Deslagging and cooling device for boiler

By designing a rotary ring and scraper drainage device, high-temperature cinder is drained to the cooling box, and cooling air reflux absorbs heat, solving the problem of inaccurate monitoring of the boiler cooling water temperature and improving automation efficiency and working efficiency.

CN222026963UInactive Publication Date: 2024-11-19ANHUI HUADIAN LIUAN POWER PLANT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420495517.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, the boiler cooling water temperature is difficult to monitor in real time, resulting in inaccurate control of cooling water flow, reducing automation efficiency and staff efficiency.

Method used

A boiler slag cooling device is designed, including a rotating ring, a rotating scraper, a rotating transmission gear, a cooling box, a shunt pipe and an auxiliary drainage assembly. The rotating ring and scraper are driven by a rotating drive machine to drain the high-temperature cinder to the cooling. The box uses an air pump and drainage pipe to reflow the cooling air, absorb the heat from the cinder, and realize heat recovery.

Benefits of technology

It realizes efficient rotary drainage and heat recovery of combustion cinders, improves the accuracy and automation efficiency of cooling water temperature control, and improves the work efficiency of staff.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222026963U_ABST
    Figure CN222026963U_ABST
Patent Text Reader

Abstract

The utility model discloses a boiler deslagging cooling device which comprises a boiler, a supporting support, an L-shaped feeding pipe and a pair of trumpet-shaped drainage blocks, the L-shaped feeding pipe is inserted into the bottom end of the boiler, the boiler is installed on the supporting support, the trumpet-shaped drainage blocks are installed on the L-shaped feeding pipe and the boiler respectively, and the trumpet-shaped drainage blocks are arranged on the supporting support. A deslagging cooling structure is mounted on the boiler bracket; the utility model relates to the technical field of boilers. Combusted coal is rotationally drained through a rejection cooling structure, combusted coal cinder is drained to the inner side of an L-shaped drainage pipe, the coal cinder is drained to the inner side of a cooling box, redundant heat in the coal cinder is recycled and drained through an auxiliary drainage assembly, and the remaining heat is used for supporting combustion.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of boilers, in particular to a boiler slag cooling device. Background Art

[0002] The high-temperature slag from the slag well of the power plant boiler falls directly into the slag cooler, and the high-temperature slag is cooled by the cooling water in the shell. The cooled slag is driven by the dual motors of the slag cooler, driving the scraper and the ring chain to continuously transport it to the slag bin outside the furnace for further processing. The water in the slag is continuously heated by the slag, and its hot water overflows into the water pool for clarification.

[0003] As the water in the slag removal machine continuously absorbs the heat from the boiler slag, the temperature of the cooling water rises accordingly. If the slag in the slag cooler is to be completely cooled, the temperature of the cooling water in the shell must be kept constant. Therefore, the cooling water must be circulated and replaced. Currently, during the slag removal work, workers are required to manually detect the cooling water temperature in the slag cooler and then adjust the cooling water flow rate. The temperature of the cooling water in the slag cooler cannot be monitored in real time, resulting in the inability to accurately control the cooling water flow rate in the slag cooler. In addition, the automation efficiency is low, which reduces the work efficiency of the workers. For the above problems, there may already be technical means to solve them in the prior art, but this case intends to provide an alternative or replacement technical solution. Utility Model Content

[0004] To achieve the above objectives, the utility model is implemented through the following technical solutions: a boiler slag cooling device, comprising: a boiler, a support bracket, an L-shaped feeding pipe and a pair of trumpet-shaped drainage blocks, the L-shaped feeding pipe is inserted into the bottom end of the boiler, the boiler is installed on the support bracket, a pair of trumpet-shaped drainage blocks are installed on the L-shaped feeding pipe and the boiler respectively, and the boiler bracket is installed on the slag cooling structure;

[0005] The slag discharge cooling structure comprises: a concave annular block, a rotating annular ring, a plurality of rotating scrapers, a rotating transmission helical gear, a rotating driving helical gear, a rotating driving machine, an L-shaped drainage pipe, a cooling box, a plurality of drainage pipes, a pair of shunt pipes, an air pump and an auxiliary drainage component;

