Pipeline cold and hot cycle testing device
By designing a pipeline hot and cold cycle testing device, which uses alternating heating and cooling water in the cooling and heating chambers, combined with a rotation and lifting mechanism, the problem that existing equipment cannot detect pipelines in rapid hot and cold alternation environments is solved, and the effective testing of pipeline performance is achieved.
Patent Information
- Application Number
- CN202420459899.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-11
AI Technical Summary
Existing pipeline inspection equipment cannot effectively detect the performance of pipelines in environments with rapid temperature changes, especially in environments with large temperature differences, where cracks and deformations are prone to occur.
A pipeline hot and cold cycle testing device was designed. The device uses a circular hot and cold test chamber to alternately heat and cool water in the cooling chamber and heating chamber, combined with a rotation and lifting mechanism, to make the pipeline quickly alternate between hot and cold environments, simulating actual working conditions.
It enables effective detection of pipelines under rapid hot and cold alternation environments, allowing observation of pipeline performance changes under such conditions, thus improving the accuracy and reliability of detection.
Smart Images

Figure CN221993245U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipeline detection, in particular to a pipeline hot and cold cycle testing device. Background Art
[0002] Temperature changes will affect the quality of pipelines, especially in environments with large temperature differences. Pipes are prone to cracks and deformation due to thermal expansion and contraction. Existing pipelines have high-temperature and low-temperature resistance testing equipment to detect whether the pipeline can withstand high and low temperatures, but there is a lack of equipment that can detect pipelines in an environment of rapid alternation between hot and cold. For this reason, we proposed a pipeline hot and cold cycle testing device. Utility Model Content
[0003] The utility model aims to provide a pipeline hot and cold cycle testing device to solve the above-mentioned technical deficiencies.
[0004] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pipeline hot and cold cycle test device, comprising a circular hot and cold detection box, a fixed cover vertically upward is fixedly provided at the center of the top inner wall of the circular hot and cold detection box, double-layer partitions are fixedly provided on the outer walls of both sides of the fixed cover, the outer walls of the double-layer partitions are fixedly connected to the inner walls of the circular hot and cold detection box, the circular hot and cold detection box is respectively provided with a cooling chamber and a heating chamber through the double-layer partitions, an electric heating plate is fixedly provided on the bottom inner wall of the heating chamber, a vertical motor is fixedly provided on the inner wall of the fixed cover, and the output shaft of the motor is fixed by a coupling A rotating rod is provided vertically upward, and a sliding sleeve is sleeved on the outer wall of the rotating rod. Rotating plates are fixedly provided on the outer walls of both sides of the sliding sleeve. A fixed plate is fixedly provided on both sides of the top of the circular hot and cold detection box. Two fixed sleeves are fixedly provided on the top outer wall of the fixed plate. Vertically downward synchronous reciprocating push rod motors are fixedly provided on the inner walls of the two fixed sleeves. The output shafts of the two synchronous reciprocating push rod motors are fixedly provided with lifting rings through couplings. A circular sliding groove is provided on the bottom outer wall of the lifting ring. Positioning balls are fixedly provided on the top outer walls of the two rotating plates. The outer walls of the positioning balls are slidably connected to the inner walls of the circular sliding grooves.
[0005] Preferably, two vertically upward limiting slide rails are fixed on the outer walls on both sides of the rotating rod, and limiting slide grooves are opened on the inner walls on both sides of the sliding sleeve. The inner walls of the limiting slide grooves are slidably connected to the outer walls of the limiting slide rails, which can prevent the sliding sleeve from idling on the outer wall of the rotating rod.
[0006] Preferably, a first fixing plate pointing vertically downward is fixedly disposed on the bottom outer walls of the two rotating plates that are close to each other, and a second fixing plate pointing vertically downward is fixedly disposed on one end of the bottoms of the two rotating plates that are far away from each other.
[0007] Preferably, the outer wall on one side adjacent to the first fixed plate and the second fixed plate is fixed with equidistantly distributed docking columns, and the outer wall of the second fixed plate is fixed with equidistantly distributed docking sleeves through openings, and the pipeline passes through the docking sleeve and is inserted into the inner wall of the docking column, so as to facilitate fixing the pipeline to the bottom of the rotating plate.
