Gas washing device and water electrolysis hydrogen production system

By combining fixed-frequency and variable-frequency water supply pumps in parallel within the water electrolysis hydrogen production system, along with a flow meter and controller, the problem of stable water supply for the water electrolysis hydrogen production system under fluctuations in new energy power was solved, thus achieving efficient operation of the water electrolysis hydrogen production system.

CN222082914UActive Publication Date: 2024-11-29SUNGROW HYDROGEN SCI &TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420074936.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-11
Publication Date
2024-11-29
Estimated Expiration
2034-01-11

AI Technical Summary

Technical Problem

Existing water electrolysis hydrogen production systems struggle to achieve stable water replenishment under fluctuating renewable energy power levels, and a single variable frequency pump cannot meet hydrogen production demands under different power levels.

Method used

The system employs a first water supply pump operating at a fixed frequency and a second water supply pump operating at a variable frequency, connected in parallel. Combined with a flow meter and controller, the water supply volume is dynamically adjusted to adapt to the power changes of the water electrolysis hydrogen production system, ensuring continuous water supply.

Benefits of technology

Within the power variation range of the water electrolysis hydrogen production system, a stable water replenishment requirement was achieved, which improved the system's operating efficiency and reliability and reduced energy consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222082914U_ABST
    Figure CN222082914U_ABST
Patent Text Reader

Abstract

The utility model discloses a gas washing device and a water electrolysis hydrogen production system, and belongs to the technical field of water electrolysis hydrogen production. The gas washing device is applied to the water electrolysis hydrogen production system and comprises a water storage tank, a gas inlet pipe and a gas outlet pipe, a first input end of the gas scrubber is connected with a first output end of a gas separator of the water electrolysis hydrogen production system, and a second output end of the gas scrubber is connected with a third input end of the gas separator; the water replenishing assembly comprises a first water replenishing pump and a second water replenishing pump which are connected in parallel, the liquid output end of the water storage tank is connected with inlets of the first water replenishing pump and the second water replenishing pump, and the second input end of the gas scrubber is connected with outlets of the first water replenishing pump and the second water replenishing pump; wherein under the condition that the operation power of the water electrolysis hydrogen production system is larger than or equal to the target power threshold value, the first make-up pump is used for fixed-frequency operation, and the second make-up pump is used for variable-frequency operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of water electrolysis hydrogen production, and in particular relates to a gas scrubbing device and a water electrolysis hydrogen production system. Background Art

[0002] The water electrolysis hydrogen production system produces hydrogen through the electrolysis of water in an electrolyzer. The electrolysis process will cause water loss in the electrolyte, and the water electrolysis hydrogen production system needs to be supplemented with pure water in a timely manner.

[0003] At present, in order to meet the demand for hydrogen production under different powers, variable frequency pumps are usually used to achieve stable water replenishment of water electrolysis hydrogen production systems. However, with the rise of new energy sources such as photovoltaics and wind power, the power variation range of water electrolysis hydrogen production systems has become wider, and a single variable frequency pump can no longer meet the water replenishment needs of water electrolysis hydrogen production systems. Utility Model Content

[0004] The present application aims to solve at least one of the technical problems existing in the prior art. To this end, the present application proposes a gas scrubbing device and a water electrolysis hydrogen production system, which can continuously replenish water for the water electrolysis hydrogen production system.

[0005] In a first aspect, the present application provides a gas scrubbing device, which is applied to a water electrolysis hydrogen production system, and comprises:

[0006] A water storage tank, wherein the water storage tank is used to store water;

[0007] at least one gas scrubber, wherein a first input end of the gas scrubber is connected to a first output end of a gas separator of the water electrolysis hydrogen production system, and a second output end of the gas scrubber is connected to a third input end of the gas separator;

[0008] A water replenishment component, the water replenishment component comprises a first water replenishment pump and a second water replenishment pump connected in parallel, the liquid output end of the water storage tank is connected to the inlet of the first water replenishment pump and the second water replenishment pump respectively, and the second input end of the gas scrubber is connected to the outlet of the first water replenishment pump and the second water replenishment pump respectively;

[0009] Wherein, when the operating power of the water electrolysis hydrogen production system is greater than or equal to the target power threshold, the first water makeup pump is used for fixed frequency operation, and the second water makeup pump is used for variable frequency operation.

[0010] According to the gas washing device of the present application, by arranging a first water replenishment pump operating at a fixed frequency and a second water replenishment pump operating at a variable frequency in parallel in the water replenishment component, when the operating power of the water electrolysis hydrogen production system is greater than or equal to the target power threshold, the first water replenishment pump and the second water replenishment pump can simultaneously replenish water for the water electrolysis hydrogen production system to meet the operating power requirement of the water electrolysis hydrogen production system.

[0011] According to one embodiment of the present application, the ratio of the rated flow of the first water replenishment pump to the maximum required flow of the gas separator is 50%-70%, and the ratio of the rated flow of the second water replenishment pump to the maximum required flow of the gas separator is 50%-70%.

[0012] According to one embodiment of the present application, the first water makeup pump and the second water makeup pump are variable frequency pumps.

[0013] According to one embodiment of the present application, the frequency modulation range of the first water replenishment pump and the second water replenishment pump is 5 Hz-50 Hz.

[0014] According to an embodiment of the present application, when the operating power of the water electrolysis hydrogen production system is less than the target power threshold, the first water makeup pump stops working and the second water makeup pump is used for variable frequency operation.

