Auxiliary device for installing and fixing chemical tower

By designing the installation fixing auxiliary device of the chemical tower, and using the docking fixing flange and support components to quickly align and straighten the chemical tower, the problems of waste of installation time and skewness are solved, and the effect of resource saving and maintenance cost reduction is achieved.

CN222045268UActive Publication Date: 2024-11-22TIANJIN TIANQING ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420648809.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-01
Publication Date
2024-11-22
Estimated Expiration
2034-04-01

AI Technical Summary

Technical Problem

When installing the chemical tower, it needs to be aligned with the fixed device through the tower crane, which consumes time and is prone to deflection. The prior art uses hydraulic cylinders to straighten the correcting problem of resource waste.

Method used

A chemical tower installation fixing auxiliary device is designed, including docking fixing flange, fixed positioning support assembly, movable positioning support assembly and support fixing flange. The bottom of the chemical tower is quickly aligned by docking fixing flange, and Fixed positioning support assembly and movable positioning support assembly are used instead of hydraulic cylinders for straightening.

Benefits of technology

It realizes rapid alignment and straightening of chemical tower installation, reduces resource waste, improves operational convenience and service life, and reduces maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222045268U_ABST
    Figure CN222045268U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of chemical towers, and provides a chemical tower mounting and fixing auxiliary device which is characterized in that a butt joint fixing flange is fixedly mounted on a mounting bottom plate, two groups of fixed positioning support components and two groups of movable positioning support components are arranged in the butt joint fixing flange, and the movable positioning support components are arranged in the butt joint fixing flange. The two fixed positioning support assemblies are adjacently and vertically arranged, the two movable positioning support assemblies are adjacently and vertically arranged, and the fixed positioning support assemblies and the movable positioning support assemblies are used in cooperation to install and fix a chemical tower body. The support fixing flange is fixedly installed outside the butt joint fixing flange and used in cooperation with the fixed positioning support assembly and the movable positioning support assembly. The chemical tower centralizer is reasonable in structure and convenient to use, resource waste is reduced, operation and use are convenient, and the chemical tower centralizing effect is good.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of chemical towers, in particular to an auxiliary device for installing and fixing a chemical tower. Background Art

[0002] Chemical towers are an important type of equipment used in the chemical production process, mainly used to complete physical and chemical reactions or storage and transportation of substances. Chemical towers can be classified according to their structure, purpose, operating pressure and other characteristics, such as distillation towers, absorption towers, reaction towers, drying towers, etc.

[0003] As disclosed in application number: CN201920408359.0, a chemical tower installation and fixing auxiliary device includes a base plate, one side of the base plate is connected to a frame, the bottom end of the frame is hinged to the base plate, one side of the top of the frame is provided with a support plate, and the other side of the top of the frame is connected to an upper support, the upper support is hinged to one end of a hydraulic cylinder, the other end of the hydraulic cylinder is hinged to a lower support, the lower support is arranged on one side of the base plate, and a triangle is formed between the base plate, the hydraulic cylinder and the frame, a support rod is arranged below the hydraulic cylinder, the two ends of the support rod are respectively hinged to one side of the frame and the top of a movable seat, the movable seat is arranged on the base plate, and the movable seat is slidably connected to the base plate, and a triangle is formed between the support rod, the frame and the base plate.

[0004] Chemical towers are generally installed by tower cranes. When the tower crane is used, the bottom of the chemical tower needs to be aligned with the installation fixture, and the docking takes a certain amount of time, which brings trouble to the staff. After the docking is completed, the chemical tower is skewed during use. The existing technology uses hydraulic cylinders for straightening, which wastes resources. Utility Model Content

[0005] In order to solve the problem that chemical towers are generally installed by tower cranes, when the tower crane is used, the bottom of the chemical tower needs to be aligned with the installation fixture, and the docking takes a certain amount of time, which brings trouble to the staff. After the docking is completed, the chemical tower is skewed during use. The prior art uses hydraulic cylinders for straightening, which wastes resources. The utility model provides a chemical tower installation and fixing auxiliary device to solve this problem.

[0006] In order to achieve the above object, the utility model provides the following technical solutions:

[0007] A chemical tower installation and fixing auxiliary device comprises: a chemical tower body, a docking fixing flange, a fixed positioning support assembly, a movable positioning support assembly, a support fixing flange and a mounting base plate, wherein the docking fixing flange is fixedly installed on the mounting base plate, the fixed positioning support assembly and the movable positioning support assembly are arranged inside the docking fixing flange, two groups of fixed positioning support assemblies are arranged adjacent to each other vertically, two groups of movable positioning support assemblies are arranged adjacent to each other vertically, the fixed positioning support assembly and the movable positioning support assembly are used in combination to install and fix the chemical tower body, and the support fixing flange is fixedly installed on the outside of the docking fixing flange and used in combination with the fixed positioning support assembly and the movable positioning support assembly.

