Cover beam bracket
By designing a detachable cover beam bracket, the problem of inability to turnover and utilize the cover beam bracket in the prior art is solved, construction efficiency and stability are improved, and resource conservation is achieved.
Patent Information
- Application Number
- CN202420288932.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-07
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-02-07
AI Technical Summary
During the construction of cast-in-place concrete cover beams, the fixed cover beam brackets cannot be turned around and used, resulting in low construction efficiency and waste of resources.
A removable cover beam bracket is designed, including supporting cow legs, adjustable trusses, load-bearing beams and cover beam support structures. The turnover and utilization of the bracket is achieved through the removable installation of supporting cow legs and the fixed installation of trusses. , improve construction efficiency and save materials.
Through this design, the easy disassembly and turnover utilization of the cover beam bracket is achieved, construction efficiency is improved, engineering materials is saved, and a flat connecting structure is set up between the load-bearing beams to improve stability and facilitate disassembly and installation.
Smart Images

Figure CN222008658U_ABST
Abstract
Description
Technical Field
[0001] The present application generally relates to the field of bridge construction technology, and specifically to a cap beam bracket. Background Art
[0002] Common cap beams include the following three categories: cast-in-place concrete cap beams, prefabricated directly supported cap beams, and cantilevered cap beams. With the rapid development of urban rail transit, the combined construction of road and rail has become an important way of urban rail transit construction. As one of the commonly used beam types in rail transit construction, the double-layer composite cast-in-place cap beam has the advantages of reliable structure, long service life, and high safety performance. Among them, cast-in-place concrete cap beams and prefabricated directly supported cap beams are often used in the conventional construction of buildings, while cantilevered cap beams are mostly used in the construction of large projects such as bridges and high-rise buildings. At present, when constructing cast-in-place concrete cap beams, the cap beam brackets used are fixed and cannot be used in a cyclical manner, resulting in the need to repeatedly build cap beam brackets, which reduces construction efficiency. Utility Model Content
[0003] In view of the above-mentioned defects or deficiencies in the prior art, it is desired to provide a cap beam bracket that can effectively realize turnover utilization.
[0004] In a first aspect, the utility model provides a cap beam bracket, which is used to support and install the cap beam on a bent frame pile pier, and the cap beam bracket includes:
[0005] Supporting corbels, which are detachably mounted on the bent pile piers;
[0006] The trusses are arranged on opposite sides of the bent pile pier and are fixedly mounted on the supporting corbels. The installation height of the trusses is adjustable, and a parallel joint structure is installed between the trusses.
[0007] The load-bearing beam is fixedly installed on the top of the truss;
[0008] The cap beam support structure is fixedly installed on the load-bearing beam and is used to support the cap beam in a limited position.
[0009] As an optional solution, the cap beam bracket also includes: a unloading block, which is located between the supporting corbel and the truss, and the truss is installed on the unloading block for adjusting the installation height of the truss.
[0010] As an optional solution, it also includes a pin rod, the supporting corbel is installed on the pin rod, and the pin rod is fixedly installed on the rack pile pier.
[0011] As an optional solution, each truss includes two columns arranged opposite to each other, a load-bearing rod is installed at the bottom of the column, the column and the load-bearing rod are both installed on the supporting corbels, and a diagonal brace is arranged between the column and the load-bearing rod.
[0012] As an optional solution, the parallel structure includes: a first steel section and a second steel section, the first steel section is installed perpendicular to the column and is detachably connected to the column, the second steel section forms an acute angle with the first steel section and is detachably connected to the column.
[0013] As an optional solution, the parallel structure includes at least two first steel sections and at least one second steel section, at least two first steel sections are arranged in parallel and spaced apart between the columns, and a second steel section is arranged between two adjacent first steel sections; the first steel section has a first end and a second end, one end of the second steel section is located at the first end of one of the first steel sections, and the other end of the second steel section is located at the second end of the other first steel section.
[0014] As an optional solution, the first steel section is connected to the column by bolts, and the second steel section is connected to the column by bolts; a connecting plate is provided at the connection between the first steel section and the second steel section and the column respectively, and bolt holes are opened on the connecting plate. Bolts pass through the bolt holes to connect the first steel section and the second steel section to the steel pipe respectively.