[0008] Preferably, a positioning ring is fixedly provided at the top center position of the fixed cover through a bracket, a bearing is fixedly provided on the inner wall of the positioning ring, and the inner ring of the bearing is fixedly connected to the bottom outer wall of the rotating rod, which is beneficial to increase the stability of the rotating rod during rotation.
[0009] Preferably, the outer wall of one side of the cooling chamber and the heating chamber is connected to a liquid adding pipe through an opening, and the outer wall of one side of the bottom of the cooling chamber and the heating chamber is connected to a liquid draining pipe through an opening. Valves are installed on the liquid adding pipe and the liquid draining pipe, so that water can be added to the cooling chamber and the heating chamber through the liquid adding pipe, and the water in the cooling chamber and the heating chamber can be drained through the liquid draining pipe.
[0010] In the above technical solution, the technical effects and advantages provided by the utility model are:
[0011] Water is respectively input into the cooling cavity and the heating cavity through the liquid adding pipe, and the water in the heating cavity is heated by the electric heating plate, so that the cooling cavity and the heating cavity provided on the circular cold and hot detection box form two cavities, one cold and one hot. The pipe is inserted into one end of the docking column through the docking sleeve, and the pipe is fixed to the bottom of the rotating plate;
[0012] The output shaft of the motor drives the rotating rod to rotate, and the rotating rod drives the rotating plate to rotate through the sliding sleeve, and the pipe at the bottom of the rotating plate starts to rotate, and the output shaft of the synchronous reciprocating push rod motor drives the lifting ring to move up and down, and the positioning ball provided on the top of the rotating plate slides on the inner wall of the circular slide groove, and the output shaft of the synchronous reciprocating push rod motor drives the rotating plate to move up and down, and the rotating plate moves up and down during the rotation process, driving the pipe at the bottom of the rotating plate to move up and down;
[0013] The rotating plate that moves up and down during the rotation process drives the pipe to move. The pipe at the bottom of the rotating plate reciprocates and immerses itself in the cooling chamber and the heating chamber. The pipe is quickly heated and cooled alternately with hot and cold water in the cooling chamber and the heating chamber, making it easy to observe the state of the pipe under the rapid alternation of hot and cold environments. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0015] Figure 1It is a three-dimensional structural schematic diagram of a pipeline hot and cold cycle testing device of the utility model;
[0016] Figure 2 This is a schematic diagram of the structure of a circular hot and cold detection box of a pipeline hot and cold cycle test device of the utility model;
[0017] Figure 3 This is a schematic diagram of the motor structure of a pipeline hot and cold cycle testing device of the utility model;
[0018] Figure 4 This is a schematic diagram of the rotating plate structure of a pipeline hot and cold cycle testing device of the utility model;
[0019] Figure 5 The utility model is a schematic diagram of the cross-sectional structure of a lifting ring of a pipeline hot and cold cycle testing device.
[0020] Description of reference numerals:
[0021] 1 circular hot and cold detection box, 2 fixed cover, 3 double-layer partition, 4 cooling chamber, 5 heating chamber, 6 electric heating plate, 7 motor, 8 rotating rod, 9 limiting slide rail, 10 sliding sleeve, 11 limiting slide groove, 12 rotating plate, 13 first fixed plate, 14 second fixed plate, 15 docking column, 16 docking sleeve, 17 positioning ball, 18 fixed plate, 19 fixed sleeve, 20 synchronous reciprocating push rod motor, 21 lifting ring, 22 circular slide groove, 23 positioning ring, 24 bearing, 25 liquid adding pipe, 26 liquid discharge pipe, 27 valve. DETAILED DESCRIPTION
[0022] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0023] Embodiment 1
[0024] Refer to the instruction manual Figure 1-5A pipeline hot and cold cycle test device comprises a circular hot and cold detection box 1, a fixed cover 2 is fixedly provided at the center of the top inner wall of the circular hot and cold detection box 1, double-layer partitions 3 are fixedly provided on the outer walls of both sides of the fixed cover 2, the outer wall of the double-layer partition 3 is fixedly connected to the inner wall of the circular hot and cold detection box 1, the circular hot and cold detection box 1 is respectively provided with a cooling chamber 4 and a heating chamber 5 through the double-layer partition 3, an electric heating plate 6 is fixedly provided on the bottom inner wall of the heating chamber 5, a motor 7 is fixedly provided on the inner wall of the fixed cover 2, a rotating rod 8 is fixedly provided on the output shaft of the motor 7 through a coupling, and the outer wall of the rotating rod 8 is sleeved There is a sliding sleeve 10, and a rotating plate 12 is fixed on the outer walls of both sides of the sliding sleeve 10. A fixed plate 18 is fixed on both sides of the top of the circular hot and cold detection box 1. Two fixed sleeves 19 are fixed on the top outer wall of the fixed plate 18. The inner walls of the two fixed sleeves 19 are fixed with vertically downward synchronous reciprocating push rod motors 20. The output shafts of the two synchronous reciprocating push rod motors 20 are fixed with lifting rings 21 through couplings. A circular groove 22 is opened on the bottom outer wall of the lifting ring 21. Positioning balls 17 are fixed on the top outer walls of the two rotating plates 12, and the outer walls of the positioning balls 17 are slidably connected with the inner walls of the circular groove 22.