[0008] Preferably, the docking fixing flange includes: a docking part, a supporting part and a fixing part, wherein the docking part, the supporting part and the fixing part are an integrated structure, the docking part is connected to the fixing part through the supporting part, the docking part is funnel-shaped, the docking part is used in conjunction with the chemical tower body, and the fixing part is fixedly connected to the mounting base plate.

[0009] Preferably, the fixed positioning support assembly comprises: a fixed righting part, a fixed mounting part, a fixed reinforcement part and a fixed isolation part, the fixed righting part, the fixed mounting part and the fixed reinforcement part are an integrated structure, the fixed isolation part is fixedly installed between the fixed righting part and the chemical tower body, the fixed righting part is fixedly installed on the mounting base plate through the fixed mounting part, and the two ends of the fixed reinforcement part are respectively connected to the fixed righting part and the fixed mounting part.

[0010] Preferably, the movable positioning support assembly includes: a movable positioning support, a guide fixing plate and a stop fixing plate. The movable positioning support is fixedly mounted on the mounting base plate. Two groups of guide fixing plates are provided. The two groups of guide fixing plates are arranged in parallel and spaced apart on the mounting base plate. The movable positioning support is slidably arranged between the two groups of guide fixing plates. The stop fixing plate is fixedly mounted on the side of the movable positioning support away from the chemical tower body after positioning.

[0011] Preferably, the movable positioning support comprises: a movable righting part, a movable isolation part, a reinforced support part and a sliding mounting part, the movable righting part, the reinforced support part and the sliding mounting part are an integrated structure, the movable isolation part is installed between the movable righting part and the chemical tower body, the movable righting part is connected to the sliding mounting part through the reinforced support part, the sliding mounting part is slidably arranged between two groups of guide fixing plates, and a stop fixing plate is arranged at the end of the sliding mounting part.

[0012] Preferably, the support fixing flange includes: a support fixing part, a connecting piece, a support supporting part, and a support mounting part. The support fixing part, the support supporting part, and the support mounting part are an integrated structure. The support fixing part is sleeved on the outside of the docking fixing flange. The support fixing part is connected to the support mounting part through the support supporting part. The support mounting part is fixedly connected to the docking fixing flange. Multiple groups of connecting pieces are provided. Multiple groups of connecting pieces are provided on the support fixing part. The support fixing part is fixedly connected to the fixed positioning support assembly and the movable positioning support assembly through the multiple groups of connecting pieces.

[0013] Preferably, a boss for placing the chemical tower body is provided on the installation base plate, and the upper end surface of the boss is a smooth plane.

[0014] The advantages of the utility model are: the utility model uses a docking fixing flange, which is convenient for quickly aligning the bottom of the chemical tower with the installation device during lifting, saving time and effort; by using a fixed positioning support assembly and a movable positioning support assembly to replace the hydraulic cylinder to straighten the chemical tower body, the waste of resources is reduced, and it is easy to operate and use, and the straightening effect is good; by setting the support fixing flange, the mechanical damage of the fixed positioning support assembly and the movable positioning support assembly during use can be prevented, thereby extending the service life of the fixed positioning support assembly and the movable positioning support assembly and reducing the maintenance cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the accompanying drawings:

[0016] Figure 1 This is a structural isometric view of the utility model from angle 1;

[0017] Figure 2 This is a structural isometric view of the utility model at angle 2;

[0018] Figure 3 It is a structural axial view of the butt-jointed fixing flange of the utility model;

[0019] Figure 4 It is a structural isometric view of the fixed positioning support assembly of the utility model;

[0020] Figure 5 It is a structural isometric view of the movable positioning support assembly of the utility model;

[0021] Figure 6 It is a structural axial view of the movable positioning support of the utility model;

[0022] Figure 7 It is a structural axial view of the support fixing flange of the utility model;

[0023] Figure 8 It is a structural axial view of the installation base plate of the utility model.

[0024] Description of reference numerals:

[0025] 1. Chemical tower body; 2. Docking fixing flange; 3. Fixed positioning support assembly; 4. Movable positioning support assembly; 5. Support fixing flange; 6. Mounting base plate; 21. Docking part; 22. Support part; 23. Fixed part; 31. Fixed righting part; 32. Fixed installation part; 33. Fixed reinforcement part; 34. Fixed isolation part; 41. Movable positioning support; 42. Guide fixing plate; 43. Stop fixing plate; 411. Movable righting part; 412. Movable isolation part; 413. Reinforced support part; 414. Sliding installation part; 51. Support fixing part; 52. Connector; 53. Support support part; 54. Support installation part; 61. Boss. DETAILED DESCRIPTION

[0026] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

[0027] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.