[0015] As an optional solution, the load-bearing beams include a plurality of first load-bearing beams and a plurality of second load-bearing beams, wherein the plurality of first load-bearing beams are arranged horizontally and in parallel at intervals on the top of the truss, and the plurality of second load-bearing beams are vertically installed between two adjacent first load-bearing beams, and a parallel connection structure is also arranged between the first load-bearing beams on the trusses on opposite sides;
[0016] Preferably, a baffle is provided on the edge of the first load-bearing beam.
[0017] As an optional solution, a distribution beam is also included. The distribution beam is installed on the first load-bearing beam and is located on the first load-bearing beam at the area on the opposite sides of the frame pile pier. The distribution beam is welded to the first load-bearing beam through a steel bar slot.
[0018] As an optional solution, the cap beam support structure includes wedge-shaped support structures fixedly installed on the distribution beams on both sides, each wedge-shaped support structure includes a third steel section, a fourth steel section and a plurality of fifth steel sections, the third steel section is horizontally arranged, the fourth steel section is inclined and forms an acute angle with the third steel section, one end of the third steel section is welded to one end of the fourth steel section, the fifth steel section is welded between the third steel section and the fourth steel section, and the distance between the fourth steel sections on both sides gradually increases along the direction vertically away from the distribution beam.
[0019] The cap beam bracket of the utility model is provided with supporting corbels, which are detachably mounted on the frame pile piers; trusses, which are provided on opposite sides of the frame pile piers and fixedly mounted on the supporting corbels, and the installation height of the trusses is adjustable, and a parallel connection structure is installed between the trusses; a load-bearing beam, which is fixedly mounted on the top of the truss; and a cap beam support structure, which is fixedly mounted on the load-bearing beam and is used to limit the support of the cap beam. By detachably mounting the supporting corbels, and fixing the trusses on the supporting corbels, and fixing the load-bearing beams and the cap beam support structure on the trusses, it is convenient to disassemble the entire cap beam bracket for turnover, improve construction efficiency, and save engineering materials; and the parallel connection structure between the load-bearing beams is conducive to improving stability and facilitating disassembly and installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:
[0021] Figure 1 This is a schematic structural diagram of a cap beam bracket according to an embodiment of the present application;
[0022] Figure 2 It is a side view of the figure;
[0023] Figure 3 A schematic diagram of a flat connection structure in a cap beam bracket according to an embodiment of the present application;
[0024] Figure 4 A schematic diagram of the structure of a supporting bracket and a pin rod according to an embodiment of the present application;
[0025] Figure 5 This is a schematic structural diagram of a cap beam support structure according to an embodiment of the present application.
[0026] In the figure,
[0027] 110, first steel section, A1, first end, A2, second end, 120, second steel section, 130, connecting plate, 140, bolt;
[0028] 210, supporting corbel, 220, truss, 221, load-bearing rod, 222, diagonal brace, 231, first load-bearing beam, 232, second load-bearing beam, 240, cap beam supporting structure, 241, third steel, 242, fourth steel, 243, fifth steel, 250, unloading block, 260, pin rod, 270, distribution beam, 280, baffle;
[0029] 300. Frame pile pier. DETAILED DESCRIPTION
[0030] The present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the relevant application, rather than to limit the application. It is also necessary to explain that, for ease of description, only the parts related to the application are shown in the accompanying drawings.
[0031] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0032] The terms used in this application are only for the purpose of describing specific embodiments and are not intended to limit this application. The singular forms of "a", "said" and "the" used in this application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings. It should also be understood that the term "and / or" used in this article refers to and includes any or all possible combinations of one or more associated listed items.
[0033] Based on the above problems, Figure 1-5 As shown, an embodiment of the present application provides a cap beam bracket 200, which is used to support and install the cap beam on the bent pile pier 300, and the cap beam bracket 200 includes:
[0034] A supporting corbel 210, which is detachably mounted on the bent pile pier 300;
[0035] The trusses 220 are arranged on opposite sides of the bent pile pier 300 and are fixedly mounted on the supporting corbels 210. The mounting height of the trusses 220 is adjustable, and a parallel connection structure is installed between the trusses 220.
[0036] A load-bearing beam, which is fixedly mounted on the top of the truss 220;
[0037] The cap beam support structure 240 is fixedly mounted on the load-bearing beam and is used to support the cap beam in a limited position.
[0038] It should be noted that the cap beam bracket 200 of the embodiment of the present application can be applicable to the support and installation of any type of cap beam.
