Diversion tunnel outlet arrangement structure

By installing electrically controlled barriers and sealing structures at the outlet of the diversion tunnel, and utilizing a motor-driven helical gear system and baffle design, the problems of high water flow impact and difficulty in sealing at the outlet of the diversion tunnel were solved, thus achieving safe water flow diversion and improving construction safety.

CN222025001UActive Publication Date: 2024-11-19SINOHYDRO BUREAU 1 CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323203488.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-27
Publication Date
2024-11-19
Estimated Expiration
2033-11-27

AI Technical Summary

Technical Problem

The existing diversion tunnel outlet layout cannot effectively mitigate the impact of water flow, nor can it seal the diversion tunnel.

Method used

It adopts a barrier structure and a sealing structure, and uses an electric telescopic rod and a motor-driven helical gear system to control the opening and closing of the baffle and the door. Combined with the rocker block design, the water flow is made to flow in a parabolic direction, and the water flow is blocked by the baffle at the optimal angle. The motor-driven gear system is used to seal the diversion hole.

Benefits of technology

It effectively mitigated the impact of the water flow at the diversion tunnel outlet, ensuring the safe flow of water into the downstream area, protecting the downstream river surface, and achieving the sealing of the diversion tunnel, thereby improving construction safety and project investment efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222025001U_ABST
    Figure CN222025001U_ABST
Patent Text Reader

Abstract

The utility model provides a diversion tunnel outlet arrangement structure, and belongs to the technical field of water conservancy and hydropower engineering. The diversion tunnel outlet arrangement structure comprises a blocking structure and a blocking structure, the blocking structure comprises a river and a blocking piece, the blocking piece comprises a bottom column, the bottom column is fixed to the top of the river, an electric telescopic rod is fixed to the interior of the bottom column, a sliding column is fixed to the end of the electric telescopic rod, and a first motor is fixed to the interior of the sliding column; a first helical tooth is fixed to the output shaft end of the first motor, a second helical tooth is meshed with one side of the first helical tooth, a connecting shaft is fixed to the interior of the second helical tooth, and the connecting shaft is rotationally connected to the interior of the sliding column. The diversion tunnel body can be blocked by closing the left door and the right door, so that personnel below can move left and right conveniently, the baffle can be located in a road section where water flow must pass through by means of lifting and rotating of the baffle, and the water flow is blocked and then flows into a downstream area under the action of gravity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy and hydropower engineering, and in particular to a diversion tunnel outlet arrangement structure. Background Art

[0002] Tunnel diversion is a commonly used diversion method in the construction of water conservancy, hydropower and hydropower projects. Most of the hydropower projects currently under construction are located in the mountains of the southwest. The terrain at the exit of the diversion tunnel is generally steep, the excavation slope is high, and the construction is difficult. Therefore, under the action of upstream water pressure, the water ejected from the exit of the diversion tunnel will violently impact the downstream, thus creating a large deep pit downstream.

[0003] Chinese patent number CN215629807U provides a diversion tunnel outlet layout structure, which belongs to the technical field of diversion tunnel construction in water conservancy, hydropower and hydropower engineering. The utility model includes a diversion tunnel, which is provided with an outlet hole at its outlet end, and a construction road is provided above the outlet hole. The outlet hole is a concrete structure, and the internal size of the outlet hole is the same as that of the diversion tunnel. The utility model has a construction road above the outlet hole, and there is no need to build a bridge separately. The construction layout is convenient and the project investment is saved. The structure itself is safe, and it helps to increase the stability of the excavated slope, can block the falling rocks on the slope, and ensure the safety of the diversion tunnel outlet during operation.

[0004] At present, the existing diversion tunnel outlet layout structure can block the falling rocks on the slope through the retaining wall, but there is no good measure to alleviate the impact force of the water sprayed out of the diversion tunnel, and the diversion tunnel cannot be blocked. Utility Model Content

[0005] In order to make up for the above shortcomings, the utility model provides a diversion hole outlet arrangement structure, aiming to improve the diversion hole outlet arrangement structure. Under normal circumstances, there is no solution to the impact force of water sprayed from the diversion hole and the diversion hole cannot be blocked.

