Formwork hanging device
By using connectors to wrap embedded steel bars in the lifting mold device, the problem of easy displacement and cumbersome components during use of the lifting mold device is solved, efficient concrete forming and anti-seepage effects are achieved, and the construction process is simplified. Reduced costs.
Patent Information
- Application Number
- CN202420541746.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-20
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-20
AI Technical Summary
The existing lifting die devices are prone to displacement during use, resulting in slurry leakage problems, and there are many components, making them inconvenient to make and use.
The connecting piece is wound on the embedded steel bars at the pouring place for stress. As a disposable embedded parts construction, the bottom pad can be removed after the construction is completed. The metal wire is used as the connecting piece, and the embedded steel bars are wound and Supports are fixed, reducing seepage channels, improving anti-seepage effects, and simplifying assembly installation and disassembly.
Effectively prevent the displacement of the hanging mold and the floor slab, simplify the construction process, improve the quality of concrete forming, reduce the demand for post-grinding, reduce costs, and improve the efficiency of steel bar connection and concrete pouring.
Smart Images

Figure CN222009589U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of template support, in particular to a template hanging device. Background Art
[0002] A hanging formwork refers to a formwork that is suspended in the air without any lower support and can be fixed in various ways.
[0003] At present, most prefabricated cantilever slabs have a large space reserved for joint construction, which requires more steel bars and more concrete for pouring. When the space reserved for the joints is too large, a steel pipe scaffolding needs to be set up at the bottom as a formwork support before the steel bars of the upper cantilever slabs can be connected and concrete poured. This conventional construction method will result in a large demand for labor and materials, and a relatively long construction period.
[0004] For example, a floor slab formwork device disclosed in a Chinese utility model patent application with authorization announcement number CN205663189U includes an upper mold assembly, a lower mold assembly, a connecting assembly, and a sealing member. The upper mold assembly is arranged on the top of the floor slab. The lower mold assembly is connected to the upper mold assembly through the connecting assembly to fit the bottom of the floor slab. The sealing member is arranged on both sides of the lower mold assembly to seal the gap between the floor slab and the lower mold assembly.
[0005] The above-mentioned prior art is reusable and low-cost, but has the following problems:
[0006] 1. The upper mold assembly is overlapped on the floor slab, which is prone to displacement during use, resulting in leakage;
[0007] 2. There are many components, which makes it inconvenient to manufacture and use.
[0008] Therefore, how to effectively connect the hanging formwork with the floor slab to prevent displacement and simplify the construction of each component is a technical problem that needs to be solved urgently. Utility Model Content
[0009] In view of the deficiencies in the above-mentioned background technology, the utility model proposes a hanging formwork device, which solves the problem that the hanging formwork and the floor slab are easily displaced and the construction is complicated.
[0010] The technical solution of this application is:
[0011] A hanging formwork device comprises a supporting plate, a supporting member and a reinforcing member which are sequentially connected from top to bottom through a connecting member, wherein the upper end of the connecting member is connected to the embedded steel bars at the pouring location. The utility model adopts a connecting piece that is wrapped around the embedded steel bars at the pouring location for stress. As a one-time embedded piece construction, after the construction is completed and the strength of the joint concrete is reached, it is only necessary to cut off the connecting piece below, and the bottom pad can be removed and reused. The pad has good strength and rigidity and is not easy to deform. The concrete molding quality of the joint is good and no subsequent grinding construction is required. In addition, the connecting piece is pre-buried in the joint for a one-time period, and there is no need to penetrate the plate surface to reinforce the hanging formwork, which reduces the water seepage channel, has an excellent anti-seepage effect, reduces the spatial width of the plate joint, and is faster in steel bar connection construction, with a small amount of poured concrete. After the pouring is completed, the amount of cast-in-place concrete is small, and the plate surface is not easy to shrink and crack. The components are detachably connected, and installation and disassembly are very convenient. The connecting piece adopts a metal wire with high plasticity. The upper end is wrapped around the embedded steel bar and the lower end is wrapped into a ball to play a fixing role. The operation is simple and no other auxiliary tools are needed. When it needs to be dismantled, it is only necessary to cut the connecting piece, which saves time and effort and saves cost.
[0012] Furthermore, the connecting piece includes a metal wire, which has high plasticity and is easy to use. The top end of the metal wire is wound around the embedded steel bar, and the end of the metal wire is wound into a ball and stops and cooperates with the reinforcement piece.