[0039] Among them, the supporting corbel 210 is an overhanging structure located on the outside of the frame pile pier 300. In order to meet the bearing capacity requirements, it is usually made thick enough and shaped like a corbel; the function of the supporting corbel 210 is to connect the cantilever beam and the hanging beam, and transfer the load from the hanging beam, and disperse the force of the beam support to the load-bearing object below; the truss 220 is a plane or spatial structure composed of straight rods and generally has triangular units. The truss 220 rods mainly bear axial tension or pressure, so as to make full use of the strength of the material. When the span is large, it can save materials compared with solid beams, reduce self-weight and increase rigidity; the load-bearing beam is mainly used for bearing weight to ensure that the cap beam bracket 200 can reliably support the cap beam; the cap beam support structure 240 is mainly used for limiting the support of the cap beam. The cap beam support structure 240 limits the space for casting the cap beam according to the actual shape of the cap beam, which is convenient for cast-in-place cap beam construction on the bracket.
[0040] It can be understood that the support bracket 210 and the bent frame pile pier 300 are connected by any detachable manner, for example, the support bracket 210 and the bent frame pile pier 300 are connected by a buckle; of course, the support bracket 210 and the bent frame pile pier 300 can also be connected by a pin rod 260 or a pin column, etc., as long as the detachable connection of the support bracket 210 can be ensured, so as to facilitate the overall disassembly and turnover of the entire cap beam bracket 200;
[0041] The truss 220 may be a truss 220 of any existing structure. For example, the truss 220 includes two columns, a load-bearing rod 221 is connected between the two columns, and an oblique support rod 222 is provided between each column and the load-bearing rod 221. A triangular structure is formed between the oblique support rod 222, the load-bearing rod 221 and the column, thereby making the truss 220 structure stable.
[0042] The load-bearing beam can be welded by steel sections. In the actual construction site, a load-bearing beam is set on each of the two opposite sides of the frame pile pier 300. After the load-bearing beams on both sides are installed, the tension rod construction is immediately carried out to ensure that the load-bearing beam forms a whole, prevent the load-bearing beam from falling, and ensure the safety of the construction;
[0043] The cap beam support structure 240 is formed by welding steel sections according to the actual cap beam shape and is arranged on both sides of the load-bearing beam located at the bent pile pier 300. The cap beam support structure 240 defines a space for the cap beam construction.
[0044] The cap beam bracket 200 of the embodiment of the present application solves the problem that the cap beam bracket 200 in the prior art cannot be circulated and utilized, resulting in waste of resources and low construction efficiency. The cap beam bracket 200 of the embodiment of the present application is provided with a supporting corbel 210, which is detachably mounted on the frame pile pier 300; a truss 220, which is provided on opposite sides of the frame pile pier 300 and fixedly mounted on the supporting corbel 210, and the installation height of the truss 220 is adjustable, and a parallel connection structure is installed between the trusses 220; a load-bearing beam, which is fixedly mounted on the top of the truss 220; and a cap beam support structure 240, which is fixedly mounted on the load-bearing beam and is used to limit the support of the cap beam. By detachably installing the supporting corbel 210 and fixing the truss 220 on the supporting corbel 210, and fixing the load-bearing beam and the cap beam support structure 240 on the truss 220, it is convenient to disassemble the entire cap beam bracket 200 for turnover utilization, thereby improving construction efficiency and saving engineering materials; and the parallel connection structure between the load-bearing beams is conducive to improving stability and facilitating disassembly and installation.
[0045] As an achievable method, Figure 1 and 2 As shown, the cap beam bracket 200 also includes: a removal block 250 , which is located between the supporting corbel 210 and the truss 220 , and the truss 220 is installed on the removal block 250 for adjusting the installation height of the truss 220 .
[0046] The truss 220 may be installed on the unloading block 250 by any fixed connection method, such as but not limited to welding, bolt fixing, etc.
[0047] It is understandable that the unloading block 250 has the advantages of strong overall structural integrity and high reliability. The height of the unloading block 250 can be adjusted by the bolts and studs on the unloading block 250, so as to adjust the height of the cap beam bracket 200; and the unloading block 250 is also conducive to the safe and rapid removal of the cast-in-place beam support. Currently, the commonly used support unloading blocks 250 mainly include wedges, sand cylinders, etc., but due to the limited distance between the top of the pier and the cast-in-place beam, the unloading block 250 is set to achieve the purpose of being able to quickly and safely remove the support outside the pier top.
[0048] In actual construction, the single weight of the unloading block 250 is 88kg, the minimum height is 240mm, the maximum height is 340mm, and the height can be adjusted up and down by 100mm.
