Rapid pipeline opening aligning die
By designing a fast pipe counterpart mold, using the block and bolt structure and adjustable hoop assembly, the flatness and adaptability of the pipe welding work surface is solved, and the construction efficiency and applicability are improved. It is suitable for different diameters and materials. pipeline.
Patent Information
- Application Number
- CN202420282965.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-05
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-02-05
AI Technical Summary
In pipeline construction, the existing technology requires that the working surface must be very flat during pipe opening welding, and the operation is cumbersome, which affects construction efficiency and has high technical requirements for staff, making it difficult to meet the adaptation of pipes of different diameters.
A pipe fast counterpart mold is designed, adopting multiple blocks and bolt structures, and the pipe is aligned through the matching of the blocks and bolts, combining adjustable clamps and tightening components to adapt to pipes of different diameters and on the mold Integrate level and stainless steel billets to simplify operation and fixation.
It reduces the flatness requirements of the working surface, improves construction efficiency, has a wide range of application and is convenient to operate, is suitable for pipes of different materials, and reduces construction costs.
Smart Images

Figure CN222020999U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of pipeline construction, and in particular to a pipeline quick-joining mold. Background Art
[0002] During the construction of pipelines, the butt welding of pipelines is to weld the laid pipelines together through pipe ring welds. Before welding, the two pipelines to be welded must be matched at the pipe ends so that the butt joints meet the roundness, misalignment and butt clearance requirements of relevant specifications.
[0003] The main method of welding pipe ends is to manually level them using a spirit level. This method has high requirements for the working surface during construction. If the working surface is uneven, it will seriously affect the leveling work. In addition, the technical requirements for the staff are also relatively high, and the operation is cumbersome, which affects the construction efficiency. Utility Model Content
[0004] In order to improve the problem that pipe joints have high requirements on the flatness of the working surface, the present application provides a pipe quick joint mold.
[0005] The present application provides a pipe quick docking die adopting the following technical solution:
[0006] A quick-joint pipe mold comprises: a clamp and a plurality of pressing blocks arranged on the clamp, wherein the plurality of pressing blocks are used to abut against the side wall of a first pipe, a connecting rod is provided on the pressing block, and a first bolt is threadedly connected to one end of the connecting rod away from the pressing block, and the plurality of the first bolts are used to abut against the side wall of a second pipe.
[0007] By adopting the above technical solution, multiple pressing blocks abut against the first pipe, and multiple first bolts abut against the second pipe, so that the first pipe is aligned with the second pipe, the flatness requirement of the working surface is low, the operation is convenient, and the construction efficiency is improved.
[0008] Optionally: a slide groove is provided on the pressing block, the clamp is slidably inserted into the slide groove, and a tightening component for tightening the clamp is provided on the clamp.
[0009] By adopting the above technical solution, multiple pressing blocks can slide freely along the clamp. When adapting to pipes of different diameters, the position of the pressing blocks can be adjusted so that the multiple pressing blocks are evenly distributed on the outside of the pipe. Then the tightening assembly is used to tighten the clamp to fix the pipe. The invention has a wide range of applications and strong practicality.
[0010] Optionally: the tightening assembly includes a first positioning block arranged at one end of the clamp, and a second positioning block is arranged at the other end of the clamp, a second bolt is slidably passed through the first positioning block, and the second bolt is threadedly connected to the second positioning block.
[0011] By adopting the above technical solution, the second bolt is screwed onto the second positioning block, and the nut of the second bolt abuts against the first positioning block, thereby tightening the clamp until multiple pressing blocks abut against the outer wall of the first pipe. The operation is convenient and the fixation is stable. By changing the screw-in depth of the second bolt, the diameter of the clamp can be changed to adapt to first pipes of different diameters.
[0012] Optionally, a handle is provided on the end of the first bolt away from the second pipe.