[0006] The concave shape is connected to a pair of trumpet-shaped drainage blocks, the rotating ring is movably inserted on the inner side of the concave ring block, a plurality of rotating scrapers are evenly installed on the rotating ring, the rotating transmission bevel gear is installed on the rotating ring, the rotating drive machine is installed on the inner side of the concave ring block, the rotating drive bevel gear is installed on the driving end of the rotating drive machine, and the rotating drive bevel gear and the rotating transmission bevel gear are meshed, the L-shaped drainage pipe is inserted on the concave ring block, the cooling box is installed on the boiler, and the cooling box is connected to the L-shaped drainage pipe, a plurality of drainage pipes are evenly inserted on the cooling box, a pair of shunt pipes are respectively installed on a plurality of drainage pipes, the air pump is installed on the shunt pipe, and the auxiliary drainage assembly is installed on a plurality of drainage pipes;

[0007] It should be noted that, in the above, the operation of the rotary driving machine drives the rotary driving bevel gear on the driving end of the rotary driving machine to rotate, and the rotary transmission bevel gear meshing with the rotary driving gear rotates, and the rotary transmission bevel gear drives the rotating ring thereon, so that the rotating ring rotates along the inner side of the concave circular ring block, and the rotating circular ring drives a plurality of rotating scrapers thereon respectively, and the coal in the concave circular ring block is rotated by the plurality of rotating scrapers, so that the burned coal powder on the inner side of the concave circular ring block is drained to the L-shaped drainage pipe, and drained to the inner side of the L-shaped drainage pipe through the filtering holes, and the high-temperature coal ash is drained to the inner side of the cooling box through the L-shaped drainage pipe, and the shunt pipe is inflated by the air pump, and the cooling air is drained to the inner side of the plurality of drainage pipes through the shunt pipe, and the heat in the falling coal ash is recovered by the low-temperature air inside the plurality of drainage pipes.

[0008] Preferably, the auxiliary drainage assembly comprises: a plurality of inclined drainage plates, a gathering pipe and a belt conveyor;

[0009] A plurality of the inclined drainage plates are evenly installed on a plurality of the drainage pipes, the gathering pipe is inserted on the cooling box, the belt conveyor is installed on the supporting bracket, and the belt conveyor is connected to the gathering pipe;

[0010] It should be noted that, in the above, the coal slag is drained and heat is absorbed at the same time by a plurality of inclined drainage plates, and the coal slag inside the cooling box is drained to the belt conveyor through a gathering pipe, thereby achieving the goal of draining the coal slag.

[0011] Preferably, the concave annular block is provided with an inner L-shaped support block and an outer L-shaped support block.

[0012] Preferably, a plurality of convex expansion slots are respectively formed on the inner L-shaped support block and the outer L-shaped support block, and a convex expansion block is respectively arranged on the inner side of the plurality of convex expansion slots.

[0013] Preferably, sealed lifting shafts are respectively arranged on the inner sides of the plurality of convex telescopic grooves, and sleeve springs are respectively arranged on the plurality of sealed lifting shafts.

[0014] Preferably, a pair of sealed bearings are provided on the rotating ring and the concave ring block. Beneficial Effects

[0015] The utility model provides a boiler slag cooling device. Compared with the prior art, the boiler slag cooling device has the following beneficial effects: the burned coal is rotated and drained through the repelling cooling structure, the burned coal slag is drained to the inside of the L-shaped drainage pipe, the coal slag is drained to the inside of the cooling box, the excess heat in the coal slag is recovered and drained through the auxiliary drainage component, and the remaining heat is used to assist combustion. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a front and cross-sectional schematic diagram of a boiler slag cooling device described in the utility model.

[0017] Figure 2 for Figure 1 A partial enlarged view of “A” in the figure.

