Deep foundation pit concrete support stiff reinforcement cage system
By using a concrete-supported stiffened steel cage system that connects precast core material and steel cage in deep foundation pit engineering, the problem of long steel cage binding time was solved, the construction cycle was shortened, soil deformation was reduced, and the strength of the support structure was improved.
Patent Information
- Application Number
- CN202420567357.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-03-22
AI Technical Summary
In existing technologies, the time required to tie the reinforcing cage of reinforced concrete supports is long, which leads to an extended construction period and makes it impossible to support deep foundation pits in a timely manner, resulting in significant deformation of the soil due to rheological changes.
A deep foundation pit concrete-supported rigid steel cage system is adopted. By connecting the precast core material inside the steel cage with the steel cage, cross-connected support members are formed. The precast core material can be a steel lattice column, steel pipe or steel section, and the filling material is expansive concrete or cement mortar. The precast steel cage is hoisted to the predetermined position for pouring using hoisting equipment.
It shortens the time for binding the reinforcing cage, reduces the construction cycle, reduces the deformation of the foundation pit caused by soil rheology, and improves the strength of the concrete support structure, making it suitable for ultra-large and ultra-deep foundation pit projects.
Smart Images

Figure CN222065488U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of foundation pit engineering, in particular to a deep foundation pit concrete supporting rigid steel cage system. Background Art
[0002] With the acceleration of urbanization and the decreasing land resources, various types of urban buildings have begun to develop underground spaces, and the number of deep foundation pit projects in cities has increased and they are getting deeper. The excavation of deep foundation pits may cause displacement of the surrounding soil, thereby affecting the safety of surrounding buildings. Conventional reinforced concrete support is to excavate the soil in steps and layers to the predetermined elevation before tying the steel cage, supporting the formwork, and pouring concrete in situ. Since the tying of the support steel cage requires a lot of construction time, the soil at the bottom of the foundation pit will cause a large displacement of the foundation pit due to rheology during this period. Therefore, there is an urgent need to provide a support system for super-large and super-deep foundation pit projects to shorten the support construction period. Utility Model Content
[0003] The purpose of the utility model is to provide a semi-prefabricated reinforced concrete support system and construction method to solve the problem in the prior art that the concrete support steel cage is tied slowly and the construction period is long, resulting in the support not being able to take effect in time and causing the soil body to undergo large deformation due to rheological changes. In order to solve the above technical problems, the technical solution of the utility model is as follows:
[0004] A deep foundation pit concrete support rigid steel cage system, the deep foundation pit concrete support rigid steel cage system is composed of a plurality of support rods cross-connected in the same plane, the support rods are formed by pouring concrete in a steel cage with a prefabricated core material inside, and the prefabricated core material is coaxially fixedly installed in the steel cage.
[0005] Furthermore, the outer wall of the prefabricated core material abuts against the inner wall of the steel cage, or
[0006] The outer wall of the prefabricated core material is connected to the steel cage via a prefabricated connecting piece.
[0007] Furthermore, the prefabricated core material is one of steel lattice columns, steel pipes, steel sections, or a combination of several of them distributed along the axial direction of the steel cage.
[0008] Furthermore, the diameter of the steel pipe is provided with a core filling material.
[0009] Furthermore, the core filling material is expansive concrete or cement mortar.
[0010] Furthermore, the outer wall of the prefabricated core material is connected to the steel cage via a plurality of prefabricated connectors in the circumferential direction, or
[0011] The prefabricated connecting piece is sleeved and fixed on the outer wall of the prefabricated core material and connected to the steel cage.
[0012] Furthermore, the prefabricated connecting piece is connected to the prefabricated core material and the steel cage by welding.
[0013] Furthermore, the prefabricated connecting member is provided with a foot for welding connection to the steel cage.
