Temporary consolidation device for continuous beam bridge pier
By designing a temporary consolidation device for fixing frames, auxiliary rings and adjustment components on the zero block of the continuous beam bridge, the problems of uneven force and insufficient support effect of the temporary consolidation device of the zero block are solved, and the problem of uneven force and insufficient support effect of the zero block is achieved. Better support effect and longer stable support.
Patent Information
- Application Number
- CN202323619496.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-28
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2033-12-28
AI Technical Summary
The temporary consolidation device of the existing continuous beam bridge in the construction stage has problems such as uneven force and not long-lasting support effect. Especially in bad weather or long-term use, the support device is prone to slide down, affecting subsequent construction.
A temporary consolidation device including a fixed frame, an auxiliary ring body and an adjustment component is designed. The fixed frame sleeve is arranged on the bridge pier, the support member abuts the bottom of the main body, and the frame is fixed by a rotating threaded rod, and the pull rope is used to The hook assembly ensures the position of the frame, and the adjustment assembly adjusts the length of the pull rope to ensure support effect.
The support effect and durability of the temporary consolidation device are improved, the roof loosening is avoided due to environmental factors, and the support is stable and supportive effect of the support on the main body is simple in structure and low in cost.
Smart Images

Figure CN222024891U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of construction engineering, and in particular to a temporary consolidation device for continuous beam bridge piers. Background Art
[0002] With the development of society, the span of continuous beam bridges is getting larger and larger, and the hanging basket construction method is used more and more. However, the continuous beam bridges built with the hanging basket construction method have the problem of system conversion. During the construction stage, the No. 0 block has to undergo a system conversion from temporary consolidation to a bridge support. Different anchoring forms have different effects on the internal force of the No. 0 block, so the anchoring form of the No. 0 block should be fully considered in the design.
[0003] In the prior art, usually only one No. 0 support block is used to support the main body. This support method makes the force uneven. There are also additional support devices, which are usually mounted on the piers. However, the support effect of this method is not long-lasting. When encountering bad weather or long-term use, the support device will slide down along the pier under the influence of the external environment. At this time, the support device does not support the main body, but pulls it down, which is very unfavorable for subsequent construction. Utility Model Content
[0004] Based on this, it is necessary to provide a temporary consolidation device for continuous beam bridge piers, including a main body, a No. 0 block is provided at the lower end of the No. 0 block, a pier is provided at the lower end of the No. 0 block, a temporary fixing device is sleeved on the pier, the temporary fixing device includes a fixed frame and an auxiliary ring body, the fixed frame is sleeved on the pier, support members are provided on the left and right sides of the fixed frame, and the ends of the support members support the bottom of the main body; threaded holes are provided on the front and back sides of the fixed frame, threaded rods are passed through the threaded holes, and a top plate is provided at the inner end of the threaded rod; the auxiliary ring body is sleeved on the No. 0 block, a plurality of lifting ropes are arranged at intervals on the auxiliary ring body, and a plurality of hooks corresponding to the lifting ropes are provided on the fixed frame, and the hooks hang the ends of the lifting ropes.
[0005] The auxiliary ring body is provided with a plurality of adjustment components at intervals, and the adjustment components include two mounting blocks and a rod. The mounting blocks are provided with mounting holes, the rod is penetrated with two mounting holes, the pulling rope is wound around the rod, and the auxiliary ring body is provided with a fixing component for fixing the rod.
[0006] The fixing assembly comprises a mounting block, a positioning screw rod arranged on the mounting block, and a thread is threadedly connected to the thread; an operating rod is arranged at one end of the rod, and a positioning hole is arranged on the operating rod.
[0007] The top of the pier is provided with a plurality of positioning grooves opening upward at intervals, and the bottom of the auxiliary ring body is provided with a plurality of positioning protrusions corresponding to the positioning grooves one by one.
[0008] A connecting seat 1 for connecting the support member is provided at the bottom of the main body, and connecting seats 2 for connecting the support member are provided on the left and right sides of the fixed frame respectively, and the two ends of the support member are respectively hinged to the connecting seat 1 and the connecting seat 2 located on the same side.
