Large-span steel-concrete composite beam multi-point walking type pushing device

By introducing a combined design of mobile rack, track and hydraulic cylinder into the pushing device, the existing pushing device has solved the problems of large friction and inconvenience in use, achieving higher load-bearing capacity and flexible lifting operation, and extending the equipment life And simplifies the maintenance process.

CN222008650UActive Publication Date: 2024-11-15HENAN HIGHWAY ENG GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323606865.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-11-15
Estimated Expiration
2033-12-28

AI Technical Summary

Technical Problem

The existing pushing device has a large friction under sliding mode, is prone to wear, and cannot be effectively sealed, which affects the efficiency of use, especially under inconsistent lifting weight conditions.

Method used

Using mobile rack, moving wheel, crawler, hydraulic cylinder and hoisting mechanism, reduce friction through track movement, increase load-bearing capacity, and clean impurities through cleaning brushes, combining the hydraulic cylinder and multiple jack settings to achieve flexible hoisting and Going.

Benefits of technology

It reduces wear of the thrust mechanism, improves service life, enhances the load-bearing capacity of the equipment, simplifies the lifting operation under different weight conditions, and improves the maintenance convenience of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008650U_ABST
    Figure CN222008650U_ABST
Patent Text Reader

Abstract

The utility model discloses a multi-point walking type pushing device for a large-span steel-concrete composite beam, and relates to the field of technical combined bridges, in particular to the multi-point walking type pushing device for the large-span steel-concrete composite beam, which comprises a beam seat, a pushing mechanism arranged in the beam seat and a jacking mechanism arranged at the top of the pushing mechanism, a bottom limiting groove is formed in the bottom of the beam base, and the lifting mechanism is composed of a top mounting groove, a clamping assembly, a clamping plate, a jack and an abutting plate. According to the large-span steel-concrete composite beam multi-point walking type pushing device, through the arrangement of the moving wheels, the crawler belt and the hydraulic oil cylinder, abrasion of the pushing mechanism can be reduced in a high-load-bearing environment, the service life of the pushing mechanism is prolonged, the effect of protecting the crawler belt is improved through a sweeping brush, and through the arrangement of a top mounting groove and a clamping assembly, the service life of the pushing mechanism is prolonged. During use, a plurality of jacks at different positions can be mounted, so that steel-concrete composite beams with different weights and different widths can be conveniently lifted, and when the jacks are damaged, the jacks can be quickly dismounted for maintenance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of combined bridges, in particular to a multi-point walking type jacking device for a large-span steel-concrete combined beam. Background Art

[0002] The jacking method refers to the method that when a structure is to pass under the embankment of an existing line, in order not to disturb the existing line, the structure can be built in sections on one side of the embankment, and then jacked with a jack to make it pass through the embankment. Before the jacking construction, the appropriate jacking method should be selected according to the main beam length, the designed jacking span, the horizontal thrust that the pier can withstand, the jacking equipment and the sliding device. Single-point jacking: limited to straight bridges, when the jacking beam section is short, the pier can withstand a large horizontal load, and the rear seat can provide sufficient horizontal reaction force, most of the jacking jacks or tie rod brackets are installed on both sides of the box beam. The jacking device is concentrated on the abutment or pier near the main beam prefabrication site, and sliding supports are set on the fulcrums of the front pier. During jacking, the slider slides on the stainless steel plate and slides out in front, and the slider is continuously fed in behind the slideway to drive the beam forward. Its construction procedure is to push the beam → push → drop the vertical jack → retract the piston rod of the horizontal jack; multi-point push: a pair of small-tonnage (400-800kN) horizontal jacks are set on each pier to disperse the concentrated push force to each pier. Since the reaction force transmitted to the pier by the horizontal jack is used to balance the friction resistance generated on the pier when the beam slides, the pier bears less horizontal force during the push process, so multi-point push construction can be used on the flexible pier. At the same time, the push equipment required for multi-point push is small in tonnage and easy to obtain.

