of the movable tongue I 5 is rotatably connected to the fixing ear 6 of one of the hanging plates 7, and the upper part of the movable tongue II 9 is rotatably connected to the fixing ear 6 of the other hanging plate 7, and the movable tongue I 5 is connected to the movable tongue II 9 through the pull rod 4, and the side surfaces of the movable tongue I 5 and the side surfaces of the movable tongue II 9 are respectively provided with tongue portions 10, and the tongue portions 10 correspond to the lower wing plate of the steel beam, and when the pull rod 4 is pulled, the movable tongue I 5 and the movable tongue II 9 rotate, and the tongue portion 10 cooperates with the hanging plates 7 to firmly fix the support device on the lower wing plate of the steel beam.
[0019] The pull rod 4 is arranged as a T-shaped structure, one end of the pull rod 4 is rotatably connected to the lower part of the movable tongue I5, an open groove 12 is arranged at the lower part of the movable tongue II9, a limiting column 11 is passed through the pull rod 4, the limiting column 11 is stuck in the open groove 12, a sleeve portion 13 is arranged on the outer side of the limiting column 11, and a nut 14 is threadedly connected to the other end of the pull rod 4, the nut 14 abuts against the sleeve portion 13, by rotating the nut 14, the nut 14 applies pressure to the sleeve portion 13 and the limiting column 11, and the movable tongue I5 and the movable tongue II9 are locked. At this time, the tongue portion 10 is tightly pressed against the lower wing plate of the steel beam, thereby firmly fixing the device, and the pull rod 4 can be removed from between the movable tongue I5 and the movable tongue II9 by loosening the nut 14, which is easy to operate.
[0020] The movable tongue I5, movable tongue II9 and the pull rod 4 together form a locking mechanism, which is symmetrically arranged on both sides of the steel pipe 1. By setting the symmetrical locking mechanism, the device is firmly fixed on the lower wing plate of the steel beam.
[0021] A reinforcing rib 8 is arranged between the hanging plate 7 and the steel pipe 1. The reinforcing rib 8 is arranged in a triangular structure. The vertical surface of the reinforcing rib 8 is welded to the steel pipe 1, and the horizontal surface of the reinforcing rib 8 is welded to the hanging plate 7. The reinforcing rib 8 increases the connection strength between the hanging plate 7 and the steel pipe 1, thereby increasing the ability of the device to withstand pressure.
[0022] A movable ear 3 is provided at the lower part of the steel pipe 1 , and the movable ears 3 are connected by a connecting plate 2 , and both ends of the connecting plate 2 are hinged to the movable ears 3 respectively.
[0023] The construction procedure of using this device is as follows: after the installation of the steel columns and beams of the first, second and third floors is completed, you can start directly from the third floor, and set up the formwork, tie the steel bars, and pour concrete in the order of the third, second and first floors. You can also construct it from top to bottom in sequence to form a flow operation. After the concrete pouring of the third floor slab, the installation of the steel columns and beams of the fourth, fifth and sixth floors has a working surface and can start installation. The first and second floor slabs can also be constructed simultaneously under the protection of the third floor slab. In this way, the previous steel structure construction interval time can be reduced from the time for the construction of three floor slabs in sequence to the construction time of one floor slab. The interval time is reduced by 60% compared with the original time, and the main construction period can be shortened by 30%. The rental fee of construction machinery and equipment for prefabricated steel structure construction accounts for a large proportion. The use of this support device is of great significance to reducing costs and increasing efficiency in the construction of prefabricated steel structure high-rise residential buildings.
[0024] The basic principles, main features and advantages of the present invention are shown and described above. Without departing from the spirit and scope of the present invention, the present invention may also be subject to various changes and improvements, which are all within the scope of the present invention to be protected.
Claims
1. An assembled steel structure floor deck formwork support device, comprising a steel pipe (1), a hanging plate (7), a movable tongue I (5), a movable tongue II (9) and a tie rod (4), characterized in that: Two steel pipes (1) are provided, and hanging plates (7) are respectively fixed on corresponding surfaces of the steel pipes (1). The hanging plates (7) are provided with fixing ears (6). The upper part of the movable tongue I (5) is rotatably connected to the fixing ear (6) of one of the hanging plates (7), and the upper part of the movable tongue II (9) is rotatably connected to the fixing ear (6) of the other hanging plate (7). The movable tongue I (5) and the movable tongue II (9) are connected by a pull rod (4), and the side surfaces of the movable tongue I (5) and the side surfaces of the movable tongue II (9) are respectively provided with tongue portions (10).
2. The assembled steel structure floor deck formwork support device according to claim 1, characterized in that: The pull rod (4) is arranged as a T-shaped structure, one end of the pull rod (4) is rotatably connected to the lower part of the movable tongue I (5), the lower part of the movable tongue II (9) is provided with an open groove (12), a limit column (11) is passed through the pull rod (4), the limit column (11) is clamped on the open groove (12), a sleeve portion (13) is arranged on the outer side surface of the limit column (11), and a nut (14) is threadedly connected to the other end of the pull rod (4), and the nut (14) abuts against the sleeve portion (13).
3. The assembled steel structure floor deck formwork support device according to claim 1, characterized in that: The movable tongue I (5), the movable tongue II (9) and the pull rod (4) together form a locking mechanism, which is symmetrically arranged on both sides of the steel pipe (1).
4. The assembled steel structure floor deck formwork support device according to claim 1, characterized in that: A reinforcing rib (8) is provided between the hanging plate (7) and the steel pipe (1), and the reinforcing rib (8) is provided in a triangular structure. The vertical surface of the reinforcing rib (8) is welded to the steel pipe (1), and the horizontal surface of the reinforcing rib (8) is welded to the hanging plate (7).
5. The assembled steel structure floor deck formwork support device according to claim 1, characterized in that: A movable ear (3) is provided at the lower part of the steel pipe (1), and the movable ears (3) are connected by a connecting plate (2), and the two ends of the connecting plate (2) are respectively hinged to the movable ears (3).