Regional heat supply system of expanded unit system based on one-time reheating backpressure unit

By designing spare boiler heating units and bypass systems in the unit heating system, the steam supply cutoff problem of unit heating system when failure or shutdown is solved, and the continuous heating and stable operation of the system are achieved.

CN222011871UActive Publication Date: 2024-11-15CHINA UNITED ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420578319.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-11-15
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

When the existing unit heating system fails or shuts down in the commonly used area heating unit, it is easy to cause steam supply to be cut off and cannot meet the needs of continuous and stable heat.

Method used

A regional heating system based on primary reheating backpress unit was designed, including common and spare boiler heating units. New steam was generated in the event of failure or shutdown of the furnace by the spare boiler, driving the normal operation of the steam turbine to ensure that The system continues to provide heating to the outside world. The system includes commonly used boilers, backpressure turbines, main steam pipelines, cold and reheated steam pipelines, hot and reheated steam pipelines, external medium-pressure steam pipelines and external low-pressure steam pipelines, as well as high- and low-pressure bypass systems, through gate valves and a temperature reducing pressure reducer to achieve steam switching and bypass utilization.

Benefits of technology

It effectively solves the problem of heating interruption when the furnace is shut down in common area heating units, ensures the continuity and stability of the heating system, avoids steam supply interruption, and meets the heat consumption needs of industrial users.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222011871U_ABST
    Figure CN222011871U_ABST
Patent Text Reader

Abstract

The utility model provides an expanded unit system regional heat supply system based on a primary reheating backpressure unit, which can utilize a standby boiler to generate new steam to drive a steam turbine to operate normally, and the system can continuously supply heat to the outside, so that the problem that heat supply is cut off when a common regional heat supply unit is shut down is solved. A superheater header steam outlet of the common boiler is connected with a new steam inlet of a high-pressure cylinder of the back-pressure steam turbine through a main steam pipeline; a dead steam outlet of a high-pressure cylinder of the back-pressure steam turbine is connected with a dead steam inlet of a reheater header of the common boiler through a cold reheat steam pipeline; a steam outlet of a reheater header of the common boiler is connected with a reheat steam inlet of a low-pressure cylinder of the back-pressure steam turbine through a reheat steam pipeline; a steam exhaust outlet of the low-pressure cylinder of the back-pressure steam turbine is connected with an external supply low-pressure steam pipeline; the reheat steam pipeline is connected with an external supply medium-pressure steam pipeline; a superheater header steam outlet of the standby boiler is connected with a main steam switching connection pipe through a standby main steam pipeline, and the main steam switching connection pipe is connected with a main steam pipeline.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an enlarged unit regional heating system based on a single reheat back pressure unit, which is mainly used in the fields of combined cooling, heating and power generation, self-provided thermal power plants, urban centralized heating, etc. Background Art

[0002] Starting from 2021, multiple factors will interact with each other to cause global energy supply tension, the global energy model is accelerating the transformation, and the proportion of non-fossil energy power generation and heating installed capacity is gradually increasing. Achieving green energy security, reliable capacity, and sustainable development will become the global theme. In this context, the whole society has put forward higher requirements for the operating efficiency, stability, and economy of coal-fired units.

[0003] Newly built thermal power plants usually adopt the principle of determining electricity production based on heat. The main project access indicators include comprehensive thermal efficiency and standard coal consumption per unit of power supply. When the scale of regional heating load is determined, the configuration relationship between boiler evaporation capacity, turbine steam intake and generator power generation can be finalized. At this time, increasing the maximum power of a single turbine is an effective way to improve comprehensive thermal efficiency and reduce standard coal consumption per unit of power supply. One of the specific methods is to increase the new steam parameters of the turbine. At present, small and medium-sized thermal power plants generally use high-pressure or ultra-high-pressure boilers to produce main steam.

[0004] There are usually two types of industrial heat loads. One is saturated steam or superheated steam with low superheat. Heat users mainly use the latent heat of steam vaporization for process production and have no strict requirements on the superheat of steam. The other is superheated steam with high superheat. Heat users use it as new steam for industrial turbines or for special process production and have strict requirements on the superheat of steam.

