Floor structure and building
By setting the first and second beams between the floor structures to form wiring spaces, the problem of low construction efficiency in the prior art is solved, and the structural strength and space utilization are improved.
Patent Information
- Application Number
- CN202420404528.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-01
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-03-01
AI Technical Summary
During subsequent renovation or decoration of a building, wires, water pipes and other lines need to be re-arranged, resulting in the preset installation holes on the main beam being unable to be used, affecting construction efficiency.
A floor structure is designed, in which a plurality of first and second beams are arranged at intervals to form a wiring space, avoid preset installation holes on the beams, and allow the pipeline position to be adjusted as needed in subsequent renovations, reducing construction difficulty.
It improves pipeline construction efficiency, enhances the overall strength of the building structure, reduces construction difficulty, and optimizes space utilization and aesthetics.
Smart Images

Figure CN222065899U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction, in particular to a floor structure and a building. Background Art
[0002] With the development of society and economy, there are more and more office buildings and factory buildings in cities, and office buildings and rectangular buildings usually need to lay wires, water pipes and other lines. In order to avoid the lines affecting the beauty of the building, the lines are usually laid in the floor structure of the building.
[0003] In the related art, the floor structure includes a floor slab, a plurality of main beams and a plurality of secondary beams. The plurality of main beams are arranged below the floor slab at intervals and are directly connected to the floor slab. The plurality of secondary beams are distributed between the plurality of main beams and are used to connect the plurality of main beams so that the main beams and the secondary beams form a supporting structure of the floor slab, thereby supporting the floor slab. At this time, wires, water pipes and other lines usually need to be set through the main beams, so it is necessary to preset installation holes for laying the lines on the main beams.
[0004] In this way, during the subsequent transformation or renovation of the building, if it is necessary to re-lay out the wires, water pipes and other lines, the position of the pipelines may need to be changed, which will make the preset installation holes on the main beam unusable. Therefore, it is necessary to open the installation holes on the main beam again, which will affect the construction efficiency of the pipelines. Utility Model Content
[0005] The embodiments of the utility model provide a floor structure and a building, which are used to improve the construction efficiency of indoor pipelines.
[0006] In order to achieve the above object, the embodiment of the utility model adopts the following technical solution:
[0007] In a first aspect of the present application, a floor structure is provided, the floor structure comprising a floor, a plurality of first beams and a plurality of second beams. The plurality of first beams are connected to the bottom of the floor and are arranged at intervals along a first horizontal direction, the first horizontal direction being perpendicular to the axial direction of the first beams. The plurality of second beams are arranged at intervals along the axial direction of the first beams, the axial direction of the second beams being consistent with the first horizontal direction. The plurality of second beams are connected to the plurality of first beams and are located below the floor, and there is a gap between the plurality of second beams and the floor.
[0008] Through the above-mentioned arrangement, by arranging multiple first beams at intervals along the first horizontal direction, a certain space can be provided between any two adjacent first beams, and multiple second beams are connected to the multiple first beams and have gaps with the floor slabs, so that wiring space can be formed between any two adjacent first beams, the second beams and the floor slabs. Therefore, the number of wiring spaces is multiple and is arranged along the axial direction of the second beams.
[0009] When laying pipelines in the floor structure, the pipelines can be laid in any wiring space. In this way, there is no need to preset installation holes for laying pipelines on the first beam or the second beam, thereby reducing the construction difficulty of the first beam and the second beam.
[0010] Moreover, during the subsequent transformation and renovation of the floor structure, if the position of the pipeline needs to be changed, the pipeline only needs to be laid out in a suitable wiring space according to actual needs, thereby avoiding the need to reopen the installation holes on the first beam or the second beam, thereby improving the construction efficiency of the pipeline.
[0011] In some embodiments of the present application, any first cross beam includes a plurality of connecting beams, which are spaced apart along the axial direction of the first cross beam and are all connected to the lower side of the floor slab. For any first cross beam, one connecting beam is connected between two adjacent second cross beams.
