Dirt collecting device for bridge demolition

By designing a dirt collection device for bridge removal, the first and second sewage collection silos connected by sewage pipes are used to achieve unified collection of sewage and waste slag, solving the environmental pollution problem caused by direct discharge of pollutants during bridge removal process , suitable for bridge demolition scenarios with large areas and large height difference.

CN222065233UActive Publication Date: 2024-11-26齐鲁高速公路股份有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420549243.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-19
Publication Date
2024-11-26
Estimated Expiration
2034-03-19

AI Technical Summary

Technical Problem

In the process of bridge removal, the direct discharge of sewage and waste slag leads to environmental pollution, especially in scenarios such as cross-highway overpasses, where pollutants cannot be effectively collected, resulting in limited environmental pollution and use scenarios. Very sexy.

Method used

A dirt collection device is designed, including the first dirt tank and the second dirt tank, which is connected by a sewage pipe. The first dirt tank is installed on a bridge pier or a cover beam, and a dirt connection is provided for the main beam cutting position. The sewage and waste slag fall into the first sewage tank through the sewage connection, and then discharge it to the second sewage tank through the sewage discharge pipe for unified collection, and use gravity to achieve the collection and collection of dirt.

Benefits of technology

It effectively avoids direct emission of pollutants, achieves coverage of large-area and high-level differential work scenarios such as cross-highway overpasses, improves the compatibility of dirt collection devices, and ensures safe collection and environmental protection of dirt.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065233U_ABST
    Figure CN222065233U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of bridges, in particular to a dirt collecting device for bridge demolition, which comprises a first dirt collecting bin, a second dirt collecting bin, a third dirt collecting bin and a fourth dirt collecting bin, the second sewage collecting bin is installed on the pier or the cover beam and located on the side, away from the main beam, of the first sewage collecting bin, and the sewage discharging pipe communicates with the first sewage collecting bin and the second sewage collecting bin. Thus, pollutants such as sewage and waste residues generated in the cutting process of the main beam fall into the inner cavity of the first sewage collecting bin through the sewage receiving opening and then are discharged to the second sewage collecting bin through the sewage discharging pipe under the gravity effect to be collected in a unified mode, and therefore environmental pollution caused by direct discharging can be avoided; and the sewage collecting device is suitable for working scenes with large laying area and large height difference, such as a highway overbridge, so that the compatibility of the sewage collecting device is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridges, in particular to a dirt collecting device used for bridge demolition. Background Art

[0002] In the related technology, rope saw cutting combined with mechanical lifting is a commonly used bridge cutting and demolition solution. Condensed water is required to cool the wire rope during rope saw cutting, and the subsequent discharge of pollutants such as sewage and waste residue is usually achieved by direct discharge or by laying plastic waterproof cloth under the bridge.

[0003] However, for some work scenarios with large paving areas and large height differences, such as overpasses across highways, the direct discharge of pollutants such as sewage and waste residue will cause great pollution to the environment, especially the sewage and other pollutants generated by the wire rope saw cutting of the highway overpass, which are directly discharged under the bridge, which will seriously affect the highway and cleaning; and the method of laying waterproof cloth under the bridge to discharge sewage has great limitations, and has many disadvantages such as being unusable and sewage and other pollutants cannot be collected normally.

[0004] In summary, the sewage discharge method in the relevant technology has the problem that pollutants cannot be effectively collected, resulting in environmental pollution, and is not suitable for work scenarios with large paving areas and large height differences, such as overpasses across highways. Utility Model Content

[0005] The purpose of the utility model is to provide a dirt collection device for bridge demolition in view of the problems existing in the prior art.

[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0007] A waste collection device for bridge demolition comprises: a first waste collecting bin installed on a pier or a cap beam and provided with a waste inlet corresponding to a cutting position of a main beam; a second waste collecting bin installed on the pier or the cap beam and located on a side of the first waste collecting bin away from the main beam, and a sewage discharge pipe connecting the first waste collecting bin and the second waste collecting bin, respectively.

[0008] Optionally, multiple sewage pipes are arranged along the length direction and / or width direction of the main beam.

[0009] Optionally, it also includes: a mounting frame arranged on the pier or the cap beam, located between the first sewage collecting bin and the second sewage collecting bin, a slide rail and a slider, the slide rail is arranged on the mounting frame, the slider slides along the length direction of the main beam and is connected to the slide rail, and the slider is connected to the first sewage collecting bin.

[0010] Optionally, it further comprises a traction assembly connected to the slider or the first dirt collecting bin, and the traction assembly can drive the first dirt collecting bin to move along with the slider.

