Wind power tower

By adopting lattice structure and ultra-high performance concrete materials in wind power towers, combined with ground anchoring and prestressing technology, the problem of insufficient performance of wind power tower materials at 300 meters is solved, and higher bending efficiency is achieved. Wind resistance stability simplifies construction and reduces maintenance costs.

CN222066958UActive Publication Date: 2024-11-26HUNAN JINYI ENGINEERING TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420967728.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-07
Publication Date
2024-11-26
Estimated Expiration
2034-05-07

AI Technical Summary

Technical Problem

The conventional concrete tower columns and steel tower columns of 300-meter-level wind power towers have insufficient material performance and stiffness requirements, resulting in production, transportation, lifting problems, high maintenance costs, and are not economical.

Method used

Using no less than 3 gravity-based lattice wind power towers, including ultra-high performance concrete tower columns and beams, combined with ground anchors and prestressing technology, a structure with high bending efficiency and wind stability is formed to simplify Construction process and reduce maintenance costs.

Benefits of technology

It has achieved economic and wind resistance improvements in wind power towers, simplified construction and reduced maintenance costs, avoided the increase in structural size and weight of the high towers, and extended the service life of the towers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222066958U_ABST
    Figure CN222066958U_ABST
Patent Text Reader

Abstract

The embodiment of the utility model discloses a wind power tower which comprises a plurality of gravity type foundations and a plurality of sections of tower bodies, and each section of tower body further comprises an ultra-high performance concrete tower column and a transition section ultra-high performance concrete cross beam. A second ultra-high-performance concrete tower column is vertically arranged on the transition section ultra-high-performance concrete cross beam of the uppermost tower body, a conversion section ultra-high-performance concrete cross beam is arranged on the second ultra-high-performance concrete tower column, and an ultra-high-performance concrete tower drum is vertically arranged in the middle of the conversion section ultra-high-performance concrete cross beam; the ultra-high performance concrete tower column and the second ultra-high performance concrete tower column are provided with internal prestress or external prestress, and the other end of the prestress anchor is fixed to the gravity type foundation. By the adoption of the technical scheme, higher bending resistance efficiency and wind resistance stability are achieved, the size and weight of the structure are greatly reduced, construction is easier and more convenient, the construction period is short, and the later maintenance cost is effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of wind power generation, in particular to a wind power tower. Background Art

[0002] With the introduction of my country's "dual carbon" strategy, the country has made it clear in the "14th Five-Year Plan" that the total installed capacity of wind power and solar power generation will reach more than 1.2 billion kilowatts in 2030. With the continuous advancement of technology and manufacturing, the onshore wind power industry is moving towards the trend of "high towers". "High towers" can bring wind turbine blades closer to a higher level of stable airflow, thereby capturing higher-speed wind and improving power generation efficiency. "High towers" can also be used for larger diameter wind turbines, which can provide greater power generation and effectively reduce the cost per unit of electricity. In the planning and construction of future wind farms, the configuration of "high towers" will be a key consideration, in line with the progress and development direction of the industry.

[0003] In order to make better use of wind energy resources, the world's largest wind turbine tower has reached a height of 199 meters, and the domestic largest tower has reached a height of 185 meters, which is about to break the 200-meter mark. Starting from the second half of 2023, all leading main engine manufacturers have launched 10-megawatt wind turbines, and the corresponding wind turbine blade length will reach about 230 to 260 meters. Considering factors such as land saving and large-scale wind turbines, increasing the tower height can greatly increase the space for wind energy resource construction. Therefore, wind turbine towers above 200 meters and 300 meters are the only way to go in the future wind energy field.

[0004] For 300-meter-class tower structures, if conventional concrete tower columns are used, due to limitations in material properties, large structural dimensions are required, which brings a series of difficulties in manufacturing, transportation, and hoisting, and is not economical; for conventional steel tower columns, when the tower columns are too high, they often cannot meet the stiffness requirements. At the same time, steel towers have fatigue and durability problems, and the subsequent operation and maintenance costs are high. Utility Model Content

[0005] In order to solve the above technical problems, the utility model proposes a wind power tower with greater bending resistance efficiency and wind resistance stability, greatly reducing the size and weight of the structure, making the construction easier and shortening the construction period, and effectively reducing the subsequent maintenance costs.