[0014] The beneficial effects of the utility model are:
[0015] (1) When the earthwork has not yet been excavated to the predetermined elevation, the steel cage can be tied on the ground, and then the prefabricated core material can be fixed as a skeleton in the steel cage for easy lifting and transportation. When the earthwork is excavated to the predetermined elevation, the steel cage can be hoisted to the predetermined position by hoisting equipment; this can reduce the time spent on steel cage tying during concrete support construction, thereby shortening the support construction period and reducing foundation pit deformation caused by soil rheology;
[0016] (2) The prefabricated core material in the steel cage is connected to the steel cage, which further improves the strength of the concrete support structure and is conducive to the high-standard construction of ultra-large and ultra-deep foundation pits. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0018] Figure 1 A top view of a concrete support system of the utility model in one embodiment;
[0019] Figure 2 In one embodiment, when the prefabricated core material is a steel lattice column, Figure 1 Sectional view of AA in the middle;
[0020] Figure 3 In one embodiment, when the prefabricated core material is steel, Figure 1 Sectional view of AA in the middle;
[0021] Figure 4 In one embodiment, when the prefabricated core material is steel tube concrete, Figure 1 Sectional view of AA in the middle;
[0022] Figure 5 is a schematic diagram of a prefabricated connecting piece welded on the outer diameter of a prefabricated steel pipe core material in one embodiment;
[0023] Figure 6 A structural diagram of a prefabricated connection piece for connecting a prefabricated steel pipe core material and a steel cage in one embodiment;
[0024] Figure 7 is a schematic diagram of a prefabricated connecting piece welded on the outer diameter of a prefabricated steel core material in one embodiment;
[0025] Figure 8 The present invention is a structural diagram of a prefabricated connecting member used to connect a prefabricated steel core material and a steel cage in one embodiment.
[0026] Description of reference numerals:
[0027] 1. Reinforced concrete support structure; 2. Support rods; 3. Steel cage; 4. Prefabricated core material; 5. Concrete; 6. Core filling material; 7. Steel section; 8. Steel pipe; 9. Prefabricated connecting parts. DETAILED DESCRIPTION
[0028] In the following description, a large number of specific details are given to provide a more thorough understanding of the utility model. However, it is obvious to those skilled in the art that the utility model can be implemented without one or more of these details. In other examples, in order to avoid confusion with the utility model, some technical features known in the art are not described.
[0029] In order to thoroughly understand the present invention, detailed steps and detailed structures will be presented in the following description to illustrate the technical solution of the present invention. The preferred embodiments of the present invention are described in detail below, but in addition to these detailed descriptions, the present invention may also have other implementations.
[0030] Reference Figure 1 As shown, the utility model provides a deep foundation pit concrete support rigid steel cage system, the deep foundation pit concrete support rigid steel cage system 1 is arranged horizontally, and is composed of a plurality of support rods 2 cross-connected. Figure 2-4 As shown, the support rod 2 is formed by pouring concrete 5 in a steel cage 3 having a prefabricated core material 4 inside, the steel cage 3 is formed by tying a plurality of steel bars, and the prefabricated core material 4 is coaxially fixedly installed in the steel cage 3. In an optional embodiment, the prefabricated core material 4 is a steel lattice column (such as Figure 2 )、Steel pipe 8 (such as Figure 4 ), steel 7 (such as Figure 3 ) or several combinations distributed along the axial direction of the steel cage 3, which can be selected according to construction requirements.
[0031] When the prefabricated core material 4 is a steel pipe 8, it is calculated based on the design whether to fill the steel pipe 8 with a core to further improve its strength. Preferably, the core filling material 6 can be expansive concrete or cement mortar (but not limited thereto).
[0032] In an optional embodiment, the outer wall of the prefabricated core material 4 can be abutted against the inner wall of the steel cage 3 to achieve connection with the steel cage 3. In another embodiment, the outer wall of the prefabricated core material 4 can also be connected to the steel cage 3 through a prefabricated connector 9. The prefabricated connector 9 can be adjusted according to the cross-sectional shape and size of the prefabricated core material 4. Figure 5 and Figure 6 as well as Figure 7 and Figure 8 The structural diagrams are shown respectively when the prefabricated core material 4 is a steel pipe 8 and a steel section 7. In this embodiment, the prefabricated connector 9 is sleeved and welded to the outer diameter of the steel pipe 8 or the steel section 7, and the prefabricated connector 9 is also provided with a plurality of circumferentially distributed welding feet for welding and fixing with the steel cage 3. It should be noted that the prefabricated connector 9 is not limited to Figure 6 and Figure 8 The shape in the figure can also be fixed to the prefabricated core material 4 and the steel cage 3 by using materials such as angle steel or steel bar head; when the prefabricated core material 4 is a lattice column, it is not necessary to use prefabricated connectors 9 and can be directly welded to the steel cage 3, such as Figure 2 shown.
