Automatic quality inspection device for intelligent short-circuit grounding equipment
By designing automated quality inspection devices, including execution systems, control systems and cloud servers, multiple functions of intelligent short-circuit grounding equipment are realized, which solves the problem of lack of detection devices in the existing technology, and ensures the comprehensiveness of equipment quality inspection and Accuracy.
Patent Information
- Application Number
- CN202420337926.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-23
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-02-23
AI Technical Summary
The lack of all-round detection devices for intelligent short-circuit grounding equipment in the prior art, which makes it difficult to guarantee the quality of the equipment.
An automated quality inspection device was designed, including an execution system, a control system and a cloud server. Through the number of hook-up test units, connecting cable clamps, vertical mobile modules and optoelectronic doors, the hook-up of intelligent short-circuit grounding equipment is achieved. Test, hibernation battery life test, hook reaction test, dormant reaction test and hook number test.
It realizes comprehensive and automated detection of the functions of intelligent short-circuit grounding equipment, ensures the comprehensiveness and accuracy of the inspection, and facilitates the deployment of the device, and meets the needs of on-site operation and safety protection.
Smart Images

Figure CN222014420U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of electric power work automation, and in particular relates to a quality inspection device for automatically detecting the functions of intelligent short-circuit grounding equipment. Background Art
[0002] At present, the power industry is constantly developing, and various intelligent safety tools are emerging in an endless stream, among which the development of intelligent short-circuit grounding equipment is particularly prominent. The existing intelligent short-circuit grounding equipment on the market mainly features sensitive wire clamp hanging judgment function, advanced and accurate positioning, long equipment life and fast charging function, which greatly ensures the safety of on-site construction personnel and eliminates unnecessary safety hazards. The diversity of intelligent short-circuit grounding equipment also represents the uneven quality of manufacturers' products, but there are fewer corresponding testing equipment. Therefore, it is urgent to develop targeted testing devices to fill this market gap. Under the premise of operability, the main functions of intelligent short-circuit grounding equipment should be fully tested to ensure the quality of intelligent short-circuit grounding equipment. Summary of the invention
[0003] In order to solve the defects existing in the prior art, the purpose of the utility model is to provide an automated quality inspection device for intelligent short-circuit grounding equipment. The detection device can perform comprehensive automated detection of the functions of the intelligent short-circuit grounding equipment, including hook-up endurance test, sleep endurance test, hook-up reaction test, sleep reaction test, and hook-up number test.
[0004] In order to achieve the above purpose, a technical solution adopted by the utility model is:
[0005] An automated quality inspection device for intelligent short-circuit grounding equipment, the intelligent short-circuit grounding equipment comprising an intelligent short-circuit grounding rod and an intelligent short-circuit grounding main module, the intelligent short-circuit grounding rod comprising three phases A, B, and C, each of which is provided with a hook, each of which is provided with a spring iron sheet; the device comprises an execution system, a control system, and a cloud server; during testing, the intelligent short-circuit grounding rod is installed on the execution system, and the intelligent short-circuit grounding main module is remotely connected to the cloud server via HTTP;
[0006] The execution system includes a hooking times test unit and a connecting wire clamp, wherein the hooking times test unit is used to control the cyclic hooking and disconnecting state of the three-phase hook of the intelligent short-circuit grounding rod; the connecting wire clamp is used to connect the three-phase hook of the intelligent short-circuit grounding rod to realize the continuous hooking of the intelligent short-circuit grounding rod;
[0007] The control system includes a host, an operating platform and an operation platform. The hook-up times test unit is connected to the operating platform via NIDAQ. The cloud server realizes remote communication connection with the operation platform via HTTP. The cloud server is used to read data and upload the data to the operation platform to realize the display and judgment of the status of the intelligent short-circuit grounding device to be tested. The operation platform has the required test programs built in, and the test programs include hook-up endurance test, sleep endurance test, hook-up reaction test, sleep reaction test and hook-up times test programs.
[0008] Furthermore, in the above-mentioned automated quality inspection device for intelligent short-circuit grounding equipment, the intelligent short-circuit grounding rod and the intelligent short-circuit grounding main module are communicatively connected via LoRa.
