Grab bucket capable of being replaced on ground

By adopting the design of long chains and auxiliary ropes on the grab, combined with the action of the crane, the ground replacement of the grab is realized, solving the safety hazards of high-altitude operations and the low replacement efficiency, saving manpower and material resources, and improving replacement efficiency.

CN222007063UActive Publication Date: 2024-11-15广州港股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420844815.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-23
Publication Date
2024-11-15
Estimated Expiration
2034-04-23

AI Technical Summary

Technical Problem

When replacing the existing grabs, there are problems such as safety hazards in high altitude operations, low replacement efficiency, and consumption of manpower and material resources.

Method used

A gripper that can be replaced on the ground is designed, using long chains and auxiliary ropes. Through the action of the crane, workers can contact the ends of the gripper load-bearing chain and open and closing wire ropes on the ground, avoiding high-altitude operations and simplifying replacement operations.

Benefits of technology

It eliminates the safety hazards of high-altitude operations, reduces the use of forklifts, saves manpower and material resources, improves replacement efficiency, and simplifies the operation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222007063U_ABST
    Figure CN222007063U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of crane accessories, and discloses a grab bucket capable of being replaced on the ground, which is provided with two grab bucket opening and closing steel wire ropes, two grab bucket bearing chains and an auxiliary rope, one end of the auxiliary rope is detachably connected with the tail ends of the two grab bucket opening and closing steel wire ropes, and the other end of the auxiliary rope is a free end used for being detachably connected with the two crane opening and closing steel wire ropes; the two grab bucket bearing chains are long chains, and the free ends of the grab bucket bearing chains are used for being detachably connected with the two crane supporting steel wire ropes. When the grab bucket is located on the ground in an open state, the auxiliary rope and the two grab bucket bearing chains can freely droop to the ground. According to the grab bucket disclosed by the utility model, a worker can mount / dismount the shackle on the ground by virtue of the middle action of the auxiliary rope, so that the replacement operation of the grab bucket is changed from high altitude to ground, potential safety hazards of high altitude operation are eliminated, the use of a forklift is reduced, manpower and material resources are saved, the replacement operation of the grab bucket is simplified, time and labor are saved, and the replacement efficiency of the grab bucket is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of crane accessories, in particular to a grab bucket which can be replaced on the ground. Background Art

[0002] Grab cranes are widely used in ports, docks, station freight yards, mines, etc. to load various bulk cargoes, such as logs, minerals, coal, sand and gravel, earth and stone, etc. The grab and the crane are generally connected by a shackle: the grab load-bearing chain is connected to the crane support wire rope through the shackle, and the grab opening and closing wire rope is connected to the crane opening and closing wire rope through the shackle. Figure 1 The figure shows a grab bucket with an existing structure. Its two load-bearing chains are relatively short and are installed on the top of the grab bucket. When the grab bucket is open and located on the ground, the ends (free ends) of the two load-bearing chains and the two opening and closing wire ropes are 4-6 meters above the ground (the grab bucket is about 5 meters high). In this way, when the grab bucket needs to be replaced, workers need to use a forklift and an auxiliary replacement platform to reach a high place to disassemble and assemble the connecting shackle. The details are as follows:

[0003] When dismantling the grab, the crane driver controls the operation to open the grab and place it on the ground. The workers first climb onto the auxiliary replacement platform, and then the forklift lifts the auxiliary replacement platform to the top of the grab. The workers remove the shackles at a height to separate the grab from the crane, and then the forklift shovels the removed grab to the rear yard. When installing the grab, the forklift shovels the grab from the yard to the bottom of the crane, and the workers first climb onto the auxiliary replacement platform, and then the forklift lifts the auxiliary replacement platform to the top of the grab. The workers install the shackles at a height to connect the grab with the crane.