[0033] The construction method of the utility model is as follows:
[0034] (1) Calculate the predetermined cross-sectional dimensions and length of a single support rod 2 in advance to cut the length of the steel bars and prefabricated core material 4.
[0035] (2) Tie up the steel cage 3 according to the relevant design drawings.
[0036] (3) Place the prefabricated core material 4 in the tied steel cage 3, and then use the prefabricated connectors 9 to fix the steel cage 3 and the prefabricated core material 4. The horizontal spacing between the prefabricated connectors 9 is determined according to the design calculation, and the lifting lugs are welded on the upper part of the prefabricated connectors 9 to facilitate construction and lifting. Alternatively, the prefabricated core material 4 can be placed at a predetermined position, and then the steel cage 3 is tied around its periphery. Both of the above construction methods are acceptable and can be freely selected according to the actual situation of the construction site.
[0037] (4) After the excavation reaches the predetermined elevation and the steel cage 3 and the prefabricated core material 4 are fixed, the steel cage 3 with the prefabricated core material 4 inside is hoisted to the predetermined position by hoisting equipment for formwork support, and finally concrete 5 is poured in the steel cage 3 to form the support rod 2.
[0038] The above describes the preferred embodiments of the utility model. It should be understood that the utility model is not limited to the above-mentioned specific implementation methods, and the devices and structures that are not described in detail should be understood to be implemented in a common manner in the art; any technician familiar with the art can use the above-disclosed methods and technical contents to make many possible changes and modifications to the technical solutions of the utility model without departing from the scope of the technical solution of the utility model, or modify them into equivalent embodiments of equivalent changes, which does not affect the essential content of the utility model. Therefore, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the utility model without departing from the content of the technical solution of the utility model still falls within the scope of protection of the technical solution of the utility model.
Claims
1. A deep foundation pit concrete support rigid steel cage system, characterized in that: A deep foundation pit concrete supporting rigid steel cage system (1) is composed of a plurality of support rods (2) cross-connected in the same plane, wherein the support rods (2) are formed by pouring concrete (5) in a steel cage (3) having a prefabricated core material (4) inside, wherein the prefabricated core material (4) is fixedly installed in the steel cage (3).
2. A deep foundation pit concrete support rigid steel cage system as claimed in claim 1, characterized in that: The outer wall of the prefabricated core material (4) abuts against the inner wall of the steel cage (3), or the outer wall of the prefabricated core material (4) is connected to the steel cage (3) via a prefabricated connecting piece (9).
3. A deep foundation pit concrete support rigid steel cage system as claimed in claim 2, characterized in that: The prefabricated core material (4) is one of a steel lattice column, a steel pipe (8), a steel section (7), or a combination of several of them distributed along the axial direction of the steel cage (3).
4. A deep foundation pit concrete support rigid steel cage system as claimed in claim 3, characterized in that: The diameter of the steel pipe (8) is provided with a core filling material (6).
5. A deep foundation pit concrete support rigid steel cage system as claimed in claim 4, characterized in that: The core filling material (6) is expansive concrete or cement mortar.
6. A deep foundation pit concrete support rigid steel cage system as claimed in claim 2, characterized in that: The outer wall of the prefabricated core material (4) is connected to the steel cage (3) in the circumferential direction via a plurality of prefabricated connecting pieces (9), or The prefabricated connecting piece (9) is sleeved and fixed on the outer wall of the prefabricated core material (4) and is connected to the steel cage (3).
7. A deep foundation pit concrete support rigid steel cage system as claimed in claim 6, characterized in that: The prefabricated connecting piece (9) is connected to the prefabricated core material (4) and the steel cage (3) by welding.
8. A deep foundation pit concrete support rigid steel cage system as claimed in claim 7, characterized in that: The prefabricated connecting piece (9) is provided with a foot for being welded to the steel cage (3).