[0018] In the figure: 1. boiler; 2. support bracket; 3. L-shaped feeding pipe; 4. trumpet-shaped drainage block; 5. concave ring block; 6. rotating ring; 7. rotating scraper; 8. rotating transmission bevel gear; 9. rotating drive bevel gear; 10. rotating drive machine; 11. L-shaped drainage pipe; 12. cooling box; 13. drainage pipe; 14. diverter pipe; 15. air pump; 16. inclined drainage sheet; 17. gathering pipe; 18. belt conveyor. DETAILED DESCRIPTION

[0019] Based on the embodiments of the present utility model, all other embodiments obtained by ordinary technicians in the field without making any creative work shall fall within the scope of protection of the present utility model.

[0020] Through the personnel in this field, all the electrical components in this case are connected to their corresponding power supplies through wires, and appropriate controllers and encoders should be selected according to actual conditions to meet the control requirements. The specific connection and control sequence should refer to the following working principle, and the electrical connection between the electrical components is completed in the order of working in sequence. The detailed connection means are well-known technologies in this field. The following mainly introduces the working principles and processes, and no longer explains the electrical control. Example

[0021] The present invention will be described in detail below in conjunction with the accompanying drawings. Figure 1-2 As shown, the L-shaped feeding pipe 3 is inserted into the bottom end of the boiler 1, the boiler 1 is installed on the supporting bracket 2, a pair of the trumpet-shaped drainage blocks 4 are respectively installed on the L-shaped feeding pipe 3 and the boiler 1, and the boiler 1 bracket is installed on the slag cooling structure; the slag cooling structure includes: a concave ring block 5, a rotating ring 6, a plurality of rotating scrapers 7, a rotating transmission bevel gear 8, a rotating drive bevel gear 9, a rotating drive machine 10, an L-shaped drainage pipe 1311, a cooling box 12, a plurality of drainage pipes 13, a pair of shunt pipes 14, an air pump 15 and an auxiliary drainage component; the concave connection On a pair of the trumpet-shaped drainage blocks 4, the rotating ring 6 is movably inserted into the inner side of the concave ring block 5, a plurality of the rotating scrapers 7 are evenly installed on the rotating ring 6, the rotating transmission bevel gear 8 is installed on the rotating ring 6, the rotating driving machine 10 is installed on the inner side of the concave ring block 5, the rotating driving bevel gear 9 is installed on the driving end of the rotating driving machine 10, and the rotating driving bevel gear 9 is meshed with the rotating transmission bevel gear 8, the L-shaped drainage pipe 1311 is inserted into the concave ring block 5, and the cooling box 12 is installed on the boiler 1 The cooling box 12 is connected to the L-shaped drainage pipe 1311, a plurality of the drainage pipes 13 are evenly inserted in the cooling box 12, a pair of the shunt pipes 14 are respectively installed on the plurality of the drainage pipes 13, the air pump 15 is installed on the shunt pipe 14, and the auxiliary drainage assembly is installed on the plurality of the drainage pipes 13; the auxiliary drainage assembly comprises: a plurality of inclined drainage sheets 16, a gathering pipe 17 and a belt conveyor 18; a plurality of the inclined drainage sheets 16 are evenly installed on the plurality of the drainage pipes 13, and the gathering pipe 17 is inserted in the cooling box 12 The belt conveyor 18 is installed on the supporting bracket 2, and the belt conveyor 18 is connected to the gathering tube 17; the concave circular ring block 5 is provided with an inner L-shaped support block and an outer L-shaped support block; the inner L-shaped support block and the outer L-shaped support block are respectively provided with a plurality of convex expansion grooves, and a plurality of convex expansion blocks are respectively arranged on the inner sides of the convex expansion grooves; the plurality of convex expansion grooves are respectively provided with sealed lifting shafts on the inner sides, and a plurality of sealed lifting shafts are respectively provided with set springs; a pair of sealed bearings are respectively arranged on the rotating ring 6 and the concave circular ring block 5.