[0004] The existing grab structure has at least the following problems when replacing: (1) There are high-altitude operations, which poses a safety hazard. Workers need to work on the auxiliary replacement platform supported by a forklift. Once the forklift driver and the commander do not cooperate well, the auxiliary replacement platform may slip out of the forklift shovel teeth, causing the risk of workers falling from a height and getting injured. (2) Replacing the grab is time-consuming and labor-intensive, and the replacement efficiency is not high. Since parts such as wire ropes and shackles are heavy and high-altitude operations are difficult, each replacement of the grab requires the assistance of a forklift and a commander. The forklift also needs to lift the auxiliary replacement platform, and high-altitude operations are involved. In order to ensure the safety of personnel, the driving speed of the crane driver and the forklift driver cannot be too fast. (3) It consumes manpower and material resources. Each replacement of the grab requires at least 2 workers, 1 commander, 1 forklift (with 1 driver) and the auxiliary replacement platform to complete. When there is a shortage of manpower during the busy production period, production efficiency will be greatly affected. Utility Model Content

[0005] In view of the defects and shortcomings in the above-mentioned prior art, the utility model proposes a grab bucket that can be replaced on the ground to solve the problems that the grab bucket of the existing structure requires high-altitude operation when replacing, which poses a safety hazard; replacing the grab bucket is time-consuming and labor-intensive, and the replacement efficiency is low; and it consumes manpower and material resources.

[0006] The above-mentioned purpose of the utility model is achieved through the following technical solutions:

[0007] The grab bucket which can be replaced on the ground is provided with two grab bucket opening and closing steel wire ropes and two grab bucket load-bearing chains, and is also equipped with an auxiliary rope, one end of which is detachably connected to the ends of the two grab bucket opening and closing steel wire ropes, and the other end is a free end for detachably connecting to the two crane opening and closing steel wire ropes;

[0008] The two grab bucket load-bearing chains are both long chains, and their free ends are used for detachable connection with two crane support wire ropes;

[0009] When the grab bucket is located on the ground in an open bucket state, the auxiliary rope and two grab bucket load-bearing chains can freely hang down to the ground.

[0010] Preferably, two self-locking hooks are respectively arranged at both ends of the auxiliary rope.

[0011] Preferably, the auxiliary rope is removed from the grab bucket after completing the intermediate action and is temporarily hung on the traveling trolley or the machine foot of the crane.

[0012] Preferably, the auxiliary rope is made of steel wire rope.

[0013] Preferably, the auxiliary rope is 4.5-5.5 meters long.

[0014] Preferably, the grab bucket load-bearing chain is 4.5-5.5 meters long.

[0015] Compared with the prior art, the beneficial effects of the technical solution of the utility model are:

[0016] The utility model transforms the existing grab bucket by replacing the original load-bearing chain of the grab bucket with a long chain, so that workers can touch the end of the load-bearing chain of the grab bucket on the ground; and an auxiliary rope is added to the grab bucket, and the lifting / lowering, closing / opening and other actions of the grab bucket are controlled by a crane, and the intermediate effect of the auxiliary rope is cleverly used to enable the workers to touch the end of the opening and closing wire rope of the grab bucket on the ground, so that the grab bucket replacement operation is transferred from high altitude to ground; the previous restrictions on high-altitude operations are broken, and the safety hazards of workers' high-altitude operations are eliminated, which is safer and more reliable; the use of forklifts is reduced, energy-saving and environmentally friendly, and only two workers are needed on site to complete the replacement on the ground, saving manpower and material resources; the grab bucket replacement operation is simplified, saving time and labor, and improving the efficiency of grab bucket replacement; no auxiliary replacement platform is required, so as to avoid occupying space and affecting vehicle driving.

[0017] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A schematic diagram of a grab bucket structure of the prior art is shown;

[0019] Figure 2 A schematic diagram of the structure of a grab bucket that can be replaced on the ground according to an embodiment of the utility model is shown;

[0020] Figure 3 A schematic diagram showing the installation / removal of a crane wire rope;

[0021] Figure 4 A schematic diagram showing a grab bucket raised and in a closed bucket state is shown;

[0022] Figure 5 A schematic diagram of the removal / installation auxiliary rope is shown;

[0023] Figure 6 A schematic diagram of installing / removing a shackle is shown;

[0024] In the figure: grab bucket load-bearing chain 11, grab bucket opening and closing wire rope 12, crane support wire rope 21, crane opening and closing wire rope 22, auxiliary rope 3, self-locking hook 31, shackle 4. DETAILED DESCRIPTION

[0025] The drawings are for illustrative purposes only and should not be construed as limiting the present patent;

[0026] In order to better illustrate the present embodiment, some parts in the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product;

[0027] It is understandable to those skilled in the art that some well-known structures and their descriptions may be omitted in the drawings;

[0028] In the description of the present utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "set" and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, which can be said to be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances. The orientation or position relationship indicated by the terms "upper", "lower", "left", "right", "front", "back", etc. is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model.