[0028] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0029] Embodiment 1, combined with Figure 1 and Figure 2 To explain:

[0030] A chemical tower installation and fixing auxiliary device comprises: a chemical tower body 1, a docking fixing flange 2, a fixed positioning support assembly 3, a movable positioning support assembly 4, a support fixing flange 5 and a mounting base plate 6, wherein the docking fixing flange 2 is fixedly installed on the mounting base plate 6, the fixed positioning support assembly 3 and the movable positioning support assembly 4 are arranged inside the docking fixing flange 2, two groups of fixed positioning support assemblies 3 are arranged adjacent to each other vertically, two groups of movable positioning support assemblies 4 are arranged adjacent to each other vertically, the fixed positioning support assembly 3 and the movable positioning support assembly 4 are used in combination to install and fix the chemical tower body 1, and the support fixing flange 5 is fixedly installed outside the docking fixing flange 2 and used in combination with the fixed positioning support assembly 3 and the movable positioning support assembly 4.

[0031] By using the docking fixing flange 2, it is convenient to quickly align the bottom of the chemical tower body 1 with the installation device during lifting, which saves time and effort. By using the fixed positioning support assembly 3 and the movable positioning support assembly 4 to replace the hydraulic cylinder to straighten the chemical tower body 1, the waste of resources is reduced, and it is easy to operate and use, and the straightening effect is good. By setting the support fixing flange 5, the fixed positioning support assembly 3 and the movable positioning support assembly 4 can be prevented from mechanical damage during use, thereby extending the service life of the fixed positioning support assembly 3 and the movable positioning support assembly 4 and reducing maintenance costs.

[0032] Embodiment 2, based on embodiment 1, combined with Figure 3 To explain:

[0033] The docking fixing flange 2 includes: a docking portion 21, a supporting portion 22 and a fixing portion 23. The docking portion 21, the supporting portion 22 and the fixing portion 23 are an integrated structure. The docking portion 21 is connected to the fixing portion 23 through the supporting portion 22. The docking portion 21 is funnel-shaped and is used in conjunction with the chemical tower body 1. The fixing portion 23 is fixedly connected to the mounting base plate 6. The upper end of the docking portion 21 is transitioned by an arc.

[0034] In this way, the joints between the components can be reduced by the integrated structure of the docking portion 21, the supporting portion 22 and the fixing portion 23, thereby enhancing the overall sealing performance and pressure resistance, and also improving the stability and durability of the structure. The funnel-shaped docking portion 21 is used to facilitate the rough positioning of the bottom of the chemical tower body 1.

[0035] Embodiment 3, based on embodiment 1, combined with Figure 4 To explain:

[0036] The fixed positioning support assembly 3 includes: a fixed righting part 31, a fixed mounting part 32, a fixed reinforcement part 33 and a fixed isolation part 34. The fixed righting part 31, the fixed mounting part 32 and the fixed reinforcement part 33 are an integrated structure. The fixed isolation part 34 is fixedly installed between the fixed righting part 31 and the chemical tower body 1. The fixed righting part 31 is fixedly installed on the mounting base plate 6 through the fixed mounting part 32. Both ends of the fixed reinforcement part 33 are respectively connected to the fixed righting part 31 and the fixed mounting part 32.

[0037] In this configuration, the fixed isolation part 34 is located between the fixed righting part 31 and the chemical tower body 1, which is convenient for isolating the direct contact between the two, reducing wear and corrosion, and only the fixed isolation part 34 needs to be replaced during subsequent maintenance, thereby reducing maintenance costs. The fixed reinforcement part 33 connects the fixed righting part 31 and the fixed mounting part 32, providing additional support and reinforcement, thereby improving the bearing capacity and anti-deformation ability of the support.

[0038] Embodiment 4, based on embodiment 1, combined with Figure 5 To explain:

[0039] The movable positioning support assembly 4 includes: a movable positioning support 41, a guide fixing plate 42 and a stop fixing plate 43. The movable positioning support 41 is fixedly installed on the installation base plate 6. The guide fixing plates 42 are provided in two groups. The two groups of guide fixing plates 42 are arranged in parallel and spaced apart on the installation base plate 6. The movable positioning support 41 is slidably arranged between the two groups of guide fixing plates 42. The stop fixing plate 43 is fixedly installed on the side of the movable positioning support 41 away from the chemical tower body 1 after positioning.