[0005] An ordinary unit heating system is operated by one boiler system and one steam turbine system. The system is relatively simple and convenient for centralized control of the machine and boiler. However, failure of the main equipment in the heating unit will lead to a steam supply interruption, which cannot meet the continuous and stable heating needs of steam users. Utility Model Content

[0006] The purpose of the utility model is to overcome the above-mentioned deficiencies in the prior art and to provide an expanded unit district heating system based on a single reheat back pressure unit with a reasonable structural design, which can utilize a spare boiler to produce new steam to drive the normal operation of the steam turbine, and the system can continue to supply heat to the outside, thus solving the problem of heat supply interruption when the commonly used district heating unit is shut down.

[0007] The technical solution adopted by the utility model to solve the above-mentioned problems is: an expanded unit-based regional heating system based on a single-reheat back-pressure unit, comprising a commonly used regional heating unit, the commonly used regional heating unit comprising a commonly used boiler, a back-pressure steam turbine, a main steam pipeline, a cold reheat steam pipeline, a hot reheat steam pipeline, an external medium-pressure steam pipeline and an external low-pressure steam pipeline, the back-pressure steam turbine comprising a back-pressure steam turbine high-pressure cylinder and a back-pressure steam turbine low-pressure cylinder; the steam outlet of the superheater header of the commonly used boiler is connected to the new steam inlet of the back-pressure steam turbine high-pressure cylinder through the main steam pipeline; the exhaust steam outlet of the back-pressure steam turbine high-pressure cylinder is connected to the exhaust steam inlet of the reheater header of the commonly used boiler through the cold reheat steam pipeline; the steam outlet of the reheater header of the commonly used boiler is connected to the reheat steam inlet of the low-pressure cylinder of the back-pressure steam turbine through the hot reheat steam pipeline; the exhaust steam outlet of the low-pressure cylinder of the back-pressure steam turbine is connected to the external low-pressure cylinder The steam pipeline is connected; the hot reheat steam pipeline is connected to the external medium-pressure steam pipeline; it is characterized in that: it also includes a standby boiler heating unit, the standby boiler heating unit includes a standby boiler, a standby main steam pipeline, a standby cold reheat steam pipeline, a standby hot reheat steam pipeline, a main steam switching connecting pipe, a cold reheat steam switching connecting pipe and a hot reheat steam switching connecting pipe; the steam outlet of the superheater header of the standby boiler is connected to the main steam switching connecting pipe through the standby main steam pipeline, and the main steam switching connecting pipe is connected to the main steam pipeline; the exhaust steam inlet of the reheater header of the standby boiler is connected to the cold reheat steam switching connecting pipe through the standby cold reheat steam pipeline, and the cold reheat steam switching connecting pipe is connected to the cold reheat steam pipeline; the steam outlet of the reheater header of the standby boiler is connected to the hot reheat steam switching connecting pipe through the standby hot reheat steam pipeline, and the hot reheat steam switching connecting pipe is connected to the hot reheat steam pipeline.

[0008] The common boiler and the standby boiler described in the utility model are both single-reheat boilers.

[0009] The utility model is provided with a high-pressure bypass system in both a common district heating unit and a standby boiler heating unit, and the high-pressure bypass system comprises a high-pressure bypass steam inlet pipeline, a high-pressure bypass steam outlet pipeline and a high-pressure temperature reducing and pressure reducing device; in the common district heating unit: the inlet of the high-pressure temperature reducing and pressure reducing device is connected to the main steam pipeline, and the outlet is connected to the cold reheat steam pipeline; in the standby boiler heating unit: the inlet of the high-pressure temperature reducing and pressure reducing device is connected to the standby main steam pipeline, and the outlet is connected to the standby cold reheat steam pipeline.

[0010] The utility model has a cooling water pipeline connected to the high-pressure cooling and pressure reducing device.

[0011] The utility model is provided with a low-pressure bypass system in both a common district heating unit and a standby boiler heating unit, and the low-pressure bypass system comprises a low-pressure bypass steam inlet pipeline, a low-pressure bypass steam outlet pipeline and a low-pressure temperature reducing and pressure reducing device; in the common district heating unit: the inlet of the low-pressure temperature reducing and pressure reducing device is connected to the hot reheat steam pipeline, and the outlet is connected to the external low-pressure steam pipeline; in the standby boiler heating unit: the inlet of the low-pressure temperature reducing and pressure reducing device is connected to the standby hot reheat steam pipeline, and the outlet is connected to the external low-pressure steam pipeline.

[0012] The utility model has a cooling water pipeline connected to the low-pressure cooling and pressure reducing device.

[0013] The cold reheat steam pipeline of the utility model is equipped with a safety valve and a check valve.