[0029] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0030] like Figure 2 As shown, the grab bucket replaceable on the ground of the embodiment of the utility model is located on the ground in an open bucket state, and two long iron chains, namely, the grab bucket load-bearing chains 11, are installed at both ends of the top thereof, and the free ends thereof are used to connect with two crane support wire ropes 21 through shackles, mainly playing a supporting role for the grab bucket. The ends of the two grab bucket opening and closing wire ropes 12 are located on the top of the grab bucket, and are connected with auxiliary ropes 3, and the free ends of the auxiliary ropes are used to be detachably connected with the two crane opening and closing wire ropes 22. The auxiliary ropes 3 and the two grab bucket load-bearing chains 11 can be freely drooped to the ground, and the workers can connect / remove the connection with the corresponding wire ropes of the crane on the ground, and the crane controls the lifting / dropping, closing / opening of the bucket and other actions, and finally realizes the installation of shackles 4 on the ground to connect the crane opening and closing wire ropes 22 with the grab bucket opening and closing wire ropes 12 / removal of the shackles 4 to disconnect the crane opening and closing wire ropes 22 from the grab bucket opening and closing wire ropes 12, thereby realizing the replacement of the grab bucket on the ground. After the auxiliary rope 3 completes the intermediate action, it is removed from the grab bucket and temporarily hung on the crane's walking trolley or machine foot (not shown), which does not occupy ground space and does not affect the vehicle's travel; after the shackle connection between the crane's opening and closing wire rope 22 and the grab bucket's opening and closing wire rope 12 is removed, the auxiliary rope 3 is installed back on the grab bucket, and the rope moves with the bucket. See the ground replacement operation process below for details.

[0031] Among them, in order to facilitate connection and disassembly, two self-locking hooks 31 are arranged at both ends of the auxiliary rope 3. One end of the auxiliary rope 3 is connected to the ends of the two grab opening and closing steel wire ropes 12 through the two self-locking hooks 31, and the other end is connected to the two crane opening and closing steel wire ropes 22 through the two self-locking hooks 31.

[0032] The auxiliary rope 3 can be made of steel wire rope, synthetic fiber rope or chain, but considering that the bearing capacity of steel wire rope is stronger than that of synthetic fiber rope, its dead weight is lighter than that of chain, and steel wire rope is wear-resistant, corrosion-resistant, high-temperature resistant and has a long service life, it is preferred to use steel wire rope to make the auxiliary rope.

[0033] To ensure Figure 2 In the state shown, the auxiliary rope 3 and the two grab bucket load-bearing chains 11 can freely hang down to the ground, and the length of the auxiliary rope 3 is configured to be 4.5-5.5 meters, and the length of the grab bucket load-bearing chains 11 is configured to be 4.5-5.5 meters.

[0034] The ground replacement operation process of the modified grab bucket is as follows:

[0035] 1. Install the grab bucket:

[0036] 1.1 Connect the crane wire rope

[0037] Use a forklift to Figure 2 The grab bucket of the utility model embodiment shown in the figure is shoveled from the yard to the bottom of the crane. At this time, the grab bucket is in the open state. The long chain and auxiliary rope on the grab bucket are equivalent to extending the length of the load-bearing chain and the opening and closing wire rope of the original grab bucket structure to the ground. The worker uses a shackle on the ground to connect the crane support wire rope 21 with the grab bucket load-bearing chain 11, and uses the self-locking hook 31 on the auxiliary rope 3 to connect the crane opening and closing wire rope 22 with the auxiliary rope 3. Please refer to Figure 3 .