[0006] The utility model is achieved in this way:

[0007] The utility model provides a diversion tunnel outlet arrangement structure, comprising a blocking structure and a blocking structure.

[0008] The blocking structure includes a river and a blocking member, the blocking member includes a bottom column, the bottom column is fixed at the top of the river, an electric telescopic rod is fixed inside the bottom column, a sliding column is fixed at the end of the electric telescopic rod, a first motor is fixed inside the sliding column, a helical gear 1 is fixed to the output shaft end of the first motor, a helical gear 1 is meshed with a helical gear 2 on one side of the helical gear 1, a connecting shaft is fixed inside the helical gear 2, the connecting shaft is rotatably connected to the inside of the sliding column, a baffle is fixed at the end of the connecting shaft, the blocking structure includes a blocking member and a power member, the blocking member is rotatably connected to the top of the river, and the power member is fixed inside the river.

[0009] In an embodiment of the utility model, an upstream area is arranged at the top of the river, a downstream area is arranged at the top of the river, and a diversion tunnel body is opened inside the river.

[0010] In one embodiment of the utility model, a tilting block is fixed on the top of the river, a retaining wall is fixed on the top of the river, and a driving lane is fixed on the top of the river.

[0011] In an embodiment of the present utility model, the blocking member includes a left door and a right door, the left door is rotatably connected to the inside of the diversion tunnel body, and the right door is rotatably connected to the inside of the diversion tunnel body.

[0012] In an embodiment of the utility model, a sealing gasket 1 is fixed to one side of the left door, and a sealing gasket 1 is fixed to one side of the left door.

[0013] In an embodiment of the utility model, a sealing gasket 2 is fixed to one side of the right door, and a sealing gasket 2 is fixed to one side of the right door.

[0014] In an embodiment of the utility model, the power component includes a second motor, the second motor is fixed inside the river, a gear is fixed to the output shaft end of the second motor, a gear ring is meshed on one side of the gear, and the end of the gear ring is fixed to one side of the left door.

[0015] The beneficial effects of the utility model are as follows: the utility model obtains a diversion tunnel outlet arrangement structure through the above-mentioned design. When in use, the electric telescopic rod drives the sliding column to move up and down, so that the baffle can move up and down synchronously, and the first motor drives the bevel gear 1 to rotate, so that the bevel gear 2 can drive the baffle to rotate through the connecting shaft, so that the baffle can withstand the impact force of water at a better angle, and the left door and the right door can be closed by starting the power part, so that the diversion tunnel body can be blocked. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the drawings required for use in the implementation mode will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 It is a schematic diagram of the overall structure of the diversion tunnel outlet arrangement structure provided by the embodiment of the utility model;

[0018] Figure 2 A schematic diagram of a blocking member of a diversion tunnel outlet arrangement structure provided in an embodiment of the utility model;

[0019] Figure 3 A schematic diagram of a plugging structure of a diversion tunnel outlet arrangement structure provided in an embodiment of the utility model;

[0020] Figure 4 A partially enlarged schematic diagram of the diversion tunnel outlet arrangement structure provided in an embodiment of the utility model.

[0021] In the figure: 100-blocking structure; 110-river; 111-upstream area; 112-downstream area; 113-diversion tunnel body; 114-tilt block; 115-retaining wall; 116-driving lane; 120-blocking member; 121-bottom column; 122-electric telescopic rod; 123-sliding column; 124-first motor; 125-bevel gear one; 126-bevel gear two; 127-connecting shaft; 128-baffle; 200-blocking structure; 210-blocking member; 211-left door; 212-sealing gasket one; 213-sealing gasket one; 214-right door; 215-sealing gasket two; 216-sealing gasket two; 220-power member; 221-second motor; 222-gear; 223-gear ring. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solution and advantages of the implementation of the utility model clearer, the technical solution in the implementation of the utility model will be clearly and completely described below in conjunction with the drawings in the implementation of the utility model. Obviously, the described implementation is a part of the implementation of the utility model, not all of the implementations. Based on the implementation of the utility model, all other implementations obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] Example

[0024] See also Figure 1-4The utility model provides a technical solution: a diversion tunnel outlet arrangement structure, including a blocking structure 100 and a blocking structure 200.