[0003] A walking-type jacking device disclosed in the Chinese utility model patent application disclosure specification CN202320259712.X has the advantages of using a rubber plate to seal the slide groove when in use, preventing damage to the device during movement and reducing energy consumption, but still has the following defects: First, the device adopts a slide groove sliding method, which has large friction and is more severely worn when it is heavy, and the rubber plate can only be sealed when it is moving. When there are impurities inside, it will still affect the internal moving mechanism. Second, the device uses a fixed jack for jacking. When jacking steel-concrete composite beams of inconsistent weights, sometimes multiple jacks of different numbers and positions are required, which makes the device inconvenient to use during jacking. Utility Model Content

[0004] 1. Technical issues to be solved

[0005] In view of the deficiencies in the prior art, the utility model provides a multi-point walking type jacking device for a large-span steel-concrete composite beam, which solves the problems raised in the above-mentioned background technology.

[0006] (II) Technical solution

[0007] To achieve the above purpose, the utility model is implemented through the following technical solutions: a multi-point walking jacking device for a large-span steel-concrete composite beam, comprising a beam seat, a pushing mechanism arranged inside the beam seat, and a lifting mechanism installed on the top of the pushing mechanism, wherein the pushing mechanism is composed of a moving frame, a moving wheel, a crawler track, a positioning wheel, a hydraulic cylinder, a fixed plate, an oil tank and an oil pump box, a bottom limiting groove is provided at the bottom of the beam seat, the bottom of the fixed plate is plugged into the bottom limiting groove, and the moving frame is arranged inside the beam seat, the moving wheel is installed on one side of the moving frame, the moving frame is arranged in two groups, and the two groups of moving frames are connected by a connecting frame, the crawler track is arranged on the moving wheel, and the positioning wheel is installed at the center of the moving wheel, a side limiting groove is provided on the inner side wall of the beam seat, the positioning wheel is arranged inside the side limiting groove, the lifting mechanism is composed of a top mounting groove, a clamping assembly, a clamping plate, a jack and an abutment plate, a plurality of clamping plates and jacks can be arranged inside the top mounting groove, and the abutment plate is installed on the top of the jack.

[0008] Optionally, multiple moving wheels are arranged on the outside of the moving frame, and the tracks are connected to the moving wheels. Two hydraulic cylinders are provided and are respectively arranged on both sides of the moving frame. One end of the bottom of the hydraulic cylinder is fixedly connected to the mounting frame, and the mounting frame and the moving frame are connected by bolts. The end of the hydraulic cylinder is fixedly connected to one side of the fixed plate.

[0009] Optionally, the oil tank is fixedly mounted on the outside of the mobile frame, and the oil pump box is installed inside the oil tank. An oil pump is arranged inside the oil pump box. The oil pump is provided with two oil discharge ports and one oil inlet port, and the two oil discharge ports are independent of each other.

[0010] Optionally, the oil inlet port is connected to the oil tank through a pipeline, and the two oil discharge ports are respectively connected to oil inlet pipes, the ends of the oil inlet pipes are connected to the hydraulic cylinder, and a first one-way valve is provided on the oil inlet pipe, and an oil discharge pipe is provided between the hydraulic cylinder and the oil tank, and a second one-way valve is provided on the oil discharge pipe.

[0011] Optionally, detachably connected cleaning brushes are provided on both sides of the bottom of the pushing mechanism, the cleaning brushes are respectively provided on both sides of the track, and the width of the cleaning brush exceeds the width of the track, and the bottom of the cleaning brush abuts against the bottom of the beam seat.

[0012] Optionally, multiple grooves are provided on both sides of the inner wall of the top mounting groove, and the grooves are distributed in a linear array on the inner wall of the top mounting groove. The snap-on assembly is arranged inside the groove. The snap-on assembly consists of an abutment terminal and an abutment spring. The end of the abutment terminal is hemispherical. One end of the abutment spring is fixedly connected to the abutment terminal, and the other end of the abutment spring is fixedly connected to the inner wall of the top mounting groove.

[0013] Optionally, two sides of the card plate abut against the abutment terminals, an outer wall of the card plate abuts against the abutment terminals, and the bottom of the jack is fixedly connected to the top of the card plate.