[0012] Through the above arrangement, by providing gaps between the plurality of second beams and the floor slab, the support structure of the floor slab formed by the plurality of second beams and the plurality of connecting beams can be made higher in the vertical direction, thus enhancing the support effect of the support structure formed by the plurality of second beams and the plurality of connecting beams on the floor slab. In this way, the floor structure formed by the floor slab, the plurality of connecting beams and the plurality of second beams can bear greater force, thus improving the overall strength of the floor structure.
[0013] In some embodiments of the present application, the floor slab includes a plurality of bearing parts and a plurality of reinforcing parts. The plurality of bearing parts are arranged at intervals along the axial direction of the first cross beam. A reinforcing part is connected between any two adjacent bearing parts of the plurality of reinforcing parts, and the plurality of reinforcing parts correspond to the plurality of second cross beams one by one, and the plurality of reinforcing parts are all connected to the plurality of first cross beams.
[0014] Through the above arrangement, although the reinforcement part is not connected to the second cross beam at the bottom, since the reinforcement part has a higher structural strength, the supporting structure formed by the reinforcement part, the first cross beam and the second cross beam can support the bearing part more stably, thereby improving the overall structural strength of the floor structure.
[0015] In some embodiments of the present application, an orthographic projection of a second cross beam on the lower side of the floor slab is located within a reinforcement portion.
[0016] In this way, since the orthographic projection of a second beam on the lower side surface of the floor slab is located in a reinforcement portion, and the reinforcement portion is located above the second beam, the force borne on the reinforcement portion will tend to be transmitted in the vertical direction during the process of being transmitted to the second beam. This can reduce the influence of the horizontal force on the second beam during the process of the force borne on the reinforcement portion being transmitted to the second beam, thereby enabling the second beam, the first beam and the reinforcement portion to more stably support the bearing portion, thereby further improving the overall structural strength of the floor structure.
[0017] In some embodiments of the present application, a distance between an upper side of the second cross beam and a lower side of the floor slab is greater than or equal to 300 mm and less than or equal to 400 mm.
[0018] In this way, by setting the distance between the upper side surface of the second cross beam and the lower side surface of the floor slab to a size that matches the sum of the height of the ventilation duct and the thickness of the insulation layer located on the outside of the ventilation duct, the ventilation duct can normally pass through the gap between the upper side surface of the second cross beam and the lower side surface of the floor slab, thereby ensuring the normal installation of the ventilation duct.
[0019] In some embodiments of the present application, the floor structure further includes a suspended ceiling structure, which is connected below the second cross beam and contacts the bottom of the second cross beam.
[0020] In this way, since no noise will be generated between the ventilation duct and the ceiling structure, there is no need to reserve a gap between the second beam and the ceiling structure. In this way, the ceiling structure is closer to the floor, that is, the distance between the ceiling structure and the floor will be reduced, thereby increasing the indoor net height and improving the utilization rate of the indoor space.
[0021] In some embodiments of the present application, the reinforcement portion includes a hidden beam plate, and a hidden beam plate is connected between any two adjacent bearing portions.
[0022] In this way, since the construction difficulty of the hidden beam slab is relatively low, it is convenient to set the reinforcement part. In addition, the appearance of the hidden beam slab is consistent with the appearance of the bearing part, which can improve the overall aesthetics of the floor slab.
[0023] In some embodiments of the present application, the reinforcement portion and the bearing portion are an integral structure.
[0024] In this way, the structural strength between the reinforcement part and the bearing part can be increased, that is, the structural strength of the floor slab can be improved. At the same time, secondary construction can be avoided and the construction process can be simplified.
[0025] In some embodiments of the present application, the floor structure also includes a third beam, which is located below the floor slab and directly connected to the floor slab. The axial direction of the third beam is consistent with the axial direction of the second beam, and along the axial direction of the first beam, the third beam is located on one side of one of the second beams.
[0026] Through the above arrangement, since it is easier to cast the third crossbeam than the second crossbeam, by setting the third crossbeam and directly connecting the third crossbeam to the floor slab, when casting the floor structure, the second crossbeam can be cast only at the position where pipelines and ventilation ducts need to be installed, and the third crossbeam can be cast at other positions to reduce the number of second crossbeams. This can reduce the construction difficulty of the floor structure and facilitate the construction of the floor structure.