[0022] According to the attached Figure 1-2It is concluded that the rotary drive machine 10 is operated to drive the rotary drive bevel gear 9 on the driving end of the rotary drive machine 10 to rotate, and the rotary drive bevel gear 8 meshed with the rotary drive bevel gear 9 rotates, and the rotary drive bevel gear 8 drives the rotary ring 6 thereon, so that the rotary ring 6 rotates along the inner side of the concave circular ring block 5, and the rotary ring 6 drives a plurality of rotary scrapers 7 thereon respectively, and the coal on the concave circular ring block 5 is rotated by the plurality of rotary scrapers 7, so that the burned coal powder inside the concave circular ring block 5 is drained to the L-shaped drainage pipe 1311, and then the coal powder on the inner side of the concave circular ring block 5 is drained to the L-shaped drainage pipe 1311. The filtered holes are drained to the inner side of the L-shaped drainage pipe 1311, and the high-temperature coal slag is drained to the inner side of the cooling box 12 through the L-shaped drainage pipe 1311. The diverter pipe 14 is inflated through the air pump 15, and the cooling air is drained to the inner side of several drainage pipes 13 through the diverter pipe 14. The heat in the falling coal slag is recovered through the low-temperature air inside the several drainage pipes 13; the coal slag is drained and absorbs heat at the same time through several inclined drainage plates 16, and the coal slag inside the cooling box 12 is drained to the belt conveyor 18 through the gathering pipe 17, thereby achieving the drainage of the coal slag.

[0023] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A boiler slag cooling device, comprising: A boiler, a support bracket, an L-shaped feeding pipe and a pair of trumpet-shaped drainage blocks, characterized in that the L-shaped feeding pipe is inserted into the bottom end of the boiler, the boiler is installed on the support bracket, a pair of trumpet-shaped drainage blocks are installed on the L-shaped feeding pipe and the boiler respectively, and the boiler bracket is installed on the slag cooling structure; The slag discharge cooling structure comprises: a concave annular block, a rotating annular ring, a plurality of rotating scrapers, a rotating transmission helical gear, a rotating driving helical gear, a rotating driving machine, an L-shaped drainage pipe, a cooling box, a plurality of drainage pipes, a pair of shunt pipes, an air pump and an auxiliary drainage component; The concave shape is connected to a pair of trumpet-shaped drainage blocks, the rotating ring is movably inserted on the inner side of the concave ring block, and a plurality of rotating scrapers are evenly installed on the rotating ring. The rotating transmission bevel gear is installed on the rotating ring, and the rotating driving machine is installed on the inner side of the concave ring block. The rotating driving bevel gear is installed on the driving end of the rotating driving machine, and the rotating driving bevel gear and the rotating transmission bevel gear are meshed with each other. The L-shaped drainage pipe is inserted on the concave ring block, the cooling box is installed on the boiler, and the cooling box is connected to the L-shaped drainage pipe, and a plurality of drainage pipes are evenly inserted on the cooling box. A pair of shunt pipes are respectively installed on a plurality of drainage pipes, the air pump is installed on the shunt pipe, and the auxiliary drainage assembly is installed on a plurality of drainage pipes.

2. A boiler slag cooling device according to claim 1, characterized in that: The auxiliary drainage assembly includes: a plurality of inclined drainage plates, a gathering pipe and a belt conveyor; A plurality of the inclined drainage plates are evenly installed on a plurality of the drainage pipes, the gathering pipe is inserted on the cooling box, the belt conveyor is installed on the supporting bracket, and the belt conveyor is connected to the gathering pipe.

3. A boiler slag cooling device according to claim 2, characterized in that: The concave circular ring block is provided with an inner L-shaped support block and an outer L-shaped support block.

4. A boiler slag cooling device according to claim 3, characterized in that: The inner L-shaped support block and the outer L-shaped support block are respectively provided with a plurality of convex expansion and contraction grooves, and the inner sides of the plurality of convex expansion and contraction grooves are respectively provided with convex expansion and contraction blocks.

5. A boiler slag cooling device according to claim 4, characterized in that: The inner sides of the plurality of convex telescopic grooves are respectively provided with sealed lifting shafts, and the plurality of sealed lifting shafts are respectively provided with sleeve springs.

6. A boiler slag cooling device according to claim 5, characterized in that: A pair of sealed bearings are arranged on the rotating ring and the concave ring block.