[0040] In this way, two sets of guide fixing plates 42 are arranged in parallel and spaced apart on the mounting base plate 6, providing a guiding function for the movable positioning support 41. The movable positioning support 41 is slidably arranged between the two sets of guide fixing plates 42. This sliding mechanism allows the support to slide freely within a certain range, which is convenient for adjusting and limiting the position of the chemical tower body 1. The stop fixing plate 43 is fixedly installed on the side away from the chemical tower body 1 after the movable positioning support 41 is positioned, and its position can be locked after the movable positioning support 41 slides to a predetermined position, ensuring that the movable positioning support 41 does not move unnecessarily.

[0041] Embodiment 5, based on embodiment 4, combined with Figure 6 To explain:

[0042] The movable positioning support 41 includes: a movable righting part 411, a movable isolating part 412, a reinforcing support part 413 and a sliding mounting part 414. The movable righting part 411, the reinforcing support part 413 and the sliding mounting part 414 are an integrated structure. The movable isolating part 412 is installed between the movable righting part 411 and the chemical tower body 1. The movable righting part 411 is connected to the sliding mounting part 414 through the reinforcing support part 413. The sliding mounting part 414 is slidably arranged between two groups of guide fixing plates 42, and a stop fixing plate 43 is arranged at the end of the sliding mounting part 414.

[0043] In this configuration, the movable isolation part 412 is located between the fixed righting part 31 and the chemical tower body 1, which is convenient for isolating the direct contact between the two, reducing wear and corrosion, and only the movable isolation part 412 needs to be replaced during subsequent maintenance, thereby reducing maintenance costs. The strengthening support part 413 plays a role in strengthening the structural stability, and the sliding mounting part 414 facilitates the adjustment of the righting position of the movable righting part 411.

[0044] Embodiment 6, based on embodiment 1, combined with Figure 7 To explain:

[0045] The support fixing flange 5 includes: a support fixing part 51, a connecting piece 52, a support supporting part 53, and a support mounting part 54. The support fixing part 51, the support supporting part 53, and the support mounting part 54 are an integrated structure. The support fixing part 51 is sleeved on the outside of the docking fixing flange 2. The support fixing part 51 is connected to the support mounting part 54 through the support supporting part 53. The support mounting part 54 is fixedly connected to the docking fixing flange 2. A plurality of connecting pieces 52 are provided. The plurality of connecting pieces 52 are provided on the support fixing part 51. The support fixing part 51 is fixedly connected to the fixed positioning support assembly 3 and the movable positioning support assembly 4 through the plurality of connecting pieces 52.

[0046] Such an arrangement can make the structure more compact. The connecting member 52 is used to prevent the fixed positioning support assembly 3 and the movable positioning support assembly 4 from deforming, thereby improving the structural strength. The annular support fixing portion 51 is not easily deformed.

[0047] Embodiment 7, based on embodiment 1, combined with Figure 8 To explain:

[0048] The mounting base plate 6 is provided with a boss 61 for placing the chemical tower body 1 . The upper end surface of the boss 61 is a smooth plane with a roughness of 1.6. This arrangement facilitates the chemical tower body 1 to slide on the boss 61 .

[0049] Working principle of the utility model: when the utility model is in use, a tower crane is used to move the chemical tower body 1 to the top of the docking fixing flange 2, and the chemical tower body 1 is lowered. Under the guidance of the docking fixing flange 2, the chemical tower body 1 enters between the fixed positioning support assembly 3 and the movable positioning support assembly 4, and then the chemical tower body 1 is positioned by the fixed positioning support assembly 3, and the movable positioning support assembly 4 is moved to limit and fix the positioned chemical tower body 1, which plays a role in straightening, and then the support fixing flange 5 is installed to improve the structural strength and extend the service life of parts. The utility model has a reasonable structure and is easy to use. It is convenient to install and fix the chemical tower body 1, reducing the waste of resources.

[0050] For those skilled in the art, the present invention is not limited to the details of the above exemplary embodiments, and can be implemented in other specific forms without departing from the spirit or basic features of the present invention; therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so it is intended to include all changes within the meaning and scope of the equivalent elements of the claims. Any figure mark in the claims should not be regarded as limiting the claims involved.

[0051] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any minor modifications, equivalent substitutions and improvements made to the above embodiments based on the technical essence of the present invention should be included in the protection scope of the technical solution of the present invention.