[0009] Furthermore, the automated quality inspection device for intelligent short-circuit grounding equipment as described above,
[0010] The parameters that need to be set in the hook endurance test program include the flip time and the test time;
[0011] The parameters that need to be set in the sleep endurance test program include the flip time and the sleep time;
[0012] The parameters that need to be set in the hook reaction test program include hook duration and test times;
[0013] The parameters that need to be set in the sleep reaction test program include the hook-up time, sleep time and test times;
[0014] The parameters that need to be set in the hooking times test program include hooking duration and hooking times.
[0015] Furthermore, in the automated quality inspection device for intelligent short-circuit grounding equipment as described above, the hooking times test unit includes a vertical moving module, an intelligent short-circuit grounding rod fixing clamp and a hooking test rod, the vertical moving module and the intelligent short-circuit grounding rod fixing clamp are fixed on the hooking test rod, and the intelligent short-circuit grounding rod fixing clamp is used to fix the intelligent short-circuit grounding rod during the hooking times test; the vertical moving module includes a motor, a slide and a metal sheet, one end of the metal sheet is fixed on the slide and the other end is free, the free end of the metal sheet is located below the three-phase hook of the intelligent short-circuit grounding rod, and the operating platform controls the operation of the motor through NIDAQ to move the metal sheet up and down, thereby achieving contact and disconnection with the three-phase hook of the intelligent short-circuit grounding rod.
[0016] Furthermore, in the automated quality inspection device for intelligent short-circuit grounding equipment as described above, the hooking times test unit also includes a photoelectric gate, which is installed in a preset fixed position and is used to determine the hooking and disconnecting status of the intelligent short-circuit grounding rod in the hooking times test.
[0017] Furthermore, in the automated quality inspection device for intelligent short-circuit grounding equipment as described above, the structure of the connecting wire clamp is a duckbill wire clamp, and the duckbill wire clamp is used to connect the A, B, and C three-phase hooks of the intelligent short-circuit grounding rod in the hanging endurance test, the dormant endurance test, the hanging reaction test, and the dormant reaction test to achieve continuous hanging of the intelligent short-circuit grounding rod.
[0018] Furthermore, in the automated quality inspection device for intelligent short-circuit grounding equipment as described above, the vertical moving module is a linear slide module, which includes a two-phase stepper motor, a ball screw, a slide and a metal sheet, one end of the metal sheet is fixed to the slide and the other end is free.
[0019] Furthermore, in the above-mentioned automated quality inspection device for intelligent short-circuit grounding equipment, the material of the hanging test rod is an aluminum alloy square tube.
[0020] Furthermore, in the above-mentioned automated quality inspection device for intelligent short-circuit grounding equipment, the hanging test rod is vertically fixed on a base made of cast iron.
[0021] Furthermore, in the automated quality inspection device for intelligent short-circuit grounding equipment as described above, the cloud server reads data once per second and uploads the data to the operating platform.
[0022] The automatic quality inspection device for intelligent short-circuit grounding equipment provided by the utility model has the following significant technical effects:
[0023] The detection device can perform targeted automatic detection on the main functions of the intelligent short-circuit grounding equipment, including hanging endurance test, sleep endurance test, hanging reaction test, sleep reaction test, and hanging number test, ensuring the comprehensiveness and accuracy of the detection equipment test; and the device is easy to build, easy to deploy, simple to operate, and has complete functional detection, meeting the basic needs in field operation, application intelligence, safety protection and other aspects. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 This is a functional structure diagram of an automated quality inspection device for intelligent short-circuit grounding equipment provided in an embodiment of the utility model;
[0025] Figure 2 for Figure 1 A schematic diagram of the overall structure of the quality inspection device;
[0026] Figure 3 for Figure 1 The structural diagram of the motor;
[0027] Figure 4 for Figure 3 Schematic diagram of the structure of the metal ball screw linear slide module;
[0028] Figure 5 for Figure 1 A working diagram of the device;
[0029] Figure 6a-6e They are the flow charts of the hook endurance test, dormant endurance test, hook response test, dormant response test, and hook times test;
[0030] Figure 7 It is the state diagram of the intelligent short-circuit grounding device;
[0031] Figure 8 This is the disconnect state diagram of the intelligent short-circuit grounding device. DETAILED DESCRIPTION
[0032] The present invention will be further described below in conjunction with specific embodiments and the accompanying drawings.
