Through the modular photovoltaic component installation structure, the use of components such as positioning rods, docking grooves, modular rods and movable rods, the existing photovoltaic installation structure is solved for complicated operation and inconvenient maintenance, and efficient and convenient installation and maintenance are achieved.
Patent Information
- Application Number
- CN202420639344.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-29
AI Technical Summary
The photovoltaic installation structure of existing building buildings is complicated to operate, has high working strength, low installation efficiency, and is inconvenient to repair after damage to the welding bracket, which has poor use effect.
Adopt the photovoltaic module installation structure of modular building houses, including positioning rods, docking slots, modular rods, movable rods and card parts, and the flexible adjustment and fixation of the installation angle is achieved through modular connections, simplifying the installation process, improving efficiency, and simplifying maintenance. .
It realizes the installation of photovoltaic modules with higher installation convenience and higher efficiency, simplifies the operation process, reduces the difficulty of maintenance and the complexity of replacement and maintenance.
Smart Images

Figure CN222016463U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of photovoltaic installation of buildings and houses, and in particular to a photovoltaic component installation structure of modular buildings and houses. Background Art
[0002] For the current large-scale building roof resources in China, except for meeting certain fixed HVAC and water conservancy design functions, they are basically in a state of idleness and waste. However, due to their unique building location, building roofs are very suitable for the installation and use of distributed photovoltaic systems. Therefore, photovoltaic installation and popularization are being carried out on roofs that meet construction requirements.
[0003] However, the existing installation structure generally installs the supporting base frame on the roof first, then welds the connecting frame on the base frame, and then installs the solar panel on the connecting frame. The operation steps are complicated and the workload is large. In addition, the welding work on the roof is high in work intensity and the installation efficiency is low. At the same time, once the welded bracket is damaged or deformed, it is very inconvenient to replace and repair it, and the use effect is not good. Utility Model Content
[0004] In view of the problems existing in the prior art, the purpose of the utility model is to provide a photovoltaic module installation structure for modular building houses to improve the installation efficiency and solve the background technology problems.
[0005] To achieve the above purpose, the utility model adopts the following technical solution.
[0006] A photovoltaic component installation structure for a modular building house includes two positioning rods, each of which is provided with equidistantly arranged docking grooves, a module rod is installed between the docking grooves on the two positioning rods by bolts, two matching movable rods are hinged inside the module rod, both of the two movable rods are provided with matching hole groups, and solar modules are installed between the movable rods in pairs longitudinally.
[0007] As a further description of the above technical solution: the movable rod includes a long rod and a short rod, and the hole group is arranged on a section opposite to the long rod and the short rod.
[0008] As a further description of the above technical solution: a notch is provided on the long rod, and a section of the short rod is inserted into the notch.
[0009] As a further description of the above technical solution: an ear plate is fixedly connected between the two opposite sides of the two positioning rods, and a positioning hole is opened on the ear plate.
[0010] As a further description of the above technical solution: the solar module includes a solar panel and four clamps, the four clamps are respectively fixedly installed at the four corners of the bottom of the solar panel, and the clamps are clamped to the long pole.
[0011] As a further description of the above technical solution: the clamping member includes a semi-arc clamping ring and two vertical clamping plates, the top of the semi-arc clamping ring is fixedly connected to the solar panel, the two vertical clamping plates are respectively fixedly connected to the opening edges on both sides of the semi-arc clamping ring, and the two vertical clamping plates are tightened and fixed by bolts.
[0012] Compared with the prior art, the advantages of the present invention are:
[0013] This solution realizes modular connection by cooperating with the module rod in conjunction with the docking grooves on the two positioning rods, and realizes flexible and adjustable installation angles through two movable rods, which is convenient and efficient. The device thus has the advantages of better installation convenience and improved efficiency through modular component coordination, as well as easy adjustment and maintenance. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the open front cross-sectional structure of the utility model;
[0015] Figure 2 It is a schematic diagram of the top view structure of the utility model;
[0016] Figure 3 It is a schematic diagram of a closed front cross-sectional structure of the utility model;
[0017] Figure 4 It is a partial three-dimensional structural schematic diagram of the utility model.
[0018] Description of the numbers in the figure:
[0019] 1. Positioning rod; 2. Docking groove; 3. Module rod; 4. Ear plate; 41. Positioning hole; 5. Movable rod; 51. Long rod; 511. Notch; 52. Short rod; 6. Hole group; 7. Solar module; 71. Solar panel; 72. Clamp; 721. Semi-arc clamp; 722. Vertical clamp. DETAILED DESCRIPTION
[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0021] See also Figures 1 to 4In the utility model, a photovoltaic module installation structure of a modular building house includes two positioning rods 1, and the positioning rods 1 are provided with docking grooves 2 arranged at equal distances. A module rod 3 is installed between the docking grooves 2 on the two positioning rods 1 by bolts. Two matching movable rods 5 are hinged inside the module rod 3, and matching hole groups 6 are provided on the two movable rods 5. Solar modules 7 are installed between the longitudinal movable rods 5 in pairs.