[0006] A wind power tower provided by an embodiment of the utility model comprises no less than 3 gravity foundations, wherein the gravity foundations are fixed on the ground, and no less than 1 tower body section is arranged on the gravity foundations, and each tower body section comprises the same number of ultra-high performance concrete tower columns and transition section ultra-high performance concrete cross beams as the gravity foundations, and all ultra-high performance concrete tower columns in each tower body section are cylinders with the same height and diameter, and the bottom of the ultra-high performance concrete tower column of the lowest tower body section is vertically installed on the gravity foundation, and a transition section ultra-high performance concrete cross beam is arranged between the tops of every 2 ultra-high performance concrete tower columns in each tower body section, and the bottoms of the ultra-high performance concrete tower columns of other tower bodies section are vertically installed on the transition section ultra-high performance concrete cross beams of the next tower body section, and the ultra-high performance concrete tower columns of the previous tower body section are vertically installed on the transition section ultra-high performance concrete cross beams of the next tower body section. The distance between the concrete tower columns is smaller than the distance between the ultra-high performance concrete tower columns of the next tower section, the length of the ultra-high performance concrete beam of the transition section of the upper tower section is smaller than the length of the ultra-high performance concrete beam of the transition section of the next tower section, and the second ultra-high performance concrete tower columns with the same number as the gravity foundation are vertically arranged on the ultra-high performance concrete beam of the transition section of the uppermost tower section, and the conversion section ultra-high performance concrete beam is arranged on the second ultra-high performance concrete tower column, and the conversion section ultra-high performance concrete beam is a plane, and an ultra-high performance concrete tower tube is vertically arranged in the middle of the conversion section ultra-high performance concrete beam, and the ultra-high performance concrete tower column and the second ultra-high performance concrete tower column are provided with internal prestress or external prestress, and the other end of the prestressed anchor is fixed on the gravity foundation.

[0007] Furthermore, the number of the gravity foundations is 3, and each section of the tower body includes 3 ultra-high performance concrete tower columns and 3 transition section ultra-high performance concrete beams, and the 3 ultra-high performance concrete tower columns are vertically arranged at the vertices of an equilateral triangle.

[0008] Furthermore, the tower body has two sections.

[0009] Furthermore, in the lower section of the tower body, the height of the ultra-high performance concrete tower column is 45 meters to 55 meters, the outer diameter of the ultra-high performance concrete tower column is 4.5 meters to 5.5 meters, the wall thickness of the ultra-high performance concrete tower column is 0.1 meters to 0.2 meters, the height of the ultra-high performance concrete beam of the transition section is 1 meter to 2 meters, and the width of the ultra-high performance concrete beam of the transition section is 4 meters to 5 meters.

[0010] Furthermore, in the upper section of the tower body, the height of the ultra-high performance concrete tower column is 45 meters to 55 meters, the outer diameter of the ultra-high performance concrete tower column is 4 meters to 5 meters, the wall thickness of the ultra-high performance concrete tower column is 0.1 meters to 0.2 meters, the height of the ultra-high performance concrete beam of the transition section is 1 meter to 2 meters, and the width of the ultra-high performance concrete beam of the transition section is 4 meters to 5 meters.

[0011] Furthermore, the height of the second ultra-high performance concrete tower column is 45 meters to 55 meters, the outer diameter of the second ultra-high performance concrete tower column is 3.5 meters to 4.5 meters, the wall thickness of the second ultra-high performance concrete tower column is 0.1 meters to 0.2 meters, the height of the ultra-high performance concrete beam of the transition section is 1 meter to 2 meters, and the width of the ultra-high performance concrete beam of the transition section is 4 meters to 5 meters.