[0011] Optionally, the traction assembly includes a fixed pulley arranged on the slide rail, and a pull rope connected to the slider or the first dirt collecting bin, one end of the pull rope is connected to the slider or the first dirt collecting bin, and the other end is passed around the fixed pulley.

[0012] Optionally, the first sewage collecting bin includes sewage blocking parts arranged in pairs, and supporting parts connecting the sewage blocking parts, and sewage receiving ports close to the main beam are formed between the sewage blocking parts arranged in pairs. The supporting parts are arranged on the side of the sewage blocking parts facing the second sewage collecting bin and are arranged opposite to the sewage receiving ports.

[0013] Optionally, the dirt blocking member is an elastic sealing member, and the dirt blocking member is used to abut against the main beam.

[0014] Optionally, the first dirt collecting bin further comprises a plug, which covers ports of the first dirt collecting bin at two opposite sides along the extension direction of the dirt blocking member.

[0015] Optionally, it also includes a bracket, which is connected to the first sewage collecting bin and is provided with a sewage collecting groove facing the main beam.

[0016] Optionally, a waterproof cloth is also included, and the waterproof cloth is laid in the sewage collecting tank of the bracket.

[0017] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:

[0018] The present application discloses a waste collection device for bridge demolition, which includes: a first waste collection bin, which is installed on a pier or a cap beam and is provided with a waste inlet corresponding to a cutting position of the main beam; a second waste collection bin, which is installed on the pier or the cap beam and is located on a side of the first waste collection bin away from the main beam, and a sewage discharge pipe, which connects the first waste collection bin and the second waste collection bin, respectively.

[0019] In this way, the sewage, waste residue and other pollutants generated by the main beam during the cutting process will fall into the inner cavity of the first sewage collecting bin through the sewage inlet, and then be discharged to the second sewage collecting bin through the sewage pipe under the action of gravity for unified collection. On the one hand, this can avoid environmental pollution caused by direct discharge. On the other hand, for some working scenes with large paving areas and large height differences such as highway overpasses, the sewage collection device of the present application can cover the cutting position, and can collect sewage from the main beam position with a larger height to the location of the second sewage collecting bin with a lower height, so as to improve the compatibility of the sewage collection device of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the dirt collection device of the utility model;

[0021] Figure 2 The utility model Figure 1 A magnified view of point I;

[0022] Figure 3The utility model Figure 1 AA section view;

[0023] Figure 4 It is a schematic diagram of the first waste collection bin of the utility model for collecting waste.

[0024] icon:

[0025] X-length direction, Y-width direction,

[0026] 1- Bridge pier,

[0027] 2- Main beam,

[0028] 2a-bridge, P-cutting position,

[0029] 10-The first episode of dirty warehouse,

[0030] 11- dirt blocking part, 12- bearing part, 13- plug, 101- inner cavity,

[0031] 20-The second episode of dirty warehouse,

[0032] 30- sewage pipe,

[0033] 40-Mounting frame,

[0034] 51-slide rail, 52-slider,

[0035] 60-traction components,

[0036] 61-fixed pulley, 62-pull rope, 63-hook,

[0037] 70-Stand,

[0038] 71-Sewage collecting tank,

[0039] 80-Taper. DETAILED DESCRIPTION

[0040] The utility model is described in detail below in conjunction with the accompanying drawings.

[0041] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0042] In the related art, a rope saw is usually used to cut bridges, and the pollutants such as sewage and waste residue generated during the rope saw cutting are discharged directly or discharged by laying plastic waterproof cloth. However, the direct discharge of pollutants to the outside world is likely to pollute the environment; and the method of discharging pollutants by laying plastic waterproof cloth is not applicable to some work scenarios with large laying areas and large height differences, such as overpasses across highways. In summary, the discharge of pollutants after bridge cutting in the related art has problems such as environmental pollution and large limitations in usage scenarios. For this reason, the technical solution of this application was produced. Figure 1 to Figure 4 To elaborate.

[0043] Example 1

[0044] like Figure 1 and Figure 4 As shown, this embodiment discloses a dirt collecting device, which is used for bridge demolition. Generally speaking, the main structure of the bridge includes a main beam 2 and a pier 1 or a cap beam for supporting the main beam 2.