[0027] In a second aspect of the present application, a building is provided. Since the building contains the floor structure in the above embodiment, it can achieve the same beneficial effects as the above technical solution, so it will not be described in detail here. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 A schematic diagram of an external structure of a floor structure and beams and columns provided in an embodiment of the present application;
[0029] Figure 2 A schematic diagram of the external structure of a floor structure provided in an embodiment of the present application;
[0030] Figure 3 Another schematic diagram of the external structure of the floor structure and beams and columns provided in the embodiment of the present application;
[0031] Figure 4 This is a schematic diagram of the external structure of the second crossbeam and the third crossbeam provided in the embodiment of the present application;
[0032] Figure 5 This is another schematic diagram of the external structure of the floor structure provided in an embodiment of the present application.
[0033] Figure numbers: 01-floor structure; 1-floor; 11-bearing part; 12-reinforcement part; 2-first crossbeam; 21-connecting beam; 3-second crossbeam; 4-third crossbeam; 5-ceiling structure; 02-beam column; M-gap; X-first direction. DETAILED DESCRIPTION
[0034] The embodiments of the utility model are described in detail below with reference to the accompanying drawings.
[0035] In the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.
[0036] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "plurality" means two or more.
[0037] In the description of the present utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be internal communication between two components. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances. In addition, when describing pipelines or channels, the "connected" and "connected" used in this application have the meaning of conduction. The specific meaning needs to be understood in conjunction with the context.
[0038] In the embodiments of the present application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.
[0039] With the development of society and economy, there are more and more office buildings and factory buildings in cities, and the requirements for floor structures in buildings are getting higher and higher. Among them, the floor structure has extremely strict requirements on the layout of pipelines such as wires and water pipes and the net height for indoor use.
[0040] In the related art, a plurality of main beams are arranged below the floor at intervals and are directly connected to the floor, and a plurality of secondary beams are distributed between the plurality of main beams and are used to connect the plurality of main beams so that the main beams and the secondary beams form a supporting structure of the floor, thereby supporting the floor. At this time, wires, water pipes and other lines usually need to be set through the main beams, so it is necessary to preset installation holes for laying the lines on the main beams.
[0041] In this way, during the subsequent transformation or renovation of the building, if it is necessary to re-lay out the wires, water pipes and other lines, the position of the pipelines may need to be changed, which will make the preset installation holes on the main beam unusable. Therefore, it is necessary to open the installation holes on the main beam again, which will affect the construction efficiency of the pipelines.
[0042] Based on this, the present application provides a building such as Figure 1 As shown, the building includes a floor structure 01 and a plurality of beams and columns 02 , wherein the plurality of beams and columns 02 are connected below the floor structure 01 to support the floor structure 01 .
[0043] Specifically, Figure 1 As shown, the floor structure 01 includes a floor slab 1, and the floor slab 1 is used to support people or objects located above the floor slab 1.
[0044] The floor structure 01 further includes a plurality of first beams 2 and a plurality of second beams 3. The plurality of first beams 2 are connected to the bottom of the floor 1 and extend along a first horizontal direction ( Figure 1 The first horizontal direction is perpendicular to the axial direction of the first beam 2.
[0045] It should be noted that the first cross beam 2 is a horizontally arranged beam, that is, the axial direction of the first cross beam 2 is a horizontal direction.
[0046] The plurality of second beams 3 are arranged at intervals along the axial direction of the first beam 2, and the axial direction of the second beam 3 is consistent with the first horizontal direction. The plurality of second beams 3 are connected to the plurality of first beams 2 and are located below the floor 1. Specifically, the second beam 3 is a main beam in the floor structure 01.
[0047] like Figure 1 , Figure 3 As shown, a gap M is provided between the plurality of second beams 3 and the floor slab 1 in the present application, and along the axial direction of the first beam 2 , a portion of the first beam 2 overlaps a portion of the second beam 3 .
[0048] Through the above-mentioned arrangement, by arranging multiple first beams 2 at intervals along the first horizontal direction, a certain space can be provided between any two adjacent first beams 2, and multiple second beams 3 are connected to the multiple first beams 2 and have gaps with the floor 1, so that wiring space can be formed between any two adjacent first beams 2, the second beams 3 and the floor 1. Therefore, the number of wiring spaces is multiple and is arranged along the axial direction of the second beam 3.