[0014] (III) Beneficial effects

[0015] The utility model provides a multi-point walking type jacking device for a large-span steel-concrete composite beam, which has the following beneficial effects:

[0016] 1. The multi-point walking pushing device for the large-span steel-concrete composite beam can be pushed by the movement of the crawler when in use, through the arrangement of moving wheels, crawler tracks and hydraulic cylinders, thereby reducing friction and greatly increasing the load-bearing capacity. The wear of the pushing mechanism can be reduced in a high-load-bearing environment, thereby increasing its service life. The cleaning brush can clean impurities on the crawler moving track in advance during pushing, thereby greatly reducing the probability of crawler damage and improving the effect of protecting the crawler.

[0017] 2. The multi-point walking jacking device for the large-span steel-concrete composite beam can be used to install multiple jacks at different positions through the arrangement of the top mounting groove and the clamping assembly, making it more convenient to lift steel-concrete composite beams of different widths and weights. When the jack is damaged, it can also be quickly disassembled for maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a schematic diagram of the internal cross-sectional structure of the utility model;

[0019] Figure 2 This is a schematic diagram of the top view structure of the utility model;

[0020] Figure 3 For this utility model Figure 1 The enlarged structural diagram of the middle A part;

[0021] Figure 4 For this utility model Figure 2 A schematic diagram of the enlarged structure of the middle B part;

[0022] Figure 5 It is a three-dimensional structural schematic diagram of the push mechanism of the utility model.

[0023] In the figure: 1. beam seat; 2. moving frame; 3. moving wheel; 4. crawler track; 5. positioning wheel; 6. hydraulic cylinder; 7. fixed plate; 8. oil tank; 9. oil pump box; 10. oil inlet pipe; 11. oil outlet pipe; 12. first one-way valve; 13. second one-way valve; 14. bottom limit groove; 15. connecting frame; 16. mounting frame; 17. cleaning brush; 18. fixed plate; 19. top mounting groove; 20. abutment terminal; 21. abutment spring; 22. clamping plate; 23. jack; 24. abutment plate; 25. side limit groove. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0025] Embodiment 1:

[0026] See also Figures 1 to 5 The utility model provides a technical solution: a multi-point walking jacking device for a large-span steel-concrete composite beam, comprising a beam seat 1, a pushing mechanism arranged inside the beam seat 1, and a lifting mechanism installed on the top of the pushing mechanism, wherein the pushing mechanism is composed of a moving frame 2, a moving wheel 3, a crawler 4, a positioning wheel 5, a hydraulic cylinder 6, a fixed plate 7, an oil tank 8, and an oil pump box 9. A bottom limiting groove 14 is provided at the bottom of the beam seat 1, and the bottom of the fixed plate 7 is inserted into the bottom limiting groove 14. The moving frame 2 is arranged inside the beam seat 1, and the moving wheel 3 is installed on one side of the moving frame 2. The moving frame 2 is arranged in two groups, and the two groups of moving frames 2 are connected by a connecting frame 15. The crawler 4 is arranged on the moving wheel 3, and the positioning wheel 5 is installed at the center of the moving wheel 3. A side limiting groove 25 is provided on the inner side wall of the beam seat 1, and the positioning wheel 5 is arranged inside the side limiting groove 25. A plurality of moving wheels 3 are arranged outside the moving frame 2, and the crawler 4 is sleeved on the moving wheel 3. On the top, two hydraulic cylinders 6 are provided, and are respectively arranged on both sides of the mobile frame 2, one end of the bottom of the hydraulic cylinder 6 is fixedly connected with a mounting frame 16, the mounting frame 16 and the mobile frame 2 are bolted, the end of the hydraulic cylinder 6 is fixedly connected to one side of the fixed plate 7, the oil tank 8 is fixedly installed on the outer side of the mobile frame 2, and the oil pump box 9 is installed inside the oil tank 8, an oil pump is arranged inside the oil pump box 9, the oil pump is provided with two oil discharge ports and an oil inlet port, and the two oil discharge ports are independent of each other, the oil inlet port is connected to the oil tank 8 through a pipeline, the two oil discharge ports are respectively connected with oil inlet pipes 10, the end of the oil inlet pipe 10 is connected to the hydraulic cylinder 6, and the oil inlet pipe 10 is provided with a first one-way valve 12, an oil discharge pipe 11 is provided between the hydraulic cylinder 6 and the oil tank 8, and the oil discharge pipe 11 is provided with a second one-way valve 13, and the jacking mechanism is composed of a top mounting groove 19, a clamping assembly, a clamping plate 22, a jack 23 and an abutment plate 24.