[0049] This embodiment provides a removal block 250 , which is beneficial for further adjusting the height of the entire cap beam bracket 200 , and facilitates installation and disassembly of the cap beam bracket 200 , thereby facilitating the turnover utilization of the cap beam bracket 200 .
[0050] In some embodiments, a pin rod 260 is further included, and the supporting corbel 210 is mounted on the pin rod 260 , and the pin rod 260 is fixedly mounted on the bent pile pier 300 .
[0051] The pin rod 260 of this embodiment is mainly used to fix the supporting corbel 210 to facilitate the detachable installation of the supporting corbel 210 .
[0052] During the specific construction process, the pin rod 260 and the supporting corbel are installed manually in cooperation with a truck crane. The operator guides the pin rod 260 to the vicinity of the PVC pipe and pushes it into the reserved hole, then slowly installs the supporting corbel 210 on the pin rod 260, and uses a total station to adjust the installation angle and accuracy of the supporting corbel 210.
[0053] In some embodiments, each truss 220 includes two oppositely arranged columns, a load-bearing rod 221 is installed at the bottom of the column, the column and the load-bearing rod 221 are both installed on the supporting corbel 210, and a diagonal brace 222 is arranged between the column and the load-bearing rod 221.
[0054] The truss 220 of this embodiment is composed of diagonal braces 222, columns and load-bearing rods 221, which is conducive to forming a triangular structure, so that the truss 220 has good stability and can reliably bear the cap beam.
[0055] As an achievable method, Figure 3 As shown, the parallel structure 100 includes: a first steel section 110 and a second steel section 120. The first steel section 110 is installed perpendicular to the column and is detachably connected to the column. The second steel section 120 forms an acute angle with the first steel section 110 and is detachably connected to the column.
[0056] It can be understood that the first steel section 110 is arranged perpendicular to the column, that is, the first steel section 110 is installed horizontally; the second steel section 120 forms an acute angle with the first steel section 110, that is, the second steel section 120 is installed obliquely, and the second steel section 120 is installed obliquely between the columns. In this way, a triangular structure is formed between the first steel section 110, the second steel section 120 and the column, which is conducive to ensuring the structural stability of the entire steel pipe support 200.
[0057] The second steel section 120 and the first steel section 110 form an acute angle of any angle, such as but not limited to 30 o , 45 o , 55 o , 60 o , 70 o , 75 o or 80 oAs long as the second steel section 120 and the first steel section 110 are installed at an acute angle, it is beneficial to form a triangular structure with the column and ensure the stability of the steel pipe bracket 200.
[0058] It can also be understood that the first steel section 110 is connected to the column by any detachable connection method, for example, the first steel section 110 is connected to the column by bolts 140. Of course, in some other embodiments, the first steel section 110 is connected to the column by snap-fit connection, and the embodiments of the present application are not limited to this; similarly, the second steel section 120 is connected to the column by any detachable method, such as but not limited to bolt 140 connection or snap-fit connection.
[0059] In actual use, a parallel connection structure 100, two parallel connection structures 100 or more than two parallel connection structures 100 can be set between the columns, which is determined according to actual needs; of course, a parallel connection structure 100 can be a second steel section 120 set between two first steel sections 110; it can also be a first steel section 110 and a second steel section 120; it can also be two second steel sections 120 set between two first steel sections 110; or it can also be more than two first steel sections 110, and one or two second steel sections 120 are set between two adjacent first steel sections 110, which is determined according to actual construction needs, and the embodiments of the present application do not make specific limitations on this.
[0060] In some embodiments, the parallel structure 100 includes at least two first steel sections 110 and at least one second steel section 120, at least two first steel sections 110 are arranged in parallel and spaced apart between the columns, and a second steel section 120 is arranged between two adjacent first steel sections 110; the first steel section 110 has a first end A1 and a second end A2, one end of the second steel section 120 is located at the first end A1 of one of the first steel sections 110, and the other end of the second steel section 120 is located at the second end A2 of the other first steel section 110.
[0061] At least two first steel sections 110 are arranged in parallel and spaced apart along the height direction of the column, so as to connect the columns in the transverse direction.
[0062] In this embodiment, it is helpful to adjust the arrangement of the parallel structure 100 according to construction requirements and the height of the columns, and the stability of the entire parallel structure 100 is improved by arranging a second steel section 120 between two adjacent first steel sections 110 .