[0009] The support member includes a rod body 1 and a rod body 2. The upper end of the rod body 1 is connected to the connecting seat 1, the lower end of the rod body 1 is sleeved with the rod body 2, and the rod body 2 is connected to the connecting seat 2. An elastic member is arranged in the rod body 2, and the lower end of the rod body 1 presses against the rod body 2.
[0010] The connecting seat 1 and the connecting seat 2 are both provided with a limiting hole, and a limiting rod is threadedly passed through the limiting hole. When the end of the limiting rod is abutted against the rod body 1 or the rod body 2, the position of the rod body 1 or the rod body 2 is fixed.
[0011] The pulling rope is a steel wire rope.
[0012] The auxiliary ring body comprises two semi-ring bodies connected end to end, and connecting holes are respectively arranged at both ends of the semi-ring body, and the two semi-ring bodies are connected end to end by bolts.
[0013] Compared with the prior art, the advantages of the utility model are:
[0014] The utility model provides a temporary consolidation device for continuous beam bridge piers. When in use, the fixed frame is sleeved on the pier, the position of the fixed frame is adjusted so that the two support members are both in contact with the bottom of the main body to support the main body, the threaded rod is rotated so that the top plate at the inner end of the threaded rod is pressed tightly against the pier, thereby fixing the fixed frame on the pier, and then the end of the pulling rope is hung on the hook on the fixed frame, and the pulling rope is tightened by the adjusting component so that the pulling rope can play a certain pulling role on the fixed frame, thereby avoiding the loosening of the top plate caused by a long time or environmental factors, causing the fixed frame to move downward. The setting of the pulling rope limits the position of the fixed frame, ensures the supporting role of the support member on the main body, and makes the supporting effect of the entire temporary consolidation device better and longer, and has a simple structure and low cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 This is a three-dimensional structural schematic diagram of the temporary consolidation device for the continuous beam bridge pier of this application;
[0017] Figure 2 This is a schematic diagram of the three-dimensional structure of the auxiliary ring body of this application;
[0018] Figure 3 This is a schematic diagram of the top view of the fixed frame of the present application.
[0019] Description of reference numerals:
[0020] 1. Main body; 2. Block 0; 3. Pier; 4. Fixed frame; 5. Auxiliary ring; 50. Half ring; 51. Positioning protrusion; 6. Support; 60. Rod body 1; 61. Rod body 2; 7. Threaded rod; 8. Adjustment assembly; 80. Mounting block 1; 81. Rod; 82. Operating rod; 9. Pull rope; 10. Hook; 11. Fixed assembly; 110. Mounting block 2; 111. Positioning screw; 112. Nut; 12. Connecting seat 1; 13. Connecting seat 2; 14. Limit rod; 15. Top plate; DETAILED DESCRIPTION
[0021] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.
[0022] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0023] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0024] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0025] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0026] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only implementation method.
[0027] A temporary consolidation device for a continuous beam bridge pier comprises a main body 1, a No. 0 block 2 is provided at the lower end of the main body 1, a pier 3 is provided at the lower end of the No. 0 block 2, and the characteristic is that a temporary fixing device is sleeved on the pier 3, and the temporary fixing device comprises a fixed frame 4 and an auxiliary ring body 5, the fixed frame 4 is sleeved on the pier 3, and support members 6 are provided on the left and right sides of the fixed frame 4, and the ends of the support members 6 support the bottom of the main body 1; threaded holes are provided on the front and rear sides of the fixed frame 4, and threaded rods 7 are passed through the threaded holes, and a top plate 15 is provided at the inner end of the threaded rod 7; the auxiliary ring body 5 is sleeved on the No. 0 block 2, and adjustment components 8 are arranged at intervals on the auxiliary ring body 5, and the adjustment components 8 are connected to a pulling rope 9, and a plurality of hooks 10 corresponding to the pulling ropes 9 are provided on the fixed frame 4, and the hooks 10 hang the ends of the pulling ropes 9.