[0013] Furthermore, the support plate includes a steel pad, which is connected to the pouring location. The support plate is provided with a hole for the connection to pass through. The steel pad can be reused and has a high turnover rate. Compared with conventional wooden formworks, the steel pad bottom formwork has high strength and rigidity. After the concrete is poured and formed, the concrete surface can be guaranteed to be flat and smooth, and the quality is more guaranteed.
[0014] Furthermore, the support member comprises a square tube, the upper surface of which is fitted with the lower surface of the support plate, and the metal wire passes through the upper end surface and the lower end surface of the square tube. The support member can meet the overall force requirements and can be reused.
[0015] Furthermore, the support member comprises a channel steel, an open end of the channel steel is in top contact with the support plate, and the metal wire passes through a lower end surface of the channel steel.
[0016] Furthermore, the support member comprises an I-beam, the upper surface of the I-beam is in contact with the lower surface of the support plate, and the metal wire passes through the upper flange and the lower flange of the I-beam.
[0017] Furthermore, the reinforcement member includes a steel washer attached to the bottom of the square tube. The steel washer is made of a rigid material. The buffer wire is directly fixed to the bottom of the support member to avoid damage to the support member due to excessive force, thereby better extending the durability of the support member.
[0018] Furthermore, a cushion strip is provided between the support plate and the plate at the casting location.
[0019] Furthermore, the pad is made of elastic material, which can ensure that the upper and lower components fit closely to form an elastic structure. The tightness can be adjusted by wire winding according to actual conditions during the concrete pouring process, and the bottom is not prone to leakage after concrete pouring.
[0020] Furthermore, a plurality of the connecting members, the supporting members, and the reinforcing members are arranged at intervals and evenly along the connecting parts to enhance the stability of the hanging formwork supporting structure.
[0021] The specific beneficial effects of the utility model include:
[0022] 1. The utility model adopts a connecting piece wrapped around the embedded steel bars at the pouring place to bear the force. As a one-time embedded piece construction, after the construction is completed and the strength of the joint concrete is reached, it is only necessary to cut off the lower connecting piece, and the bottom pad can be removed and reused. The pad has good strength and rigidity and is not easy to deform. The concrete molding quality of the joint is good and no subsequent grinding construction is required. In addition, the connecting piece is embedded in the joint at one time, and there is no need to penetrate the board surface to reinforce the hanging formwork, which reduces the water seepage channel, has an excellent anti-seepage effect, reduces the space width of the board joint, and the steel bar connection construction is faster. The amount of poured concrete is small. After the pouring is completed, the amount of cast-in-place concrete is small, and the board surface is not easy to shrink and crack;
[0023] 2. The components of the utility model are detachably connected, and installation and disassembly are very convenient;
[0024] 3. The connector of the utility model adopts metal wire with high plasticity. The upper end is wrapped with the embedded steel bar and the lower end is wrapped into a ball to play a fixing role. The operation is simple and no other auxiliary tools are required. When it needs to be removed, only the connector needs to be cut off, which saves time, labor and cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the embodiments of the present utility model, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0026] Figure 1 This is a schematic diagram of the use state of the utility model;
[0027] Figure 2 This is a schematic diagram of Embodiment 1 of the present utility model;
[0028] Figure 3This is a schematic diagram of Embodiment 2 of the present utility model;
[0029] Figure 4 This is a schematic diagram of Embodiment 3 of the present utility model;
[0030] Figure 5 This is a schematic diagram of Example 4 of the utility model.
[0031] Description of Figure Numbers:
[0032] 2. Hanging formwork support structure;
[0033] 3. Pre-buried steel bars;
[0034] 21. Connecting piece; 22. Support plate; 23. Support piece; 24. Reinforcement piece; 25. Cushion strip. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0036] Embodiment 1, a hanging mold device, such as Figure 1 As shown, it includes a support plate 22, a support member 23, and a reinforcement member 24 which are sequentially connected from top to bottom through a connecting member 21, and the upper end of the connecting member 21 is connected to the embedded steel bar 3 at the casting location.
[0037] On the basis of the above-mentioned embodiment, the connecting member 21 comprises a metal wire, the top end of the metal wire is wound around the embedded steel bar 3 , and the end of the metal wire is wound into a ball and stops and cooperates with the reinforcing member 24 .
