Sewage treatment system

By introducing sand sedimentation tanks and overpass pipes in the sewage treatment system, the sedimentation sedimentation is directly output to the distribution well, avoiding the initial sedimentation tank consumption, solving the problem of high BOD consumption in traditional sedimentation systems, and reducing drug consumption and cost effect and improve processing volume balance.

CN222007461UInactive Publication Date: 2024-11-15DALIAN LUSHUN URBAN SEWAGE TREATMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420629283.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-28
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The initial sedimentation tank in traditional sewage treatment systems consumes 20-30% of the biochemical oxygen demand (BOD) during operation, resulting in the water plant requiring continuous carbon source to increase drug consumption and cost.

Method used

A sewage treatment system is designed, including a sand sedimentation tank, a first initial sedimentation tank, a second initial sedimentation tank, a first distribution well and a transcendent pipe. After sand sedimentation tank, it is directly output to the first distribution well to avoid sewage. It flows through the initial sedimentation tank to reduce BOD consumption, and when necessary, the sewage is supplied to the initial sedimentation tank for buffering and adjustment, improving the balance of processing volume.

Benefits of technology

The wastewater BOD consumption entering the next operation section is reduced, the carbon-nitrogen ratio is improved, and the drug consumption and cost are reduced. At the same time, the initial sedimentation tank plays a buffering and regulation role to ensure the balance of processing volume.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222007461U_ABST
    Figure CN222007461U_ABST
Patent Text Reader

Abstract

The sewage treatment system comprises a grit chamber, a first primary sedimentation tank, a second primary sedimentation tank, a first water distribution well and a surpassing pipe, and on the basis, in the sewage treatment process, sewage can be output to the first water distribution well through the surpassing pipe after being subjected to grit settling through the grit chamber; and then the sewage can be supplied to the next operation section through the first water distribution well, that is, the sewage does not flow through the first primary sedimentation tank and the second primary sedimentation tank, so that the BOD consumption can be reduced, the carbon-nitrogen ratio of the sewage entering the next operation section is higher, the chemical consumption is reduced, and the cost is reduced. Meanwhile, in consideration of a large amount of supplied sewage, the sewage output by the grit chamber can also be supplied into the first primary sedimentation tank and / or the second primary sedimentation tank, and the first primary sedimentation tank and the second primary sedimentation tank can play a role in buffering and adjusting sewage supply, so that the treatment capacity of the next operation section can be more balanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present application relate to the technical field of sewage treatment, and in particular to a sewage treatment system. Background Art

[0002] Most sewage treatment systems in traditional technology are equipped with primary sedimentation tanks, the function of which is to reduce suspended solids. However, the utility model inventors found that in actual operation, the primary sedimentation tank consumes 20-30% of BOD during operation. Taking the average data of a certain plant from January to November 2023 as an example, the inlet BOD is 105 mg / l, and the effluent BOD data of the primary sedimentation tank is reduced to about 84 mg / l, while the total nitrogen data remains at 40 mg / l, and the carbon-nitrogen ratio data is about 2. In actual operation, the water plant needs to continuously add carbon sources, which increases the water plant's drug consumption. Utility Model Content

[0003] The utility model aims to solve at least one of the technical problems existing in the prior art or related technology.

[0004] In view of this, an embodiment of the present application proposes a sewage treatment system, comprising:

[0005] grit chamber;

[0006] a first primary sedimentation tank and a second primary sedimentation tank, wherein the grit chamber is connected to the first primary sedimentation tank and the second primary sedimentation tank;

[0007] A first water distribution well, wherein the first water distribution well is connected to the first primary sedimentation tank and the second primary sedimentation tank, and the first primary sedimentation tank and the second primary sedimentation tank are connected in parallel;

[0008] An override pipe, one end of which is connected to the sand settling tank, and the other end of which is connected to the first water distribution well.

[0009] In a feasible implementation manner, the sewage treatment system further comprises:

[0010] A second water distribution well, the grit chamber is connected to the second water distribution well, and the second water distribution well is connected to the first primary sedimentation tank and the second primary sedimentation tank;

[0011] A flow meter is arranged between the second water distribution well and the sand settling tank.

[0012] In a feasible implementation manner, the sewage treatment system further comprises:

[0013] A V-filter backwash wastewater pipe, one end of which is connected to the second water distribution well.

