Green slope alien soil stability protection system for drilling platform

Through double-layer hanging net and vegetation spraying technology, a comprehensive slope protection system is formed, which solves the problems of early and long-term stability and ecological insufficient slope of the drilling platform, and achieves slope stability and ecological environment recovery. It is suitable for drilling Green slope protection of the platform.

CN222065501UActive Publication Date: 2024-11-26CHINA NAT PETROLEUM CORP +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323504875.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-21
Publication Date
2024-11-26
Estimated Expiration
2033-12-21

AI Technical Summary

Technical Problem

The drilling platform slopes have shortcomings in early and long-term stability and ecological nature, especially in the early instability and slippage of passenger soil in excavated slopes, the vegetation has not grown or the root soil complex is insufficient in the early stages of growth, resulting in soil erosion and ecological environment damage. .

Method used

The double-layer hanging network system is adopted, including the base hanging network and the surface hanging network, combined with anchor rods, anchor nails and three-dimensional vegetation network, and through anchoring and vegetation spraying technology, a comprehensive slope protection system is formed to improve the physical and mechanical properties of the slope. And promote vegetation growth.

Benefits of technology

It effectively improves the early and long-term stability and ecology of the slope, promotes the survival rate and uniformity of vegetation, restores the natural ecological environment, and meets the requirements of low-carbon and sustainable development.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065501U_ABST
    Figure CN222065501U_ABST
Patent Text Reader

Abstract

The utility model provides a green slope soil dressing stability protection system for a drilling platform, the slope ratio of the system is 1: 0.5-1: 1, the system comprises a double-layer hanging net, the double-layer hanging net is configured at a position 5-7cm away from the slope surface, the double-layer hanging net comprises a first hanging net and a second hanging net, the first hanging net is hung by adopting anchor rods and / or anchor nails, the second hanging net is hung by adopting anchor rods and / or anchor nails, and the second hanging net is hung by adopting anchor rods and / or anchor nails. And the second hanging net is positioned above the first hanging net. According to the environment-friendly side slope soil dressing stability protection system for the drilling platform, the hanging net anchoring measure is adopted, vegetation and root system engineering is introduced, the physical and mechanical properties of soil dressing are effectively improved, and the early-stage and long-term stability and ecological property of a side slope are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of land oil and gas drilling platform slope ecological protection, and specifically, to a drilling platform green slope soil stability protection system. Background Art

[0002] The traditional slopes of oil and gas drilling platforms are naturally exposed. They weather and disintegrate under the influence of the natural environment. Rainwater seepage causes soil erosion, affects the ecological environment, and does not meet the requirements of low-carbon sustainable development of the oil industry.

[0003] At present, the research on green slopes in China is mainly based on the needs of safety, stability and durability. The fill slope is controlled by the slope ratio and compaction requirements, and the green slope spraying and grass planting are adopted. The excavated slope adopts the soil spraying technology, and the net spraying is used to plant grass, shrubs and trees. Pilot applications have been carried out in some projects, and the research on the engineering mechanism of green slopes and engineering practice experience have made great progress. The fill slope of the pre-drilling project is affected by the insufficient fertility of the fill soil and the climatic conditions such as rain and drought. There are problems such as low survival rate, poor uniformity, poor growth, and the vegetation soil fixation effect is not obvious. The early instability and slippage of the excavated slope soil is the main problem faced by this technology in the application. Before the vegetation grows out or in the early stage of vegetation growth, because the root-soil complex has not yet formed strength, under the action of rain scouring, seepage and gravity, the green slope soil will be overall or partially unstable.

[0004] Green slope protection technology is developed for natural gas drilling platforms. It integrates basic knowledge of multiple disciplines such as engineering mechanics, soil science, ecology and botany, and uses the interaction between plants and rock and soil to protect and reinforce the surface of the slope, forming a comprehensive slope protection system composed of engineering and plants. It can not only meet the requirements for slope stability, but also restore the damaged natural ecological environment. It plays a role in protecting the slope and restoring the ecological environment, and has good sustainability. Under the current "dual carbon" background, the application of green slope protection technology for natural gas drilling platforms has broad prospects.