[0038] Preferably, the connecting member 21 uses iron wire, and the upper end of the iron wire is firmly tied to the protruding part of the embedded steel bar 3. The iron wire is the main load-bearing member. Since the amount of concrete in the connecting joint is small and the weight is not large, generally a 2mm diameter iron wire can be used. One end of the iron wire is connected to the embedded steel bar 3 protruding from the end of the prefabricated cantilever plate, and is wrapped and fixed. The other end passes through the bottom support plate 22, support member 23, and reinforcement member 24, and is finally wrapped and fixed at the bottom. The iron wire is more securely fixed and the structure is better stressed. In addition, the iron wire is embedded in the concrete once and connected to the internal steel bars. It does not need to penetrate the floor structure, which can greatly avoid water seepage quality problems. The iron wire has high plasticity and is easy to use.
[0039] On the basis of the above embodiment, the support plate 22 includes a steel backing plate, the steel backing plate is connected to the casting location, and the support plate 22 is provided with a hole for the connection member 21 to pass through.
[0040] Preferably, the support plate 22 is made of a rigid material, and the steel pad can be reused with a high turnover rate. Compared with conventional wooden formworks, the steel pad bottom formwork has high strength and rigidity, and can ensure that the concrete surface is flat and smooth after concrete pouring, and the quality is more guaranteed.
[0041] On the basis of the above-mentioned embodiment, the support member 23 comprises a square tube, such as Figure 2 As shown, the upper surface of the square tube is in contact with the lower surface of the support plate 22, the metal wire passes through the upper end surface and the lower end surface of the square tube, and the gap in the square tube is used to cut the metal wire.
[0042] Specifically, the square tube is made of aluminum square tube. Since one end of the iron wire of the main load-bearing component is buried in the prefabricated cantilever board and is poured with the concrete at one time and cannot be removed and recycled, a detachable iron wire device must be set at the other end. The aluminum square tube is undoubtedly the most convenient. The aluminum structure can not only meet the overall force, but also can be reused. After the concrete is formed and reaches the strength, you only need to cut the iron wire inside the aluminum square tube, and it can be recycled and continued to be used.
[0043] On the basis of the above embodiment, the reinforcing member 24 includes a steel washer attached to the bottom of the square tube. Specifically, the steel washer is made of rigid material, and the buffer wire is directly fixed to the bottom of the support member 23 to avoid damage to the support member 23 due to excessive force, thereby better extending the durability of the support member 23.
[0044] On the basis of the above-mentioned implementation mode, a padding strip 25 is provided between the support plate 22 and the prefabricated eaves plate, and the padding strip 25 is made of elastic material.
[0045] Specifically, the pad 25 is made of rubber material and is used between the support plate 22 and the prefabricated cantilever plate 1, which can ensure that the two components fit closely to form an elastic structure. The tightness can be adjusted by wire winding during the concrete pouring process according to actual conditions, and the bottom is not prone to leakage after concrete pouring.
[0046] On the basis of the above-mentioned implementation mode, a plurality of the connecting members 21 , the supporting members 23 , and the reinforcing members 24 are arranged at intervals and evenly arranged along the connection points to enhance the stability of the hanging formwork supporting structure 2 .
[0047] On the basis of the above-mentioned implementation mode, the bottom is provided with a groove for clamping the hanging formwork device. When the hanging formwork device is removed, the groove is smoothed with anti-cracking mortar, and the board surface is not easy to shrink and crack.
[0048] Preferably, the cross-section of the joint of the prefabricated cantilever board is quadrilateral, such as Figure 2 As shown, since the prefabricated cantilever panels need to be hoisted and constructed, the size cannot be too large, and the weight also needs to be controlled within a certain range, so they can only be prefabricated in blocks and sections for easy hoisting and installation in the later stage. Therefore, the connection between the panels needs to be processed. This connection joint is similar to the post-cast strip structure. After the installation and settlement on both sides of the prefabricated cantilever panels are stable, the concrete of the connection joint is poured. This makes the connection more stable. If a similar connection joint is not set, the overall prefabricated cantilever panels will be too large, which will easily lead to cracking in the later stage, which is not conducive to the durability of the structure. In addition, a chamfered surface is provided at the top of the joint of the prefabricated cantilever panels, which is beneficial to the treatment of the finished surface and makes the finished surface smoother.