[0014] In a feasible implementation manner, the sewage treatment system further comprises:

[0015] Three-way valve;

[0016] A sludge pipe, the sludge pipe is connected to a valve port of the three-way valve;

[0017] A sludge thickening tank, wherein the sludge thickening tank is connected to a valve port of the three-way valve;

[0018] Wherein, the first primary sedimentation tank is connected to a valve port of the three-way valve.

[0019] In a feasible implementation manner, the sewage treatment system further comprises:

[0020] A control gate valve is arranged on the surpassing pipe.

[0021] In a feasible implementation manner, the sewage treatment system further comprises:

[0022] A first channel gate, the first channel gate is arranged on the sand settling tank and is connected to the overtaking pipe;

[0023] A second channel gate, wherein the second channel gate is arranged on the first water distribution well and is connected to the override pipe.

[0024] In a feasible implementation manner, the sewage treatment system further comprises:

[0025] A biochemical treatment unit, wherein the output end of the first water distribution well is connected to the biochemical treatment unit.

[0026] In a feasible embodiment, the biochemical treatment unit includes at least two treatment modules, and the water distribution well is connected to each of the treatment modules.

[0027] In a feasible embodiment, the processing module includes a biochemical pool.

[0028] In a feasible implementation manner, the sewage treatment system further comprises:

[0029] A water distribution pipe and a pump room, one end of the override pipe is connected to the sand settling tank, and the other end is connected to the pump room; one end of the water distribution pipe is connected to the pump room, and the other end is connected to the first water distribution well.

[0030] Compared with the prior art, the present invention has at least the following beneficial effects:

[0031] The sewage treatment system provided in the embodiment of the present application includes a grit chamber, a first primary sedimentation tank, a second primary sedimentation tank, a first water distribution well and an override pipe. Based on this, during the sewage treatment process, the sewage can be output to the first water distribution well through the override pipe after the grit is deposited in the grit chamber, and then the sewage can be supplied to the next operation section through the first water distribution well. In other words, the sewage does not need to flow through the first primary sedimentation tank and the second primary sedimentation tank. Based on this, the consumption of BOD can be reduced, so that the carbon-nitrogen ratio of the sewage entering the next operation section is higher, thereby reducing drug consumption and reducing costs. At the same time, considering that the sewage supply is large, the sewage output through the grit chamber can also be supplied to the first primary sedimentation tank and / or the second primary sedimentation tank. The first primary sedimentation tank and the second primary sedimentation tank can play a role in buffering and regulating the sewage supply, which can make the processing volume of the next operation section more balanced. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0033] Figure 1 A schematic step flow chart of a sewage treatment system according to an embodiment of the present application.

[0034] in, Figure 1 The corresponding relationship between the reference numerals and the component names is as follows:

[0035] 110 grit tank, 120 first primary sedimentation tank, 130 second primary sedimentation tank, 140 first water distribution well, 150 override pipe, 160 second water distribution well, 170 flow meter, 180V filter backwash wastewater pipe, 190 three-way valve, 200 sludge pipe, 210 sludge thickening tank, 220 control gate valve, 230 first channel gate, 240 second channel gate, 250 biochemical treatment unit, 251 treatment module. DETAILED DESCRIPTION

[0036] In order to better understand the above-mentioned technical scheme, the technical scheme of the embodiments of the present application is described in detail below through the accompanying drawings and specific embodiments. It should be understood that the embodiments of the present application and the specific features in the embodiments are detailed descriptions of the technical scheme of the embodiments of the present application, rather than limitations on the technical scheme of the present application. In the absence of conflict, the embodiments of the present application and the technical features in the embodiments may be combined with each other.

[0037] like Figure 1As shown, an embodiment of the present application proposes a sewage treatment system, including: a grit tank 110; a first primary settling tank 120 and a second primary settling tank 130, the grit tank 110 is connected to the first primary settling tank 120 and the second primary settling tank 130; a first water distribution well 140, the first water distribution well 140 is connected to the first primary settling tank 120 and the second primary settling tank 130, the first primary settling tank 120 and the second primary settling tank 130 are connected in parallel; an override pipe 150, one end of the override pipe 150 is connected to the grit tank 110, and the other end is connected to the first water distribution well 140.