[0063] It can be understood that a second steel section 120 is arranged between two adjacent first steel sections 110 as an example for explanation: the second steel section 120 is installed between two adjacent first steel sections 110, one end of the second steel section 120 is connected to the first end A1 of one of the first steel sections 110, and the other end of the second steel section 120 is connected to the second end A2 of the other first steel section 110. In this way, while protecting the second steel section 120 from being installed at an acute angle to the first steel section 110, the second steel section 120 connects the two adjacent first steel sections 110 to form a triangle with the columns, thereby improving the stability of the entire steel pipe bracket 200.
[0064] In some other embodiments, the first steel section 110 is bolted to the column, and the second steel section 120 is bolted to the column; a connecting plate 130 is provided at the connection between the first steel section 110 and the second steel section 120 and the column respectively, and bolt holes are opened on the connecting plate 130, and bolts 140 pass through the bolt holes to connect the first steel section 110 and the second steel section 120 to the columns respectively.
[0065] As an achievable manner, the parallel structure 100 includes at least two first steel sections 110 and at least two second steel sections 120 , wherein the at least two first steel sections 110 are arranged in parallel and spaced apart between the columns, and two second steel sections 120 are arranged between two adjacent first steel sections 110 and the two second steel sections 120 are arranged crosswise.
[0066] Furthermore, each end of the second steel section 120 is located at the end of the first steel section 110 and is detachably connected to the column.
[0067] It can be understood that two second steel sections 120 are arranged between two adjacent first steel sections 110 as an example for explanation: the two second steel sections 120 are installed between two adjacent first steel sections 110, one end of one of the second steel sections 120 is connected to the first end A1 of one of the first steel sections 110, the other end of one of the second steel sections 120 is connected to the second end A2 of the other first steel section 110, one end of the other second steel section 120 is connected to the second end A2 of one of the first steel sections 110, and the other end of the other second steel section 120 is connected to the first end A1 of the other first steel section 110. In this way, an "X"-shaped second steel section 120 is arranged between the two adjacent first steel sections 110. In this way, while ensuring that the second steel section 120 is installed at an acute angle to the first steel section 110, the second steel section 120 connects the two adjacent first steel sections 110 to form a triangle with the column, thereby improving the stability of the entire steel pipe support 200.
[0068] In this embodiment, the parallel structure 100 is facilitated to reliably connect the first steel section 110 and the column to form a triangular structure, thereby improving the stability of the steel pipe support 200 by arranging two staggered second steel sections 120 between two adjacent first steel sections 110, and the second steel section 120 is located at the end of the first steel section 110.
[0069] In some embodiments, the first steel section 110 is connected to the column by bolts 140 , and the second steel section 120 is connected to the column by bolts 140 .
[0070] In this embodiment, the first steel section 110 and the second steel section 120 are respectively connected to the columns by bolts 140, which is convenient for disassembly and installation and improves construction efficiency.
[0071] As an achievable method, Figure 3 As shown, a connecting plate 130 is provided at the connection between the first steel section 110 and the second steel section 120 and the column respectively. The connecting plate 130 is provided with a bolt 140 hole. The bolt 140 passes through the bolt hole to connect the first steel section 110 and the second steel section 120 to the steel pipe respectively.
[0072] In this embodiment, the connection plate 130 is mainly used to connect the first steel section 110 and the column through the bolt 140, or to connect the second steel section 120 and the column through the bolt 140, and at the same time, the force distribution at the connection between the first steel section 110 and the column is uniform, and the force distribution at the connection between the second steel section 120 and the column is uniform, so that the connection is reliable and firm, and the stability of the steel pipe support 200 can be reliably guaranteed.
[0073] In some embodiments, the first steel section 110 and the second steel section 120 are each connected to the column by at least four bolts 140 .
[0074] In this embodiment, the first steel section 110 and the second steel section 120 are respectively connected to the column by at least four bolts 140, which is conducive to fixing the first steel section 110 and the column, and the second steel section 120 and the column from different directions, and is conducive to further reliably ensuring the connection between the parallel structure 100 and the column and ensuring the stability of the steel pipe bracket 200.
[0075] As a feasible method, the load-bearing beams include a plurality of first load-bearing beams 231 and a plurality of second load-bearing beams 232. The plurality of first load-bearing beams 231 are horizontally arranged in parallel and at intervals on the top of the truss 220, and the plurality of second load-bearing beams 232 are vertically installed between two adjacent first load-bearing beams 231. A parallel connection structure 100 is also arranged between the first load-bearing beams 232 on the trusses 220 on opposite sides.