[0033] The intelligent short-circuit grounding device 140 includes an intelligent short-circuit grounding rod 141 and an intelligent short-circuit grounding main module 142. The intelligent short-circuit grounding rod has three phases A, B, and C. Each of the three phases A, B, and C is provided with a hook, and a spring iron sheet is built into the hook. For the inspection of the intelligent short-circuit grounding device of this structure, the utility model provides an automated quality inspection device. Figure 1 The functional structure diagram of the quality inspection device is shown. Figure 2 The overall structural diagram of the device is shown, in which the interactive area 100 of the device is arranged above the power supply area 200, and the interactive area of the quality inspection device includes an execution system 110, a control system 120 and a cloud server 130; during testing, the intelligent short-circuit grounding rod 141 is installed on the execution system 110, and the intelligent short-circuit grounding main module 142 is remotely connected to the cloud server 130 via HTTP.
[0034] The execution system 110 includes a hooking times test unit and a connecting wire clamp. The hooking times test unit is used to control the cyclic hooking and disconnecting status of the three-phase hook of the intelligent short-circuit grounding rod in the hooking times test; the connecting wire clamp is used to connect the three-phase hook of the intelligent short-circuit grounding rod in other tests to achieve continuous hooking of the intelligent short-circuit grounding rod.
[0035] The control system 120 includes a host, an operating platform 121, an operation platform 122, and accessories such as a keyboard and a mouse. The hook-up times test unit is connected to the operating platform 121 of the control system via NIDAQ, and the cloud server 130 is remotely connected to the operation platform 122 of the control system via HTTP; the cloud server 130 is used to read data and upload the data to the operation platform to display and determine the status of the intelligent short-circuit grounding device to be tested; the operation platform 122 has the required test programs built in, and the test programs include hook-up endurance test, sleep endurance test, hook-up reaction test, sleep reaction test and hook-up times test programs.
[0036] In a specific embodiment, if Figure 3 As shown, the hooking times test unit includes a vertical moving module 111, an intelligent short-circuit grounding rod fixing clamp 112, a hooking test rod 113, a photoelectric gate and a base 114; the hooking test rod 113 is made of an aluminum alloy square tube, which is vertically fixed on a cast iron base 114, and the vertical moving module 111 and the intelligent short-circuit grounding rod fixing clamp 112 are fixed on the hooking test rod 113, and the intelligent short-circuit grounding rod fixing clamp 112 is used to fix the intelligent short-circuit grounding rod during the hooking times test; the vertical moving module 111 includes a motor, a slide and a metal sheet, one end of the metal sheet is fixed on the slide, and the other end is free, and the free end of the metal sheet is located below the three-phase hook of the intelligent short-circuit grounding rod, and the operating platform 121 controls the operation of the motor through NIDAQ to move the metal sheet up and down, thereby realizing contact and disconnection with the three-phase hook of the intelligent short-circuit grounding rod. The photoelectric gate is installed in a preset fixed position, which is used to judge the hooking and disconnection status of the intelligent short-circuit grounding rod in the hooking times test.
[0037] In a specific embodiment, the connecting wire clamp is a duckbill wire clamp, which is used to connect the A, B, and C three-phase hooks of the intelligent short-circuit grounding rod in the hanging endurance test, sleep endurance test, hanging reaction test, and sleep reaction test to achieve continuous hanging of the intelligent short-circuit grounding rod.
[0038] In a specific embodiment, if Figure 4As shown, the vertical moving module 111 is a metal ball screw linear slide module, which includes a two-phase stepper motor 1111, a ball screw 1112, a slide 1113 and a metal sheet 1114. The metal sheet 1114 is cantilevered, one end of which is fixed on the slide 1113, and the other end is located below the three-phase hook of the intelligent short-circuit grounding rod; the two-phase stepper motor 1111 is connected to the operating platform 121 of the control system through NIDAQ, and the operation of the two-phase stepper motor 1111 is controlled by the operating platform 121. The two-phase stepper motor 1111 converts the rotational motion of the two-phase stepper motor 1111 into the up and down linear motion of the slide 1113 and the metal sheet 1114 through the information transmitted by the operating platform 121, thereby realizing the connection and disconnection of the metal sheet 1114 and the three-phase hook of the intelligent short-circuit grounding rod.