[0049] The main construction technology of this utility model:
[0050] ①After the prefabricated cantilever panels are installed, clean the concrete and steel bars inside the joints and connect them in place;
[0051] ② Connect and fix the steel washer and aluminum square at the bottom with universal iron wire. Similarly, make and store according to the quantity required by the drawing;
[0052] ③ Stick rubber pads on both sides of the steel pad and install them tightly against the bottom of the joint;
[0053] ④Install the previously prepared iron wire, washer, and aluminum square tube according to the design position of the hanging formwork in the design drawing, and fix them to the steel bars inside the cantilever plate after passing through the steel pad;
[0054] ⑤ After the bottom formwork is installed, check the tightness of the wire, the stability of the wire binding, and the cleaning of the steel bars and bottom formwork;
[0055] ⑥ Start pouring concrete for the joints. Use a small vibrator to compact the concrete. Check the fixation of the wire and the bottom formwork for leakage during the pouring process, and make adjustments in time.
[0056] ⑦ After the concrete is poured, timely maintenance should be carried out to avoid cracking of the concrete joints;
[0057] ⑧ After the joint concrete reaches the required strength, cut the wire inside the aluminum square tube, remove the bottom mold and continue the next joint construction;
[0058] ⑨ The groove at the bottom of the eaves board joint is plastered and leveled. Finally, the entire construction process is completed. The parts not detailed in the present utility model are all conventional technical means known to those skilled in the art.
[0059] Example 2, as a preferred implementation of the hanging formwork device, is different from Example 1 in that it includes a support plate 22, a support member 23, and a reinforcement member 24 connected in sequence from top to bottom through a connecting member 21, and the upper end of the connecting member 21 is connected to the embedded steel bars 3 at the casting location.
[0060] On the basis of the above-mentioned embodiment, the connecting member 21 comprises a metal wire, the top end of the metal wire is wound around the embedded steel bar 3 , and the end of the metal wire is wound into a ball and stops and cooperates with the reinforcing member 24 .
[0061] Preferably, the connecting member 21 uses iron wire, and the upper end of the iron wire is firmly tied to the protruding part of the embedded steel bar 3. The iron wire is the main load-bearing member. Since the amount of concrete in the connecting joint is small and the weight is not large, generally a 2mm diameter iron wire can be used. One end of the iron wire is connected to the embedded steel bar 3 protruding from the end of the prefabricated cantilever plate, and is wrapped and fixed. The other end passes through the bottom support plate 22, support member 23, and reinforcement member 24, and is finally wrapped and fixed at the bottom. The iron wire is more securely fixed and the structure is better stressed. In addition, the iron wire is embedded in the concrete once and connected to the internal steel bars. It does not need to penetrate the floor structure, which can greatly avoid water seepage quality problems. The iron wire has high plasticity and is easy to use.
[0062] On the basis of the above embodiment, the support plate 22 includes a steel backing plate, the steel backing plate is connected to the casting location, and the support plate 22 is provided with a hole for the connection member 21 to pass through.
[0063] Preferably, the support plate 22 is made of a rigid material, and the steel pad can be reused with a high turnover rate. Compared with conventional wooden formworks, the steel pad bottom formwork has high strength and rigidity, and can ensure that the concrete surface is flat and smooth after concrete pouring, and the quality is more guaranteed.
[0064] On the basis of the above-mentioned embodiment, the support member 23 comprises a channel steel, such as Figure 3 As shown, the open end of the channel steel is connected to the support plate 22, and the metal wire passes through the lower end surface of the channel steel. The gap between the channel steel and the support plate 22 is used to facilitate cutting of the metal wire.
[0065] On the basis of the above embodiment, the reinforcing member 24 includes a steel washer attached to the bottom of the square tube. Specifically, the steel washer is made of rigid material, and the buffer wire is directly fixed to the bottom of the support member 23 to avoid damage to the support member 23 due to excessive force, thereby better extending the durability of the support member 23.
[0066] On the basis of the above-mentioned embodiment, a cushion strip 25 is provided between the support plate 22 and the plate at the casting location, and the cushion strip 25 is made of elastic material.
