Building engineering management engineering budget drawing device
By designing expansion boards and adjustment components in the construction project management project budget drawing device, the problems of small area and inconvenient angle adjustment of existing equipment are solved, and the drawing of larger areas and flexible angles is achieved, and the work efficiency of engineering budgeters is improved. and drawing comfort.
Patent Information
- Application Number
- CN202420653827.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing construction project management project budget drawing equipment has a small area, is inconvenient to use, and is inconvenient to adjust the angle, which affects the drawing efficiency.
A device including a base, an expansion board, a connecting frame, a rotary shaft, a limiting block, a movable plate, a pin, a spring, a motor, a rotating plate, a sleeve, a bump and a fixing frame is designed. Through the mutual cooperation of these structures, it can realize The area expansion and angle adjustment of the drawing board provide a larger drawing area and flexible drawing angle.
It improves drawing efficiency, facilitates drawing of large-area drawings and comparison of multiple project budget drawings, reduces the pressure on the wrist and arms, reduces the fatigue caused by long-term use, and improves the work efficiency of the draftsman.
Smart Images

Figure CN222031789U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field related to construction engineering, in particular to a construction engineering management engineering budget drawing device. Background Art
[0002] Project budget refers to the process of estimating and forecasting the various costs required for a construction project based on the project design and specification parameters before or during the construction project. Engineering drawings are essential technical documents in production, and engineering drawings often use drawing devices.
[0003] After searching, the Chinese patent document public number: CN216494119U discloses a construction engineering management engineering budget drawing device, including a box body, the front and rear sides of the bottom of the box body are fixedly connected with a double-headed motor, the left and right sides of the drawing table are provided with slide grooves, the slide grooves are slidably connected with sliders, the sliders are respectively fixedly connected to the middle of the left and right ends of the tool bin, the middle of the upper and lower ends of the sliders are provided with openings, and the openings are fixedly connected with rotating shafts. In the utility model, a tool bin is provided inside the drawing table, and drawing tools can be stored in the tool bin. The tool bin is divided into several spaces by a partition plate, so that people can classify and store the tools for people's use. At the same time, sliders and rollers are provided on both sides of the tool bin, so that the tool bin can be easily drawn out from the inside of the drawing table, so that people can quickly take tools, which helps to improve drawing efficiency.
[0004] The beneficial effects of the above patent specification mentions that "the double-headed motor can drive the worm to rotate, thereby driving the worm wheel engaged with the worm to rotate. Since the worm wheel is fixed to the bottom of the threaded rod, the threaded rod can rotate synchronously with it. Since the threaded rod and the sleeve are in a threaded connection relationship, the sleeve can move up and down on the threaded rod during use, so that it can achieve the purpose of adjusting the height, which is convenient for people to use." Although the above patent can solve the problem of height adjustment of the construction project management engineering budget drawing device, in the prior art, the current drawing device has a small area, which makes it extremely inconvenient for engineering budget personnel to use drawing paper, affecting the drawing efficiency. Therefore, in view of the above shortcomings, a construction project management engineering budget drawing device is proposed. Utility Model Content
[0005] The purpose of the utility model is to solve the shortcomings existing in the prior art, and the proposed construction project management engineering budget drawing device is intended to improve the problems in the prior art that the current drawing device has a small area, the engineering budget personnel are extremely inconvenient when using drawing paper to draw, and the angle of the drawing device is inconvenient to adjust when drawing the engineering budget.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A construction project management engineering budget drawing device includes a base and an expansion plate, and is characterized in that: a support block is fixedly connected to the top front side of the base, a drawing board is rotatably connected to the top of the support block, the left and right sides of the drawing board are fixedly connected to a connecting frame, the left and right sides of the expansion plate are fixedly connected to a rotating shaft, and two limit blocks are fixedly connected to the far sides of the two rotating shafts, a movable plate 1 is slidably connected to the inside of the connecting frame, a latch 1 is fixedly connected to the middle of the movable plate 1, a spring 1 is sleeved on the outside of the latch 1, the left and right sides of the top of the base are fixedly connected to support plates, two adjustment components are fixedly connected to the adjacent sides of the two support plates, and clamping components are provided on the left and right sides of the expansion plate.
