Construction structure of orthogonal bridge with staggered-hole-arranged piers and abutments at road-bridge junction
By setting up cantilever retaining walls and composite drainage pads at the orthogonal arrangement of the bridge, the problem of soil filling intrusion into the bridge is solved, the construction process is simplified, the engineering cost is reduced, and the standardized design and construction progress of the bridge is promoted.
Patent Information
- Application Number
- CN202420210355.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-26
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-01-26
AI Technical Summary
When the bridge is orthogonal arrangement, the fill slope of the half-walk roadbed invades the other half of the bridge beam body, affecting structural safety, and the design and construction of oblique bridges are complex, resulting in increased engineering cost and delayed construction progress.
The orthogonal bridge construction structure is arranged with a pier staggered hole, including the installation of cantilever retaining walls and composite drainage pads at the junction of roads and bridges, to control soil filling to prevent invasion of the bridge, ensure structural stability through layered filling and special compaction, and to The retaining wall area is equipped with drainage holes and water stabilization base layer.
Effectively prevent soil filling from invading bridges, reduce project cost, simplify the construction process, avoid large span structures, promote standardized bridge design and accelerate construction progress.
Smart Images

Figure CN222065174U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of roads and bridges, and in particular relates to a construction structure at the junction of a road and a bridge. Background Art
[0002] Bridges are usually set up to cross obstacles such as rivers, roads, and canyons, and are an important part of highways. In actual situations, highway bridges are generally double-span separate bridges, and they often have oblique intersections with the roads and rivers they cross. Compared with orthogonal bridges, the conventional oblique layout scheme of bridges is more complex in force and inconvenient to construct. If the bridge is arranged orthogonally and the two piers are aligned, the span of the bridge structure will inevitably increase in order to cross the oblique obstacles, resulting in an increase in the project cost. In addition, when the span is greater than 40m, it is not conducive to prefabricated standardized design and construction. If the bridge is orthogonal, the two bridge piers are arranged with staggered holes, which can effectively reduce the span of the structure and avoid the use of oblique bridges. However, due to the staggered arrangement of the two bridges, the left and right sides of the highway near the bridge abutments are usually half bridge and half roadbed. When the abutments are filled sections, during the construction process, the fill slope of the half roadbed will invade the other half bridge beam, affecting the safety of the bridge structure and not conducive to construction. Utility Model Content
[0003] The technical problem to be solved by the present invention is to overcome the deficiencies and defects mentioned in the above background technology, and to provide a construction structure of an orthogonal bridge with staggered piers at the junction of a road and a bridge, which can prevent the fill and slope of half of the roadbed from invading the other half of the bridge beam, affecting the safety of the bridge structure, and is conducive to the construction of the junction of the road and the bridge. In order to solve the above technical problems, the technical solution proposed by the present invention is as follows:
[0004] A construction structure for an orthogonal bridge with staggered piers and a road-bridge junction, wherein the orthogonal bridge with staggered piers is a double-span bridge, and the road-bridge junction is a half-road and half-bridge area, including a half-width bridge and a half-width roadbed (fill roadbed) that are adjacently arranged (arranged side by side along the transverse direction of the bridge), and the construction structure includes a retaining wall (cantilever retaining wall) for preventing the fill of the half-width roadbed from invading the beam body of the half-width bridge, and the retaining wall is located on the half-width roadbed and is arranged facing the half-width bridge.
[0005] In the above construction structure, preferably, the end of the half-width roadbed is provided with a first abutment (i.e., the abutment where the half-width roadbed connects with the bridge on that side), the end of the half-width bridge is provided with a second abutment (i.e., the abutment at the end of the half-width bridge), and the retaining wall starts from the first abutment and ends at the second abutment. The above arrangement is equivalent to the section adjacent to the half-width bridge and the half-width roadbed being provided with a retaining wall, which can well prevent the fill on the half-width roadbed side from invading the beam body of the half-width bridge during construction.