[0012] Furthermore, the ultra-high performance concrete tower is a cylinder with a height of 150 meters, an outer diameter of 8 to 9 meters, and a wall thickness of 0.1 to 0.2 meters.

[0013] The above technical solution has the following advantages:

[0014] 1. The wind turbine tower adopts a novel lattice structure to fully match the durability of the excellent mechanical properties of ultra-high performance concrete. Compared with conventional wind turbine towers, the lattice tower column structure has greater bending efficiency and wind resistance stability, providing an economically feasible core technology for wind turbine towers to exceed 200 meters in height.

[0015] 2. The wind turbine tower structure uses ground anchors, which puts the ultra-high performance concrete tower column in a state of high compressive stress, giving full play to the advantages of ultra-high performance concrete's high compressive strength and improving its force-bearing performance. At the same time, the ground anchors can make the tower structure have a self-reset function in strong winds to ensure that it does not collapse.

[0016] 3. The wind turbine tower is made of ultra-high performance concrete material, and the structural form has high force efficiency, which can greatly reduce the size and weight of the structure, so it has good economy.

[0017] 4. The ultra-high performance concrete components of wind power towers are light in weight and can be prefabricated and hoisted in long sections, greatly reducing the difficulty of hoisting and the construction period. Ultra-high performance concrete structures do not require a large amount of on-site welding, high-altitude welding, or a large amount of cast-in-place concrete processes, making construction easier and shortening the construction period.

[0018] 5. Ultra-high performance concrete materials have good durability and fatigue resistance, and can be basically maintenance-free during the operation cycle, which can effectively reduce the later maintenance costs. Ultra-high performance concrete materials also have good impact toughness, which can effectively prevent the blades from sweeping the tower and damaging the tower column.

[0019] The technical solution of the utility model is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The above and other purposes, features and advantages of the present invention will become more apparent by describing the embodiments of the present invention in more detail in conjunction with the accompanying drawings. The accompanying drawings are used to provide a further understanding of the embodiments of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings, the same reference numerals generally represent the same components or steps.

[0021] Figure 1 It is a structural schematic diagram of a wind power tower in an embodiment of the utility model. DETAILED DESCRIPTION

[0022] Below, the exemplary embodiments according to the present invention will be described in detail with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments of the present invention, and it should be understood that the present invention is not limited to the exemplary embodiments described here.

[0023] It should be noted that the relative arrangement of components and steps, numerical expressions and numerical values ​​set forth in these embodiments do not limit the scope of the present invention unless specifically stated otherwise.

[0024] Those skilled in the art can understand that the terms "first" and "second" in the embodiments of the present invention are only used to distinguish different steps, devices or modules, etc., and neither represent any specific technical meaning nor indicate the necessary logical order between them.

[0025] It should also be understood that in the embodiments of the present invention, “plurality” may refer to two or more than two, and “at least one” may refer to one, two or more than two.

[0026] It should also be understood that any component, data or structure mentioned in the embodiments of the present invention can generally be understood as one or more, unless explicitly limited or otherwise indicated in the context.

[0027] Figure 1 Schematic diagram of the structure of the wind power tower in the embodiment of the utility model. Figure 1 As shown, the wind power tower includes three gravity foundations 1, which are fixed on the ground. The number of gravity foundations should be no less than three, and three are used in this embodiment.

[0028] A tower body is arranged on a gravity foundation, and the tower body may include multiple sections, each section of the tower body includes three ultra-high performance concrete (UHPC) tower columns and a transition section ultra-high performance concrete cross beam, all ultra-high performance concrete tower columns in each section of the tower body are cylinders with the same height and diameter, and the three ultra-high performance concrete tower columns are vertically arranged at the vertices of an equilateral triangle. In this embodiment, a two-section tower body is used.

[0029] In the lowest section of the tower, the bottoms of three ultra-high performance concrete tower columns 2 are vertically installed on a gravity foundation. The height of the ultra-high performance concrete tower columns is 45 meters to 55 meters, the outer diameter of the ultra-high performance concrete tower columns is 4.5 meters to 5.5 meters, and the wall thickness of the ultra-high performance concrete tower columns is 0.1 meters to 0.2 meters.