[0005] A Chinese patent application with application number "CN201910682797.0" and titled "A self-pressurized protective device and method for maintaining the stability of an expansive soil slope" discloses a self-pressurized protective device and method for maintaining the stability of an expansive soil slope, including a rainwater storage tank fixed on the slope, the water outlet of the water storage tank is connected to an anchor rod through a water pipe, the anchor rod is a hollow strip-shaped tube, a baffle is provided in the middle of the anchor rod, the baffle divides the anchor rod into two chambers, namely a first chamber and a second chamber, and the first chamber is connected to the anchor rod. A hollow anchor water pipe is arranged in a chamber, one end of the hollow anchor water pipe is connected to the water pipe, the other end of the hollow anchor water pipe is fixed on the baffle and passes through the baffle to be connected to the second chamber, a plurality of water holes are provided on the outer wall of the second chamber, the anchor is inserted into the slope, the water tank is located above the anchor, and rainwater in the water tank penetrates from the water holes on the outer wall of the second chamber into the surrounding expansive soil, the expansive soil absorbs water and expands, forming annular extrusion stress on the anchor, thereby improving the anchoring force of the anchor. However, the present application is different from its structure and use method. Utility Model Content

[0006] In view of the deficiencies in the prior art, the purpose of the present invention is to solve one or more problems in the prior art. For example, one of the purposes of the present invention is to provide a drilling platform green slope soil stability protection system that effectively improves the early and long-term stability of the slope and the ecology.

[0007] In order to achieve the above-mentioned purpose, the utility model provides a green slope soil stability protection system for a drilling platform. The system is applicable to slopes with a slope ratio of 1:0.5 to 1:1, and may include a double-layer hanging net, which is arranged 5 to 7 cm away from the slope surface. The double-layer hanging net includes a first hanging net and a second hanging net, wherein the first hanging net is hung with anchor rods and / or anchor nails, and the second hanging net is located above the base hanging net.

[0008] According to one or more exemplary embodiments of the present invention, the first hanging mesh may include a galvanized steel wire mesh, the mesh spacing of which may be 45-55 mm×45-55 mm, and the overlap width may be greater than or equal to 20 cm.

[0009] According to one or more exemplary embodiments of the present utility model, when the slope ratio of the applicable slope is 1:0.5 to 1:0.75, the first hanging net can be hung with anchor rods and anchored with mortar.

[0010] According to one or more exemplary embodiments of the present utility model, the end of the anchor rod may be 80 to 120 mm away from the slope surface, and steel bars may be welded longitudinally and transversely at the anchoring position.

[0011] According to one or more exemplary embodiments of the present invention, the length of the anchor rod may be at least 150-200 cm, and the anchor rod may be drilled into the slope perpendicular to the slope surface or at an inclination angle of 10-15° to the slope.

[0012] According to one or more exemplary embodiments of the present utility model, the overlap length between the mesh pieces of the galvanized steel wire mesh may be greater than or equal to 10 cm, and the overlap length between the galvanized steel wire mesh and the slope top may be greater than or equal to 10 cm.

[0013] According to one or more exemplary embodiments of the present utility model, when the slope ratio of the applicable slope is 1:0.75 to 1:1, the first hanging net may be hung with anchors, and the anchors may include U-shaped anchors, and the arrangement spacing of the U-shaped anchors is 800 to 1200 mm.

[0014] According to one or more exemplary embodiments of the present invention, the width of the upper end of the anchor may be greater than 100 mm so as to simultaneously play a role of vertical suppression.

[0015] According to one or more exemplary embodiments of the present invention, the second hanging net may include a three-dimensional vegetation net, the mesh spacing of which may be 45-55 mm×45-55 mm, and the mass per unit area may be greater than or equal to 350 g / m 2 The thickness can be greater than or equal to 14mm, and the maximum tensile strength (longitudinal and transverse) can be greater than or equal to 2.0KN / m.

[0016] According to one or more exemplary embodiments of the present utility model, the protection system may further include vegetation, and the vegetation may be obtained by spraying and maintaining the soil of the slope where the first hanging net and the second hanging net are installed.