[0006] In the above construction structure, preferably, a main beam is erected on the second abutment, and the top of the retaining wall is not lower than the top of the main beam. Controlling the height of the retaining wall can ensure that the fill on the half-width roadbed side does not invade the beam body of the half-width bridge.
[0007] In the above construction structure, preferably, the retaining wall is arranged perpendicular to the first abutment and the second abutment, and is located on the side of the half-width roadbed close to the half-width bridge. The arrangement method and location of the retaining wall can better ensure that the fill on this side of the half-width roadbed does not invade the beam of the half-width bridge.
[0008] In the above construction structure, preferably, the half-width roadbed is provided with a first backfill layer and a second backfill layer, the first backfill layer is trapezoidal (trapezoidal in the vertical section in the transverse direction of the bridge), and is partially located on the side of the half-width bridge (that is, one side of the trapezoid will be located below the cap beam of the half-width bridge, and this side is equivalent to the slope of the first backfill layer), the toe of the retaining wall is buried in the first backfill layer, and the second backfill layer is located on the first backfill layer, and is located on the side of the retaining wall away from the half-width bridge. The utility model can greatly reduce the setting height of the retaining wall by first setting the first backfill layer and then setting the second backfill layer after the retaining wall is constructed, which will be more excellent in terms of both engineering cost and structural stability. Before the construction of the retaining wall, the lower layer of the half-width roadbed should be backfilled to the layered filling line (that is, the first backfill layer should be backfilled first), the elevation of the layered filling line is located near the bottom of the abutment cap beam, and generally the elevation of the layered filling line should be higher than the toe of the retaining wall. The first backfill layer should be particularly compacted, and the compaction degree should not be less than 96% to ensure structural stability.
[0009] In the above construction structure, preferably, a crushed stone cushion is provided at the bottom of the toe of the retaining wall. Providing a crushed stone cushion is beneficial to improving the structural stability of the retaining wall.
[0010] In the above construction structure, preferably, a special backfill layer is provided between the wall body of the retaining wall and the second backfill layer, and the special backfill layer includes a lower backfill clay layer, and a composite drainage mat, a filter layer (such as a crushed (gravel) stone filter layer) and a permeable filler layer (such as high-quality excavated slag or unscreened crushed stone and other permeable fillers) are vertically arranged in sequence on the lower backfill clay layer, and the composite drainage mat is arranged close to the retaining wall, and an upper backfill clay layer is provided on the composite drainage mat and the filter layer. The special backfill layer is mainly to facilitate the drainage of the soil inside the retaining wall area and prevent safety problems such as the collapse of the retaining wall. By arranging mutually coordinated composite drainage mats, filter layers and permeable filler layers, and then through subsequent drainage holes, the purpose of water collection and drainage can be well achieved.
[0011] In the above construction structure, preferably, a water-stable base layer is provided above the second backfill layer and the special backfill layer. The water-stable base layer mainly serves as a load-bearing layer, bears vehicle loads, and improves road surface strength.
[0012] In the above construction structure, preferably, the retaining wall is provided with a plurality of drainage holes. The provision of drainage holes, in combination with the special backfill layer, is conducive to the drainage of the soil inside the retaining wall area, and prevents safety problems such as the collapse of the retaining wall. The above drainage holes can be arranged at a certain angle and tilted downward.
[0013] In the above construction structure, preferably, the first abutment and the second abutment both include an abutment pile foundation and an abutment cap beam, the abutment cap beam is located on the abutment pile foundation, a main beam is erected on the abutment cap beam, a guardrail is provided on the main beam, and a guardrail is also provided on the retaining wall.