[0028] When using the temporary consolidation device for continuous beam bridge piers, the fixed frame 4 is sleeved on the pier 3, the position of the fixed frame is adjusted so that the two support members 6 are both in contact with the bottom of the main body 1 to support the main body 1, and the threaded rod 7 is rotated so that the top plate 15 at the inner end of the threaded rod 7 is pressed against the pier 3, so that the fixed frame 4 is fixed on the pier 3, and then the end of the pulling rope 9 is hung on the hook 10 on the fixed frame 4, and the lifting rope 9 is tightened by the adjusting component 8, so that the lifting rope 9 can play a certain pulling role on the fixed frame 4, so as to avoid the top plate 15 from loosening due to a long time or environmental factors, causing the fixed frame to move downward. The setting of the pulling rope 9 limits the position of the fixed frame, ensures the supporting effect of the support member 6 on the main body 1, and makes the supporting effect of the entire temporary consolidation device better and longer.
[0029] In the utility model, the adjustment component 8 includes two mounting blocks 80 and a rod 81. The mounting block 80 is provided with a mounting hole, and the rod 81 is penetrated with two mounting holes. The pulling rope 9 is wound around the rod 81. The auxiliary ring body 5 is provided with a fixing component 11 for fixing the rod 81. The pulling rope 9 can be retracted and released by rotating the rod 81 to change the length of the pulling rope 9. In this way, the fixed frame 4 at different fixed positions can play a pulling role. After the length of the pulling rope 9 is adjusted, the rod 81 is fixed by the fixing component 11, so that the rod 81 cannot continue to rotate, thereby limiting the length of the pulling rope 9.
[0030] In the utility model, the fixing assembly 11 includes a second mounting block 110, a positioning screw 111 arranged on the second mounting block 110, and a nut 112 is threadedly connected to the thread; an operating rod 82 is provided at one end of the rod 81, and a positioning hole is provided on the operating rod 82. The operating rod 82 is sleeved on the positioning screw 111 through the positioning hole, and then the operating rod 82 is fixed to the positioning screw 111 by the nut 112, so that the position of the operating rod 82 is fixed, that is, the rod 81 is fixed so that the rod 81 cannot continue to rotate.
[0031] In the utility model, a plurality of positioning grooves with openings facing upward are provided at intervals on the top of the bridge pier 3, and a plurality of positioning protrusions corresponding to the positioning grooves are provided on the bottom of the auxiliary ring body 5. After the positioning protrusions of the auxiliary ring body 5 are embedded in the positioning grooves, the displacement of the auxiliary ring body 5 can be avoided, so that the pulling rope 9 is always kept in the original position, so that the pulling force of the pulling rope 9 can be ensured to remain unchanged, and the size and direction of the supporting force of the support member 6 on the main body 1 will not be changed.
[0032] In the utility model, the bottom of the main body 1 is provided with a connection seat 12 for connecting the support member 6, and the left and right sides of the fixed frame 4 are respectively provided with connection seats 2 13 for connecting the support member 6, and the two ends of the support member 6 are respectively hinged with the connection seat 12 and the connection seat 2 13 located on the same side. The direction of the supporting force can be adjusted by rotating the support member 6, and it is also convenient to disassemble, and the connection seat 12 and the connection seat 2 13 are both provided with limiting holes, and the limiting holes are threaded with limiting rods 14. When the adjustment position of the support member 6 is adjusted, the limiting rod 14 can be screwed toward the direction of the support member 6, so that the end of the limiting rod 14 abuts against the support member 6, so that the position of the support member 6 can be fixed, and the support member 6 can be prevented from rotating again. When the rod body 1 60 or the rod body 2 61, the position of the rod body 1 60 or the rod body 2 61 is fixed. The connecting seat 12 and the connecting seat 12 each include two mounting blocks 3 arranged side by side, the mounting blocks 3 are provided with holes, hinge rods are passed through the two holes, and the support member 6 is sleeved on the hinge rods.
[0033] In the utility model, the support member 6 includes a rod body 1 60 and a rod body 2 61. The upper end of the rod body 1 60 is connected to the connecting seat 12, and the lower end of the rod body 1 60 is sleeved with the rod body 2 61. The rod body 2 61 is connected to the connecting seat 2 13. An elastic member is arranged in the rod body 2 61. The lower end of the rod body 1 60 presses against the elastic member. When the support member 6 is adjusted, the elastic member is in a compressed state, thereby adding an elastic support to the main body 1, and the supporting effect is better. In addition, when the frame 4 is fixed in time and slightly displaced, the elastic member can also play an adjusting role to prevent the support member 6 from being pulled down by the fixed frame 4.