[0049] When laying pipelines in the floor structure 01, the pipelines can be laid in any wiring space. In this way, there is no need to pre-set installation holes for laying pipelines on the first beam 2 or the second beam 3, so as to reduce the construction difficulty of the first beam 2 and the second beam 3.
[0050] Furthermore, during the subsequent transformation and renovation of the floor structure 01, if the position of the pipeline needs to be changed, the pipeline only needs to be laid out in a suitable wiring space according to actual needs, thereby avoiding the need to reopen the installation holes on the first beam 2 or the second beam 3, thereby improving the construction efficiency of the pipeline.
[0051] In addition, since part of the first beam 2 overlaps part of the second beam 3 along the axial direction of the first beam 2, the top of the second beam 3 can be located between two adjacent first beams 2. In this way, after the first beam 2 and the second beam 3 are constructed, the first beam 2 and the second beam 3 can have a higher connection strength, thereby ensuring the overall structural strength of the floor structure 01.
[0052] In some other embodiments, the plurality of second beams 3 may also be connected to the lower sides of the plurality of first beams 2 , so that there is a gap between the plurality of second beams 3 and the floor slab 1 .
[0053] Exemplarily, the first crossbeam 2 and the second crossbeam 3 may be separate structures or may be an integrated structure.
[0054] In some examples, such as Figure 1 As shown, the axial direction of the beam column 02 is consistent with the vertical direction, and the top of the beam column 02 is connected to the floor 1. Along the axial direction of the second beam 3, for any second beam 3, the second beam 3 is connected to multiple beam columns 02, and the multiple beam columns 02 are arranged at intervals along the axial direction of the second beam 3.
[0055] After part of the force carried by the floor 1 is transferred to the second beam 3 through the first beam 2, the force on the second beam 3 is transferred to the beam column 02, and the floor structure 01 is supported by the beam column 02; and another part of the force carried by the floor 1 is directly transferred to the beam column 02. The force transferred to the beam column 02 is finally transferred to the foundation, so that the beam column 02 supports the floor structure 01.
[0056] Exemplarily, when a building includes a plurality of floor structures 01 , the plurality of floor structures 01 are arranged at intervals in a vertical direction, and two adjacent floor structures 01 are connected together by a plurality of beams and columns 02 .
[0057] In some examples, such as Figure 2As shown, any first beam 2 includes a plurality of connecting beams 21, which are arranged at intervals along the axial direction of the first beam 2 and are all connected to the lower side of the floor 1. For any first beam 2, one connecting beam 21 is connected between two adjacent second beams 3. Specifically, the connecting beam 21 is a secondary beam in the floor structure 01.
[0058] Through the above arrangement, after the second cross beam 3 is connected to the first cross beam 2 , the force borne by the floor slab 1 will be first transferred to the first cross beam 2 , and then transferred to the second cross beam 3 .
[0059] It should be noted that the floor slab 1, multiple connecting beams 21 and the floor structure 01 that can be formed by the multiple connecting beams 21 have a shape and force similar to those of a hollow truss structure, wherein the floor slab 1 is similar to the upper chord in the hollow truss structure, the multiple connecting beams 21 are similar to the web members in the hollow truss structure, and the multiple second cross beams 3 are similar to the lower chord in the hollow truss structure.
[0060] In the related art, the main beam and the floor slab 1 are directly connected, and the force borne by the floor slab 1 is borne jointly by the main beam and the secondary beam.
[0061] In comparison, by providing a gap between the multiple second beams 3 and the floor 1, the support structure of the floor 1 formed by the multiple second beams 3 and the multiple connecting beams 21 can be made higher in the vertical direction, thereby enhancing the supporting effect of the support structure formed by the multiple second beams 3 and the multiple connecting beams 21 on the floor 1.
[0062] In this way, the floor structure 01 formed by the floor slab 1 , the plurality of connecting beams 21 and the plurality of second cross beams 3 can bear a greater force, thus improving the overall strength of the floor structure 01 .