[0014] The construction structure of the orthogonal bridge with staggered piers at the junction of the road and bridge of the utility model is a construction system for bridge and roadbed construction in the case of staggered bridge arrangement in the fill section of the highway project. The construction structure should backfill the first backfill layer to the layered filling line before the construction of the retaining wall. Generally, the elevation of the layered filling line should be higher than the toe of the retaining wall. The first backfill layer should be particularly compacted, and the compaction degree should not be less than 96%. Then, the foundation and wall of the retaining wall are constructed by reverse excavation. After the construction of the retaining wall is completed, the second backfill layer, the special backfill layer on the back of the retaining wall and the water-stable base are backfilled, and then the pile foundation, cap beam and bridge superstructure (main beam, bridge deck, etc.) of the other half of the bridge are excavated and constructed, and the retaining wall and the anti-collision guardrail of the bridge are installed.
[0015] The specific construction method and steps of the construction structure of the orthogonal bridge with staggered piers at the junction of the road and bridge of the utility model can be as follows:
[0016] Clear the site, construct the lower layer of half of the roadbed to the layered filling line, and compact this part of the roadbed.
[0017] Reverse excavate the lower layer of half of the roadbed, construct the retaining wall cushion layer and cantilever retaining wall structure, and reserve drainage holes in the wall.
[0018] Reserve special backfill areas and fill the general backfill areas.
[0019] Backfill the special backfill area with clay, composite drainage mat and crushed (gravel) stone filter layer, high-quality excavated stone slag or unscreened crushed stone and other permeable fillers to construct the water-stable base.
[0020] Reverse excavation is used to construct the pile foundation of half of the abutment, cast the abutment cap beam, and erect the upper structure beam.
[0021] Install retaining walls and anti-collision guardrails on bridge structures.
[0022] Compared with the prior art, the advantages of the utility model are:
[0023] The utility model of the orthogonal bridge with staggered piers at the junction of roads and bridges can effectively solve the safety problem caused by the slope of the half-width roadbed invading the other half-width bridge beam during the construction process when the bridge with staggered piers is arranged orthogonally on the fill road section, which is conducive to construction. At the same time, the staggered orthogonal arrangement of bridges across oblique roads and rivers can avoid the use of oblique bridges with complex design and construction, and avoid the use of superstructures with larger spans, which is conducive to promoting bridge standardization, accelerating construction progress, and reducing project costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 It is a structural schematic diagram (cross-sectional view) of the construction structure of an orthogonal bridge with staggered piers and abutments at the junction of a road and a bridge in an embodiment.
[0026] Figure 2 It is a structural schematic diagram (top view) of the construction structure of an orthogonal bridge with staggered piers and abutments at the junction of a road and a bridge in the embodiment.
[0027] Figure 3 It is a structural schematic diagram of the special backfill layer behind the retaining wall in the construction structure of the orthogonal bridge with staggered piers at the junction of the road and bridge in the embodiment.
[0028] Legend:
[0029] 1. Retaining wall; 2. First abutment; 3. Second abutment; 4. Guardrail; 5. First backfill layer; 6. Second backfill layer; 7. Special backfill layer; 71. Lower backfill clay layer; 72. Composite drainage mat; 73. Filter layer; 74. Permeable filler layer; 75. Upper backfill clay layer; 8. Drainage hole; 9. Water-stable base layer; 10. Main beam; 11. Gravel cushion layer; 12. Abutment pile foundation; 13. Abutment cap beam; 100. Half-width bridge; 200. Half-width roadbed. DETAILED DESCRIPTION
[0030] In order to facilitate the understanding of the present invention, the present invention will be described more comprehensively and carefully below in conjunction with the accompanying drawings and preferred embodiments of the specification, but the protection scope of the present invention is not limited to the following specific embodiments.
[0031] Unless otherwise defined, all professional terms used below have the same meanings as those generally understood by those skilled in the art. The professional terms used herein are only for the purpose of describing specific embodiments and are not intended to limit the scope of protection of the present utility model.
[0032] Unless otherwise specified, various raw materials, reagents, instruments and equipment used in the present invention can be purchased from the market or prepared by existing methods.