[0017] Compared with the prior art, the beneficial effects of the present invention include at least one of the following:

[0018] (1) The green slope soil stability protection system for drilling platforms provided by the utility model adopts a hanging net anchoring measure and introduces vegetation and root system engineering to effectively improve the physical and mechanical properties of the soil and enhance the early and long-term stability and ecology of the slope.

[0019] (2) The green slope soil stability protection system for drilling platforms provided by the utility model integrates basic knowledge of multiple disciplines such as engineering mechanics, soil science, ecology and botany, and uses the interaction between plants and rock and soil to protect and reinforce the surface of the slope, forming a comprehensive slope protection system composed of engineering and plants. This system can not only meet the requirements for slope stability, but also restore the damaged natural ecological environment. It plays a role in protecting the slope, restoring the ecological environment, and promoting the sustainable development of the ecological environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The above and other objects and / or features of the present invention will become more apparent through the following description in conjunction with the accompanying drawings, in which:

[0021] Figure 1 A schematic diagram of the side structure of a green slope soil stability protection system for a drilling platform in an exemplary embodiment of the utility model is shown;

[0022] Figure 2 Shows Figure 1 Schematic diagram of the structure of the steel reinforcement skeleton.

[0023] Description of reference numerals:

[0024] 1-base mesh, 2-transverse reinforcement bars, 3-anchor nails, 4-longitudinal reinforcement bars, 5-surface mesh, 6-reinforcement skeleton. DETAILED DESCRIPTION

[0025] Hereinafter, a drilling platform green slope soil stability protection system of the present invention will be described in detail with reference to the accompanying drawings and exemplary embodiments.

[0026] In the description of the present application, it should be understood that the terms "upper", "lower", "top", "inside", "outside", etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. The terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.

[0027] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installation" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.

[0028] Exemplary Embodiment 1

[0029] Figure 1 A schematic diagram of the side structure of a green slope soil stability protection system for a drilling platform in an exemplary embodiment of the utility model is shown; Figure 2 Shows Figure 1 Schematic diagram of the structure of the steel reinforcement skeleton.

[0030] This exemplary embodiment provides a green slope soil stability protection system for a drilling platform. The protection system is applicable to slopes with a slope gradient of 1:0.5 to 1:1 and may include a double-layer net, which is arranged 5 to 7 cm away from the slope surface. The double-layer net may include a first net, i.e., a base layer net, and a second net, i.e., a surface layer net, wherein the first net is hung using anchor rods and / or anchor nails, and the second net is located above the first net.

[0031] like Figure 1 and Figure 2 As shown in FIG. 1 , the green slope soil stability protection system of the drilling platform in this exemplary embodiment may include a base layer hanging net 1, a surface layer hanging net 5 and a steel skeleton 6. The base layer hanging net 1 may include a galvanized steel wire mesh, specifically, 8 # The mesh spacing of galvanized diamond wire mesh can be 45-55mm×45-55mm, for example, 47mm×47mm, 49mm×49mm, 50mm×50mm, 52mm×52mm or 54mm×54mm, with double twist structure, welded or tied firmly with anchor rods or anchor nails, and the overlap length can be greater than or equal to 20cm. The overlap length between the meshes of galvanized steel wire mesh can be greater than or equal to 10cm, and the overlap length between the galvanized steel wire mesh and the slope top can be greater than or equal to 10cm.

[0032] In this exemplary embodiment, when the slope ratio of the applicable slope is 1:0.5 to 1:0.75, the base layer mesh can be hung with anchor rods and anchored with mortar. Here, the mortar can be M30 mortar. The length of the anchor rod can be at least 150cm to 200cm, for example, 160cm, 168cm, 173cm, 177cm, 183cm, 189cm, 193cm or 197cm, depending on the rock slope conditions. The anchor rod shall be tied to the galvanized wire mesh according to the design standards. The anchor rod can be drilled into the slope vertically or at an angle of 10 to 15° to the slope to form a hole in one time. The hole spacing is 1000 to 1500mm, for example, 1100mm, 1150mm, 1200mm, 1250mm, 1300mm, 1350mm, 1400mm, 1450mm, or 1480mm, and the allowable deviation is ±20mm. The end of the anchor rod can be 80 to 120 mm away from the slope, for example, 83 mm, 88 mm, 93 mm, 99 mm, 101 mm, 110 mm, 113 mm or 118 mm, and steel bars are welded longitudinally and transversely at the anchoring position. The transverse steel bars 2 are vertically distributed with the longitudinal steel bars 4, and the welded steel bars are tied firmly with anchor nails 3.

