Grouting packing device

By employing a multi-stage packer structure in the packer, the problem of sealing failure during packer insertion is solved, achieving a more efficient sealing effect and a convenient installation process.

CN222008893UActive Publication Date: 2024-11-15LIAONING FUTAI CHEM MASCH CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420148535.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-22
Publication Date
2024-11-15
Estimated Expiration
2034-01-22

AI Technical Summary

Technical Problem

Existing packers are easily scratched during the insertion of steel piles, leading to seal failure, affecting the grouting sealing effect, and requiring frequent replacement, wasting assembly time.

Method used

It adopts a multi-stage sealing structure, including a first sealing component and a second sealing component, which are suitable for deep-sea and shallow-sea environments respectively. By connecting multiple sealing parts in series or distributing them at intervals, the sealing effect is enhanced and the component strength is improved, making it easy to install.

Benefits of technology

It improves the sealing effect of the packer, avoids seal failure during the piling process, simplifies the installation process, and reduces maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008893U_ABST
    Figure CN222008893U_ABST
Patent Text Reader

Abstract

The utility model discloses a grouting packing device which comprises a steel sleeve, a pile shoe sleeve is fixedly assembled on the top of the steel sleeve, a first packing assembly is fixedly assembled on the inner side wall of the steel sleeve, the first packing assembly comprises first packing parts, and a connecting part is fixedly connected between the first packing parts. The ends of the first packing parts at the upper end and the lower end are fixedly connected with assembling parts correspondingly, and first fixing bolts and first fixing nuts are fixedly assembled in the connecting parts and the assembling parts correspondingly. Two packing schemes of the first packing assembly and the second packing assembly are provided, the first packing assembly and the second packing assembly both adopt a packing mode of additionally arranging packing parts, and a plurality of packing parts are connected in series to form the multi-stage sealing packer, so that the packing sealing effect of the packer can be effectively improved, and meanwhile, the problem that when a single packing part is arranged, the packing effect is poor is solved. And the steel pile is inserted into the steel sleeve to scratch the packing part, so that the integral sealing of the packer is invalid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of packers, in particular to a grouting packing device. Background Art

[0002] During the construction of offshore platforms, steel piles are needed to support and fix the offshore platforms. The more commonly used steel pile fixing method is to pre-fix the sleeve on the seabed, then insert the steel pile into the sleeve and pour cement mortar between the steel pile and the sleeve to strengthen the stability of the steel pile on the seabed. A packer is required between the steel pile and the sleeve to prevent the backflow of seabed mud and sand. Most existing packers only use a single sealing setting. If only a single packer is set, the steel pile can easily scratch the packer during the insertion of the steel pile into the sleeve, causing the packer to be damaged and fail, resulting in the need to lift the steel pile and the sleeve again, and then reassemble and set it, wasting a lot of assembly time. To this end, we propose a grouting packer. Utility Model Content

[0003] The utility model aims to provide a grouting isolation device to solve the problems raised in the above background technology.

[0004] To achieve the above object, the utility model provides the following technical solutions: a grouting isolation device, comprising a steel sleeve, a pile shoe sleeve is fixedly mounted on the top of the steel sleeve, and a first isolation assembly is fixedly mounted on the inner side wall of the steel sleeve;

[0005] The first sealing assembly includes a first sealing part, a connecting part is fixedly connected between the first sealing parts, the ends of the first sealing parts at the upper and lower ends are respectively fixedly connected with an assembly part, and a first fixing bolt and a first fixing nut are respectively fixedly assembled between the connecting part, the assembly part and the steel sleeve.

[0006] Preferably, the number of the first sealing parts is at least two groups, and the two groups of first sealing parts are evenly distributed from top to bottom.

[0007] Preferably, the inner wall of the steel sleeve is fixedly equipped with a second sealing assembly, the second sealing assembly includes a second sealing part, the inner wall of the steel sleeve is fixedly equipped with an assembly frame, and the second sealing part is fixedly equipped in the assembly frame by a second fixing bolt and a second fixing nut.

[0008] Preferably, the number of the second sealing parts is at least two groups, and the two groups of second sealing parts are evenly distributed from top to bottom.

[0009] Preferably, the second sealing portion is provided with a connecting end, a sealing end and a flipping end, and the connecting end is plugged into the assembly frame.