[0076] In this embodiment, the load-bearing beam structure reliably enhances the stability and strength of the load-bearing structure of the load-bearing beam by setting a first load-bearing beam 231 and a second load-bearing beam 232 in two directions perpendicular to each other, so that the load-bearing beam has good load-bearing capacity.
[0077] The first load-bearing beam 231 and the second load-bearing beam 232 may be supported by steel sections or steel pipes, etc., and the embodiments of the present application do not specifically limit this.
[0078] In actual installation, a supporting corbel 210 and a relief block 250 may also be installed at a preset position on the side of the first load-bearing beam facing the ground.
[0079] In a preferred embodiment, a baffle 280 is provided on the edge of the first load-bearing beam 231 .
[0080] It can be understood that blocks are provided on the first load-bearing beams 231 on both sides of the frame piers. The blocks are located on both sides of the cap beam support structure 240 and are mainly used to prevent the cap beam support structure 240 from moving when the cap beam concrete is poured, thereby ensuring reliable pouring of the cap beam.
[0081] The baffle 280 is made of profiled steel and welded to the first load-bearing beam 231 .
[0082] As a feasible method, a distribution beam 270 is also included. The distribution beam 270 is installed on the first load-bearing beam 231 and is located on the first load-bearing beam 231 at the area on the opposite sides of the frame pile pier 300. The distribution beam 270 is welded to the first load-bearing beam 231 through a steel bar slot.
[0083] The distribution beam 270 in this embodiment is mainly used to support and connect the cap beam support structure 240, so that the entire cap beam bracket 200 can reliably bear the cap beam. The distribution beam 270 is conducive to evenly distributing the force on the load-bearing beam, and reliably distributes the shear force, bending moment and torque of the load-bearing beam during the force process, thereby ensuring the reliable use of the entire cap beam bracket 200.
[0084] In specific use, the distribution beam 270 can be made of I25a steel.
[0085] In some embodiments, Figure 5As shown, the cap beam support structure 240 includes wedge-shaped support structures fixedly mounted on the distribution beams 270 on both sides, each wedge-shaped support structure includes a third steel section 241, a fourth steel section 242 and a plurality of fifth steel sections 243. The third steel section 241 is horizontally arranged, the fourth steel section 242 is inclined and forms an acute angle with the third steel section 241, one end of the third steel section 241 is welded to one end of the fourth steel section 242, and the fifth steel section 243 is welded between the third steel section 241 and the fourth steel section 242. Along the direction vertically away from the distribution beam 270, the distance between the fourth steel sections 242 on both sides gradually increases.
[0086] Among them, the wedge-shaped support structures located on both sides of the frame pile pier 300, the ends at which the third steel section 241 and the fourth steel section 242 are connected are placed facing each other, and a trapezoidal space with a larger top and a smaller bottom is defined between the wedge-shaped support structures on both sides, that is, along the direction vertically away from the distribution beam 270, the distance between the fourth steel sections 242 located on both sides gradually increases.
[0087] In this embodiment, the third steel section 241 and one end of the fourth steel section 242 are welded to form an angle structure, and the fifth steel section 243 is welded between the third steel section 241 and the fourth steel section 242. One end of the fifth steel section 243 is welded to the third steel section 241, and the other end of the fifth steel section 243 is welded to the fourth steel section 242. The fifth steel section 243, the third steel section 241 and the fourth steel section 242 form a triangular structure, so that the cap beam support structure 240 has good stability.
[0088] The cap beam bracket 200 of the present application is described in detail below through an embodiment.
[0089] like Figure 1-5As shown, the bent pile pier 300 is fixedly installed with at least two supporting brackets 210 through a pin rod 260, each supporting bracket 210 is provided with a discharge block 250, each discharge block 250 is respectively fixedly installed with a truss 220, and a flat joint structure is provided between the columns of the trusses 220 on both sides, and the flat joint structure includes two first steel sections 110 and a second steel section 120, the two first steel sections 110 are installed in parallel at intervals, the second steel section 120 is installed between the two first steel sections 110 at an acute angle with the first steel section 110, and the end of the second steel section 120 is located at the end of the first steel section 110. The first load-bearing beam 231 is fixedly installed on the top of each truss 220, and the second load-bearing beam 232 is vertically welded to the first load-bearing beam 231. A supporting corbel 210 is also provided on the side of the first load-bearing beam 231 close to the ground. The first load-bearing beam 231 is located on the edge area on both sides of the frame pile pier 300 and is welded with a distribution beam 270. A wedge-shaped supporting structure is welded to the distribution beam 270 on each side. A trapezoidal space with a larger upper part and a smaller lower part is defined between the two wedge-shaped supporting structures for pouring cap beam concrete. A baffle 280 is also welded to the edge of the first load-bearing beam 231 for limiting the wedge-shaped supporting structure.