[0045] The waste collection device may include a first waste collection bin 10, a second waste collection bin 20 and a sewage discharge pipe 30. The first waste collection bin 10 is installed on the pier 1 or the cap beam, and is provided with a sewage connection port corresponding to the cutting position P of the main beam 2. The main beam 2 can be cut by a rope saw, and the rope saw cutting direction is usually the width direction Y of the main beam 2. The second waste collection bin 20 is installed on the pier 1 or the cap beam, and is located on the side of the first waste collection bin 10 away from the main beam 2, that is, the first waste collection bin 10 and the second waste collection bin 20 are arranged in sequence along the height direction of the bridge, and the height direction is the gravity direction. The sewage discharge pipe 30 is connected to the first waste collection bin 10 and the second waste collection bin 20 respectively.

[0046] In this way, the sewage, waste residue and other pollutants generated by the main beam 2 during the cutting process will fall into the inner cavity 101 of the first sewage collecting bin 10 through the sewage inlet, and then be discharged to the second sewage collecting bin 20 through the sewage pipe 30 under the action of gravity for unified collection. On the one hand, this can avoid environmental pollution caused by direct discharge. On the other hand, for some working scenes with large paving areas and large height differences such as highway overpasses, the sewage collection device of the present application can cover the cutting position P, and can collect sewage from the main beam 2 with a larger height to the second sewage collecting bin 20 with a lower height, so as to improve the compatibility of the sewage collection device of the present application.

[0047] Optionally, multiple sewage pipes 30 can be set along the length direction X of the main beam 2, and / or the width direction Y, where the length direction X can also be understood as the span direction of the bridge. For example, multiple sewage pipes 30 are only set along the length direction X of the main beam 2, and the sewage pipes 30 are only set on both sides of the first sewage collecting bin 10 along the width direction Y. The sewage pipes 30 are both set along the length direction X of the main beam 2 and on both sides of the first sewage collecting bin 10 along the width direction Y, thereby improving the sewage discharge capacity.

[0048] Alternatively, if Figure 1 and Figure 2 As shown, the collecting device may further include a mounting frame 40, a slide rail 51 and a slider 52. The mounting frame 40 is provided on the pier 1 or the cap beam, for example, the mounting frame 40 is fixed on the pier 1 or the cap beam by means of a tie anchor, and the mounting frame 40 is located between the first sewage collecting bin 10 and the second sewage collecting bin 20. The slide rail 51 is provided on the mounting frame 40, and the slider 52 is connected to the slide rail 51 by sliding along the length direction X of the main beam 2, and the slider 52 is connected to the first sewage collecting bin 10.

[0049] The length direction X of the main beam 2 can also be understood as the span direction of the bridge. During the bridge cutting process, after each cutting, the cut bridge deck 2a is removed, and then the first waste collection bin 10 is controlled to move along the length direction X with the slider 52 to the next cutting position P for cutting. This process is repeated to cut the main beam 2 in batches to form a plurality of cut bridge decks 2a, which is convenient for the completion of the cutting work. Figure 3 and Figure 4 shown.

[0050] Alternatively, if Figure 1 As shown, the mounting frame 40 can be set on the bridge pier 1 or the cap beam that is relatively set along the width direction Y, and the slide rails 51 and the sliders 52 are also set one by one and installed on the mounting frame 40 to provide a more stable support for the first sewage collecting bin 10, and the multi-point support method can also ensure the smoothness of the sliding of the first sewage collecting bin 10 along the length direction X.

[0051] Alternatively, if Figure 3 As shown, the mounting frame 40 can also be set on the adjacent bridge piers 1 or cap beams along the length direction X, and the slide rail 51 is mounted on the mounting frame 40 and spans the adjacent bridge piers 1 or cap beams along the length direction X, that is, the slide rail 51 is located between a span of the bridge, so that the slide rail 51 can be better loaded.

[0052] Alternatively, if Figure 3 As shown, the collecting device may further include a traction assembly 60 connected to the slider 52 or the first dirt collecting bin 10. The traction assembly 60 can drive the first dirt collecting bin 10 to move along with the slider 52, thereby improving the operability of the device of the present application.

[0053] Optionally, with regard to the specific structure of the traction assembly 60, the traction assembly 60 may be configured as a telescopic driving mechanism to drive the first dirt collecting bin 10 by its own telescopic movement. To simplify the structure, the traction assembly 60 in the present application is configured as follows:

[0054] The traction assembly 60 may include a fixed pulley 61 disposed at the end of the slide rail 51, and a pull rope 62 connected to the slider 52 or the first dirt collection bin 10, one end of the pull rope 62 is connected to the slider 52 or the first dirt collection bin 10, and the other end is passed around the fixed pulley 61. In this way, in the first aspect, the structure of the traction assembly 60 can be simplified, thereby reducing the material cost of the collection device. In the second aspect, by disposing the fixed pulley 61 at the end of the slide rail 51, the slider 52 can be limited to prevent the slider 52 from excessively moving and separating from the slide rail 51.