[0067] Specifically, the pad 25 is made of rubber material and is used between the support plate 22 and the plate. It can be used for various plates, such as the splicing of floor slabs, the splicing of eaves plates, etc., to ensure that the two components fit tightly to form an elastic structure. The tightness of the concrete pouring process can be adjusted by winding with wire according to actual conditions, and the bottom is not easy to leak after the concrete is poured.
[0068] On the basis of the above-mentioned implementation mode, a plurality of the connecting members 21 , the supporting members 23 , and the reinforcing members 24 are arranged at intervals and evenly arranged along the connection points to enhance the stability of the hanging formwork supporting structure 2 .
[0069] Preferably, the bottom of the prefabricated cantilever board may be provided with a groove for clamping the hanging formwork device. When the hanging formwork device is removed, the groove is smoothed with anti-cracking mortar, and the board surface is not prone to shrinkage and cracking.
[0070] Preferably, the cross-section of the joint of the prefabricated cantilever board is a quadrilateral. Since the prefabricated cantilever board needs to be hoisted and constructed, the size cannot be too large and the weight needs to be controlled within a certain range. Therefore, it can only be prefabricated in blocks and sections for easy hoisting and installation in the later stage. Therefore, it is necessary to involve the connection processing between the boards. This connection seam is also similar to the post-cast strip structure. After the installation and settlement on both sides of the prefabricated cantilever board are stable, the concrete of the connection seam is poured. This makes the connection more stable. If a similar connection seam is not set, the size of the overall board will be too large, which will easily lead to cracking in the later stage, which is not conducive to the durability of the structure. And the top of the joint of the prefabricated cantilever board is provided with a chamfered surface, which is conducive to the processing of the finished surface and makes the finished surface smoother.
[0071] Example 3, as a preferred implementation of the hanging formwork device, is different from Example 1 and Example 2 in that it includes a support plate 22, a support member 23, and a reinforcement member 24 connected in sequence from top to bottom through a connecting member 21, and the upper end of the connecting member 21 is connected to the embedded steel bars 3 at the casting location.
[0072] On the basis of the above-mentioned embodiment, the connecting member 21 comprises a metal wire, the top end of the metal wire is wound around the embedded steel bar 3 , and the end of the metal wire is wound into a ball and stops and cooperates with the reinforcing member 24 .
[0073] Preferably, the connecting member 21 uses iron wire, and the upper end of the iron wire is firmly tied to the protruding part of the embedded steel bar 3. The iron wire is the main load-bearing member. Since the amount of concrete in the connecting joint is small and the weight is not large, generally a 2mm diameter iron wire can be used. One end of the iron wire is connected to the embedded steel bar 3 protruding from the end of the connecting plate, and is wrapped and fixed. The other end passes through the bottom support plate 22, support member 23, and reinforcement member 24, and is finally wrapped and fixed at the bottom. The iron wire is more securely fixed and the structure is better stressed. In addition, the iron wire is embedded in the concrete once and is connected to the internal steel bars. It does not need to penetrate the floor structure, which can greatly avoid water seepage quality problems. The iron wire has high plasticity and is easy to use.
[0074] On the basis of the above embodiment, the support plate 22 includes a steel backing plate, the steel backing plate is connected to the casting location, and the support plate 22 is provided with a hole for the connection member 21 to pass through.
[0075] Preferably, the support plate 22 is made of a rigid material, and the steel pad can be reused with a high turnover rate. Compared with conventional wooden formworks, the steel pad bottom formwork has high strength and rigidity, and can ensure that the concrete surface is flat and smooth after concrete pouring, and the quality is more guaranteed.
[0076] On the basis of the above-mentioned embodiment, the support member 23 comprises an I-beam, such as Figure 4 As shown, the upper surface of the I-beam fits the lower surface of the support plate 22, and the metal wire passes through the upper flange and the lower flange of the I-beam. The gap between the upper flange and the lower flange of the I-beam is used to facilitate cutting of the metal wire.
[0077] On the basis of the above embodiment, the reinforcing member 24 includes a steel washer attached to the bottom of the square tube. Specifically, the steel washer is made of rigid material, and the buffer wire is directly fixed to the bottom of the support member 23 to avoid damage to the support member 23 due to excessive force, thereby better extending the durability of the support member 23.
[0078] On the basis of the above-mentioned embodiment, a cushion strip 25 is provided between the support plate 22 and the plate at the casting location, and the cushion strip 25 is made of elastic material.