[0063] In some embodiments, Figure 4 As shown, the floor structure 01 also includes a third cross beam 4, which is located below the floor slab 1 and directly connected to the floor slab 1. The axial direction of the third cross beam 4 is consistent with the axial direction of the second cross beam 3, and along the axial direction of the first cross beam 2, the third cross beam 4 is located on one side of one of the second cross beams 3.
[0064] Exemplarily, the number of the third cross beams 4 may be one, or may be multiple, such as two, three, four, etc.
[0065] Since it is relatively easy to cast the third crossbeam 4 and relatively difficult to cast the second crossbeam 3, by providing the third crossbeam 4 and directly connecting the third crossbeam 4 to the floor slab 1, when casting the floor structure 01, the second crossbeam 3 can be cast only at locations where pipelines and ventilation ducts need to be installed, and the third crossbeam 4 can be cast at other locations to reduce the number of second crossbeams 3. This can reduce the construction difficulty of the floor structure 01 and facilitate the construction of the floor structure 01.
[0066] It should be noted that the number and distribution of the second beams 3 need to meet the layout requirements of wires, water pipes and other pipelines. In addition, the number and distribution of the second beams 3 can also reserve some spare wiring space for use when the position of the subsequent pipelines changes. Since there is a gap M between the second beam 3 and the floor slab 1, the force carried by the part of the floor slab 1 located directly above the second beam 3 cannot be directly transmitted to the second beam 3, which may affect the overall structural strength of the floor slab 1.
[0067] In order to ensure the overall structural strength of the floor 1, in some embodiments, such as Figure 5 As shown, the floor slab 1 includes a plurality of bearing parts 11 and a plurality of reinforcing parts 12. The plurality of bearing parts 11 are arranged at intervals along the axial direction of the first cross beam 2.
[0068] A reinforcing portion 12 is connected between any two adjacent bearing portions 11 , and the plurality of reinforcing portions 12 correspond one-to-one to the plurality of second beams 3 , and the plurality of reinforcing portions 12 are all connected to the plurality of first beams 2 .
[0069] It should be noted that the structural strength of the reinforcement portion 12 is higher than the structural strength of the bearing portion 11 .
[0070] Through the above arrangement, although the reinforcement part 12 is not connected to the second cross beam 3 at the bottom, since the reinforcement part 12 has a higher structural strength, the support structure formed by the reinforcement part 12, the first cross beam 2 and the second cross beam 3 can more stably support the bearing part 11, thereby improving the overall structural strength of the floor structure 01.
[0071] Furthermore, since the multiple reinforcement parts 12 are connected to the multiple first beams 2 , the force borne by the multiple reinforcement parts 12 can be directly and more stably transferred to the first beams 2 , and then transferred to the second beams 3 through the first beams 2 .
[0072] Exemplarily, the reinforcing portion 12 includes a metal plate and a bearing structure. The bearing structure has the same structure as that of the bearing portion 11 , and the metal plate is fixed to the bearing structure to reinforce the bearing structure.
[0073] Exemplarily, the reinforcement part 12 may be a hidden beam plate, and a hidden beam plate is connected between any two adjacent bearing parts 11. Specifically, a hidden beam is formed in the hidden beam plate.
[0074] In this way, since the construction difficulty of the hidden beam slab is relatively low, when processing the reinforcement part 12 , the reinforcement part 12 can be processed more conveniently, so as to facilitate the setting of the reinforcement part 12 .
[0075] Furthermore, since the hidden beam slab improves its structural strength by forming hidden beams with steel bars inside the hidden beam slab, the appearance of the hidden beam slab is consistent with the appearance of the bearing portion 11. After the hidden beam slab and the bearing portion 11 are processed and the floor slab 1 is formed, the floor slab can present a plate-like appearance, thereby improving the overall aesthetics of the floor slab 1.
[0076] Exemplarily, the bearing portion 11 and the reinforcing portion 12 are separate structures, the bearing portion 11 and the reinforcing portion 12 are processed separately, and then the processed bearing portion 11 and the reinforcing portion 12 are connected together.
[0077] Exemplarily, the reinforcing portion 12 and the bearing portion 11 are an integral structure. Specifically, the reinforcing portion 12 and the bearing portion 11 are integrally cast.