[0030] A transition section ultra-high performance concrete cross beam 3 is arranged between the tops of every two ultra-high performance concrete tower columns. The height of the transition section ultra-high performance concrete cross beam 3 is 1 meter to 2 meters, and the width of the transition section ultra-high performance concrete cross beam 3 is 4 meters to 5 meters.

[0031] In the upper section of the tower body, the bottom of the ultra-high performance concrete tower column 4 is vertically installed on the ultra-high performance concrete beam of the transition section of the lowest section of the tower body. The height of the ultra-high performance concrete tower column 4 is 45 meters to 55 meters, the outer diameter of the ultra-high performance concrete tower column 4 is 4 meters to 5 meters, and the wall thickness of the ultra-high performance concrete tower column 4 is 0.1 meters to 0.2 meters.

[0032] A transition section ultra-high performance concrete cross beam 5 is arranged between the tops of every two ultra-high performance concrete tower columns. The height of the transition section ultra-high performance concrete cross beam 5 is 1 meter to 2 meters, and the width of the transition section ultra-high performance concrete cross beam 5 is 4 meters to 5 meters.

[0033] The distance between the ultra-high performance concrete columns 4 of the upper tower section is smaller than the distance between the ultra-high performance concrete columns 2 of the lower tower section, and the length of the ultra-high performance concrete beam 5 of the transition section of the upper tower section is smaller than the length of the ultra-high performance concrete beam 3 of the transition section of the lower tower section.

[0034] Three ultra-high performance concrete tower columns 6 are vertically arranged on the ultra-high performance concrete beam of the transition section of the previous tower body. The height of the ultra-high performance concrete tower column 6 is 45 meters to 55 meters, the outer diameter of the ultra-high performance concrete tower column 6 is 3.5 meters to 4.5 meters, and the wall thickness of the ultra-high performance concrete tower column 6 is 0.1 meters to 0.2 meters.

[0035] A transition section ultra-high performance concrete cross beam 7 is arranged on the ultra-high performance concrete tower column 6. The transition section ultra-high performance concrete cross beam 7 is a plane. The height of the transition section ultra-high performance concrete cross beam 7 is 1 meter to 2 meters, and the width of the transition section ultra-high performance concrete cross beam 7 is 4 meters to 5 meters.

[0036] An ultra-high performance concrete tower 8 is vertically arranged in the middle of the ultra-high performance concrete beam 7 of the conversion section. The ultra-high performance concrete tower 8 is a cylinder with a height of 150 meters, an outer diameter of 8 to 9 meters, and a wall thickness of 0.1 to 0.2 meters.

[0037] All of the above-mentioned ultra-high performance concrete tower columns are provided with internal prestress or external prestress, and the other end of the prestress anchor is fixed on a gravity foundation.

[0038] The installation process of the wind turbine tower is described below.

[0039] First, after the gravity foundation 1 is completed on the construction site, the prefabricated ultra-high performance concrete tower column 2 of the lowest tower section is hoisted onto the ground gravity foundation 1 and installed.

[0040] Secondly, the prefabricated transition section ultra-high performance concrete beam 3 in the lowest section of the tower body is installed on site, and the external prestressing force is tensioned to form an overall frame structure.

[0041] Again, repeat the above step 2 to complete the installation of the previous tower section, including the installation of the ultra-high performance concrete tower column 4 in the previous tower section and the ultra-high performance concrete beam 5 in the transition section.

[0042] Then, the prefabricated ultra-high performance concrete tower column 6 is installed on the transition section ultra-high performance concrete cross beam 5 , and the prefabricated conversion section ultra-high performance concrete cross beam 7 is installed on the ultra-high performance concrete tower column 6 .

[0043] Finally, the prefabricated ultra-high performance concrete tower 8 is installed in sections to complete the construction.