[0034] In the present invention, the pulling rope 9 is a steel wire rope. Of course, the user can also use ropes made of other materials that are not easy to break as the pulling rope 9.
[0035] In the present invention, the auxiliary ring body 5 includes two semi-ring bodies 50 connected end to end, and connection holes are respectively provided at both ends of the semi-ring bodies 50. The two semi-ring bodies 50 are connected end to end by bolts and nuts. The bolts pass through the connection holes at one end of the two semi-ring bodies at the same time and are fixed by nuts. Another bolt passes through the connection holes at the other ends of the two semi-ring bodies 50 at the same time and is fixed by nuts to form a ring body, which is convenient for installation and disassembly.
[0036] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.
Claims
1. A temporary consolidation device for a continuous beam bridge pier, comprising a main body, the lower end of which is connected to a No. 0 block, the lower end of which is connected to a bridge pier, characterized in that: A temporary fixing device is sleeved on the pier, and the temporary fixing device includes a fixing frame and an auxiliary ring body. The fixing frame is sleeved on the pier, and support members are provided on the left and right sides of the fixing frame, and the ends of the support members support the bottom of the main body; threaded holes are provided on the front and back sides of the fixing frame, and threaded rods are passed through the threaded holes, and a top plate is provided at the inner end of the threaded rod; the auxiliary ring body is sleeved on the zero block, and a plurality of lifting ropes are arranged at intervals on the auxiliary ring body, and a plurality of hooks corresponding to the lifting ropes are provided on the fixing frame, and the hooks hang the ends of the lifting ropes.
2. A temporary consolidation device for continuous beam bridge piers according to claim 1, characterized in that: The auxiliary ring body is provided with a plurality of adjustment components at intervals, and the adjustment components include two mounting blocks and a rod. The mounting blocks are provided with mounting holes, the rod is penetrated with two mounting holes, the pulling rope is wound around the rod, and the auxiliary ring body is provided with a fixing component for fixing the rod.
3. A temporary consolidation device for continuous beam bridge piers according to claim 2, characterized in that: The fixing assembly comprises a mounting block, a positioning screw rod arranged on the mounting block, and a thread is threadedly connected to the thread; an operating rod is arranged at one end of the rod, and a positioning hole is arranged on the operating rod.
4. A temporary consolidation device for continuous beam bridge piers according to claim 1, characterized in that: The top of the pier is provided with a plurality of positioning grooves opening upward at intervals, and the bottom of the auxiliary ring body is provided with a plurality of positioning protrusions corresponding to the positioning grooves one by one.
5. A temporary consolidation device for continuous beam bridge piers according to claim 1, characterized in that: A connecting seat 1 for connecting the support member is provided at the bottom of the main body, and connecting seats 2 for connecting the support member are provided on the left and right sides of the fixed frame respectively, and the two ends of the support member are respectively hinged to the connecting seat 1 and the connecting seat 2 located on the same side.
6. A temporary consolidation device for continuous beam bridge piers according to claim 5, characterized in that: The support member includes a rod body 1 and a rod body 2. The upper end of the rod body 1 is connected to the connecting seat 1, the lower end of the rod body 1 is sleeved with the rod body 2, and the rod body 2 is connected to the connecting seat 2. An elastic member is arranged in the rod body 2, and the lower end of the rod body 1 presses against the elastic member.
7. A temporary consolidation device for continuous beam bridge piers according to claim 6, characterized in that: The connecting seat 1 and the connecting seat 2 are both provided with a limiting hole, and a limiting rod is threadedly passed through the limiting hole. When the end of the limiting rod is abutted against the rod body 1 or the rod body 2, the position of the rod body 1 or the rod body 2 is fixed.
8. A temporary consolidation device for continuous beam bridge piers according to claim 1, characterized in that: The pulling rope is a steel wire rope.
9. A temporary consolidation device for continuous beam bridge piers according to claim 1, characterized in that: The auxiliary ring body comprises two semi-ring bodies connected end to end, and connecting holes are respectively arranged at both ends of the semi-ring body, and the two semi-ring bodies are connected end to end by bolts.