[0038] The sewage treatment system provided in the embodiment of the present application includes a grit chamber 110, a first primary sedimentation tank 120, a second primary sedimentation tank 130, a first water distribution well 140 and a bypass pipe 150. Based on this, during the sewage treatment process, the sewage can be output to the first water distribution well 140 through the bypass pipe 150 after the grit is deposited in the grit chamber 110, and then the sewage can be supplied to the next operation section through the first water distribution well 140, that is, the sewage can not flow through the first primary sedimentation tank 120 and the second primary sedimentation tank 130, based on which the consumption of BOD can be reduced, so that the carbon-nitrogen ratio of the sewage entering the next operation section is higher, thereby reducing drug consumption and reducing costs. At the same time, considering that the sewage supply water volume is large, the sewage output through the grit chamber 110 can also be supplied to the first primary sedimentation tank 120 and / or the second primary sedimentation tank 130, the first primary sedimentation tank 120 and the second primary sedimentation tank 130 can play a role in buffering and regulating the sewage supply, which can make the processing volume of the next operation section more balanced.

[0039] like Figure 1 As shown, in a feasible embodiment, the sewage treatment system also includes: a second water distribution well 160, the grit tank 110 is connected to the second water distribution well 160, and the second water distribution well 160 is connected to the first primary sedimentation tank 120 and the second primary sedimentation tank 130; a flow meter 170, and the flow meter 170 is arranged between the second water distribution well 160 and the grit tank 110.

[0040] In this technical solution, the sewage treatment system may also include a second water distribution well 160 and a flow meter 170. The output end of the grit chamber 110 is connected to the second water distribution well 160, and then the sewage can be distributed through the second water distribution well 160 to facilitate the supply to the first primary sedimentation tank 120 and the second primary sedimentation tank 130. The setting of the flow meter 170 facilitates the statistics of the sewage supply.

[0041] like Figure 1 As shown, in a feasible implementation, the sewage treatment system further includes: a V-filter backwash wastewater pipe 180, one end of which is connected to the second water distribution well 160. This arrangement facilitates the feedback of the V-filter backwash wastewater to the front end.

[0042] In a feasible embodiment, the sewage treatment system also includes: a three-way valve 190; a sludge pipe 200, the sludge pipe 200 is connected to a valve port of the three-way valve 190; a sludge thickening tank 210, the sludge thickening tank 210 is connected to a valve port of the three-way valve 190; wherein the first primary settling tank 120 is connected to a valve port of the three-way valve 190.

[0043] In this technical solution, the sewage treatment system may further include a three-way valve 190, a sludge pipe 200 and a sludge thickening tank 210. The sludge pipe 200 is connected to the sludge thickening tank 210 and the first primary sedimentation tank 120 through the three-way valve 190. This arrangement is made in consideration of the limited volume of the sludge thickening tank 210 and the general sedimentation effect, while the first primary sedimentation tank 120 has a larger volume. Therefore, in this case, it is possible to consider storing the sewage output from the sludge pipe 200 through the first primary sedimentation tank 120 to achieve a better sedimentation effect. In other words, the first primary sedimentation tank 120 can be used as a sludge thickening tank 210, and the second primary sedimentation tank 130 can be used as a regulating tank. The sewage does not need to be flocculated through the first primary sedimentation tank 120 and the second primary sedimentation tank 130, which can reduce the consumption of BOD. At the same time, the first primary sedimentation tank 120 and the second primary sedimentation tank 130 are utilized, which is convenient for the transformation of the existing sewage treatment system, and the transformation cost is low.

[0044] like Figure 1 As shown, in a feasible implementation manner, the sewage treatment system further includes: a control gate valve 220 , and the control gate valve 220 is disposed on the override pipe 150 .

[0045] In this technical solution, the sewage treatment system may include a control gate valve 220 , which is configured to facilitate the control of the opening and closing of the override pipe 150 .

[0046] like Figure 1 As shown, in a feasible embodiment, the sewage treatment system also includes: a first channel gate 230, the first channel gate 230 is arranged on the sand settling tank 110 and is connected to the bypass pipe 150; a second channel gate 240, the second channel gate 240 is arranged on the first water distribution well 140 and is connected to the bypass pipe 150.

[0047] In this technical solution, the sewage treatment system may further include a first channel gate 230 and a second channel gate 240 , which are arranged to facilitate the communication between the shear grit chamber 110 , the bypass pipe 150 and the first water distribution well 140 .