[0033] Example:
[0034] like Figure 1 and Figure 2 As shown, the construction structure of an orthogonal bridge with staggered piers in this embodiment at the junction of a road and a bridge is that the orthogonal bridge with staggered piers is a double-width bridge, and the junction of the road and the bridge is a half-road and half-bridge area, including a half-width bridge 100 and a half-width roadbed 200 arranged adjacently, and the construction structure includes a retaining wall 1 (cantilever retaining wall) for preventing the backfill of the half-width roadbed 200 from invading the beam body of the half-width bridge 100, and the retaining wall 1 is located on the half-width roadbed 200, and is arranged facing the half-width bridge 100.
[0035] In this embodiment, a first abutment 2 is provided at the end of the half-width roadbed 200 , a second abutment 3 is provided at the end of the half-width bridge 100 , and the retaining wall 1 starts from the first abutment 2 and ends at the second abutment 3 .
[0036] In this embodiment, a main beam 10 is erected on the second abutment 3 , and the top of the retaining wall 1 is not lower than the top of the main beam 10 .
[0037] In this embodiment, the retaining wall 1 is arranged perpendicular to the first abutment 2 and the second abutment 3 , and is located on a side of the half-width roadbed 200 close to the half-width bridge 100 .
[0038] In this embodiment, a first backfill layer 5 and a second backfill layer 6 are provided on the half-width roadbed 200. The first backfill layer 5 is trapezoidal and is partially located on the side of the half-width bridge 100. The toe of the retaining wall 1 is buried in the first backfill layer 5. The second backfill layer 6 is located on the first backfill layer 5 and is located on the side of the retaining wall 1 away from the half-width bridge 100.
[0039] In this embodiment, a crushed stone cushion layer 11 is provided at the bottom of the toe of the retaining wall 1 .
[0040] like Figure 3As shown, in this embodiment, a special backfill layer 7 is provided between the wall body of the retaining wall 1 and the second backfill layer 6, and the special backfill layer 7 includes a lower backfill clay layer 71, and a composite drainage mat 72, a filter layer 73 and a permeable filler layer 74 are vertically arranged in parallel on the lower backfill clay layer 71, and the composite drainage mat 72 is arranged close to the retaining wall 1, and an upper backfill clay layer 75 is provided on the composite drainage mat 72 and the filter layer 73. In this embodiment, the lower backfill clay layer 71, the composite drainage mat 72, the filter layer 73, the permeable filler layer 74 and the upper backfill clay layer 75 can all use existing conventional fillers, such as clay for the lower backfill clay layer 71 and the upper backfill clay layer 75, crushed (gravel) stone for the filter layer 73, and permeable filler layer 74 for high-quality excavated slag or unscreened crushed stone and other permeable fillers.
[0041] In this embodiment, a water-stable base layer 9 is provided above the second backfill layer 6 and the special backfill layer 7 .
[0042] In this embodiment, a plurality of drainage holes 8 are provided on the wall of the retaining wall 1 .
[0043] In this embodiment, the first abutment 2 and the second abutment 3 both include an abutment pile foundation 12 and an abutment cap beam 13. The abutment cap beam 13 is located on the abutment pile foundation 12. A main beam 10 is mounted on the abutment cap beam 13. A guardrail 4 is provided on the main beam 10. A guardrail 4 is also provided on the retaining wall 1.
[0044] The construction structure of the orthogonal bridge with staggered piers and abutments at the junction of the road and bridge in this embodiment is a construction system for bridge and roadbed construction in the case of staggered bridge arrangement in the fill section of the highway project. Before the construction of the retaining wall 1, the construction structure should backfill the first backfill layer 5 to the layered filling line. Generally, the elevation of the layered filling line should be higher than the toe of the retaining wall 1. The first backfill layer 5 should be particularly compacted, and the compaction degree should not be less than 96%. Then, the foundation and wall body of the retaining wall 1 are back-excavated. After the construction of the retaining wall 1 is completed, the second backfill layer 6, the special backfill layer 7 on the back of the retaining wall 1 and the water-stable base layer 9 are backfilled, and then the abutment pile foundation 12, the abutment cap beam 13 and the bridge superstructure (main beam 10, bridge deck, etc.) of the other half of the bridge 100 are excavated and constructed, and the guardrails 4 of the retaining wall 1 and the bridge are installed.