[0078] In this way, during the process of casting the reinforcement part 12 and the bearing part 11, the reinforcement part 12 and the bearing part 11 can be directly cast to form the floor 1. This can increase the structural strength between the reinforcement part 12 and the bearing part 11, thereby improving the structural strength of the floor 1. At the same time, secondary construction can be avoided and the construction process of the reinforcement part 12 and the bearing part 11 can be simplified.
[0079] In order to ensure the improvement effect of the reinforcing part 12 on the structural strength of the floor 1, in some embodiments, such as Figure 5 As shown, the orthographic projection of a second cross beam 3 on the lower side of the floor slab 1 is located within a reinforcement 12 .
[0080] Exemplarily, the shape of the reinforcing portion 12 may match the shape of the second cross beam 3. For example, if the second cross beam 3 is in the shape of a cuboid, the shape of the reinforcing portion 12 is also in the shape of a cuboid.
[0081] Exemplarily, the shape of the reinforcing portion 12 may not match the shape of the second crossbeam 3. For example, the shape of the second crossbeam 3 is a cuboid, and the shape of the reinforcing portion 12 is a cylinder.
[0082] In this way, since the orthographic projection of a second cross beam 3 on the lower side of the floor slab 1 is located in a reinforcement portion 12, and the reinforcement portion 12 is located above the second cross beam 3, the force carried on the reinforcement portion 12 will tend to be transmitted in the vertical direction during the process of being transmitted to the second cross beam 3. This can reduce the influence of the horizontal force on the second cross beam 3 during the process of the force carried on the reinforcement portion 12 being transmitted to the second cross beam 3, thereby enabling the second cross beam 3, the first cross beam 2 and the reinforcement portion 12 to more stably support the bearing portion 11, thereby further improving the overall structural strength of the floor structure 01.
[0083] Based on the above, in some embodiments, such as Figure 4 As shown, the floor structure 01 further includes a suspended ceiling structure 5, which is connected below the second crossbeam 3. The suspended ceiling structure 5 is used to shield the floor structure 01 and pipelines, etc., so as to improve the overall aesthetics of the interior.
[0084] In the related art, the building also includes ventilation ducts. Since the main beam and the floor slab 1 are directly connected in the related art, when installing the ventilation duct, the ventilation duct needs to be installed below the main beam. At this time, the suspended ceiling structure 5 is arranged on the lower side of the ventilation duct. The ventilation duct may vibrate when air flows, thereby causing friction between the ventilation duct and the suspended ceiling structure 5, and then making noise. In order to avoid noise caused by friction between the ventilation duct and the suspended ceiling structure 5, it is necessary to set the suspended ceiling structure 5 and the ventilation duct at a distance.
[0085] In the present application, when the ventilation duct needs to be installed, since there is a gap M between the second cross beam 3 and the floor slab 1, the gap M can be set to a suitable size.
[0086] Specifically, under normal circumstances, the sum of the radial dimension of the ventilation duct and the thickness of the insulation layer located on the outside of the ventilation duct is between 300 mm and 400 mm. Therefore, in some embodiments, the distance between the upper side of the second cross beam 3 and the lower side of the floor slab 1 is greater than or equal to 300 mm and less than or equal to 400 mm.
[0087] Exemplarily, the distance between the upper side of the second cross beam 3 and the lower side of the floor slab 1 may be 300 mm, 320 mm, 340 mm, 360 mm, 380 mm, 400 mm, etc.
[0088] In this way, by setting the distance between the upper side surface of the second cross beam 3 and the lower side surface of the floor slab 1 to a size that matches the sum of the radial dimension of the ventilation duct and the thickness of the insulation layer located on the outside of the ventilation duct, the ventilation duct can normally pass through the gap M between the upper side surface of the second cross beam 3 and the lower side surface of the floor slab 1, thereby ensuring the normal installation of the ventilation duct.
[0089] Through the above arrangement, since the ventilation duct is arranged between the second cross beam 3 and the floor 1, and the ceiling structure 5 is connected to the bottom of the second cross beam 3, the ventilation duct will not contact the ceiling structure 5, and the ventilation duct will not rub against the ceiling structure 5 when vibrating, thereby preventing noise from being generated between the ventilation duct and the ceiling structure 5.