[0013] By adopting the above technical solution, holding the handle makes it easier to rotate the first bolt, reducing the possibility of slipping, eliminating the need to use tools such as wrenches, making the operation more convenient and improving construction efficiency.
[0014] Optionally, a stainless steel blank is provided on one end of the first bolt close to the second pipe.
[0015] By adopting the above technical solution, the mold can meet the working requirements of both carbon steel and stainless steel, and has a wide range of applications and strong practicality.
[0016] Optionally: a level is provided on the connecting rod.
[0017] By adopting the above technical solution, whether the first pipe and the second pipe are aligned can be determined by observing the level. The level is integrated with the connecting rod, which is more convenient to carry and reduces the possibility of losing the level.
[0018] Optionally: a nut is provided on the end of the connecting rod away from the pressing block, and the first bolt is threadedly connected to the nut.
[0019] By adopting the above technical solution, nuts are common materials on the construction site. They can be used by welding the nuts to the connecting rods, eliminating the step of processing threaded holes on the connecting rods, reducing construction costs and improving construction efficiency.
[0020] Optionally: deformation holes are provided on the clamp at intervals along the length direction of the clamp.
[0021] By adopting the above technical solution, the flexibility of the clamp is improved. Under the action of the tightening component, the clamp and the pressure block fit more closely, and the fixing effect of the pipeline is better.
[0022] In summary, this application has the following beneficial effects:
[0023] A plurality of pressing blocks fix the first pipe, and a plurality of first bolts fix the second pipe, so that the first pipe is aligned with the second pipe. The flatness requirement for the working surface is low, the operation is convenient, and the construction efficiency is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1It is a schematic diagram of the overall structure of an embodiment of the present application.
[0025] Description of reference numerals:
[0026] 1. Clamp; 11. Deformation hole; 2. Press block; 21. Slide groove; 3. First pipe; 4. Connecting rod; 41. Level; 42. Nut; 5. First bolt; 51. Handle; 52. Stainless steel billet; 6. Second pipe; 7. Tightening assembly; 71. First positioning block; 72. Second positioning block; 73. Second bolt. DETAILED DESCRIPTION
[0027] The present application is further described in detail below in conjunction with the accompanying drawings.
[0028] This embodiment: a pipeline quick docking mold, refer to Figure 1 , including: a hoop 1 and four pressing blocks 2 arranged around the hoop 1, each of the four pressing blocks 2 is provided with a slide groove 21, the hoop 1 is slidably inserted into the slide groove 21, and the hoop 1 is provided with deformation holes 11 spaced apart along the length direction of the hoop 1, and the deformation holes 11 are rectangular. The hoop 1 is provided with a tightening component 7 for tightening the hoop 1 so that the four pressing blocks 2 abut against the side wall of the first pipe 3.
[0029] A connecting rod 4 is fixedly connected to one side of the pressing block 2, and a level 41 is installed on any one of the connecting rods 4. A nut 42 is fixedly connected to the end of the connecting rod 4 away from the pressing block 2, and a first bolt 5 is internally threadedly connected to the nut 42. A handle 51 is fixedly connected to the end of the first bolt 5 away from the second pipe 6. The four first bolts 5 are used to abut against the side wall of the second pipe 6 to fix the second pipe 6.
[0030] During construction, the clamp 1 is placed on the first pipe 3, and the positions of the four pressing blocks 2 are adjusted according to the diameter of the first pipe 3, so that there is a 90-degree angle between adjacent pressing blocks 2. The clamp 1 is tightened using the tightening assembly 7, and under the action of the clamp 1, the four pressing blocks 2 are pressed against the outer wall of the first pipe 3, and the first pipe 3 is fixed.
[0031] Hold the handle 51 and turn the first bolt 5 until the four first bolts 5 are pressed against the outer wall of the second pipe 6, and the second pipe 6 is fixed. Observe the level 41 and fine-tune the four first bolts 5 until the first pipe 3 is aligned with the second pipe 6. The flatness requirement of the working surface is low, the operation is convenient, and the construction efficiency is improved.