[0079] Specifically, the pad 25 is made of rubber material and is used between the support plate 22 and the plate to ensure that the two components fit closely to form an elastic structure. The tightness can be adjusted by wire winding according to actual conditions during the concrete pouring process, and the bottom is not prone to leakage after concrete pouring.
[0080] On the basis of the above-mentioned implementation mode, a plurality of the connecting members 21 , the supporting members 23 , and the reinforcing members 24 are arranged at intervals and evenly arranged along the connection points to enhance the stability of the hanging formwork supporting structure 2 .
[0081] Preferably, the bottom of the prefabricated cantilever board may be provided with a groove for clamping the hanging formwork device. When the hanging formwork device is removed, the groove is smoothed with anti-cracking mortar, and the board surface is not prone to shrinkage and cracking.
[0082] Preferably, the cross-section of the joint of the prefabricated cantilever board is a quadrilateral. Since the prefabricated cantilever board needs to be hoisted and constructed, the size cannot be too large and the weight needs to be controlled within a certain range. Therefore, it can only be prefabricated in blocks and sections for easy hoisting and installation in the later stage. Therefore, it is necessary to involve the connection processing between the boards. This connection seam is also similar to the post-cast strip structure. After the installation and settlement on both sides of the prefabricated cantilever board are stable, the concrete of the connection seam is poured. This makes the connection more stable. If a similar connection seam is not set, the size of the overall board will be too large, which will easily lead to cracking in the later stage, which is not conducive to the durability of the structure. And the top of the joint of the prefabricated cantilever board is provided with a chamfered surface, which is conducive to the processing of the finished surface and makes the finished surface smoother.
[0083] Example 4, as a preferred implementation of the hanging formwork device, is different from Example 1 in that the cross section of the prefabricated cantilever plate joint is an inverted triangle, such as Figure 5 As shown, the connecting members 21 are arranged in a row at intervals along the joints of the plates, which is equivalent to an optimization modification based on the quadrilateral joints in Example 1, Example 2, and Example 3, and can reduce the amount of the hanging formwork support structure. The width at the top and the narrowness at the bottom can be beneficial for pouring concrete from the top, and the stress on the hanging formwork support structure at the bottom is small, the connection joints are not prone to leakage, the concrete molding effect is good, and the joints basically do not need to be processed.
[0084] The above content shows and describes the basic principle, main features and beneficial effects of the utility model. The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A hanging mold device, characterized in that: It comprises a support plate (22), a support member (23), and a reinforcement member (24) which are sequentially connected from top to bottom via a connecting member (21), wherein the upper end of the connecting member (21) is connected to a pre-buried steel bar (3) at a casting location.
2. The hanging mold device according to claim 1, characterized in that: The connecting piece (21) comprises a metal wire, the top end of the metal wire is wound around the embedded steel bar (3), and the end of the metal wire is wound into a ball and is stop-matched with the reinforcing piece (24).
3. The hanging mold device according to claim 1, characterized in that: The support plate (22) comprises a steel backing plate, the steel backing plate is connected to the casting location, and the support plate (22) is provided with a hole for the connecting piece (21) to pass through.
4. The hanging mold device according to claim 2, characterized in that: The support member (23) comprises a square tube, the upper surface of the square tube is in contact with the lower surface of the support plate (22), and the metal wire passes through the upper end surface and the lower end surface of the square tube.
5. The hanging mold device according to claim 2, characterized in that: The support member (23) comprises a channel steel, the open end of the channel steel is in abutment with the support plate (22), and the metal wire passes through the lower end surface of the channel steel.
6. The hanging mold device according to claim 2, characterized in that: The support member (23) comprises an I-beam, the upper surface of the I-beam is in contact with the lower surface of the support plate (22), and the metal wire passes through the upper flange and the lower flange of the I-beam.
7. The hanging mold device according to claim 1 or 2, characterized in that: The reinforcement member (24) comprises a steel washer fitted under the square tube.
8. The hanging mold device according to claim 1 or 3, characterized in that: A cushion strip (25) is provided between the support plate (22) and the plate at the casting location.
9. The hanging mold device according to claim 8, characterized in that: The cushion strip (25) is made of elastic material.
10. The mold hanging device according to any one of claims 1 to 6 and 9, characterized in that: A plurality of the connecting members (21), the supporting members (23), and the reinforcing members (24) are arranged at intervals.