[0033] In this exemplary embodiment, when the slope ratio of the applicable slope is 1:0.75 to 1:1, the base layer can be hung with anchors, which can include U-shaped anchors. Specifically, the anchors can be made of Ф8 steel bars into a U shape, and the spacing of the U-shaped anchors is 800 to 1200 mm, for example, 830 mm, 890 mm, 930 mm, 960 mm, 1010 mm, 1090 mm, 1130 mm or 1180 mm. The length of the anchors is at least 20 cm to 30 cm, for example, 23 cm, 25 cm, 27 cm or 29 cm. The length of the nails should be lengthened for loose surfaces, and the mesh pad should be kept flat and the nail density should be increased in places with sudden or complex terrain. The overlap length should be no less than 10 cm, the nails should be nailed in at the overlap, the nail density should be doubled, and the upper mesh pad should be close together at the overlap without leaving any gaps. The width of the upper end of the anchor can be greater than twice the mesh diameter so as to simultaneously play a role in vertical suppression.

[0034] In this exemplary embodiment, the surface hanging net 5 may include a three-dimensional vegetation net, which is laid and tensioned in order from top to bottom. The overlap length between the slope top and the net and the overlap length between the meshes should not be less than 10 cm. The mesh spacing may be 45-55 mm × 45-55 mm, for example, 47 mm × 47 mm, 49 mm × 49 mm, 50 mm × 50 mm, 52 mm × 52 mm or 54 mm × 54 mm, and the unit area mass may be greater than or equal to 350 g / m 2 The thickness can be greater than or equal to 14mm, and the maximum tensile strength (longitudinal and transverse) can be greater than or equal to 2.0KN / m.

[0035] In this exemplary embodiment, the protection system may also include vegetation, and the vegetation may be obtained by spraying and maintaining the slope soil installed with the base layer hanging net and the surface layer hanging net. Here, hydraulic spraying greening technology may be used, and the mechanical equipment, wind, water pipelines and wires must be fully inspected and tested before the spraying operation. Before spraying the soil, the slope surface should be washed clean with clean water, the surface of the rock layer should be moistened, and the mix ratio of the soil and the maximum particle size of the machine-made material should be strictly controlled. The mixture should be mixed evenly during spraying, and the amount of water should be controlled during the spraying construction to ensure that the matrix has sufficient water content and does not flow. The base layer hanging net and the surface layer hanging net are sprayed twice, and attention should be paid to leveling and making drainage holes during spraying. The spraying thickness should reach 80 to 100 mm as required by the design, with a deviation of no more than ±10 mm. When spraying and protecting, spray from bottom to top for the first time (mainly to control the thickness), and then spray from top to bottom (mainly to control the appearance) to ensure uniform thickness, consistent color and no flow marks. After spraying, sprinkle a little soil as needed to cover the net bag. After sowing, sweep it lightly with a broom to ensure that all the grass seeds fall into the net mat. Pay attention to the humidity of the slope during maintenance until the grass is planted. After the sowing operation is completed, a layer of non-woven fabric is covered from top to bottom by hand to protect the ungerminated grass seeds from being destroyed by wind or rain, and to maintain the moisture on the slope to promote uniform distribution of seeds. When the average height of the lawn reaches 45mm to 55mm, remove the covering. The initial maintenance period must be no less than 7 days. During the maintenance period, the slope must be kept moist and there must be no dryness or alternating dryness and wetness. During the seed germination and seedling stage, watering is used for maintenance. When watering, try to form a mist to reduce the impact of water flow on the slope. During the maintenance stage, people should be sent to check whether the slope is damaged so as to make timely repairs. The maintenance time is selected in the morning or evening, and the period of strong sunlight should be avoided. The maintenance period depends on the growth of plants on the slope and is no less than 45 days. When the vegetation grows and takes shape, and the root system passes through the three-dimensional net, the non-woven fabric can be removed to ensure the normal growth of the grass seedlings. The water spraying equipment should use a rocker arm nozzle for mobile spraying, and avoid direct spraying with high-pressure water heads. Always pay attention to the growth of vegetation and apply appropriate topdressing to promote growth. When the seedling height is 8cm to 10cm, compound fertilizer can be used for the first topdressing. Foliar topdressing can also be performed according to actual conditions. Pesticides should be sprayed regularly and targeted, and weeds should be removed regularly to ensure the healthy growth of the lawn.