[0044] In the above embodiments, the wind turbine tower adopts a novel lattice structure to fully match the durability of the excellent mechanical properties of ultra-high performance concrete. Compared with conventional wind turbine towers, the lattice tower column structure has greater bending efficiency and wind resistance stability, providing an economically feasible core technology for the wind turbine tower to exceed 200 meters. The wind turbine tower structure adopts a ground anchor bundle, which makes the ultra-high performance concrete tower column in a state of high compressive stress, which can give full play to the advantages of high compressive strength of ultra-high performance concrete and improve its force performance. At the same time, the ground anchor bundle can make the tower structure have a self-reset function in strong winds to ensure that it does not collapse. The wind turbine tower adopts ultra-high performance concrete material, and the structural form has high force efficiency, which can greatly reduce the size and weight of the structure, so it has good economy. The ultra-high performance concrete components of the wind turbine tower are light in weight and can be prefabricated and hoisted in long sections, which greatly reduces the difficulty of hoisting and the construction period. The ultra-high performance concrete structure does not require a large amount of on-site welding and high-altitude welding work, nor does it require a large amount of cast-in-place concrete processes, so the construction is simpler and the construction period is short. Ultra-high performance concrete materials have good durability and fatigue resistance, and can be basically maintenance-free during the operation cycle, which can effectively reduce the subsequent maintenance costs. Ultra-high performance concrete materials also have good impact toughness, which can effectively prevent the blades from sweeping the tower and damaging the tower column.

[0045] The basic principle of the technical solution is described above in conjunction with specific embodiments. However, it should be pointed out that the advantages, strengths, effects, etc. mentioned in the technical solution are only examples and not limitations, and it cannot be considered that these advantages, strengths, effects, etc. must be possessed by each embodiment of the technical solution. In addition, the specific details of the above technical solution are only for the purpose of illustration and facilitation of understanding, rather than limitation, and the above details do not limit the technical solution to the need to adopt the above specific details to be implemented.

[0046] Each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the system embodiment, since it basically corresponds to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0047] The block diagrams of the devices, apparatuses, equipment, and systems involved in the present technical solution are only illustrative examples and are not intended to require or imply that they must be connected, arranged, and configured in the manner shown in the block diagram. As will be appreciated by those skilled in the art, these devices, apparatuses, equipment, and systems can be connected, arranged, and configured in any manner. Words such as "including", "comprising", "having", etc. are open words, meaning "including but not limited to", and can be used interchangeably with them. The words "or" and "and" used here refer to the words "and / or" and can be used interchangeably with them, unless the context clearly indicates otherwise. The word "such as" used here refers to the phrase "such as but not limited to", and can be used interchangeably with it.

[0048] The method and apparatus of the present technical solution may be implemented in many ways. For example, the method and apparatus of the present technical solution may be implemented by software, hardware, firmware, or any combination of software, hardware, and firmware. The above order of steps for the method is for illustration only, and the steps of the method of the present technical solution are not limited to the order specifically described above, unless otherwise specifically stated. In addition, in some embodiments, the present technical solution may also be implemented as a program recorded in a recording medium, which includes machine-readable instructions for implementing the method according to the present technical solution. Therefore, the present technical solution also covers a recording medium storing a program for executing the method according to the present technical solution.

[0049] It should also be noted that, in the apparatus, equipment and method of the present technical solution, each component or each step can be decomposed and / or recombined. These decompositions and / or recombinations should be regarded as equivalent solutions of the present technical solution. The above description of the aspects of the technical solution is provided to enable any technician in the field to make or use the present technical solution. Various modifications to these aspects are very obvious to those skilled in the art, and the general principles defined herein can be applied to other aspects without departing from the scope of the present technical solution. Therefore, the present technical solution is not intended to be limited to the aspects shown here, but in accordance with the widest range consistent with the principles and novel features of this technical solution.