[0032] It should be noted that a stainless steel billet 52 is fixed to one end of the first bolt 5 close to the second pipe 6. The advantage of such an arrangement is that the mold can meet the working requirements of both carbon steel and stainless steel, and has a wide range of applications and strong practicality.
[0033] Among them, the tightening assembly 7 includes a first positioning block 71 fixedly connected to one end of the clamp 1, and a second positioning block 72 fixedly connected to the other end of the clamp 1. The first positioning block 71 is provided with a through hole, and a second bolt 73 is slidably inserted into the through hole. The second positioning block 72 is provided with a threaded hole, and the second bolt 73 is threadedly connected to the threaded hole.
[0034] Pass the second bolt 73 through the through hole and screw it into the threaded hole. The nut of the second bolt 73 abuts against the first positioning block 71, thereby tightening the clamp 1 until the four pressing blocks 2 abut against the outer wall of the first pipe 3. The first pipe 3 is fixed, which is easy to operate and firmly fixed.
[0035] The implementation principle of a quick pipe docking mold in an embodiment of the present application is: during construction, the clamp 1 is sleeved on the first pipe 3, and the positions of the four pressing blocks 2 are adjusted according to the diameter of the first pipe 3 so that there is a ninety-degree angle between adjacent pressing blocks 2.
[0036] Pass the second bolt 73 through the through hole and screw it into the threaded hole. The nut of the second bolt 73 abuts against the first positioning block 71, thereby tightening the clamp 1 until the four pressing blocks 2 abut against the outer wall of the first pipe 3. The first pipe 3 is fixed, which is easy to operate and firmly fixed.
[0037] Hold the handle 51 and turn the first bolt 5 until the four first bolts 5 are pressed against the outer wall of the second pipe 6, and the second pipe 6 is fixed. Observe the level 41 and fine-tune the four first bolts 5 until the first pipe 3 is aligned with the second pipe 6. The flatness requirement of the working surface is low, the operation is convenient, and the construction efficiency is improved.
[0038] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A pipe quick docking die, characterized in that: include: A clamp (1) and a plurality of pressing blocks (2) arranged around the clamp (1), the plurality of pressing blocks (2) being used to abut against the side wall of a first pipe (3), the pressing block (2) being provided with a connecting rod (4), the connecting rod (4) having an end away from the pressing block (2) being threadedly connected with a first bolt (5), the plurality of the first bolts (5) being used to abut against the side wall of a second pipe (6).
2. A pipeline quick docking die according to claim 1, characterized in that: The pressing block (2) is provided with a slide groove (21), the clamp (1) is slidably inserted into the slide groove (21), and the clamp (1) is provided with a tightening assembly (7) for tightening the clamp (1).
3. A pipeline quick docking die according to claim 2, characterized in that: The tightening assembly (7) comprises a first positioning block (71) provided at one end of the clamp (1), and a second positioning block (72) is provided at the other end of the clamp (1). A second bolt (73) is slidably passed through the first positioning block (71), and the second bolt (73) is threadedly connected to the second positioning block (72).
4. The pipeline quick docking mold according to claim 1, characterized in that: A handle (51) is provided on the end of the first bolt (5) away from the second pipe (6).
5. The pipeline quick docking mold according to claim 1, characterized in that: A stainless steel blank (52) is provided on one end of the first bolt (5) close to the second pipe (6).
6. The pipeline quick docking die according to claim 1, characterized in that: The connecting rod (4) is provided with a level (41).
7. The pipeline quick docking mold according to claim 1, characterized in that: A nut (42) is provided at one end of the connecting rod (4) away from the pressing block (2), and the first bolt (5) is threadedly connected in the nut (42).
8. The pipeline quick docking mold according to claim 1, characterized in that: Deformation holes (11) are provided on the clamp (1) at intervals along the length direction of the clamp (1).