[0014] Gate valves are installed on the main steam pipeline, the cold reheat steam pipeline, the hot reheat steam pipeline, the main steam switching connecting pipe, the cold reheat steam switching connecting pipe and the hot reheat steam switching connecting pipe described in the utility model.

[0015] The diameter of the main steam switching connecting pipe of the utility model is the same as the diameter of the main steam pipeline, the diameter of the cold reheat steam switching connecting pipe is the same as the diameter of the cold reheat steam pipeline, and the diameter of the hot reheat steam switching connecting pipe is the same as the diameter of the hot reheat steam pipeline.

[0016] The PCV valve is installed on the emptying pipeline of the superheater header of the common boiler and the standby boiler of the utility model.

[0017] Compared with the prior art, the utility model has the following advantages and effects: the system is provided with a spare boiler heating unit. When the commonly used boiler temporarily fails or is planned to be shut down, the spare boiler heating unit can be used. The spare boiler produces new steam to drive the normal operation of the steam turbine, and the system can continue to supply heat to the outside, solving the problem of heat supply interruption when the commonly used regional heating unit is shut down. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic structural diagram of an embodiment of the utility model.

[0019] Figure 2 It is a schematic structural diagram of a commonly used regional heating unit in an embodiment of the utility model.

[0020] Figure 3 It is a schematic structural diagram of a standby boiler heating unit according to an embodiment of the utility model. DETAILED DESCRIPTION

[0021] The present invention will be further described in detail below with reference to the accompanying drawings and through examples. The following examples are provided to explain the present invention, but the present invention is not limited to the following examples.

[0022] The embodiment of the utility model includes a common regional heating unit A and a standby boiler heating unit B.

[0023] The common district heating unit A includes a common boiler 1a, a back-pressure steam turbine, a main steam pipeline 7a, a cold reheat steam pipeline 8a, a hot reheat steam pipeline 9a, a back-pressure exhaust steam pipeline 10, an external medium-pressure steam pipeline 11, an external low-pressure steam pipeline 12 and a steam branch pipeline 22. The back-pressure steam turbine includes a back-pressure steam turbine high-pressure cylinder 2 and a back-pressure steam turbine low-pressure cylinder 3.

[0024] The steam outlet of the superheater header of the common boiler 1a is connected to the new steam inlet of the high-pressure cylinder 2 of the back-pressure steam turbine through the main steam pipe 7a; the exhaust steam outlet of the high-pressure cylinder 2 of the back-pressure steam turbine is connected to the exhaust steam inlet of the reheater header of the common boiler 1a through the cold reheat steam pipe 8a; the steam outlet of the reheater header of the common boiler 1a is connected to the reheat steam inlet of the low-pressure cylinder 3 of the back-pressure steam turbine through the hot reheat steam pipe 9a; the exhaust steam outlet of the low-pressure cylinder 3 of the back-pressure steam turbine is connected to the external low-pressure steam pipe 12 through the back-pressure exhaust steam pipe 10; the hot reheat steam pipe 9a is connected to the external medium-pressure steam pipe 11 through the steam branch pipe 22. The low-pressure cylinder 3 of the back-pressure steam turbine is connected to a generator 4. The common boiler 1a is a high-parameter primary reheat boiler. Under normal operating conditions, one common boiler 1a corresponds to one back-pressure steam turbine, and they operate in unit mode. The superheater header of the common boiler 1a generates new steam, which first enters the high-pressure cylinder 2 of the back-pressure steam turbine through the main steam pipe 7a to perform work. The exhaust steam discharged from the high-pressure cylinder 2 of the back-pressure steam turbine flows back to the reheater header of the common boiler 1a through the cold reheat steam pipe 8a for reheating. The steam at the outlet of the reheater header flows through the hot reheat steam pipe 9a into the low-pressure cylinder 3 of the back-pressure steam turbine to continue to perform work. The exhaust steam of the low-pressure cylinder 3 of the back-pressure steam turbine enters the external low-pressure steam pipe 12 through the back-pressure exhaust steam pipe 10 to be supplied to the low-pressure heat load users; the steam branch pipe 22 is led out from the hot reheat steam pipe 9a and merged into the external medium-pressure steam pipe 11 to be supplied to the medium-pressure heat load users.

[0025] The utility model comprises at least two sets of mutually independent common regional heating units A. The utility model embodiment has two sets of unit heating systems, namely, Figure 1 Shown in the dotted box.