[0010] Compared with the prior art, the utility model has the following beneficial effects: a grouting isolation device improves the packer located in the steel casing, and has two isolation schemes, namely, a first isolation assembly and a second isolation assembly. Both the first isolation assembly and the second isolation assembly adopt an isolation method of adding an isolation part, and multiple isolation parts are connected in series to form a multi-stage sealed packer, which can effectively improve the isolation and sealing effect of the packer, and also solve the problem of overall sealing failure of the packer caused by the steel pile being inserted into the steel casing and scratching the isolation part when a single isolation part is set;

[0011] The first isolation assembly and the second isolation assembly are respectively suitable for different use environments. The first isolation assembly adopts an isolation method in which multiple isolation parts are connected in coordination with each other, which increases the overall strength of the isolation assembly and is suitable for deep sea. The second isolation assembly adopts a method in which multiple groups of isolation parts are distributed at intervals, which simplifies the structure of the isolation part and makes the isolation assembly easier to install and assemble, and is suitable for grouting isolation in shallow seas. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic structural diagram of the first embodiment of the utility model.

[0013] Figure 2 It is a structural schematic diagram of the first sealing component of the utility model.

[0014] Figure 3 It is a structural schematic diagram of the second embodiment of this utility model.

[0015] Figure 4 for Figure 3 Detail of point a in the figure.

[0016] In the figure: 1. steel sleeve; 2. pile shoe sleeve; 3. first packing assembly; 31. first packing part; 32. connecting part; 33. assembly part; 34. first fixing bolt; 35. first fixing nut; 4. second packing assembly; 41. second packing part; 42. assembly frame; 43. connecting end; 44. sealing end; 45. flipping end; 46. second fixing bolt; 47. second fixing nut; 5. steel pile. DETAILED DESCRIPTION

[0017] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0018] Embodiment 1

[0019] See also Figure 1 and Figure 2The utility model provides a technical solution: a grouting and sealing device, including a steel sleeve 1, a pile shoe sleeve 2 is fixedly connected to the top of the steel sleeve 1, the steel sleeve 1 and the pile shoe sleeve 2 are used for the insertion of the steel pile 5, and a first sealing component 3 for sealing the steel pile 5 and the steel sleeve 1 is assembled in the steel sleeve 1. After the steel pile 5 is inserted into the pile shoe sleeve 2 and the steel sleeve 1 through the first sealing component 3, the steel pile 5 and the pile shoe sleeve 2 are grout-sealed to increase the stability of the steel pile 5 in the steel sleeve 1 and the pile shoe sleeve 2.

[0020] like Figure 2 As shown in the figure, the first sealing component 3 includes a first sealing part 31, the number of the first sealing parts 31 is at least two groups, a connecting part 32 is integrally formed between the two groups of first sealing parts 31, and the ends of the sealing parts located at the top and the bottom are respectively integrally formed with assembly parts 33, the first sealing part 31, the connecting part 32 and the assembly part 33 are processed by integral injection molding of rubber material to increase the strength of the overall sealing part, the connecting part 32 and the assembly part 33 are fixedly assembled with a first fixing bolt 34 and a first fixing nut 35, the first sealing part 31 is fixed in the steel casing 1 by the evenly arranged first fixing bolts 34 and the first fixing nuts 35, and the first fixing bolts 34 and the first fixing nuts 35 arranged at intervals can increase the stability of the fixation of the first sealing part 31.

[0021] Working principle: During the use of the utility model, the first isolation part 31 in the first isolation assembly 3 is fixedly assembled in the steel casing 1 by the first fixing bolt 34 and the first fixing nut 35. When the steel pile 5 is inserted into the steel casing 1, cement mortar is penetrated between the steel pile 5 and the pile shoe sleeve 2. During the grouting process, the first isolation assembly 3 is used to perform grouting sealing. The utility model is improved on the traditional design, and the single sealing part of the traditional isolation device is replaced by a multi-stage sealed isolation device composed of multiple sealing parts connected in series. The use of multiple sealing parts can not only improve the sealing and isolation effect, but also solve the problem that the single seal is easily damaged during the pile insertion process, resulting in sealing and isolation failure.

