Off-field ecological interception and purification system
By designing a three-level treatment system for ecological ridges, buffer interception belts and ponds in the farmland area, the problem of difficult to effectively carry out farmland pollution control in limited spaces is solved, multi-level interception and purification treatment is achieved, and water quality and land use are improved. value.
Patent Information
- Application Number
- CN202323546871.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2033-12-26
AI Technical Summary
Farmland pollution control is difficult to effectively carry out in limited spaces. The existing technology lacks methods to use existing water bodies to build off-field ecological interception and purification systems, resulting in low pollutant removal efficiency and difficult to ensure water quality.
A off-field ecological interception purification system was designed, including ecological ridges, buffer interception belts and ponds, combining vegetation, biomass filter materials and strengthening through a three-level treatment process (near-shore settlement zone, shallow water purification zone, deep water reinforcement zone) with vegetation, biomass filter materials and reinforcement The treatment device realizes multi-stage interception and purification treatment of farmland water reclamation, and optimizes the water structure and biological habitat environment.
It effectively saves buffer space between farmland and water, improves pollutant removal efficiency, ensures water quality safety, improves land use value and biodiversity protection, and gives full play to the maximum benefits of the pond.
Smart Images

Figure CN222007481U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of water ecological protection, and in particular relates to an off-field ecological interception and purification system. Background Art
[0002] Agricultural pollution mainly comes from production activities such as farmland, aquaculture, livestock and poultry breeding, etc. Among them, farmland has a large area, and the pollution it produces has gradually become one of the main causes of global water environment problems.
[0003] The characteristics of farmland drainage are randomness, intermittency, lag and complexity of discharge, which make farmland pollution control more difficult. In recent years, the non-agriculturalization and non-grainization of cultivated land have also severely restricted the establishment of land for farmland drainage treatment, and there is less regional space available for farmland drainage treatment. In the actual process of agricultural pollution control, it is found that there are often some abandoned ponds, pools and other water bodies in and around farmland areas. It may be possible to effectively use existing ponds outside farmland to build an ecological interception and purification system. However, in the existing related technologies, there is still a lack of off-field ecological interception and purification systems that use existing water bodies in the limited space of farmland areas. Utility Model Content
[0004] The utility model provides an off-field ecological interception and purification system, which saves buffer space between farmland and water area, and effectively utilizes existing ponds and other water bodies in the farmland area for ecological transformation, realizes multi-level interception and purification treatment of farmland runoff, and improves the water environment in the farmland area.
[0005] The utility model discloses an off-field ecological interception and purification system, which is arranged in a farmland area, and comprises an ecological ridge, a buffer interception zone and a pond which are connected in sequence; the elevation of the ecological ridge is higher than the elevation of the farmland surface; the elevation of the top surface of the buffer interception zone is consistent with the elevation of the farmland surface; the water level of the pond is lower than the top surface of the buffer interception zone; from near to far from the farmland, the pond comprises a nearshore sedimentation zone, a shallow water purification zone and a deep water enhancement zone in sequence; the bottom of the shallow water purification zone is higher than the bottoms of the nearshore sedimentation zone and the deep water enhancement zone.
[0006] Optionally, the buffer interception zone includes a vegetation grass belt and a biomass interception belt in sequence, the vegetation grass belt is located on the side close to the ecological ridge; the biomass interception belt is composed of a plurality of arranged gabions, and the gabions are filled with biomass filter materials; the buffer interception zone is planted with herbaceous plants.
[0007] Optionally, the gabion box is buried in the soil layer, and the burial depth relative to the pond soil layer is ≥20 cm; and geotextiles are provided on each surface of the gabion box in contact with the soil layer.
[0008] Optionally, the slope ratios on both sides of the nearshore settlement zone are both ≤1:2, and emergent plants are planted on the slope on the side close to the buffer interception zone; the width of the nearshore settlement zone is ≥10% of the total width of the pond.
[0009] Optionally, the slope ratio of the shallow water purification area on the side close to the deep water enhancement area is ≤1:3; emergent plants and floating leaf plants are provided in the shallow water purification area; and the width of the shallow water purification area is 40-60% of the total width of the pond.