[0036] In summary, the advantages of the present invention include at least one of the following:

[0037] (1) The drilling platform green slope soil stability protection system provided by the utility model effectively improves the properties of the soil by optimizing the soil formula, thereby maintaining the stability of the slope.

[0038] (2) The green slope soil stability protection system of the drilling platform provided by the utility model optimizes the soil formula and strictly maintains the vegetation, so that the vegetation survival rate is high, the uniformity is good, and the growth is obvious, which further improves the stability of the slope.

[0039] Although the green slope soil stability protection system of a drilling platform of the utility model has been described above in combination with exemplary embodiments, those skilled in the art should be aware that various modifications and changes may be made to the exemplary embodiments of the utility model without departing from the spirit and scope defined by the claims.

Claims

1. A green slope soil stability protection system for a drilling platform, characterized in that: The system is suitable for slopes with a slope ratio of 1:0.5 to 1:1, and includes a double-layer hanging net, which is arranged 5 to 7 cm away from the slope surface. The double-layer hanging net includes a first hanging net and a second hanging net, wherein the first hanging net is hung with anchor rods and / or anchor nails. The second hanging net is located above the first hanging net.

2. The drilling platform green slope soil stability protection system according to claim 1 is characterized in that: The first hanging net comprises a galvanized steel wire mesh, the mesh spacing of which is 45-55mm×45-55mm, and the overlap width is greater than or equal to 20cm.

3. The drilling platform green slope soil stability protection system according to claim 1 is characterized in that: When the slope ratio of the applicable slope is 1:0.5 to 1:0.75, the first hanging net is hung with anchor rods and anchored with mortar.

4. The drilling platform green slope soil stability protection system according to claim 3 is characterized in that: The end of the anchor rod is 80 to 120 mm away from the slope surface, and steel bars are welded longitudinally and transversely at the anchoring position.

5. The drilling platform green slope soil stability protection system according to claim 3 is characterized in that: The length of the anchor rod is at least 150 to 200 cm, and the anchor rod is perpendicular to the slope surface or drilled into the slope at an inclination angle of 10 to 15 degrees.

6. The drilling platform green slope soil stability protection system according to claim 2 is characterized in that: The overlap length between the mesh pieces of the galvanized steel wire mesh is greater than or equal to 10 cm, and the overlap length between the galvanized steel wire mesh and the top of the slope is greater than or equal to 10 cm.

7. The drilling platform green slope soil stability protection system according to claim 1 is characterized in that: When the slope ratio of the applicable slope is 1:0.75 to 1:1, the first hanging net is hung with anchor nails, and the anchor nails include U-shaped anchor nails, and the arrangement spacing of the U-shaped anchor nails is 800 to 1200 mm.

8. The drilling platform green slope soil stability protection system according to claim 7 is characterized in that: The width of the upper end of the anchor is greater than 100 mm so as to simultaneously play a role of vertical suppression.

9. The drilling platform green slope soil stability protection system according to claim 1, characterized in that: The second hanging net includes a three-dimensional vegetation net, the mesh spacing of which is 45-55mm×45-55mm, and the unit area mass is greater than or equal to 350g / m 2 , thickness greater than or equal to 14mm, maximum tensile strength greater than or equal to 2.0KN / m.

10. The drilling platform green slope soil stability protection system according to claim 1, characterized in that: The protection system also includes vegetation, which is obtained by spraying and maintaining the soil of the slope where the first hanging net and the second hanging net are installed.