[0025] Embodiment 2
[0026] Based on the first embodiment, two vertically upward limiting slide rails 9 are fixed on the outer walls of both sides of the rotating rod 8, and limiting slide grooves 11 are opened on the inner walls of both sides of the sliding sleeve 10. The inner walls of the limiting slide grooves 11 are slidably connected to the outer walls of the limiting slide rails 9, which can prevent the sliding sleeve 10 from idling on the outer wall of the rotating rod 8. A positioning ring 23 is fixedly provided at the top center position of the fixed cover 2 through a bracket, and a bearing 24 is fixedly provided on the inner wall of the positioning ring 23. The inner ring of the bearing 24 is fixedly connected to the bottom outer wall of the rotating rod 8, which is beneficial to increase the stability of the rotating rod 8 during rotation.
[0027] Embodiment 3
[0028] Based on the first embodiment, a first fixed plate 13 pointing vertically downward is fixed on the bottom outer wall of the two rotating plates 12 which are close to each other, and a second fixed plate 14 pointing vertically downward is fixed on the end of the bottom of the two rotating plates 12 which are far away from each other. The outer wall of one side adjacent to the first fixed plate 13 and the second fixed plate 14 is fixed with equidistantly distributed docking columns 15, and the outer wall of the second fixed plate 14 is fixed with equidistantly distributed docking sleeves 16 through openings. The pipeline passes through the docking sleeve 16 and is inserted into the inner wall of the docking column 15, so as to fix the pipeline to the bottom of the rotating plate 12.
[0029] Embodiment 4
[0030] Based on the first embodiment, a liquid adding pipe 25 is connected to the outer wall of one side of the cooling chamber 4 and the heating chamber 5 through an opening, and a liquid draining pipe 26 is connected to the outer wall of the bottom side of the cooling chamber 4 and the heating chamber 5 through an opening. Valves 27 are installed on the liquid adding pipe 25 and the liquid draining pipe 26. Water can be added to the cooling chamber 4 and the heating chamber 5 through the liquid adding pipe 25, and the water in the cooling chamber 4 and the heating chamber 5 can be drained through the liquid draining pipe 26.
[0031] Working principle of this utility model:
[0032] Refer to the instruction manual Figure 1-5 When the utility model is used, water is firstly input into the cooling chamber 4 and the heating chamber 5 respectively through the liquid adding pipe 25, and the water is heated by the electric heating plate 6 provided on the inner wall at the bottom of the heating chamber 5. At this time, the pipeline to be detected is inserted into one end of the docking column 15 through the docking sleeve 16, and the pipeline is fixed to the bottom of the rotating plate 12, and the rotating rod 8 is driven to rotate by the output shaft of the motor 7. The rotating rod 8 drives the rotating plate 12 to rotate through the sliding sleeve 10, and then the pipeline at the bottom of the rotating plate 12 starts to rotate, and the output shaft of the synchronous reciprocating push rod motor 20 drives the lifting ring 21 to move up and down, and the positioning ball 17 provided on the top of the rotating plate 12 slides on the inner wall of the circular slide groove 22, and the output shaft of the synchronous reciprocating push rod motor 20 drives the rotating plate 12 to move up and down. By moving up and down during the rotation of the rotating plate 12, it can drive the steel pipe installed at the bottom to reciprocate and sink into the inner wall of the cooling chamber 4 and the heating chamber 5, so that the pipeline can quickly perform alternating heating and cooling of hot and cold water in the cooling chamber 4 and the heating chamber 5, which is convenient for observing the state of the pipeline under the rapid alternation of hot and cold environments.