[0022] Embodiment 2

[0023] See also Figure 3 and Figure 4 The utility model provides a technical solution: a grouting and sealing device, including a steel sleeve 1, a pile shoe sleeve 2 is fixedly connected to the top of the steel sleeve 1, the steel sleeve 1 and the pile shoe sleeve 2 are used for the insertion of the steel pile 5, and a second sealing component 4 for sealing the steel pile 5 and the steel sleeve 1 is assembled in the steel sleeve 1. After the steel pile 5 is inserted into the pile shoe sleeve 2 and the steel sleeve 1 through the second sealing component 4, the steel pile 5 and the pile shoe sleeve 2 are grout-sealed, thereby increasing the stability of the steel pile 5 in the steel sleeve 1 and the pile shoe sleeve 2.

[0024] The second sealing assembly 4 includes a second sealing part 41, and the number of the second sealing parts 41 is at least two groups. The two groups of second sealing parts 41 are uniformly assembled on the inner wall of the steel casing 1 from top to bottom. The inner wall of the steel casing 1 is welded and fixed with an assembly frame 42 for connecting and fixing the second sealing parts 41. The number of the assembly frames 42 matches the number of the second sealing parts 41. By setting at least two groups of second sealing parts 41, a multi-stage seal is formed as in the scheme of the first embodiment, thereby increasing the sealing performance of the formed sealing part. At the same time, compared with the scheme of the first embodiment, the minimum number of sealing parts used is reduced, so that when this scheme is used in shallow waters, it can not only achieve the effect of multi-stage sealing, but also reduce the cost of the product ( Figure 3 The example is to set three sets of second sealing parts 41);

[0025] like Figure 4 As shown in the figure, the second sealing part 41 is provided with a connecting end 43, a sealing end 44 and a flipping end 45. The connecting end 43 is inserted into the assembly frame 42 and fixed by a second fixing bolt 46 and a second fixing nut 47. When the steel pile 5 is inserted into the steel sleeve 1, the bottom of the steel pile 5 squeezes the flipping end 45 to flip it, so that the sealing end 44 and the flipping end 45 fit with the side wall of the steel pile 5 to form a "Y-shaped" sealing structure for sealing the mud injected subsequently.

[0026] Working principle: This solution is suitable for grouting and sealing of steel piles 5 in shallow seas. The second sealing part 41 is evenly assembled in the steel casing 1 and then fixed to the seabed. After the steel pile 5 is subsequently inserted into the steel casing 1, the flip end 45 is driven by the steel pile 5 to flip downward, so that the Y-shaped sealing structure formed by the sealing end 44 and the flip end 45 fits tightly with the side wall of the steel pile 5, completing the sealing treatment of the mud during grouting.

Claims

1. A grouting isolation device, comprising a steel casing (1), characterized in that: A pile shoe sleeve (2) is fixedly mounted on the top of the steel casing (1), and a first packing assembly (3) is fixedly mounted on the inner side wall of the steel casing (1); The first sealing assembly (3) comprises a first sealing part (31), a connecting part (32) is fixedly connected between the first sealing parts (31), the ends of the first sealing parts (31) at the upper and lower ends are respectively fixedly connected with an assembly part (33), and a first fixing bolt (34) and a first fixing nut (35) are respectively fixedly assembled between the connecting part (32), the assembly part (33) and the steel sleeve (1).

2. A grouting isolation device according to claim 1, characterized in that: The number of the first sealing parts (31) is at least two groups, and the two groups of the first sealing parts (31) are evenly distributed in sequence from top to bottom.

3. A grouting isolation device according to claim 1, characterized in that: The inner wall of the steel sleeve (1) is fixedly mounted with a second sealing assembly (4), the second sealing assembly (4) comprising a second sealing portion (41), the inner wall of the steel sleeve (1) is fixedly mounted with an assembly frame (42), the second sealing portion (41) being fixedly mounted in the assembly frame (42) by means of a second fixing bolt (46) and a second fixing nut (47).

4. A grouting isolation device according to claim 3, characterized in that: The number of the second sealing parts (41) is at least two groups, and the two groups of the second sealing parts (41) are evenly distributed from top to bottom.

5. A grouting isolation device according to claim 3, characterized in that: The second sealing portion (41) is provided with a connecting end (43), a sealing end (44) and a flipping end (45), and the connecting end (43) is plugged into the assembly frame (42).

Citation Information

Cited By

  • Natural gas hydrate combined mining system and method utilizing geothermal energy

    CN120083485A

  • A natural gas hydrate combined exploitation system and method using geothermal energy

    CN120083485B