[0010] Optionally, a gravel layer with a thickness of 10 to 20 cm is provided at the bottom of the shallow water purification area, and the gravel particle size of the gravel layer is 30 to 50 mm.
[0011] Optionally, the deepwater enhancement zone is provided with an enhancement treatment device, and the enhancement treatment device includes a combination of one or more of a floating wetland, an ecological infiltration island or an aerator.
[0012] Optionally, the deep water enhancement zone is planted with submerged plants; and the width of the settling zone is 30 to 50% of the total width of the pond.
[0013] Optionally, measured by the maximum width of the cross section, the width of the ecological ridge is 100 cm, and the width of the buffer interception zone is ≥1.5 m.
[0014] Optionally, the height difference between the ecological ridge and the farmland surface is 30 to 40 cm.
[0015] Optionally, the height difference between the water level of the pond and the top surface of the buffer interception zone is ≥30 cm.
[0016] Optionally, the water depth in the nearshore sedimentation zone is 1.5 to 2 m; the water depth in the shallow water purification zone is 0.3 to 1 m; and the water depth in the deep water enhancement zone is 1 to 1.5 m.
[0017] The utility model uses the existing water body (pond) to construct an off-field ecological interception and purification system in the limited space around the farmland. Through the relative setting of the elevation, the vertical structure of the ecological ridge and the buffer interception belt is formed, the land space is effectively utilized, the overall width of the land buffer belt is greatly reduced, the buffer space between the farmland and the water area is saved, and the land utilization value is improved; and through the setting of the ecological ridge and the buffer interception belt, the farmland runoff, seepage, etc. are also effectively intercepted, and the loss of fertilizer nutrients in the farmland is reduced, while reducing the pollution load of the farmland. Through the three-level treatment process of the nearshore sedimentation area-shallow water purification area-deep water strengthening area of the pond, the effective utilization of the existing pond is realized, the pollutant removal efficiency is improved, the farmland retreat water is purified, and the water quality safety is guaranteed. Furthermore, through water ecological measures such as the reconstruction of the pond and the introduction of aquatic plants, the pond structure is optimized, a diverse habitat is constructed, and conditions are created for biological habitats. At the same time, the water storage function of the pond is improved, which helps to maximize the benefits of the existing pond. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 A schematic diagram of the cross-sectional structure of the off-field ecological interception and purification system of the utility model.
[0019] In the figure: 1- farmland, 2- ecological ridge, 3- buffer interception zone, 4- nearshore sedimentation area, 5- shallow water purification area, 6- deep water enhancement area, 7- vegetation grass belt, 8- biomass interception belt, 9- gabion cage, 10- biomass filter material, 11- geotextile, 12- herbaceous plants, 13- emergent plants, 14- floating leaf plants, 15- gravel layer, 16- submerged plants. DETAILED DESCRIPTION
[0020] The off-field ecological interception and purification system of the utility model is arranged in the farmland area, and includes an ecological ridge, a buffer interception zone and a pond connected in sequence; from near to far from the farmland, the pond includes a nearshore sedimentation area, a shallow water purification area and a deep water reinforcement area in sequence. The ecological ridge and the buffer interception zone are located on land; the ecological ridge is located at the end of the farmland and on the side of the pond; the buffer interception zone is located between the farmland and the pond and belongs to the transition zone; behind the buffer interception zone are the nearshore sedimentation area, the shallow water purification area and the deep water reinforcement area in sequence. The nearshore sedimentation area, the shallow water purification area and the deep water reinforcement area are located in the pond, and are constructed by upgrading the existing pond. Surface runoff and seepage flow pass through the ecological ridge from the farmland, and are discharged into the pond through the buffer interception zone. After the three-level treatment of the nearshore sedimentation area-shallow water purification area-deep water reinforcement area in the pond, the water body is fully purified.
[0021] Specifically, after agricultural runoff, seepage and other sewage pass through the ecological ridges, the particulate and dissolved nitrogen, phosphorus, etc. in the incoming water are initially intercepted, filtered and adsorbed in the buffer interception zone, and the water quality is initially purified; further, the sewage enters the nearshore sedimentation area, where the pollutants are fully precipitated and the water quality is further improved; further, the sewage enters the shallow water purification area, where the nitrogen, phosphorus and organic matter in the water are removed through the joint action of plants, microorganisms, etc.; finally, the sewage enters the deep water enhancement area, where the water quality is fully purified after being treated with high-efficiency purification of easily-settled algae and other enhancement measures. At the same time, the water is stored in the pond and can be recycled as needed.