[0039] When the intelligent short-circuit grounding equipment is tested using the automated quality inspection device provided by the utility model, when the items to be tested are the hook-up endurance test, the dormant endurance test, the hook-up reaction test and the dormant reaction test, the A, B and C phases of the intelligent short-circuit grounding rod are connected to the duckbill wire clamp; when the item to be tested is the hook-up number test, the intelligent short-circuit grounding rod is vertically placed in the intelligent short-circuit grounding rod fixing clamp and is tightened and fixed by screws. The intelligent short-circuit grounding main module is connected to the cloud server via HTTP, and the information of the intelligent short-circuit grounding main module is transmitted and stored in the cloud server. The transmitted information mainly includes the operating status of the intelligent short-circuit grounding main module; the cloud server is connected to the operating platform of the control system via HTTP, and the information stored in the cloud server is transmitted to the operating platform to realize the information display and related functions of the operating platform. The intelligent short-circuit grounding rod and the intelligent short-circuit grounding main module are connected via LoRa communication.
[0040] refer to Figure 5 As shown, the method for detecting intelligent short-circuit grounding equipment using the above-mentioned automated quality inspection device provided by the utility model includes the following steps:
[0041] S1. Enter the SN code of the intelligent short-circuit grounding device in the operation platform and the running platform, turn on the main module of the intelligent short-circuit grounding device and connect it to the network.
[0042] Specifically, you can input the SN code of the intelligent short-circuit grounding device manually or by scanning with a barcode gun, turn on the main module of the intelligent short-circuit grounding device, and hear a "beep" sound indicating that the network is successfully connected; click on the operating platform to confirm the connection between the intelligent short-circuit grounding device and the operating platform and cloud server.
[0043] S2. Select the items to be tested, set the test parameters in the operating platform, and carry out various performance tests on the intelligent short-circuit grounding equipment according to the preset procedures.
[0044] The test items of the intelligent short-circuit grounding equipment include hook-up endurance test, sleep endurance test, hook-up reaction test, sleep reaction test and hook-up number test. Select the content to be tested, click the Start tab to start the test. During the test, the detection of the intelligent short-circuit grounding main module can be controlled by the start, pause and stop buttons on the operating platform. The operating platform uploads the obtained data to the operating platform to display and determine the status. In a specific embodiment of the utility model, during the test, the cloud server reads the data once per second and uploads the data to the operating platform.
[0045] The operation platform communicates with the cloud server through HTTP to obtain the remote status of the intelligent short-circuit grounding device. At the same time, the delay between the local and cloud status is calculated to ensure the accuracy of the test results. After the parameters of the operation platform are set and a series of operation processes are carried out, the operation platform can display the local and remote status information and test results in real time. The operation platform is connected to the server. When receiving the data from the operation end, it determines whether the "data processing thread" has ended. If it is in progress, it will be closed and reopened to parse the currently received data, including the current test item type, and perform A, B, and C comparisons based on the current test items, and display them on the interface. Status display and judgment include three parts: obtaining data from the operation end, obtaining data from the server (timer), and comparing the data obtained from the operation end and the server.
[0046] Figure 6a The flowchart of the hook-up endurance test is shown. In the hook-up endurance test, first connect the duckbill clamp to the A, B, and C phases of the intelligent short-circuit grounding rod respectively; then add the A, B, and C phases to enter the test, and finally enter the flip time and test time. After setting the parameters, start testing the added phases. For example, if only phases A and B are added for testing, and phase C is not selected to be added, then phase C is always zero (i.e., non-hooked). During the test time, whenever an integer multiple of the flip time is reached, the program enters the flip stage, and the program will generate a random number to change the state of the phase added to the test, and so on. The cycle continues until the test time is reached and the test ends.
[0047] Figure 6bThe dormant endurance test flow chart is shown. In the dormant endurance test, first connect the duckbill wire clamp to the A, B, and C phases of the intelligent short-circuit grounding rod respectively; add the A, B, and C phases to enter the test, and enter the flip time and the dormant time. For example, if only A and B phases are added for testing, and C phase is not selected to be added, then C phase is always zero (i.e., non-hook). After setting the parameters, the test enters the flip stage. The operation of the program in this stage is basically the same as the hook-up endurance test, but the duration of the flip time is fixed at 80s to wake up the device; then enter the dormant stage, in which A, B, and C phases are forced to sleep and continue for the set sleep time to complete the sleep; finally, enter the flip stage again. The operation of this stage is exactly the same as the previous flip stage to re-wake up the device and enter the cycle.