[0050] The above description has been given for the purpose of illustration and description. In addition, this description is not intended to limit the embodiments of the present technical solution to the form of the technical solution herein. Although multiple example aspects and embodiments have been discussed above, those skilled in the art will recognize certain variations, modifications, changes, additions and sub-combinations thereof.

Claims

1. A wind power tower, It is characterized in that The tower comprises no less than 3 gravity foundations, the gravity foundations are fixed on the ground, no less than 1 tower section is arranged on the gravity foundation, each tower section comprises the same number of ultra-high performance concrete tower columns and transition section ultra-high performance concrete beams as the gravity foundations, all ultra-high performance concrete tower columns in each tower section are cylinders with the same height and diameter, the bottom of the ultra-high performance concrete tower column of the lowest tower section is vertically installed on the gravity foundation, a transition section ultra-high performance concrete beam is arranged between the tops of every 2 ultra-high performance concrete tower columns in each tower section, the bottoms of the ultra-high performance concrete tower columns of other tower sections are vertically installed on the transition section ultra-high performance concrete beams of the next tower section, and the distance between the ultra-high performance concrete tower columns of the previous tower section is small. The distance between the ultra-high performance concrete columns of the next tower section, the length of the ultra-high performance concrete beam of the transition section of the upper tower section is less than the length of the ultra-high performance concrete beam of the transition section of the next tower section, the second ultra-high performance concrete columns with the same number as the gravity foundation are vertically arranged on the ultra-high performance concrete beam of the transition section of the uppermost tower section, the conversion section ultra-high performance concrete beam is arranged on the second ultra-high performance concrete column, the conversion section ultra-high performance concrete beam is a plane, and an ultra-high performance concrete tower tube is vertically arranged in the middle of the conversion section ultra-high performance concrete beam, the ultra-high performance concrete column and the second ultra-high performance concrete column are provided with internal prestress or external prestress, and the other end of the prestressed anchor is fixed on the gravity foundation.

2. A wind power tower according to claim 1, It is characterized in that There are three gravity foundations, and each section of the tower includes three ultra-high performance concrete tower columns and three transition section ultra-high performance concrete beams. The three ultra-high performance concrete tower columns are vertically arranged at the vertices of an equilateral triangle.

3. A wind power tower according to claim 1, It is characterized in that The tower body has two sections.

4. A wind power tower according to claim 3, It is characterized in that In the lower section of the tower body, the height of the ultra-high performance concrete tower column is 45 meters to 55 meters, the outer diameter of the ultra-high performance concrete tower column is 4.5 meters to 5.5 meters, the wall thickness of the ultra-high performance concrete tower column is 0.1 meters to 0.2 meters, the height of the ultra-high performance concrete beam of the transition section is 1 meter to 2 meters, and the width of the ultra-high performance concrete beam of the transition section is 4 meters to 5 meters.

5. A wind power tower according to claim 3, It is characterized in that In the upper section of the tower body, the height of the ultra-high performance concrete tower column is 45 meters to 55 meters, the outer diameter of the ultra-high performance concrete tower column is 4 meters to 5 meters, the wall thickness of the ultra-high performance concrete tower column is 0.1 meters to 0.2 meters, the height of the ultra-high performance concrete beam of the transition section is 1 meter to 2 meters, and the width of the ultra-high performance concrete beam of the transition section is 4 meters to 5 meters.

6. A wind power tower according to claim 1, It is characterized in that The height of the second ultra-high performance concrete tower column is 45 meters to 55 meters, the outer diameter of the second ultra-high performance concrete tower column is 3.5 meters to 4.5 meters, the wall thickness of the second ultra-high performance concrete tower column is 0.1 meters to 0.2 meters, the height of the ultra-high performance concrete beam of the transition section is 1 meter to 2 meters, and the width of the ultra-high performance concrete beam of the transition section is 4 meters to 5 meters.

7. A wind power tower according to claim 1, It is characterized in that The ultra-high performance concrete tower is a cylinder with a height of 150 meters, an outer diameter of 8 to 9 meters, and a wall thickness of 0.1 to 0.2 meters.