[0027] When in use, first push the large-span steel-concrete composite beam. Since the distance to be moved is long and the width is wide, it is necessary to install multiple pushing mechanisms and lifting mechanisms to ensure smooth pushing, and a longer connecting frame 15 is needed to connect the two moving frames 2, so that the positioning wheel 5 on one side of the moving wheel 3 is clamped in the side limit groove 25, and the fixing plate 7 is inserted in the bottom limit groove 14 to ensure that the pushing mechanism runs in a straight line during the pushing process. When pushing, first put the large-span steel-concrete composite beam on the left end of the top of the beam seat 1, and then start the lifting mechanism to lift the bottom of the large-span steel-concrete composite beam through the jack 23, and then start the oil pump inside the oil pump box 9, and the oil pump is filled with oil to the hydraulic cylinder 6 on the left through the oil inlet pipe 10 connected to the left oil discharge port, and then The hydraulic oil inside the hydraulic cylinder 6 on the right is injected into the oil tank 8 through the oil drain pipe 11, so that the hydraulic cylinder 6 on the left is extended and the hydraulic cylinder 6 on the right is shortened, driving the pushing mechanism to move from left to right, pushing the large-span steel-concrete composite beam a part, and then retracting the jack 23, so that the large-span steel-concrete composite beam falls on the beam seat 1, and then starting the oil pump to inject oil into the hydraulic cylinder 6 on the right through the oil inlet pipe 10 connected to the right oil drain port, and injecting the hydraulic oil inside the hydraulic cylinder 6 on the left into the oil tank 8 through the oil drain pipe 11, so that the hydraulic cylinder 6 on the right is extended and the hydraulic cylinder 6 on the left is shortened, and the moving frame 2 is restored to its original starting point; then the above-mentioned movement process is repeated, and the large-span steel-concrete composite beam can be gradually pushed and finally moved to the specified position.

[0028] Embodiment 2:

[0029] See also Figures 1 to 5The utility model provides a technical solution: detachably connected cleaning brushes 17 are arranged on both sides of the bottom of the push mechanism, the cleaning brushes 17 are arranged on both sides of the crawler 4, and the width of the cleaning brush 17 exceeds the width of the crawler 4, the bottom of the cleaning brush 17 abuts against the bottom of the beam seat 1, a plurality of grooves are opened on both sides of the inner wall of the top mounting groove 19, and the grooves are distributed in a linear array on the inner wall of the top mounting groove 19, a plurality of card plates 22 and jacks 23 can be arranged inside the top mounting groove 19, and the abutment plate 24 is installed on the top of the jack 23, the card assembly is arranged inside the groove, and the card assembly consists of an abutment terminal 20 and an abutment terminal 21. The abutment terminal 20 is composed of a spring 21, and the end of the abutment terminal 20 is hemispherical. One end of the abutment spring 21 is fixedly connected to the abutment terminal 20, and the other end of the abutment spring 21 is fixedly connected to the inner wall of the top mounting groove 19. A plurality of grooves are provided on both sides of the inner wall of the top mounting groove 19, and the grooves are distributed in a linear array on the inner wall of the top mounting groove 19. The snap-on assembly is arranged inside the groove. The snap-on assembly consists of the abutment terminal 20 and the abutment spring 21. The end of the abutment terminal 20 is hemispherical. One end of the abutment spring 21 is fixedly connected to the abutment terminal 20, and the other end of the abutment spring 21 is fixedly connected to the inner wall of the top mounting groove 19.

[0030] When in use, the pushing mechanism pushes the crawler 4 to move. At this time, the cleaning brushes 17 located on both sides of the crawler 4 can clean the impurities on its path as the crawler 4 moves, and push the impurities to both sides of the crawler 4 to prevent affecting the operation of the crawler 4. Then, when lifting large-span steel-concrete composite beams of different weights and widths, jacks 23 with different positions and different load-bearing capacities can be installed inside the top mounting groove 19 as needed. When installing the jack 23, it is necessary to insert the card plate 22 at the bottom thereof into the top mounting groove 19, and the abutting terminal 20 is squeezed to retract the abutting spring 21, and then the abutting terminals 20 on both sides limit the card plate 22. When replacing the jack 23, it is only necessary to pull the jack 23 out of the top mounting groove 19, which is convenient for use, replacement and maintenance.