[0022] Regarding the elevation design of each area, the elevation of the ecological ridge is higher than the surface elevation of the farmland, which can effectively reduce the discharge of farmland runoff and seepage, and reduce the loss of nutrients; the elevation of the top surface of the buffer interception zone is consistent with the surface elevation of the farmland, and can intercept and adsorb particulate and dissolved nitrogen and phosphorus in the incoming water through the dual effects of the vegetation grass belt and the biomass interception zone; the water level of the pond (i.e., the nearshore sedimentation zone-shallow water purification zone-deep water enhancement zone) is lower than the top surface of the buffer interception zone, so that the water brought by the buffer interception flows into the pond by gravity; in the pond, the bottom of the shallow water purification zone is higher than the bottom of the nearshore sedimentation zone and the deep water enhancement zone, forming a sedimentation, purification and enhancement treatment link.
[0023] It can be seen from the above scheme that the utility model can effectively utilize existing ponds outside the farmland area for ecological transformation, construct different functional zones, realize multi-level interception and purification of farmland drainage, and improve the water environment; and through the three-dimensional structure design of elevation, save the buffer space between farmland and water area; at the same time, through ecological treatment measures, further enhance the functions of ponds (pools) in terms of water storage and biodiversity protection.
[0024] The technical solution of the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments.
[0025] like Figure 1 As shown, the off-field ecological interception and purification system of this embodiment is arranged at the downstream end of the farmland 1. The off-field ecological interception and purification system includes five parts: ecological field ridge 2, buffer interception belt 3, nearshore settlement area 4, shallow water purification area 5 and deep water enhancement area 6.
[0026] The ecological ridge 2 is arranged downstream of the farmland 1 and is made of earth; the width of the ecological ridge 2 is about 100 cm; the top elevation is higher than the surface elevation of the farmland, and the height difference is about 30 to 40 cm.
[0027] The buffer interception belt 3 is connected to the ecological ridge 2, and is composed of a vegetation grass belt 7 and a biomass interception belt 8. The ground elevation of the vegetation grass belt 7 is consistent with the surface elevation of the farmland, and the vegetation grass belt 7 is planted with herbaceous plants 12 with strong vitality such as Bermuda grass; the biomass interception belt 8 is composed of a gabion box 9 and a biomass filter material 10 in the cage. The biomass filter material 10 uses a matrix such as biomass charcoal. The width of the gabion box 9 is ≥50cm and the height is ≥100cm; the bottom of the biomass filter material is buried in the soil layer, and the burial depth relative to the soil layer of the pond is ≥20cm. The gabion box 9 is composed of multiple arrangements. In this embodiment, the single specification is length × width × height = 1m × 0.5m × 1m, and it is made of stainless steel 304, and the aperture of the articulated mesh is 30mm. The lower part of the gabion box 9 needs to be compacted with original soil, and an original soil layer is provided, and the original soil compaction coefficient is not less than 0.9. The contact side between the gabion box 9 and the original soil needs to be provided with a geotextile 11, the specification of which is 200-300 g / m 2 The gabion box 9 is filled with biomass filter material 10. The particle size of the biomass filter material 10 is 30-50 mm, and herbaceous plants are planted on the top of the biomass filter material 10.
[0028] The nearshore settlement zone 4 is connected to the buffer interception zone 3, the slope ratio of the nearshore settlement zone 4 is ≤1:2, the water depth is about 1.5-2m, and emergent plants 13 such as reeds and cattails can be planted on the slope; the width of the nearshore settlement zone 4 should not be less than 10% of the width of the entire pond.
[0029] The shallow water purification area 5 is connected to the nearshore settlement area 4, with a water depth of about 0.3 to 1 m and a slope ratio of ≤1:3; the shallow water purification area 5 is mainly planted with emergent plants such as iris, calamus, lotus, and floating leaf plants 14 such as water lily, duckweed, and water chestnut; a gravel layer 15 with a thickness of 10 to 20 cm and a gravel particle size of 30 to 50 mm can be set at the bottom of the shallow water purification area 5; aquatic plants are planted on the upper part of the gravel layer 15. The width of the shallow water purification area 5 accounts for about 40 to 60% of the width of the entire pond.