[0026] The standby boiler heating unit B includes a standby boiler 1b, a standby main steam pipeline 7b, a standby cold reheat steam pipeline 8b, a standby hot reheat steam pipeline 9b, a main steam switching connecting pipe 7c, a cold reheat steam switching connecting pipe 8c and a hot reheat steam switching connecting pipe 9c.

[0027] The steam outlet of the superheater header of the standby boiler 1b is connected to the main steam switching connecting pipe 7c through the standby main steam pipeline 7b, and the main steam switching connecting pipe 7c is connected to the main steam pipeline 7a; the exhaust steam inlet of the reheater header of the standby boiler 1b is connected to the cold reheat steam switching connecting pipe 8c through the standby cold reheat steam pipeline 8b, and the cold reheat steam switching connecting pipe 8c is connected to the cold reheat steam pipeline 8a; the steam outlet of the reheater header of the standby boiler 1b is connected to the hot reheat steam switching connecting pipe 9c through the standby hot reheat steam pipeline 9b, and the hot reheat steam switching connecting pipe 9c is connected to the hot reheat steam pipeline 9a. The standby boiler 1b is a high-parameter primary reheat boiler.

[0028] The utility model has a standby boiler 1b as a standby boiler for two common boilers 1a. When the common boiler 1a temporarily fails or is planned to be shut down, new steam is produced by the superheater header of the standby boiler 1b. When the common boiler 1a is shut down, the gate valve 16 on the inlet and outlet pipes of the boiler is closed, and the main steam pipe 7a, the cold reheat steam pipe 8a, and the hot reheat steam pipe 9a corresponding to the boiler are cut off and isolated from the unit heating system. When the standby boiler 1b is activated, the steam outlet of the superheater header of the standby boiler 1b sends the main steam of the standby boiler 1b to the main steam pipe 7a through the standby main steam pipe 7b, and then sends the steam in the cold reheat steam pipe 8a back to the standby boiler 1b through the standby cold reheat steam pipe 8b, and then sends the steam at the outlet of the reheater header of the standby boiler 1b to the hot reheat steam pipe 9a through the standby hot reheat steam pipe 9b. The rest of the system is the same as the unit system under normal working conditions. By using the main steam switching connecting pipe 7c, the cold reheat steam switching connecting pipe 8c and the hot reheat steam switching connecting pipe 9c, switching between the common boiler 1a and the standby boiler 1b can be achieved, ensuring that when one boiler is shut down, the main steam is continuous and the system can still supply heat to the outside.

[0029] The diameter of the main steam switching connecting pipe 7c is the same as that of the main steam pipeline 7a, the diameter of the cold reheat steam switching connecting pipe 8c is the same as that of the cold reheat steam pipeline 8a, and the diameter of the hot reheat steam switching connecting pipe 9c is the same as that of the hot reheat steam pipeline 9a. In extreme cases, the new steam from the boiler of one group of commonly used regional heating units A can be transported to the turbine of another group of commonly used regional heating units A, thereby realizing cross-unit unit mode operation.

[0030] A high-pressure bypass system and a low-pressure bypass system are provided in both the common regional heating unit A and the standby boiler heating unit B. The high-pressure bypass system includes a high-pressure bypass steam inlet pipeline 18, a high-pressure bypass steam outlet pipeline 19 and a high-pressure temperature and pressure reducer 5, and the low-pressure bypass system includes a low-pressure bypass steam inlet pipeline 20, a low-pressure bypass steam outlet pipeline 21 and a low-pressure temperature and pressure reducer 6.

[0031] In the common district heating unit A: the inlet of the high-pressure desuperheater 5 is connected to the main steam pipeline 7a through the high-pressure bypass steam inlet pipeline 18, and the outlet is connected to the cold reheat steam pipeline 8a through the high-pressure bypass steam outlet pipeline 19. The inlet of the low-pressure desuperheater 6 is connected to the hot reheat steam pipeline 9a through the low-pressure bypass steam inlet pipeline 20, and the outlet is connected to the external low-pressure steam pipeline 12 through the low-pressure bypass steam outlet pipeline 21.

[0032] In the standby boiler heating unit B: the inlet of the high-pressure desuperheater 5 is connected to the standby main steam pipeline 7b through the high-pressure bypass steam inlet pipeline 18, and the outlet is connected to the standby cold reheat steam pipeline 8b through the high-pressure bypass steam outlet pipeline 19. The inlet of the low-pressure desuperheater 6 is connected to the standby hot reheat steam pipeline 9b through the low-pressure bypass steam inlet pipeline 20, and the outlet is connected to the external low-pressure steam pipeline 12 through the low-pressure bypass steam outlet pipeline 21.