[0090] The specific installation process is as follows:
[0091] (1) The pin rod 260 and the supporting bracket 210 are installed manually with a truck crane. The operator guides the pin rod 260 to the vicinity of the PVC pipe and pushes it into the reserved hole, and then slowly installs the supporting bracket 210 on the pin rod 260. The installation angle and accuracy of the bracket are adjusted using a total station;
[0092] (2) The assembled precision-cast unloading block 250 is adopted, which has strong overall structure and high reliability. The unloading block 250 has a single weight of 88kg, a minimum height of 240mm, a maximum height of 340mm, and an upper and lower height adjustment of 100mm;
[0093] (3) The steel sections that make up the truss 220 are hoisted in sections. Two truck cranes are used to hoist the truss 220 on one side, so that the truss 220 stands on the supporting bracket 210. After the truss 220 is in place, the verticality is adjusted and fixed with bolts. Finally, the truss 220 on the other side is hoisted and installed. Considering the lifting performance and hoisting conditions of the truck crane, when the steel truss 220 is hoisted, the truck crane is parked on one side of the pier and the trusses 220 are hoisted one by one.
[0094] (4) The two trusses 220 are connected by a flat joint structure to increase the overall stability of the bracket. The flat joint installation construction is a high-altitude operation, using a climbing vehicle as a climbing facility. The flat joint structure installation is bolted. After the trusses 220 are connected, the load-bearing beams are laid;
[0095] (5) The steel structure processing site completes the processing of the first load-bearing beam 231 and the second load-bearing beam 232. When hoisting on site, the position of the corbel support point is painted on the first load-bearing beam 231 with red paint, and it is hoisted horizontally to the designated position with a truck crane. The hoisting and installation should be slow to prevent sudden falling. After the first load-bearing beams 231 on both sides are installed, the tie rod construction is immediately carried out to ensure that the first load-bearing beam 231 forms a whole to prevent it from falling;
[0096] (6) Lay the distribution beam 270 on the load-bearing beam. The distribution beam 270 is made of I25a steel and hoisted to the designated position. Then the operator lays the distribution beam 270 according to the intervals in the drawing. If the distribution beam 270 conflicts with the back rib of the template, the distribution beam 270 can be moved appropriately. The moving distance shall not exceed 10 cm. The distribution beam 270 is welded to the first load-bearing beam 231 through the steel bar welding groove and fixed;
[0097] (7) The steel frame is lifted by a truck crane to the designated position of the distribution beam 270 and spot welded to the distribution beam 270. A stopper is set behind the steel frame. The stopper is welded to the main load-bearing beam with steel to prevent the steel frame from moving when the cap beam concrete is poured.
[0098] In summary, the cap beam bracket of the embodiment of the present application is provided with supporting corbels, which are detachably mounted on the frame pile piers; trusses are provided on opposite sides of the frame pile piers and the trusses are fixedly mounted on the supporting corbels, the installation height of the trusses is adjustable, and a parallel connection structure is installed between the trusses; load-bearing beams are fixedly mounted on the top of the trusses; and the cap beam support structure is fixedly mounted on the load-bearing beams for limiting the support of the cap beam. By detachably installing the supporting corbels and fixing the trusses on the supporting corbels, and fixing the load-bearing beams and the cap beam support structure on the trusses, it is convenient to disassemble the entire cap beam bracket for turnover, thereby improving construction efficiency and saving engineering materials; and the parallel connection structure between the load-bearing beams is conducive to improving stability and facilitating disassembly and installation;
[0099] In addition, by providing a detachable and installable flat-jointed structure, while ensuring the stability of the truss structure, it is convenient for disassembly and installation, and can be recycled, saving resources and improving construction efficiency.
[0100] In the description of the present application, it should be understood that the directions or positional relationships indicated by directional words such as "front, back, up, down, left, right", "lateral, vertical, perpendicular, horizontal" and "top, bottom" are usually based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present application and simplifying the description. Unless otherwise specified, these directional words do not indicate or imply that the device or element referred to must have a specific direction or be constructed and operated in a specific direction, and therefore cannot be understood as limiting the scope of protection of the present application; the directional words "inside and outside" refer to the inside and outside relative to the contours of each component itself.