[0055] Optionally, fixed pulleys 61 are provided at two opposite ends of the slide rail 51, and two pull ropes 62 are also provided and correspond one to one with the fixed pulleys 61, that is, the pull ropes 62 are connected to both sides of the slider 52 or the first sewage collecting bin 10 to facilitate the traction of the first sewage collecting bin 10.

[0056] Optionally, a hanging member 63 may be provided on the slider 52 or the first dirt collecting bin 10 , for example, the hanging member 63 is provided as a hanging ring or a hook, and the pull rope 62 may be connected to the hanging member 63 to facilitate the traction assembly 60 to drive the first dirt collecting bin 10 to move.

[0057] The collection device of the present application can be operated as follows:

[0058] The mounting frames 40 are arranged on the bridge piers 1 or cap beams adjacent to each other along the length direction X, and on the bridge piers 1 or cap beams opposite to each other along the width direction Y.

[0059] The slide rail 51 is arranged along the length direction X and mounted on the mounting frame 40, so that the slide rail 51 crosses the bridge piers 1 or cap beams arranged adjacently along the length direction X, that is, the slide rail 51 is located between one span of the bridge, and a slider 52 is arranged on the slide rail 51, wherein the slide rail 51 and the slider 52 are arranged on both sides of the bridge body along the width direction Y.

[0060] The first sewage collecting bin 10 is spanned between two oppositely arranged bridge piers 1 or cap beams along the width direction Y and connected to the slider 52 .

[0061] The sewage pipe 30 and the second sewage collecting bin 20 are installed so that the first sewage collecting bin 10, the sewage pipe 30 and the second sewage collecting bin 20 are connected in sequence. The second sewage collecting bin 20 can be extended along the length direction X so that the first sewage collecting bin 10 can always discharge sewage to the second sewage collecting bin 20 after the position is adjusted. At the same time, the second sewage collecting bin 20 is arranged on both sides of the bridge body along the width direction Y so as to correspond to the position of the sewage pipe 30.

[0062] The traction assembly 60 is installed, and the first sewage collecting bin 10 is driven to slide by the traction assembly 60 until the sewage receiving port of the first sewage collecting bin 10 faces the cutting position P of the main beam 2 .

[0063] The main beam 2 is cut at the cutting position P using a rope saw cutting device, and the bridge deck 2a after cutting is removed using a mechanical lifting device.

[0064] The traction assembly 60 drives the first dirt collecting bin 10 to slide to the next cutting position P, and then the cutting position P is cut by a rope saw cutting device.

[0065] This process is repeated repeatedly until the cutting of the main beam 2 corresponding to one span of the bridge is completed.

[0066] The collecting device is removed and installed on the next span of the bridge, and then the cutting of the main beam 2 corresponding to the span is completed.

[0067] It can be seen that the use of the collection device of the present application for bridge dismantling is not only convenient and quick, but also can better avoid environmental pollution, and can also be adapted to working scenes with large height differences such as highway bridges.

[0068] Example 2

[0069] This embodiment further introduces the structure of the first waste collecting bin 10, which is described in detail as follows:

[0070] The first dirt collecting bin 10 may include dirt retaining members 11 arranged in pairs, and bearing members 12 connected to the dirt retaining members 11. The bearing members 12 may be made of I-beams, etc. The bearing members 12 and the dirt retaining members 11 may be connected by bolts to ensure a stable connection and facilitate disassembly and replacement.

[0071] A sewage receiving port close to the main beam 2 is formed between the paired sewage blocking members 11, and the bearing member 12 is arranged on the side of the sewage blocking member 11 facing the second sewage collecting bin 20 and is arranged opposite to the sewage receiving port. In this way, the bearing member 12 and the paired sewage blocking members 11 enclose the inner cavity 101 of the first sewage collecting bin 10 to facilitate sewage collection. The sewage discharge pipe 30 passes through the bearing member 12 to communicate with the inner cavity 101 of the first sewage collecting bin 10.

[0072] Optionally, the dirt blocking member 11 may be an elastic sealing member, specifically, the dirt blocking member 11 may be configured as a sealing strip with a circular cross section, or a sealing plate with a rectangular cross section, etc. The dirt blocking member 11 is used to abut against the main beam 2. In this way, the sealing performance of the first dirt collecting bin 10 can be improved to prevent the overflow of dirt.