[0033] The high-pressure desuperheater 5 and the low-pressure desuperheater 6 are both quick-opening angle desuperheaters with flow tracking functions, which are used to track the load rate of the boiler, ensuring that when the heating mode is quickly switched from the steam turbine to the high- and low-pressure bypass systems, the high-pressure desuperheater 5 and the low-pressure desuperheater 6 can be accurately positioned to the required pressure reducing valve opening. The high-pressure desuperheater 5 and the low-pressure desuperheater 6 are both connected to a desuperheating water pipeline 13.

[0034] The high-pressure bypass system and the low-pressure bypass system mainly have two functions. First, when the boiler is just started, the temperature and pressure of the main steam generated do not meet the steam inlet requirements of the steam turbine. The bypass system can be used to import steam into the medium and low-pressure steam pipelines for external use, so as to avoid the loss caused by discharging this part of steam through the venting pipe or the drain pipe, and at the same time, some pipe warming work can be completed; second, when the steam turbine temporarily fails or is planned to be shut down, it can be quickly switched to the high and low-pressure bypass system, and the boiler continues to produce main steam, and heat is supplied to the outside after cooling and pressure reduction to ensure the continuity of heating. When the heating mode is quickly switched from the steam turbine to the high and low-pressure bypass system, the main steam flow of the boiler cannot be reduced quickly, and at the same time, cooling water must be sprayed into the high and low-pressure cooling and pressure reducing devices through the cooling water pipeline 13 to reduce the steam temperature, resulting in the steam flow produced by the high and low-pressure bypass system being greater than the demand of the heat user in a short period of time, which may cause the steam pipeline to overpressure and the boiler safety valve to trip. A PCV valve 14 is installed on the exhaust pipe of the superheater header of the common boiler 1a and the standby boiler 1b. The PCV valve 14 is interlocked with the turbine shutdown signal and the boiler overpressure signal, and can act quickly to release the main steam to ensure that the safety valve does not act during the boiler load reduction process until the steam output of the bypass system is equal to the heat user's consumption.

[0035] Safety valves 15 are installed on the cold reheat steam pipeline 8a, the back pressure exhaust steam pipeline 10, the high pressure bypass steam outlet pipeline 19 and the low pressure bypass steam outlet pipeline 21 for pipeline overpressure protection. Check valves 17 are installed on the cold reheat steam pipeline 8a and the back pressure exhaust steam pipeline 10 for checking the steam in the external steam pipeline to prevent the external steam from flowing back to the steam turbine.

[0036] Gate valves 16 are installed on the main steam pipeline 7a, the cold reheat steam pipeline 8a, the hot reheat steam pipeline 9a, the back pressure exhaust steam pipeline 10, the high pressure bypass steam inlet pipeline 18, the high pressure bypass steam outlet pipeline 19, the low pressure bypass steam inlet pipeline 20, the low pressure bypass steam outlet pipeline 21, the steam branch pipeline 22, the main steam switching connecting pipe 7c, the cold reheat steam switching connecting pipe 8c and the hot reheat steam switching connecting pipe 9c. The gate valves 16 are used to open and close the pipelines to realize the switching of the common and standby boilers, the isolation and maintenance of the equipment and other functions.

[0037] In addition, it should be noted that the shapes and names of the parts and components of the specific embodiments described in this specification may be different, and the above content described in this specification is only an example of the structure of the utility model. Any equivalent changes or simple changes made based on the structure, features and principles described in the concept of the utility model patent are included in the protection scope of the utility model patent.