[0048] like Figure 1 As shown, in a feasible implementation manner, the sewage treatment system further includes: a biochemical treatment unit 250 , and the output end of the first water distribution well 140 is connected to the biochemical treatment unit 250 .

[0049] In this technical solution, the sewage treatment system may further include a biochemical treatment unit 250, based on which the sewage that has completed the grit treatment may be biochemically treated by the biochemical treatment unit 250, thereby making the sewage treatment more thorough.

[0050] like Figure 1 As shown, in a feasible embodiment, the biochemical treatment unit 250 includes at least two treatment modules 251 , and the water distribution well is connected to each treatment module 251 .

[0051] The biochemical treatment unit 250 includes at least two treatment modules 251, and such a configuration can improve the sewage treatment efficiency.

[0052] In a feasible implementation, the treatment module 251 includes a biochemical pool, which can perform biochemical treatment on sewage.

[0053] like Figure 1 As shown, in a feasible embodiment, the sewage treatment system also includes: a water distribution pipe 260 and a pump room 270, one end of the bypass pipe 150 is connected to the sand settling tank 110, and the other end is connected to the pump room, one end of the water distribution pipe is connected to the pump room, and the other end is connected to the first water distribution well 140.

[0054] In this technical solution, the sewage treatment system may further include a water distribution pipe 260 and a pump room 270 , which is arranged to facilitate the communication between the sand settling tank 110 and the first water distribution well 140 .

[0055] In the present invention, the terms "first", "second", and "third" are used for descriptive purposes only and should not be understood as indicating or implying relative importance; the term "plurality" refers to two or more, unless otherwise clearly defined. The terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; "connected" can be a direct connection or an indirect connection through an intermediate medium. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.

[0056] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by terms such as "up", "down", "left", "right", "front" and "back" are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or unit referred to must have a specific direction, be constructed and operated in a specific orientation, and therefore, cannot be understood as a limitation on the present invention.

[0057] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "specific embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0058] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may be subject to various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A sewage treatment system, characterized in that: include: grit chamber; a first primary sedimentation tank and a second primary sedimentation tank, wherein the grit chamber is connected to the first primary sedimentation tank and the second primary sedimentation tank; A first water distribution well, wherein the first water distribution well is connected to the first primary sedimentation tank and the second primary sedimentation tank, and the first primary sedimentation tank and the second primary sedimentation tank are connected in parallel; An override pipe, one end of which is connected to the sand settling tank, and the other end of which is connected to the first water distribution well.

2. The sewage treatment system according to claim 1, characterized in that: Also includes: A second water distribution well, the grit chamber is connected to the second water distribution well, and the second water distribution well is connected to the first primary sedimentation tank and the second primary sedimentation tank; A flow meter is arranged between the second water distribution well and the sand settling tank.

3. The sewage treatment system according to claim 2, characterized in that: Also includes: A V-filter backwash wastewater pipe, one end of which is connected to the second water distribution well.

4. The sewage treatment system according to claim 1, characterized in that: Also includes: Three-way valve; A sludge pipe, the sludge pipe is connected to a valve port of the three-way valve; A sludge thickening tank, wherein the sludge thickening tank is connected to a valve port of the three-way valve; Wherein, the first primary sedimentation tank is connected to a valve port of the three-way valve.

5. The sewage treatment system according to claim 1, characterized in that: Also includes: A control gate valve is arranged on the surpassing pipe.

6. The sewage treatment system according to claim 5, characterized in that: Also includes: A first channel gate, the first channel gate is arranged on the sand settling tank and is connected to the overtaking pipe; A second channel gate, wherein the second channel gate is arranged on the first water distribution well and is connected to the override pipe.

7. The sewage treatment system according to claim 1, characterized in that: Also includes: A biochemical treatment unit, wherein the output end of the first water distribution well is connected to the biochemical treatment unit.

8. The sewage treatment system according to claim 7, characterized in that: The biochemical treatment unit includes at least two treatment modules, and the water distribution well is connected to each of the treatment modules.

9. The sewage treatment system according to claim 8, characterized in that: The processing module includes a biochemical pool.

10. The sewage treatment system according to claim 1, characterized in that: Also includes: A water distribution pipe and a pump room, one end of the override pipe is connected to the sand settling tank, and the other end is connected to the pump room; one end of the water distribution pipe is connected to the pump room, and the other end is connected to the first water distribution well.