[0073] Optionally, the first dirt collecting bin 10 may further include a plug 13, which covers ports of the first dirt collecting bin 10 on two opposite sides along the extension direction of the dirt blocking member 11. The extension direction of the dirt blocking member 11 is the width direction Y of the main beam 2, that is, the cutting direction of the main beam 2, so as to further improve the sealing performance and dirt collecting performance of the first dirt collecting bin 10. Furthermore, the plug 13 may be a rubber member to improve the sealing effect.

[0074] Example 3

[0075] This embodiment further designs the collection device, which is described in detail as follows:

[0076] The collecting device may also include a bracket 70, and the bracket 70 may be a lightweight truss to achieve lightweight collection of the collecting device of the present application. The bracket 70 is connected to the first sewage collecting bin 10, and is provided with a sewage collecting trough 71 facing the main beam 2. In order not to interfere with the bridge body space, the bracket 70 may be arranged on the side of the main beam 2 where the cutting has been completed. Specifically, a part of the bridge deck 2a to be cut of the main beam 2 is arranged opposite to the first sewage collecting bin 10, and the other part is arranged opposite to the sewage collecting trough 71 of the bracket 70. In this way, the bracket 70 can collect the dirt overflowing from the first sewage collecting bin 10 during the cutting process through the sewage collecting trough 71, thereby further improving the sewage collecting capacity of the device of the present application.

[0077] Optionally, the collecting device may further include a waterproof cloth 80, which may be made of plastic. The waterproof cloth 80 is laid in the dirt collecting tank 71 of the bracket 70 to further improve the dirt collection effect and prevent pollution.

[0078] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A dirt collection device for bridge demolition, characterized in that: include: A first sewage collecting bin (10) is installed on the bridge pier (1) or the cap beam and is provided with a sewage receiving port corresponding to a cutting position (P) of the main beam (2); The second sewage collecting bin (20) is installed on the bridge pier (1) or the cap beam and is located on a side of the first sewage collecting bin (10) away from the main beam (2). The sewage discharge pipe (30) is connected to the first sewage collecting bin (10) and the second sewage collecting bin (20) respectively.

2. The collecting device according to claim 1, characterized in that: A plurality of sewage pipes (30) are arranged along the length direction (X) and / or the width direction (Y) of the main beam (2).

3. The collecting device according to claim 1, characterized in that: Also includes: A mounting frame (40) provided on a bridge pier (1) or a cap beam, located between the first sewage collecting bin (10) and the second sewage collecting bin (20), A slide rail (51) and a slider (52), wherein the slide rail (51) is arranged on the mounting frame (40), the slider (52) is slidably connected to the slide rail (51) along the length direction (X) of the main beam (2), and the slider (52) is connected to the first dirt collecting bin (10).

4. The collecting device according to claim 3, characterized in that: It also comprises a traction assembly (60) connected to the slider (52) or the first dirt collecting bin (10), wherein the traction assembly (60) is capable of driving the first dirt collecting bin (10) to move along with the slider (52).

5. The collecting device according to claim 4, characterized in that: The traction assembly (60) comprises a fixed pulley (61) provided on the slide rail (51), and a pull rope (62) connected to the slide block (52) or the first dirt collecting bin (10). One end of the pull rope (62) is connected to the sliding block (52) or the first dirt collecting bin (10), and the other end is wound around the fixed pulley (61).

6. The collecting device according to claim 1, characterized in that: The first dirt collecting bin (10) comprises dirt blocking members (11) arranged in pairs, and a bearing member (12) connected to the dirt blocking members (11). The dirt receiving opening close to the main beam (2) is formed between the dirt blocking members (11) arranged in pairs, and the bearing member (12) is arranged on a side of the dirt blocking member (11) facing the second dirt collecting bin (20) and is arranged opposite to the dirt receiving opening.

7. The collecting device according to claim 6, characterized in that The dirt blocking member (11) is an elastic sealing member, and the dirt blocking member (11) is used to abut against the main beam (2).

8. The collecting device according to claim 6, characterized in that: The first waste collecting bin (10) further comprises a plug (13). The plug (13) covers ports of the first dirt collecting bin (10) on two opposite sides along the extension direction of the dirt blocking member (11).

9. The collecting device according to claim 1, characterized in that: It also comprises a bracket (70), the bracket (70) being connected to the first dirt collecting bin (10) and being provided with a dirt collecting groove (71) facing the main beam (2).

10. The collecting device according to claim 9, characterized in that It also includes a waterproof cloth (80), wherein the waterproof cloth (80) is laid in the dirt collecting tank (71) of the bracket (70).