Claims

1. An expanded unit district heating system based on a single reheat back pressure unit, comprising a common district heating unit, the common district heating unit comprising a common boiler, a back pressure steam turbine, a main steam pipeline, a cold reheat steam pipeline, a hot reheat steam pipeline, an external medium-pressure steam pipeline and an external low-pressure steam pipeline, the back pressure steam turbine comprising a back pressure steam turbine high-pressure cylinder and a back pressure steam turbine low-pressure cylinder; the steam outlet of the superheater header of the common boiler is connected to the new steam inlet of the back pressure steam turbine high-pressure cylinder through the main steam pipeline; the exhaust steam outlet of the back pressure steam turbine high-pressure cylinder is connected to the exhaust steam inlet of the reheater header of the common boiler through the cold reheat steam pipeline; the steam outlet of the reheater header of the common boiler is connected to the reheat steam inlet of the low-pressure cylinder of the back pressure steam turbine through the hot reheat steam pipeline; the exhaust steam outlet of the low-pressure cylinder of the back pressure steam turbine is connected to the external low-pressure steam pipeline; the hot reheat steam pipeline is connected to the external medium-pressure steam pipeline; characterized in that: It also includes a standby boiler heating unit, which includes a standby boiler, a standby main steam pipeline, a standby cold reheat steam pipeline, a standby hot reheat steam pipeline, a main steam switching connecting pipe, a cold reheat steam switching connecting pipe and a hot reheat steam switching connecting pipe; the steam outlet of the superheater header of the standby boiler is connected to the main steam switching connecting pipe through the standby main steam pipeline, and the main steam switching connecting pipe is connected to the main steam pipeline; the exhaust steam inlet of the reheater header of the standby boiler is connected to the cold reheat steam switching connecting pipe through the standby cold reheat steam pipeline, and the cold reheat steam switching connecting pipe is connected to the cold reheat steam pipeline; the steam outlet of the reheater header of the standby boiler is connected to the hot reheat steam switching connecting pipe through the standby hot reheat steam pipeline, and the hot reheat steam switching connecting pipe is connected to the hot reheat steam pipeline.

2. The expanded unit district heating system based on the single reheat back pressure unit according to claim 1 is characterized in that: The common boiler and the standby boiler are both single-reheat boilers.

3. The expanded unit district heating system based on the single reheat back pressure unit according to claim 1 is characterized in that: A high-pressure bypass system is provided in both the common district heating unit and the standby boiler heating unit, and the high-pressure bypass system includes a high-pressure bypass steam inlet pipeline, a high-pressure bypass steam outlet pipeline and a high-pressure temperature and pressure reducing device; in the common district heating unit: the inlet of the high-pressure temperature and pressure reducing device is connected to the main steam pipeline, and the outlet is connected to the cold reheat steam pipeline; in the standby boiler heating unit: the inlet of the high-pressure temperature and pressure reducing device is connected to the standby main steam pipeline, and the outlet is connected to the standby cold reheat steam pipeline.

4. The expanded unit district heating system based on the single reheat back pressure unit according to claim 3 is characterized in that: A cooling water pipeline is connected to the high-pressure cooling and pressure reducing device.

5. The expanded unit district heating system based on the single reheat back pressure unit according to claim 1 is characterized in that: A low-pressure bypass system is provided in both the common district heating unit and the standby boiler heating unit, and the low-pressure bypass system includes a low-pressure bypass steam inlet pipeline, a low-pressure bypass steam outlet pipeline and a low-pressure temperature and pressure reducer; in the common district heating unit: the inlet of the low-pressure temperature and pressure reducer is connected to the hot reheat steam pipeline, and the outlet is connected to the external low-pressure steam pipeline; in the standby boiler heating unit: the inlet of the low-pressure temperature and pressure reducer is connected to the standby hot reheat steam pipeline, and the outlet is connected to the external low-pressure steam pipeline.

6. The expanded unit district heating system based on the single reheat back pressure unit according to claim 5 is characterized in that: A cooling water pipeline is connected to the low-pressure cooling and pressure reducing device.

7. The enlarged unit district heating system based on the single reheat back pressure unit according to claim 1, characterized in that: A safety valve and a check valve are installed on the cold reheat steam pipeline.

8. The enlarged unit district heating system based on the single reheat back pressure unit according to claim 1, characterized in that: Gate valves are installed on the main steam pipeline, the cold reheat steam pipeline, the hot reheat steam pipeline, the main steam switching connecting pipe, the cold reheat steam switching connecting pipe and the hot reheat steam switching connecting pipe.

9. The enlarged unit district heating system based on the single reheat back pressure unit according to claim 1, characterized in that: The diameter of the main steam switching connecting pipe is the same as that of the main steam pipeline, the diameter of the cold reheat steam switching connecting pipe is the same as that of the cold reheat steam pipeline, and the diameter of the hot reheat steam switching connecting pipe is the same as that of the hot reheat steam pipeline.

10. The enlarged unit district heating system based on the single reheat back pressure unit according to claim 1, characterized in that: PCV valves are installed on the discharge pipes of the superheater headers of the common boilers and standby boilers.