[0030] The deep water enhancement zone 6 is connected to the shallow water purification zone 5 and is the last treatment unit of the entire system; the water depth of the deep water enhancement zone 6 is about 1 to 1.5 meters; the deep water enhancement zone 6 is mainly planted with submerged plants 16 such as water chestnuts and duckweed; floating wetlands, ecological infiltration islands, aerators and other enhanced treatment measures can be arranged in the deep water enhancement zone 6; the width of the sedimentation zone 6 accounts for about 30 to 50% of the width of the entire pond.
[0031] The present invention is described in detail above in combination with specific implementation methods and exemplary examples, but these descriptions cannot be understood as limiting the present invention. Those skilled in the art understand that, without departing from the spirit and scope of the present invention, the technical solution and implementation methods of the present invention can be subjected to various equivalent substitutions, modifications or improvements, all of which fall within the scope of the present invention.
Claims
1. An off-field ecological interception and purification system, arranged in a farmland area, characterized in that: It includes ecological ridges, buffer interception zones and ponds that are connected in sequence; the elevation of the ecological ridges is higher than the surface elevation of farmland; the elevation of the top surface of the buffer interception zone is consistent with the surface elevation of farmland; the water level of the pond is lower than the top surface of the buffer interception zone; from near to far from the farmland, the pond includes a nearshore sedimentation area, a shallow water purification area and a deep water enhancement area in sequence; the bottom of the shallow water purification area is higher than the bottom of the nearshore sedimentation area and the bottom of the deep water enhancement area.
2. The off-field ecological interception and purification system according to claim 1 is characterized in that: The buffer interception zone includes a vegetation grass belt and a biomass interception belt in sequence. The vegetation grass belt is located on the side close to the ecological field ridge; the biomass interception belt is composed of a plurality of arranged gabion boxes, and the gabion boxes are filled with biomass filter materials; the buffer interception zone is planted with herbaceous plants.
3. The off-field ecological interception and purification system according to claim 2 is characterized in that: The gabion box is buried in the soil layer, and the burial depth relative to the pond soil layer is ≥20cm; geotextiles are provided on each surface of the gabion box contacting the soil layer.
4. The off-field ecological interception and purification system according to claim 1 is characterized in that: The slope ratios on both sides of the nearshore settlement zone are both ≤1:2, and emergent plants are planted on the slope surface close to the buffer interception zone; the width of the nearshore settlement zone is ≥10% of the total width of the pond.
5. The off-field ecological interception and purification system according to claim 1 is characterized in that: The slope ratio of the shallow water purification area on the side close to the deep water strengthening area is ≤1:3; emergent plants and floating leaf plants are arranged in the shallow water purification area; the width of the shallow water purification area is 40-60% of the total width of the pond.
6. The off-field ecological interception and purification system according to claim 1 or 5, characterized in that: A gravel layer with a thickness of 10 to 20 cm is arranged at the bottom of the shallow water purification area, and the gravel particle size of the gravel layer is 30 to 50 mm.
7. The off-field ecological interception and purification system according to claim 1 is characterized in that: The deepwater enhanced area is provided with an enhanced treatment device, which includes a combination of one or more of a floating wetland, an ecological infiltration island or an aerator.
8. The off-field ecological interception and purification system according to claim 1 or 7, characterized in that: The deep water reinforcement zone is planted with submerged plants; the width of the settling zone is 30-50% of the total width of the pond.
9. The off-field ecological interception and purification system according to claim 1, characterized in that: Measured by the maximum cross-sectional width, the width of the ecological ridge is 100cm, and the width of the buffer interception zone is ≥1.5m.
10. The off-field ecological interception and purification system according to claim 1, characterized in that: The height difference between the ecological ridge and the farmland surface is 30-40cm; the height difference between the water level of the pond and the top surface of the buffer interception zone is ≥30cm; the water depth of the nearshore sedimentation area is 1.5-2m; the water depth of the shallow water purification area is 0.3-1m; and the water depth of the deep water enhancement area is 1-1.5m.