[0048] Figure 6c The hook reaction test flow chart is shown. In the hook reaction test, first connect the duckbill clamp to the A, B, and C phases of the intelligent short-circuit grounding rod respectively; add the A, B, and C phases to the test process by default; finally enter the hook duration and test times. In a single test, the A, B, and C phases are hooked in turn and the hook duration is set.
[0049] Figure 6d The dormant reaction test flow chart is shown. In the dormant reaction test, first connect the duckbill clamp to the A, B, and C phases of the intelligent short-circuit grounding rod respectively; add the A, B, and C phases to the test process by default; finally, enter the three parameters of the hooking time, the dormant time, and the number of tests. In a single test, the A, B, and C phases go through the hooking state and the dormant state in turn, and the duration is the set hooking time and dormant time.
[0050] Figure 6e The flowchart of the hooking times test is shown. In the hooking times test, the three phases A, B, and C of the intelligent short-circuit grounding rod are not connected to the duckbill wire clamp. Instead, the intelligent short-circuit grounding rod to be tested is fixed to the hooking test rod by tightening the screws through the intelligent short-circuit grounding rod fixing clamp. The operation of the two-phase stepper motor is controlled by NIDAQ to move the metal sheet fixed on the metal ball screw linear slide module up and down. As the metal sheet moves, it can contact the spring iron sheet built into the hook on the intelligent short-circuit grounding rod, or disconnect the contact with the spring iron sheet to realize the hooking test of the intelligent short-circuit grounding rod. At the same time, the data obtained by the operating platform is uploaded to the operation platform to realize the display and judgment of the status. The hooking state and disconnection state of the intelligent short-circuit grounding rod are shown as follows: Figure 7 and Figure 8As shown. The photoelectric gate is installed in a preset fixed position. During the rising process of the metal sheet, when the photoelectric gate triggers the blocking signal, it indicates that the intelligent short-circuit grounding rod has entered the hanging state, and the two-phase stepper motor stops rotating and will not drive the metal sheet to continue to rise. The time when the metal sheet stops hanging is controlled according to the preset hanging time. After the hanging time is over, the two-phase stepper motor continues to run to control the metal sheet to move downward. When the preset distance is reached, the metal sheet is disconnected from the intelligent short-circuit grounding rod. This is repeated to complete the control of the hanging and disconnecting states of the three phases A, B, and C of the intelligent short-circuit grounding rod, and complete the test of the number of hanging times. In a specific embodiment of the utility model, the control time to complete a test is 30s.
[0051] S3. After the test is completed, a test report is generated by running the platform.
[0052] During the test process of step S2, the test information will be uploaded to the running platform in real time. After all the tests are completed, click the confirmation tab on the running platform to generate the final test report. Specifically, a new printreport class is created, and the printer call and report drawing are implemented in printreport.cpp. The report format is implemented by QPainter, and the table drawing and content filling are performed.
[0053] The utility model provides an automated quality inspection device for intelligent short-circuit grounding equipment, which is connected to the intelligent short-circuit grounding equipment by inputting the SN code, selecting the test items to be performed, and setting the corresponding test parameters. The operation of the operating platform and the operation platform are controlled by a specific program of the detection device to obtain the test results. This detection device can detect the functions of the intelligent short-circuit grounding equipment to the greatest extent and perfectly, ensure the comprehensiveness and accuracy of the detection of the intelligent short-circuit grounding equipment, and is easy to deploy, meeting the basic needs in terms of field operation, application intelligence, safety protection, etc.
[0054] The above embodiments are merely illustrative of the present invention, and the present invention may also be implemented in other specific ways or other specific forms without departing from the gist or essential features of the present invention. Therefore, the described embodiments should be considered illustrative rather than restrictive in any respect. The scope of the present invention should be described by the appended claims, and any changes equivalent to the intent and scope of the claims should also be included in the scope of the present invention.