[0090] On this basis, in some embodiments, the suspended ceiling structure 5 may be in contact with the bottom of the second crossbeam 3 .
[0091] In this way, since no noise will be generated between the ventilation duct and the ceiling structure 5, there is no need to reserve a gap between the second crossbeam 3 and the ceiling structure 5. In this way, the ceiling structure 5 is closer to the floor 1, that is, the distance between the ceiling structure 5 and the floor 1 will be reduced, thereby increasing the indoor net height and improving the utilization rate of the indoor space.
[0092] Although the present application is described herein in conjunction with various embodiments, in the process of implementing the claimed application, those skilled in the art may understand and implement other changes to the disclosed embodiments by viewing the drawings, the disclosure, and the appended claims. In the claims, the word "comprising" does not exclude other components or steps, and "one" or "an" does not exclude multiple situations. A single processor or other unit may implement several functions listed in the claims. Certain measures are recorded in different dependent claims, but this does not mean that these measures cannot be combined to produce good results.
[0093] Although the present application has been described in conjunction with specific features and embodiments thereof, it is obvious that various modifications and combinations may be made thereto without departing from the spirit and scope of the present application. Accordingly, this specification and the drawings are merely exemplary illustrations of the present application as defined by the appended claims, and are deemed to have covered any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, those skilled in the art may make various modifications and variations to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
[0094] The above is only a specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model. Therefore, the protection scope of the utility model should be based on the protection scope of the claims.
Claims
1. A floor structure, It is characterized in that include: Floor slab; A plurality of first cross beams, the plurality of first cross beams are connected to the bottom of the floor slab and are arranged at intervals along a first horizontal direction, wherein the first horizontal direction is perpendicular to the axial direction of the first cross beams; A plurality of second cross beams are arranged at intervals along the axial direction of the first cross beam, and the axial direction of the second cross beam is consistent with the first horizontal direction; the plurality of second cross beams are connected to the plurality of first cross beams, and along the axial direction of the first cross beam, part of the first cross beam overlaps part of the second cross beam; the plurality of second cross beams are located below the floor slab and have a gap between the second cross beams and the floor slab.
2. A floor structure according to claim 1, It is characterized in that Any one of the first cross beams includes a plurality of connecting beams, which are spaced apart along the axial direction of the first cross beam and are all connected to the lower side surface of the floor slab; for any one of the first cross beams, one connecting beam is connected between two adjacent second cross beams.
3. A floor structure according to claim 1 or 2, It is characterized in that The floor slab comprises: A plurality of bearing parts are arranged at intervals along the axial direction of the first cross beam; A plurality of reinforcing parts, one of the reinforcing parts is connected between any two adjacent bearing parts, and the plurality of reinforcing parts correspond to the plurality of second beams one by one, and the plurality of reinforcing parts are all connected to the plurality of first beams.
4. A floor structure according to claim 3, It is characterized in that An orthographic projection of one of the second cross beams on the lower side of the floor slab is located within one of the reinforcements.
5. A floor structure according to claim 1 or 2, It is characterized in that A distance between an upper side surface of the second cross beam and a lower side surface of the floor slab is greater than or equal to 300 mm and less than or equal to 400 mm.
6. A floor structure according to claim 1 or 2, It is characterized in that The floor structure further includes a suspended ceiling structure, which is connected below the second crossbeam and contacts the bottom of the second crossbeam.
7. A floor structure according to claim 3, It is characterized in that The reinforcement part comprises a hidden beam plate, and one hidden beam plate is connected between any two adjacent bearing parts.
8. A floor structure according to claim 3, It is characterized in that The reinforcing portion and the bearing portion are an integrated structure.
9. A floor structure according to claim 1 or 2, It is characterized in that The floor structure also includes a third cross beam, which is located below the floor slab and directly connected to the floor slab. The axial direction of the third cross beam is consistent with the axial direction of the second cross beam, and along the axial direction of the first cross beam, the third cross beam is located on one side of one of the second cross beams.
10. A building, It is characterized in that The invention comprises a floor structure as claimed in any one of claims 1 to 9.
Citation Information
Cited By
Floor structure and building
CN118110293A