[0008] Furthermore, the adjustment assembly includes a motor, and the driving ends of the two motors are respectively fixedly connected to two rotating plates, the proximal sides of the two rotating plates are respectively fixedly connected to protrusions, the external rotation of the protrusions is connected to sleeves, and the distal sides of the two connecting frames are respectively fixedly connected to two fixed frames, and the interior of the fixed frames is provided with sliding grooves.
[0009] Furthermore, the clamping assembly includes a connecting plate, the interior of which is slidably connected to a movable plate 2, one end of which is rotatably connected to the inner side of the expansion plate, a middle portion of the movable plate 2 is fixedly connected to a latch 2, and an outer sleeve of the latch 2 is provided with a spring 2.
[0010] Furthermore, the exterior of the rotating shaft contacts the inner wall of the connecting frame.
[0011] Furthermore, the outer portion of the sleeve is rotatably connected to the inner side of the fixing frame, and the outer portion of the protrusion is in contact with the inner wall of the sliding groove.
[0012] Furthermore, the outer portion of the second latch is slidably connected to the inner side of the connecting plate, the outer portion of the first latch is slidably connected to the middle portion of the rear end of the connecting frame, one end of the first spring is fixedly connected to the rear end of the first movable plate, the other end of the first spring is fixedly connected to the rear end inner wall of the connecting frame, the top end of the second spring is fixedly connected to the top inner wall of the connecting plate, and the bottom end of the second spring is fixedly connected to the top end of the second movable plate.
[0013] Furthermore, a slide is provided at the front end of the middle portion of the base, and a drawer is slidably connected to the outside of the slide.
[0014] Furthermore, telescopic rods are fixedly connected to the left and right sides of the top of the base, and the top of the telescopic rods is rotatably connected to the bottom of the connecting frame.
[0015] The utility model has the following beneficial effects:
[0016] 1. In the utility model, the area of the drawing board is expanded through the cooperation of the connecting frame, the rotating shaft, the limit block, the movable plate, the latch, the spring and other structures, thereby facilitating the drawing of large-area drawings, and allowing for comparison and contrast of multiple engineering budget drawings at the same time, thereby better presenting the details of the engineering budget drawings and improving the work efficiency of engineering budgeters.
[0017] 2. In the utility model, the angle adjustment of the drawing board is achieved through the mutual cooperation of the motor, the rotating plate, the sleeve, the protrusion, the fixing frame and other structures, so that the draftsman can draw in a comfortable posture, reduce the pressure on the wrist and arm, reduce the fatigue caused by long-term use, and can better observe the drawing effect and improve the drawing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 A three-dimensional diagram of the construction project management project budget drawing device proposed by the utility model;
[0019] Figure 2 This is a schematic diagram of the drawing board structure of the construction project management engineering budget drawing device proposed by the utility model;
[0020] Figure 3 The utility model provides a schematic diagram of the expansion board structure of the construction project management engineering budget drawing device.
[0021] Figure 4 The present invention is a schematic diagram of the motor structure of the construction project management engineering budget drawing device proposed by the present invention.
[0022] Figure 5 for Figure 2 A magnified view of the structure in Figure 2.
[0023] Figure 6 for Figure 2 Enlarged view of the structure at point B in the middle.
[0024] Legend:
[0025] 1. Base; 2. Support block; 3. Drawing board; 4. Connecting frame; 5. Extension board; 6. Rotating shaft; 7. Limit block; 8. Movable plate 1; 9. Latch 1; 10. Spring 1; 11. Support plate; 12. Motor; 13. Rotating plate; 14. Sleeve; 15. Bump; 16. Fixed frame; 17. Slide; 18. Telescopic rod; 19. Connecting plate; 20. Movable plate 2; 21. Latch 2; 22. Spring 2; 23. Drawer. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] Reference Figure 1 , Figure 2 and Figure 5 The utility model provides an embodiment: a construction project management project budget drawing device, including a base 1 and an expansion board 5, the base 1 is used to provide support force for the support block 2, the drawing board 3, and the support board 11, the top front side of the base 1 is fixedly connected with the support block 2 for supporting the rotation of the drawing board 3, the top of the support block 2 is rotatably connected with the drawing board 3, the left and right sides of the drawing board 3 are fixedly connected with a connecting frame 4 for fixing the expansion board 5, the left and right sides of the expansion board 5 are fixedly connected with a rotating shaft 6 for flipping the expansion board 5, the far sides of the two rotating shafts 6 are respectively fixedly connected with two limit blocks 7 for limiting the movement of the expansion board 5, the inner sliding connection of the connecting frame 4 is a movable plate 8 for compressing A spring 10 and a latch 9 are fixedly connected in the middle of the movable plate 8 to limit the up and down movement of the expansion plate 5. The outer sleeve of the latch 9 is provided with a spring 10 to restore the position of the latch 9, thereby fixing the position of the expansion plate 5, thereby expanding the area of the drawing board 3, thereby facilitating the drawing of large-area drawings, and allowing for comparison and contrast of multiple engineering budget drawings at the same time, better presenting the details of the engineering budget drawings, and improving the work efficiency of engineering budgeters. Support plates 11 are fixedly connected to the left and right sides of the top of the base 1 to support the motor 12. Two adjustment components are fixedly connected to the adjacent sides of the two support plates 11, and clamping components are provided on the left and right sides of the expansion plate 5.