[0025] See also Figure 1-4 The blocking structure 100 includes a river 110 and a blocking member 120. The blocking member 120 includes a bottom column 121. The bottom column 121 is fixed to the top of the river 110. An electric telescopic rod 122 is fixed inside the bottom column 121. The electric telescopic rod 122 can control the height of a baffle 128 by extending. A sliding column 123 is fixed at the end of the electric telescopic rod 122. A first motor 124 is fixed inside the sliding column 123. The first motor 124 can control the baffle 128 by rotating forward or reverse. The first motor 124 rotates, and a bevel gear 125 is fixed to the output shaft end of the first motor 124. A bevel gear 126 is meshed with one side of the bevel gear 125. A connecting shaft 127 is fixed inside the bevel gear 126. The connecting shaft 127 connects the bevel gear 126 and the baffle 128. The connecting shaft 127 is rotatably connected to the inside of the sliding column 123. A baffle 128 is fixed to the end of the connecting shaft 127. The baffle 128 can block water with a higher impact force, so that it flows naturally to the downstream area 112 under the action of gravity.

[0026] An upstream area 111 is provided at the top of the river 110. Figure 1 A mountain is arranged beside the middle river, a downstream area 112 is arranged on the top of the river 110, a diversion tunnel body 113 is opened inside the river 110, the diversion tunnel body 113 can make the water in the upstream area 111 flow into the downstream area 112, a block 114 is fixed on the top of the river 110, the block 114 can make the water flowing out of the diversion tunnel body 113 form a parabola under the action of water pressure, a retaining wall 115 is fixed on the top of the river 110, the retaining wall 115 can block the water in the upstream area 111, and a carriageway 116 is fixed on the top of the river 110, the carriageway 116 is convenient for pedestrians and vehicles to cross the river 110.

[0027] See also Figure 1 and Figure 3-4 The blocking structure 200 includes a blocking member 210 and a power member 220 . The blocking member 210 is rotatably connected to the top of the river 110 , and the power member 220 is fixed inside the river 110 .

[0028] The blocking member 210 includes a left door 211 and a right door 214. The left door 211 and the right door 214 can cooperate to block the diversion hole body 113. The left door 211 is rotatably connected to the inside of the diversion hole body 113, and the right door 214 is rotatably connected to the inside of the diversion hole body 113. A sealing gasket 212 is fixed to one side of the left door 211. The sealing gasket 212 and the sealing gasket 216 are made of elastic materials, and their function is to fill the gap between the left door 211 and the right door 214. A sealing gasket 213 is fixed to one side of the left door 211. The sealing gasket 213 can fill the gap between the left door 211 and the diversion hole body 113 A sealing gasket 215 is fixed on one side of the right door 214, and the sealing gasket 215 can fill the gap between the right door 214 and the diversion tunnel body 113. A sealing gasket 216 is fixed on one side of the right door 214. The power part 220 includes a second motor 221, and the second motor 221 is fixed inside the river 110. A gear 222 is fixed on the output shaft end of the second motor 221. The gear 222 can drive the gear ring 223 to slide in the river 110 by rotating. A gear ring 223 is meshed on one side of the gear 222, and the gear ring 223 can drive the left door 211 and the right door 214 to rotate, and the end of the gear ring 223 is fixed on one side of the left door 211.