[0101] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used herein to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" may include both "above" and "below". The device may also be positioned in other different ways, rotated 90 degrees or in other orientations, and the spatially relative descriptions used herein are interpreted accordingly.
[0102] In addition, it should be noted that the use of terms such as "first" and "second" to limit components is only for the convenience of distinguishing the corresponding components. Unless otherwise stated, the above terms have no special meaning and therefore cannot be understood as limiting the scope of protection of this application.
[0103] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of application involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the concept of the application. For example, the above features are replaced with the technical features with similar functions disclosed in the present application (but not limited to) to form a technical solution.
Claims
1. Cap beam bracket, characterized in that: The cap beam bracket is used to support and install the cap beam on the bent pile pier, and the cap beam bracket includes: A supporting corbel, wherein the supporting corbel is detachably mounted on the bent pile pier; Trusses are arranged on opposite sides of the bent pile pier and fixedly mounted on the supporting corbels. The mounting height of the trusses is adjustable, and a parallel connection structure is installed between the trusses. A load-bearing beam, the load-bearing beam being fixedly mounted on the top of the truss; A cap beam support structure is fixedly mounted on the load-bearing beam and is used for supporting the cap beam in a limited position.
2. The cap beam bracket according to claim 1, characterized in that: The cap beam bracket also includes: a removal block, which is located between the supporting corbel and the truss, and the truss is installed on the removal block for adjusting the installation height of the truss.
3. The cap beam bracket according to claim 1, characterized in that: It also includes a pin rod, the supporting corbel is installed on the pin rod, and the pin rod is fixedly installed on the bent frame pile pier.
4. The cap beam bracket according to any one of claims 1 to 3, characterized in that: Each of the trusses comprises two columns arranged opposite to each other, a load-bearing rod is installed at the bottom of the column, the column and the load-bearing rod are both installed on the supporting corbel, and a diagonal brace is arranged between the column and the load-bearing rod.
5. The cap beam bracket according to claim 4, characterized in that: The parallel connection structure includes: a first steel section and a second steel section, wherein the first steel section is installed perpendicular to the column and is detachably connected to the column, and the second steel section forms an acute angle with the first steel section and is detachably connected to the column.
6. The cap beam bracket according to claim 5, characterized in that: The parallel structure includes at least two of the first steel sections and at least one of the second steel sections, at least two of the first steel sections are arranged in parallel and at intervals between the columns, and one of the second steel sections is arranged between two adjacent first steel sections; the first steel section has a first end and a second end, one end of the second steel section is located at the first end of one of the first steel sections, and the other end of the second steel section is located at the second end of another of the first steel sections.
7. The cap beam bracket according to claim 5, characterized in that: The first steel section is connected to the column by bolts, and the second steel section is connected to the column by bolts; a connecting plate is provided at the connection between the first steel section and the second steel section and the column respectively, and bolt holes are provided on the connecting plate. The bolts pass through the bolt holes to connect the first steel section and the second steel section to the steel pipe respectively.
8. The cap beam bracket according to claim 5, characterized in that: The load-bearing beams include a plurality of first load-bearing beams and a plurality of second load-bearing beams. The plurality of first load-bearing beams are horizontally arranged in parallel and at intervals on the top of the truss, and the plurality of second load-bearing beams are vertically installed between two adjacent first load-bearing beams. The flat-joint structure is also arranged between the first load-bearing beams on the trusses on opposite sides.
9. The cap beam bracket according to claim 8, characterized in that: A baffle is provided at the edge of the first load-bearing beam.
10. The cap beam bracket according to claim 8, characterized in that: It also includes a distribution beam, which is installed on the first load-bearing beam and is located on the first load-bearing beam at the area on the opposite sides of the frame pile pier. The distribution beam is welded to the first load-bearing beam through a steel bar slot.
11. The cap beam bracket according to claim 10, characterized in that: The cap beam support structure includes wedge-shaped support structures fixedly installed on the distribution beams on both sides respectively, each of the wedge-shaped support structures includes a third steel section, a fourth steel section and a plurality of fifth steel sections, the third steel section is horizontally arranged, the fourth steel section is inclined and forms an acute angle with the third steel section, one end of the third steel section is welded to one end of the fourth steel section, the fifth steel section is welded between the third steel section and the fourth steel section, and the distance between the fourth steel sections on both sides gradually increases along the direction vertically away from the distribution beam.