Claims

1. A chemical tower installation and fixing auxiliary device, comprising: The chemical tower body (1) is characterized in that it comprises: a docking fixed flange (2), a fixed positioning support assembly (3), a movable positioning support assembly (4), a support fixing flange (5) and a mounting base plate (6), wherein the docking fixed flange (2) is fixedly mounted on the mounting base plate (6), the fixed positioning support assembly (3) and the movable positioning support assembly (4) are arranged inside the docking fixed flange (2), two groups of fixed positioning support assemblies (3) are provided, and the two groups of fixed positioning support assemblies (3) are adjacently arranged vertically, and two groups of movable positioning support assemblies (4) are provided, and the two groups of movable positioning support assemblies (4) are adjacently arranged vertically, the fixed positioning support assembly (3) and the movable positioning support assembly (4) are used in conjunction with each other to install and fix the chemical tower body (1), and the support fixing flange (5) is fixedly mounted outside the docking fixed flange (2) and used in conjunction with the fixed positioning support assembly (3) and the movable positioning support assembly (4).

2. A chemical tower installation and fixing auxiliary device according to claim 1, characterized in that: The docking fixing flange (2) comprises: a docking portion (21), a supporting portion (22) and a fixing portion (23); the docking portion (21), the supporting portion (22) and the fixing portion (23) are an integrated structure; the docking portion (21) is connected to the fixing portion (23) via the supporting portion (22); the docking portion (21) is funnel-shaped; the docking portion (21) is used in conjunction with the chemical tower body (1); and the fixing portion (23) is fixedly connected to the mounting base plate (6).

3. A chemical tower installation and fixing auxiliary device according to claim 1, characterized in that: The fixed positioning support assembly (3) comprises: a fixed righting portion (31), a fixed mounting portion (32), a fixed reinforcement portion (33) and a fixed isolation portion (34); the fixed righting portion (31), the fixed mounting portion (32) and the fixed reinforcement portion (33) are an integrated structure; the fixed isolation portion (34) is fixedly mounted between the fixed righting portion (31) and the chemical tower body (1); the fixed righting portion (31) is fixedly mounted on the mounting base plate (6) via the fixed mounting portion (32); and the two ends of the fixed reinforcement portion (33) are respectively connected to the fixed righting portion (31) and the fixed mounting portion (32).

4. A chemical tower installation and fixing auxiliary device according to claim 1, characterized in that: The movable positioning support assembly (4) comprises: a movable positioning support (41), a guide fixing plate (42) and a stop fixing plate (43); the movable positioning support (41) is fixedly mounted on the mounting base plate (6); two groups of guide fixing plates (42) are provided, and the two groups of guide fixing plates (42) are arranged in parallel and spaced apart on the mounting base plate (6); the movable positioning support (41) is slidably arranged between the two groups of guide fixing plates (42); and the stop fixing plate (43) is fixedly mounted on a side of the movable positioning support (41) away from the chemical tower body (1) after the movable positioning support (41) is positioned.

5. A chemical tower installation and fixing auxiliary device according to claim 4, characterized in that: The movable positioning support (41) includes: a movable righting part (411), a movable isolating part (412), a reinforcing support part (413) and a sliding mounting part (414); the movable righting part (411), the reinforcing support part (413) and the sliding mounting part (414) are an integrated structure; the movable isolating part (412) is installed between the movable righting part (411) and the chemical tower body (1); the movable righting part (411) is connected to the sliding mounting part (414) through the reinforcing support part (413); the sliding mounting part (414) is slidably arranged between two groups of guide fixing plates (42); and a stop fixing plate (43) is provided at the end of the sliding mounting part (414).

6. A chemical tower installation and fixing auxiliary device according to claim 1, characterized in that: The support fixing flange (5) comprises: a support fixing portion (51), a connecting piece (52), a support supporting portion (53), and a support mounting portion (54); the support fixing portion (51), the support supporting portion (53), and the support mounting portion (54) are an integrated structure; the support fixing portion (51) is sleeved on the outside of the docking fixing flange (2); the support fixing portion (51) is connected to the support mounting portion (54) through the support supporting portion (53); the support mounting portion (54) is fixedly connected to the docking fixing flange (2); a plurality of connecting pieces (52) are provided; the plurality of connecting pieces (52) are provided on the support fixing portion (51); the support fixing portion (51) is fixedly connected to the fixed positioning support assembly (3) and the movable positioning support assembly (4) through the plurality of connecting pieces (52).

7. A chemical tower installation and fixing auxiliary device according to claim 1, characterized in that: The mounting base plate (6) is provided with a boss (61) for placing the chemical tower body (1), and the upper end surface of the boss (61) is a smooth plane.