[0038] 1.2 Closure

[0039] Please refer to Figure 4 The crane driver controls the grab bucket to rise and close the bucket. During the closing process, the crane opening and closing wire rope 22 rises, and the grab bucket opening and closing wire rope 12 is pulled upward through the auxiliary rope 3.

[0040] 1.3 Drop bucket and release rope

[0041] Please refer to Figure 5 , Figure 6 , the crane driver controls the grab to drop to the ground, and lowers the four steel ropes of the crane to the ground. At this time, the ends of the two grab opening and closing steel ropes 12 hang down to the ground, that is, the auxiliary rope 3 including both ends are located on the ground, so that the workers can remove the auxiliary rope 3 on the ground (temporarily hang it on the traveling trolley or machine foot of the crane), and install the shackle 4, and connect the crane opening and closing steel rope 22 with the grab opening and closing steel rope 12, thereby completing the installation of the grab.

[0042] It should be noted that when the original grab bucket was in the closed state on the ground, its opening and closing wire rope could have been lowered to the ground, but the grab bucket was stored in the open state in the yard. The original grab bucket was in the open state when it was shoveled to the bottom of the crane by a forklift for installation. The end of the opening and closing wire rope was at a height of 4-6 meters from the ground, and the workers on the ground could not reach it to install the shackle.

[0043] 2. Remove the grab bucket:

[0044] 2.1 Closing location

[0045] After the crane has completed the loading and unloading operation, the crane driver closes the grab bucket and lowers it to the ground. Figure 6 , workers remove the shackle on the ground and disconnect the shackle connection between the crane opening and closing wire rope 22 and the grab bucket opening and closing wire rope 12.

[0046] 2.2 Install auxiliary rope

[0047] Install the auxiliary rope 3 hung on the crane trolley or the machine foot back to the grab bucket. One end of the auxiliary rope 3 is connected to the ends of the two grab bucket opening and closing steel wire ropes 12 through two self-locking hooks 31, and the other end is connected to the two crane opening and closing steel wire ropes 22 through two self-locking hooks 31. Please refer to Figure 5 .

[0048] 2.3 Open the bucket and release the rope

[0049] Please refer to Figure 4 , Figure 3 , Figure 2 The crane driver controls the grab bucket to rise, opens it and lowers it to the ground in the open bucket state, then lowers the four steel ropes of the crane to the ground, and the workers remove the connection between the crane support steel rope 21 and the grab bucket load-bearing chain 11, as well as the connection between the crane opening and closing steel rope 22 and the auxiliary rope 3 on the ground, thus completing the removal of the grab bucket. Finally, the removed grab bucket (with the auxiliary rope connected) is shoveled back to the yard by a forklift.

[0050] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or changes within the technical scope disclosed by the present invention according to the technical solution and concept of the present invention, which should be included in the protection scope of the present invention.

Claims

1. A grab bucket that can be replaced on the ground is provided with two grab bucket opening and closing wire ropes and two grab bucket load-bearing chains, characterized in that: An auxiliary rope is also provided, one end of which is detachably connected to the ends of the two grab opening and closing steel ropes, and the other end is a free end for detachably connecting to the two crane opening and closing steel ropes; The two grab bucket load-bearing chains are both long chains, and their free ends are used for detachable connection with two crane support wire ropes; When the grab bucket is located on the ground in an open bucket state, the auxiliary rope and two grab bucket load-bearing chains can freely hang down to the ground.

2. The ground-replaceable grab bucket according to claim 1, characterized in that: Two self-locking hooks are respectively arranged at the two ends of the auxiliary rope.

3. The ground-replaceable grab bucket according to claim 1, characterized in that: After the auxiliary rope completes the intermediate action, it is removed from the grab bucket and temporarily hung on the traveling trolley or the machine foot of the crane.

4. The ground-replaceable grab bucket according to claim 1, characterized in that: The auxiliary rope is made of steel wire rope.

5. The ground-replaceable grab bucket according to claim 1, characterized in that: The auxiliary rope is 4.5-5.5 meters long.

6. The ground-replaceable grab bucket according to claim 1, characterized in that: The grab bucket load-bearing chain is 4.5-5.5 meters long.