[0022] In the utility model, two positioning rods 1 are parallelly fixed to the appropriate position of the roof, and then the module rods 3 are arranged and fixed in sequence inside the two rows of docking grooves 2 by bolts, and then the two movable rods 5 inside the module rod 3 are pulled up, and the hole positions on the hole group 6 are aligned and fixed with bolts, so that the two movable rods 5 and the module rods 3 form a triangle, and then the solar module 7 is installed between the adjacent groups of movable rods 5 to achieve fixation, and form an inclined angle so that the solar module 7 can better receive sunlight, and by aligning and fixing different hole positions, the inclined angle is changed, and it is convenient to adapt to different installation positions and angles, so that the device has the advantages of better installation convenience and improved efficiency through modular component cooperation, and convenient adjustment and maintenance, and solves the problem that the prior art then welds the connecting frame on the base frame and then installs the solar panel on the connecting frame, the operation steps are complicated, the workload is large, and the welding work is performed on the roof, the work intensity is high, the installation efficiency is low, and once the welded bracket is damaged and deformed, it is very inconvenient to replace and repair, and the use effect is not good.
[0023] See also Figure 1 , Figure 2 and Figure 3 , wherein: the movable rod 5 includes a long rod 51 and a short rod 52 , and the hole group 6 is arranged on a section opposite to the long rod 51 and the short rod 52 .
[0024] In the utility model, different installation tilt angles are achieved by matching the long rod 51 and the short rod 52 and aligning different hole positions in the hole group 6 .
[0025] See also Figure 1 and Figure 2 , wherein: a notch 511 is opened on the long rod 51 , and a section of the short rod 52 is inserted into the notch 511 .
[0026] In the utility model, the short rod 52 and the long rod 51 can be conveniently combined and stored through the notch 511, so as to facilitate the transportation and storage of workpieces and facilitate installation.
[0027] See also Figure 1 and Figure 2 Among them, ear plates 4 are fixedly connected between the opposite sides of the two positioning rods 1, and positioning holes 41 are opened on the ear plates 4.
[0028] In the utility model, the positioning rod 1 is conveniently installed and fixed to the roof through the positioning hole 41 on the ear plate 4.
[0029] See also Figure 1 and Figure 4 , wherein: the solar module 7 includes a solar panel 71 and four clamps 72 , the four clamps 72 are respectively fixedly installed at the four corners of the bottom of the solar panel 71 , and the clamps 72 are clamped to the long rod 51 .
[0030] In the utility model, the four clamps 72 at the bottom of the solar panel 71 facilitate installation and fixation on a group of two adjacent movable rods 5 to achieve stable connection and fixation.
[0031] See also Figure 1 and Figure 4 , wherein: the clamp 72 includes a semi-arc clamp ring 721 and two vertical clamp plates 722, the top of the semi-arc clamp ring 721 is fixedly connected to the solar cell panel 71, the two vertical clamp plates 722 are respectively fixedly connected to the opening edges on both sides of the semi-arc clamp ring 721, and the two vertical clamp plates 722 are tightened and fixed by bolts.
[0032] In the utility model, the semi-arc clamping ring 721 is used in conjunction with the vertical clamping plate 722, the semi-arc clamping ring 721 is clamped onto the long rod 51, and the two vertical clamping plates 722 are tightened with bolts to achieve clamping and fixing, and disassembly and installation are convenient and quick.
[0033] The above is only a preferred specific implementation of the utility model; however, the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and improved ideas of the utility model within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model.
Claims
1. A photovoltaic module installation structure for a modular building, comprising two positioning rods (1), characterized in that: The positioning rod (1) is provided with docking grooves (2) arranged at equal distances, a module rod (3) is installed between the docking grooves (2) on the two positioning rods (1) by bolts, two matching movable rods (5) are hinged inside the module rod (3), and matching hole groups (6) are provided on the two movable rods (5), and solar modules (7) are installed between the movable rods (5) in pairs in the longitudinal direction.
2. The photovoltaic module installation structure of a modular building house according to claim 1, characterized in that: The movable rod (5) comprises a long rod (51) and a short rod (52), and the hole group (6) is arranged on a section of the long rod (51) and the short rod (52) that are opposite to each other.
3. The photovoltaic module installation structure of a modular building according to claim 2 is characterized in that: The long rod (51) is provided with a notch (511), and a section of the short rod (52) is inserted into the notch (511).
4. The photovoltaic module installation structure of a modular building according to claim 1, characterized in that: An ear plate (4) is fixedly connected between the two opposite sides of the two positioning rods (1), and a positioning hole (41) is provided on the ear plate (4).
5. The photovoltaic module installation structure of a modular building house according to claim 2, characterized in that: The solar module (7) comprises a solar panel (71) and four clamps (72), wherein the four clamps (72) are respectively fixedly mounted at four corners of the bottom of the solar panel (71), and the clamps (72) are clamped onto the long rod (51).
6. The photovoltaic module installation structure of a modular building according to claim 5, characterized in that: The clamping member (72) comprises a semi-arc clamping ring (721) and two vertical clamping plates (722); the top of the semi-arc clamping ring (721) is fixedly connected to the solar cell panel (71); the two vertical clamping plates (722) are respectively fixedly connected to the edges of the openings on both sides of the semi-arc clamping ring (721); and the two vertical clamping plates (722) are tightened and fixed by bolts.