[0028] Reference Figure 1 , Figure 3 and Figure 4 The adjustment component includes a motor 12 for driving the rotation of a rotating plate 13. The driving ends of the two motors 12 are respectively fixedly connected to the two rotating plates 13. The proximal sides of the two rotating plates 13 are respectively fixedly connected with protrusions 15 for limiting the position of the sleeve 14. The outer rotation of the protrusion 15 is connected with the sleeve 14. The far sides of the two connecting frames 4 are respectively fixedly connected with two fixing frames 16. The fixing frames 16 are provided with sliding grooves 17 inside for connecting the protrusions 15. The protrusions 15 drive the rotation, thereby driving the rotation of the drawing board 3, realizing the angle adjustment of the drawing board 3, so that the draftsman can draw in a comfortable posture, reduce the pressure on the wrists and arms, reduce the fatigue caused by long-term use, and better observe the drawing effect, thereby improving the drawing efficiency.
[0029] A slide is provided at the front middle portion of the base 1, and a drawer 23 is slidably connected to the outside of the slide for storing drawings and drawing tools. Telescopic rods 18 are fixedly connected to the left and right sides of the top of the base 1, and the top of the telescopic rod 18 is rotatably connected to the bottom of the connecting frame 4. The telescopic rod 18 can be extended and retracted to allow the drawing board 3 to better adjust its angle.
[0030] Reference Figure 1 , Figure 2 and Figure 6 The clamping assembly includes a connecting plate 19, which can be rotated to adjust the position. The interior of the connecting plate 19 is slidably connected to a movable plate 20 for compressing a spring 22. One end of the connecting plate 19 is rotatably connected to the inner side of the expansion plate 5. The middle of the movable plate 20 is fixedly connected to a latch 21. The outer sleeve of the latch 21 is provided with a spring 22 for giving the latch 21 a downward elastic force, thereby fixing the drawing paper and protecting the drawing from falling and being damaged.
[0031] Reference Figure 2 , Figure 4 and Figure 5 The outer part of the rotating shaft 6 contacts the inner wall of the connecting frame 4, and the position of the expansion board 5 is adjusted by limiting the position of the rotating shaft 6 through the inner wall of the connecting frame 4. The outer part of the sleeve 14 is rotatably connected to the inner side of the fixing frame 16, and the outer part of the protrusion 15 contacts the inner wall of the slide groove 17, thereby driving the rotation of the fixing frame 16.
[0032] Reference Figure 2 , Figure 5 and Figure 6 The outer part of the latch 21 is slidably connected to the inner side of the connecting plate 19 and slides through the connecting plate 19. The outer part of the latch 9 is slidably connected to the middle part of the rear end of the connecting frame 4 and slides through the connecting frame 4. One end of the spring 10 is fixedly connected to the rear end of the movable plate 8, and the other end of the spring 10 is fixedly connected to the inner wall of the rear end of the connecting frame 4, so that the spring 10 can be compressed and drive the latch 9 to return to its original position. The top end of the spring 22 is fixedly connected to the inner wall of the top end of the connecting plate 19, and the bottom end of the spring 22 is fixedly connected to the top end of the movable plate 20, so that the spring 22 can be compressed and drive the latch 21 to return to its original position.