Claims
1. An automated quality inspection device for intelligent short-circuit grounding equipment, the intelligent short-circuit grounding equipment comprising an intelligent short-circuit grounding rod and an intelligent short-circuit grounding main module, the intelligent short-circuit grounding rod comprising three phases A, B, and C, each of which is provided with a hook, each of which has a spring iron sheet built in; characterized in that: The device comprises an execution system (110), a control system (120) and a cloud server (130); during testing, the intelligent short-circuit grounding rod is installed on the execution system (110), and the intelligent short-circuit grounding main module is remotely connected to the cloud server (130) through HTTP; The execution system (110) comprises a hooking times test unit and a connecting wire clamp, wherein the hooking times test unit is used to control the cyclic hooking and disconnecting state of the three-phase hook of the intelligent short-circuit grounding rod; the connecting wire clamp is used to connect the three-phase hook of the intelligent short-circuit grounding rod to achieve continuous hooking of the intelligent short-circuit grounding rod; The control system (120) comprises an operating platform (121) and an operation platform (122); the hook-up times test unit is connected to the operating platform (121) via NIDAQ; the cloud server (130) is remotely connected to the operation platform (122) via HTTP; the cloud server (130) is used to read data and upload the data to the operation platform (122) to display and determine the state of the intelligent short-circuit grounding device to be tested; the operation platform (122) is built with required test programs, and the test programs include hook-up endurance test, sleep endurance test, hook-up reaction test, sleep reaction test and hook-up times test programs.
2. The automatic quality inspection device for intelligent short-circuit grounding equipment according to claim 1 is characterized in that: The intelligent short-circuit grounding rod and the intelligent short-circuit grounding main module are connected in communication via LoRa.
3. The automatic quality inspection device for intelligent short-circuit grounding equipment according to claim 2 is characterized in that: The parameters that need to be set in the hook endurance test program include the flip time and the test time; The parameters that need to be set in the sleep endurance test program include the flip time and the sleep time; The parameters that need to be set in the hook reaction test program include hook duration and test times; The parameters that need to be set in the sleep reaction test program include the hook-up time, sleep time and test times; The parameters that need to be set in the hooking times test program include hooking duration and hooking times.
4. The automated quality inspection device for intelligent short-circuit grounding equipment according to any one of claims 1 to 3, characterized in that: The hooking times test unit comprises a vertical moving module (111), an intelligent short-circuit grounding rod fixing clamp (112) and a hooking test rod (113); the vertical moving module (111) and the intelligent short-circuit grounding rod fixing clamp (112) are fixed on the hooking test rod (113); the intelligent short-circuit grounding rod fixing clamp (112) is used to fix the intelligent short-circuit grounding rod during the hooking times test; the vertical moving module (111) comprises a motor, a slide and a metal sheet; one end of the metal sheet is fixed on the slide and the other end is free; the free end of the metal sheet is located below the three-phase hook of the intelligent short-circuit grounding rod; the operating platform (121) controls the operation of the motor through NIDAQ to move the metal sheet up and down, thereby realizing contact and disconnection with the three-phase hook of the intelligent short-circuit grounding rod.
5. The automatic quality inspection device for intelligent short-circuit grounding equipment according to claim 4, characterized in that: The hooking times test unit further comprises a photoelectric gate, which is installed at a preset fixed position and is used to judge the hooking and disconnecting states of the intelligent short-circuit grounding rod in the hooking times test.
6. The automatic quality inspection device for intelligent short-circuit grounding equipment according to claim 1, characterized in that: The structure of the connecting wire clamp is a duckbill wire clamp, which is used to connect the A, B, and C three-phase hooks of the intelligent short-circuit grounding rod in the hanging endurance test, the dormant endurance test, the hanging reaction test, and the dormant reaction test to achieve continuous hanging of the intelligent short-circuit grounding rod.
7. The automated quality inspection device for intelligent short-circuit grounding equipment according to claim 4, characterized in that: The vertical movement module (111) is a linear slide module, which comprises a two-phase stepping motor (1111), a ball screw (1112), a slide (1113) and a metal sheet (1114), wherein one end of the metal sheet (1114) is fixed on the slide (1113) and the other end is free.
8. The automatic quality inspection device for intelligent short-circuit grounding equipment according to claim 7, characterized in that: The material of the hanging test rod (113) is an aluminum alloy square tube.
9. The automatic quality inspection device for intelligent short-circuit grounding equipment according to claim 8, characterized in that: The hanging test rod (113) is vertically fixed on a base (114) made of cast iron.
10. The automatic quality inspection device for intelligent short-circuit grounding equipment according to claim 1, characterized in that: The cloud server (130) reads the data once per second and uploads the data to the operation platform (122).