[0031] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A multi-point walking jacking device for a large-span steel-concrete composite beam, comprising a beam seat, a pushing mechanism arranged inside the beam seat, and a jacking mechanism installed on the top of the pushing mechanism, characterized in that: The pushing mechanism is composed of a moving frame, a moving wheel, a crawler track, a positioning wheel, a hydraulic cylinder, a fixed plate, an oil tank and an oil pump box. A bottom limiting groove is provided at the bottom of the beam seat, the bottom of the fixed plate is inserted into the bottom limiting groove, and the moving frame is arranged inside the beam seat, the moving wheel is installed on one side of the moving frame, the moving frame is arranged in two groups, and the two groups of moving frames are connected by a connecting frame, the crawler track is arranged on the moving wheel, and the positioning wheel is installed at the center of the moving wheel, a side limiting groove is provided on the inner side wall of the beam seat, the positioning wheel is arranged inside the side limiting groove, and the jacking mechanism is composed of a top mounting groove, a clamping assembly, a clamping plate, a jack and an abutment plate, a plurality of clamping plates and jacks can be arranged inside the top mounting groove, and the abutment plate is installed on the top of the jack.

2. The multi-point walking type jacking device for a large-span steel-concrete composite beam according to claim 1 is characterized in that: There are multiple moving wheels on the outside of the moving frame, and the tracks are sleeved on the moving wheels. There are two hydraulic cylinders, which are respectively arranged on both sides of the moving frame. One end of the bottom of the hydraulic cylinder is fixedly connected to a mounting frame, and the mounting frame and the moving frame are connected by bolts. The end of the hydraulic cylinder is fixedly connected to one side of the fixed plate.

3. The multi-point walking type jacking device for a large-span steel-concrete composite beam according to claim 1 is characterized in that: The oil tank is fixedly mounted on the outer side of the mobile frame, and the oil pump box is mounted inside the oil tank. An oil pump is arranged inside the oil pump box. The oil pump is provided with two oil discharge ports and one oil inlet port, and the two oil discharge ports are independent of each other.

4. The multi-point walking type jacking device for a large-span steel-concrete composite beam according to claim 3 is characterized in that: The oil inlet port is connected to the oil tank through a pipeline, and the two oil discharge ports are respectively connected with oil inlet pipes, the ends of the oil inlet pipes are connected to the hydraulic cylinder, and a first one-way valve is arranged on the oil inlet pipe, and an oil discharge pipe is arranged between the hydraulic cylinder and the oil tank, and a second one-way valve is arranged on the oil discharge pipe.

5. The multi-point walking type jacking device for a large-span steel-concrete composite beam according to claim 1 is characterized in that: Both sides of the bottom of the pushing mechanism are provided with detachably connected cleaning brushes, which are respectively arranged on both sides of the crawler track, and the width of the cleaning brush exceeds the width of the crawler track, and the bottom of the cleaning brush abuts against the bottom of the beam seat.

6. The multi-point walking type jacking device for a large-span steel-concrete composite beam according to claim 1 is characterized in that: There are multiple grooves on both sides of the inner wall of the top mounting groove, and the grooves are distributed in a linear array on the inner wall of the top mounting groove. The snap-on assembly is arranged inside the groove. The snap-on assembly consists of an abutment terminal and an abutment spring. The end of the abutment terminal is hemispherical. One end of the abutment spring is fixedly connected to the abutment terminal, and the other end of the abutment spring is fixedly connected to the inner wall of the top mounting groove.

7. The multi-point walking type jacking device for a large-span steel-concrete composite beam according to claim 1 is characterized in that: Both sides of the card plate abut against the abutment terminals, the outer wall of the card plate abuts against the abutment terminals, and the bottom of the jack is fixedly connected with the top of the card plate.