[0033] Working principle: When the draftsman is ready to draw, he lifts the expansion board 5 and rotates it through the shaft 6. When the expansion board 5 rotates to be parallel to the drawing board 3, he holds the latch 9 and pulls it outward, and then presses the expansion board 5 downward until the expansion board 5 is level with the drawing board 3. At this time, he releases the latch 9, and the spring 10 drives the latch 9 back to the original position, so that the latch 9 is engaged with the shaft 6, thereby fixing the expansion board 5 and expanding the area of the drawing board 3, which facilitates the drawing of large-area drawings and can simultaneously process multiple engineering budget drawings. By comparing and contrasting, the details of the engineering budget drawings can be better presented, thereby improving the work efficiency of engineering budgeters; when the motor 12 is turned on, the driving end of the motor 12 will drive the rotating plate 13 to rotate, and the rotating plate 13 will drive the protrusion 15, and then the protrusion 15 will drive the fixing frame 16 to rotate, thereby driving the entire drawing board 3 to rotate, realizing the angle adjustment of the drawing board 3, so that the draftsman can draw in a comfortable posture, reduce the pressure on the wrist and arm, reduce the fatigue caused by long-term use, and can better observe the drawing effect and improve drawing efficiency.
[0034] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A construction project management project budget drawing device, comprising a base (1) and an expansion board (5), characterized in that: The top front side of the base (1) is fixedly connected with a support block (2), the top of the support block (2) is rotatably connected with a drawing board (3), the left and right sides of the drawing board (3) are fixedly connected with a connecting frame (4), the left and right sides of the expansion board (5) are fixedly connected with a rotating shaft (6), the far sides of the two rotating shafts (6) are respectively fixedly connected with two limit blocks (7), the inside of the connecting frame (4) is slidably connected with a movable plate (8), the middle part of the movable plate (8) is fixedly connected with a latch (9), the outside of the latch (9) is sleeved with a spring (10), the left and right sides of the top of the base (1) are fixedly connected with support plates (11), the adjacent sides of the two support plates (11) are respectively fixedly connected with two adjustment components, and the left and right sides of the expansion board (5) are provided with clamping components.
2. The construction project management project budget drawing device according to claim 1, characterized in that: The adjustment assembly comprises a motor (12), the driving ends of the two motors (12) are respectively fixedly connected to two rotating plates (13), the adjacent sides of the two rotating plates (13) are respectively fixedly connected to protrusions (15), the outer sides of the protrusions (15) are rotatably connected to sleeves (14), and the distant sides of the two connecting frames (4) are respectively fixedly connected to two fixing frames (16), and the fixing frames (16) are provided with sliding grooves (17) inside.
3. The construction project management project budget drawing device according to claim 1, characterized in that: The clamping assembly comprises a connecting plate (19), the interior of which is slidably connected to a movable plate 2 (20), one end of which is rotatably connected to the inner side of the expansion plate (5), a second latch (21) is fixedly connected to the middle of the movable plate 2 (20), and a second spring (22) is sleeved on the exterior of the second latch (21).
4. The construction project management project budget drawing device according to claim 1, characterized in that: The exterior of the rotating shaft (6) contacts the inner wall of the connecting frame (4).
5. The construction project management project budget drawing device according to claim 2, characterized in that: The outer portion of the sleeve (14) is rotatably connected to the inner side of the fixing frame (16), and the outer portion of the protrusion (15) is in contact with the inner wall of the sliding groove (17).
6. The construction project management project budget drawing device according to claim 3, characterized in that: The outer portion of the second latch (21) is slidably connected to the inner side of the connecting plate (19), the outer portion of the first latch (9) is slidably connected to the middle portion of the rear end of the connecting frame (4), one end of the first spring (10) is fixedly connected to the rear end of the first movable plate (8), the other end of the first spring (10) is fixedly connected to the inner wall of the rear end of the connecting frame (4), the top end of the second spring (22) is fixedly connected to the inner wall of the top end of the connecting plate (19), and the bottom end of the second spring (22) is fixedly connected to the top end of the second movable plate (20).
7. The construction project management project budget drawing device according to claim 1, characterized in that: A slideway is provided at the front end of the middle part of the base (1), and a drawer (23) is slidably connected to the outside of the slideway.
8. The construction project management project budget drawing device according to claim 1, characterized in that: Telescopic rods (18) are fixedly connected to the left and right sides of the top of the base (1), and the top of the telescopic rod (18) is rotatably connected to the bottom of the connecting frame (4).