[0045] The construction structure of the orthogonal bridge with staggered piers in this embodiment at the junction of the road and bridge can effectively solve the safety problem of the fill slope of half of the roadbed 200 invading the beam of the other half of the bridge 100 when the bridge is staggered orthogonally arranged on the fill road section. At the same time, the staggered orthogonal arrangement of the bridge across the oblique road and river can avoid the use of oblique bridges with complex design and construction, and avoid the use of a larger span superstructure, which is conducive to promoting bridge standardization, accelerating construction progress, and reducing project costs.
[0046] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A construction structure of an orthogonal bridge with staggered piers at the junction of a road and a bridge, characterized in that: The orthogonal bridge with staggered piers is a double-width bridge, the junction of the road and bridge is a half-road and half-bridge area, including a half-width bridge (100) and a half-width roadbed (200) arranged adjacently, the construction structure includes a retaining wall (1) for preventing the backfill of the half-width roadbed (200) from invading the beam body of the half-width bridge (100), the retaining wall (1) is located on the half-width roadbed (200) and is arranged facing the half-width bridge (100).
2. The construction structure according to claim 1, characterized in that: A first abutment (2) is provided at the end of the half-width roadbed (200), a second abutment (3) is provided at the end of the half-width bridge (100), and the retaining wall (1) starts from the first abutment (2) and ends at the second abutment (3).
3. The construction structure according to claim 2, characterized in that: A main beam (10) is mounted on the second abutment (3), and the top of the retaining wall (1) is not lower than the top of the main beam (10).
4. The construction structure according to claim 2, characterized in that: The retaining wall (1) is arranged perpendicular to the first abutment (2) and the second abutment (3), and is located on a side of the half-width roadbed (200) close to the half-width bridge (100).
5. The construction structure according to any one of claims 1 to 4, characterized in that: A first backfill layer (5) and a second backfill layer (6) are provided on the half-width roadbed (200); the first backfill layer (5) is trapezoidal and is partially located on the side of the half-width bridge (100); the toe of the retaining wall (1) is buried in the first backfill layer (5); and the second backfill layer (6) is located on the first backfill layer (5) and on the side of the retaining wall (1) away from the half-width bridge (100).
6. The construction structure according to claim 5, characterized in that: A crushed stone cushion layer (11) is provided at the bottom of the toe of the retaining wall (1).
7. The construction structure according to claim 5, characterized in that: A special backfill layer (7) is provided between the wall body of the retaining wall (1) and the second backfill layer (6), the special backfill layer (7) comprising a lower backfill clay layer (71), a composite drainage mat (72), a filter layer (73) and a permeable filler layer (74) being vertically arranged in sequence on the lower backfill clay layer (71), the composite drainage mat (72) being arranged close to the retaining wall (1), and an upper backfill clay layer (75) being provided on the composite drainage mat (72) and the filter layer (73).
8. The construction structure according to claim 7, characterized in that: A water-stable base layer (9) is provided above the second backfill layer (6) and the special backfill layer (7).
9. The construction structure according to claim 7, characterized in that: A plurality of drainage holes (8) are provided on the wall of the retaining wall (1).
10. The construction structure according to any one of claims 2 to 4, characterized in that: The first abutment (2) and the second abutment (3) both include an abutment pile foundation (12) and an abutment cap beam (13), wherein the abutment cap beam (13) is located on the abutment pile foundation (12), a main beam (10) is mounted on the abutment cap beam (13), a guardrail (4) is provided on the main beam (10), and a guardrail (4) is also provided on the retaining wall (1).