[0033] The above only describes some exemplary embodiments of the present invention by way of illustration. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.
Claims
1. A pipeline hot and cold cycle test device, comprising a circular hot and cold detection box (1), characterized in that: A fixed cover (2) is fixedly provided at the center of the top inner wall of the circular hot and cold detection box (1), and double-layer partitions (3) are fixedly provided on the outer walls of both sides of the fixed cover (2). The outer walls of the double-layer partitions (3) are fixedly connected to the inner wall of the circular hot and cold detection box (1). The circular hot and cold detection box (1) is provided with a cooling chamber (4) and a heating chamber (5) through the double-layer partitions (3). An electric heating plate (6) is fixedly provided on the bottom inner wall of the heating chamber (5). A motor (7) is fixedly provided on the inner wall of the fixed cover (2). A rotating rod (8) is fixedly provided on the output shaft of the motor (7) through a coupling. A sliding sleeve (10) is sleeved on the outer wall of the rotating rod (8). A rotating plate (12) is fixedly provided on the outer walls of both sides of the sliding sleeve (10), a fixed plate (18) is fixedly provided on both sides of the top of the circular hot and cold detection box (1), two fixed sleeves (19) are fixedly provided on the outer walls of the top of the fixed plate (18), a vertically downward synchronous reciprocating push rod motor (20) is fixedly provided on the inner walls of the two fixed sleeves (19), a lifting ring (21) is fixedly provided on the output shafts of the two synchronous reciprocating push rod motors (20) through a coupling, a circular groove (22) is provided on the bottom outer wall of the lifting ring (21), a positioning ball (17) is fixedly provided on the outer walls of the tops of the two rotating plates (12), and the outer wall of the positioning ball (17) is slidably connected to the inner wall of the circular groove (22).
2. A pipeline hot and cold cycle testing device according to claim 1, characterized in that: Two vertically upward limiting slide rails (9) are fixed on the outer walls on both sides of the rotating rod (8), and limiting slide grooves (11) are opened on the inner walls on both sides of the sliding sleeve (10), and the inner walls of the limiting slide grooves (11) are slidably connected to the outer walls of the limiting slide rails (9).
3. A pipeline hot and cold cycle testing device according to claim 2, characterized in that: A first fixing plate (13) pointing vertically downward is fixedly provided on the bottom outer walls of the two rotating plates (12) which are close to each other, and a second fixing plate (14) pointing vertically downward is fixedly provided on the ends of the bottoms of the two rotating plates (12) which are far away from each other.
4. A pipeline hot and cold cycle testing device according to claim 3, characterized in that: The outer wall of one side of the first fixing plate (13) adjacent to the second fixing plate (14) is fixedly provided with docking columns (15) distributed at equal distances, and the outer wall of the second fixing plate (14) is fixedly provided with docking sleeves (16) distributed at equal distances through openings.
5. The pipeline hot and cold cycle testing device according to claim 1, characterized in that: A positioning ring (23) is fixedly provided at the top center of the fixed cover (2) via a bracket, a bearing (24) is fixedly provided on the inner wall of the positioning ring (23), and the inner ring of the bearing (24) is fixedly connected to the bottom outer wall of the rotating rod (8).
6. A pipeline hot and cold cycle testing device according to claim 1, characterized in that: The outer walls of one side of the cooling chamber (4) and the heating chamber (5) are connected to a liquid adding pipe (25) through an opening, and the outer walls of one side of the bottom of the cooling chamber (4) and the heating chamber (5) are connected to a liquid draining pipe (26) through an opening, and valves (27) are installed on the liquid adding pipe (25) and the liquid draining pipe (26).