[0029] Specifically, the working principle of the diversion tunnel outlet arrangement structure is as follows: when in use, the second motor 221 drives the gear 222 to rotate, so that the gear ring 223 can rotate, thereby driving the left door 211 and the right door 214 to rotate respectively through the two gear rings 223, so that the blocked diversion tunnel body 113 is opened, and then under the action of the water pressure in the upstream area 111, water will flow out of the diversion tunnel body 113, and under the action of the tilting block 114, the water flow will flow in a parabolic form, at this time, the electric telescopic rod 122 is started to adjust the sliding column 1 23, so that the height of the baffle 128 can be adjusted, so that the baffle 128 is at the necessary point of the water flow parabola, and then the first motor 124 is started, so that the first motor 124 drives the bevel gear 125 to rotate, and the bevel gear 125 drives the bevel gear 2 126 to rotate, so that the baffle 128 is rotated through the connecting shaft 127, so that the baffle 128 can meet the impact of the water flow at the best angle, thereby blocking the turbulent water flow, and then under the action of gravity, it flows to the downstream area 112, thereby completing the river surface protection of the downstream area 112.

[0030] It should be noted that the specific models and specifications of the first motor 124 and the second motor 221 need to be selected and determined according to the actual specifications of the device, and the specific selection calculation method adopts the existing technology in the field, so it will not be described in detail.

[0031] The power supply and principle of the first motor 124 and the second motor 221 are clear to those skilled in the art and will not be described in detail here.

[0032] The above description is only the preferred implementation of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A diversion tunnel outlet arrangement structure, characterized in that: include A blocking structure (100), the blocking structure (100) comprising a river (110) and a blocking member (120), the blocking member (120) comprising a bottom column (121), the bottom column (121) being fixed on the top of the river (110), an electric telescopic rod (122) being fixed inside the bottom column (121), a sliding column (123) being fixed at the end of the electric telescopic rod (122), a first motor (124) being fixed inside the sliding column (123), a helical tooth 1 (125) being fixed at the output shaft end of the first motor (124), a helical tooth 2 (126) being meshed at one side of the helical tooth 1 (125), a connecting shaft (127) being fixed inside the helical tooth 2 (126), the connecting shaft (127) being rotatably connected to the inside of the sliding column (123), a baffle (128) being fixed at the end of the connecting shaft (127); A blocking structure (200) comprising a blocking member (210) and a power member (220), wherein the blocking member (210) is rotatably connected to the top of the river (110), and the power member (220) is fixed inside the river (110).

2. A diversion tunnel outlet arrangement structure according to claim 1, characterized in that: An upstream area (111) is arranged at the top of the river (110), a downstream area (112) is arranged at the top of the river (110), and a diversion tunnel body (113) is opened inside the river (110).

3. A diversion tunnel outlet arrangement structure according to claim 2, characterized in that: A block (114) is fixed on the top of the river (110), a retaining wall (115) is fixed on the top of the river (110), and a roadway (116) is fixed on the top of the river (110).

4. A diversion tunnel outlet arrangement structure according to claim 2, characterized in that: The blocking member (210) comprises a left door (211) and a right door (214); the left door (211) is rotatably connected to the inside of the diversion tunnel body (113); and the right door (214) is rotatably connected to the inside of the diversion tunnel body (113).

5. A diversion tunnel outlet arrangement structure according to claim 4, characterized in that: A sealing gasket (212) is fixed to one side of the left door (211), and a sealing gasket (213) is fixed to one side of the left door (211).

6. A diversion tunnel outlet arrangement structure according to claim 4, characterized in that: A second sealing gasket (215) is fixed to one side of the right door (214), and a second sealing gasket (216) is fixed to one side of the right door (214).

7. The diversion tunnel outlet arrangement structure according to claim 5, characterized in that: The power member (220) comprises a second motor (221), the second motor (221) is fixed inside the river (110), a gear (222) is fixed to the output shaft end of the second motor (221), a gear ring (223) is meshed on one side of the gear (222), and an end of the gear ring (223) is fixed to one side of the left door (211).