[0015] According to one embodiment of the present application, the gas scrubbing device further includes:

[0016] A flow meter, the flow meter being arranged between the water replenishment assembly and the gas scrubber;

[0017] A first controller, wherein the first controller is electrically connected to the flow meter, the first water make-up pump, and the second water make-up pump, an input signal of the first controller includes a flow signal of the flow meter, an output signal of the first controller is output to the first water make-up pump and the second water make-up pump, and a set value of the first controller is determined based on a target operating power of the water electrolysis hydrogen production system.

[0018] In a second aspect, the present application provides a water electrolysis hydrogen production system, the water electrolysis hydrogen production system comprising:

[0019] Electrolyzer;

[0020] Two gas separators, wherein the fourth input end of the gas separator is connected to the gas output end of the electrolyzer;

[0021] At least one gas washing device as described in the first aspect above, wherein the first input end of the gas scrubber of the gas washing device is connected to the first output end of the gas separator, and the second output end of the gas scrubber is connected to the third input end of the gas separator.

[0022] According to the water electrolysis hydrogen production system of the present application, by arranging a first water replenishment pump operating at a fixed frequency and a second water replenishment pump operating at a variable frequency in parallel in the water replenishment component, when the operating power of the water electrolysis hydrogen production system is greater than or equal to the target power threshold, the first water replenishment pump and the second water replenishment pump can simultaneously replenish water for the water electrolysis hydrogen production system to meet the operating power requirement of the water electrolysis hydrogen production system.

[0023] According to one embodiment of the present application, the water electrolysis hydrogen production system further includes:

[0024] Two first liquid level gauges, the two first liquid level gauges are respectively arranged at the two gas separators;

[0025] A second controller, the second controller is electrically connected to the two first liquid level meters and the first controller of the gas scrubbing device, the input signal of the second controller includes the liquid level signal of the first liquid level meter, and the output signal of the second controller is output to the first controller.

[0026] According to one embodiment of the present application, when the liquid level signal of the first liquid level gauge is within the target liquid level range, the first controller is used to control the first make-up water pump and the second make-up water pump of the gas washing device; when the liquid level signal of the first liquid level gauge exceeds the target liquid level range, the second controller is used to control the second make-up water pump through the first controller.

[0027] According to one embodiment of the present application, the water electrolysis hydrogen production system includes two of the gas washing devices, each of the gas washing devices includes one gas scrubber, and the two gas scrubbers are respectively connected to the two gas separators; or, the water electrolysis hydrogen production system includes one of the gas washing devices, the gas washing device includes two gas scrubbers, and the two gas scrubbers are respectively connected to the two gas separators.

[0028] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0030] Figure 1 is a schematic diagram of the structure of a gas scrubbing device provided in an embodiment of the present application;

[0031] Figure 2 It is a structural schematic diagram of a water electrolysis hydrogen production system provided in an embodiment of the present application;

[0032] Figure 3 It is a schematic diagram of a control process performed by a first controller and a second controller provided in an embodiment of the present application.

[0033] Reference numerals:

[0034] Gas washing device 100, water storage tank 110, gas scrubber 120, water replenishment assembly 130,

[0035] The first water supply pump 131, the second water supply pump 132, the flow meter 140, the electrolytic cell 210,

[0036] Gas separator 220 , first liquid level meter 230 , first controller 310 , second controller 320 . DETAILED DESCRIPTION

[0037] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.

[0038] Reference below Figure 1-Figure 3 A gas scrubbing device 100 and a water electrolysis hydrogen production system including the gas scrubbing device 100 according to an embodiment of the present application are described.

[0039] like Figure 1 As shown, the gas scrubbing device 100 includes a water storage tank 110 , at least one gas scrubber 120 and a water replenishment assembly 130 .

[0040] The first input end of the gas scrubber 120 is connected to the first output end of the gas separator 220 of the water electrolysis hydrogen production system, and the second output end of the gas scrubber 120 is connected to the third input end of the gas separator 220 .

[0041] The first input end of the gas scrubber 120 can input the gas-liquid mixture output from the first output end of the gas separator 220 , and the third input end of the gas separator 220 can input the liquid output from the second output end of the gas scrubber 120 .

[0042] In this embodiment, the water replenishment component 130 includes a first water replenishment pump 131 and a second water replenishment pump 132 connected in parallel, the liquid output end of the water storage tank 110 is respectively connected to the inlets of the first water replenishment pump 131 and the second water replenishment pump 132, and the second input end of the gas scrubber 120 is respectively connected to the outlets of the first water replenishment pump 131 and the second water replenishment pump 132.

[0043] The second input end of the gas scrubber 120 can input the liquid output from the outlets of the first water makeup pump 131 and the second water makeup pump 132 .

[0044] In this embodiment, the gas washing device 100 is applied to a water electrolysis hydrogen production system, and is a device for washing the gas generated by the water electrolysis hydrogen production system and replenishing water to the water electrolysis hydrogen production system.

[0045] In this embodiment, the water storage tank 110 is used to store water. The stored water can be raw water that meets the standards for hydrogen production by water electrolysis. Tap water can be treated using deionization equipment to obtain raw water. The raw water is input into the water storage tank 110 through the liquid input end of the water storage tank 110 for storage.

[0046] In this embodiment, the gas scrubber 120 can scrub the alkali mist carried in the gas discharged from the gas separator 220 to obtain high-purity gas.

[0047] The gas separator 220 is a device for separating the mixture of gas and alkaline solution generated by the water electrolysis hydrogen production system. The separated gas can be output to the gas scrubber 120 for washing, and the alkaline solution can be recycled.

[0048] In this embodiment, the water replenishment component 130 is a device for transporting water in the water storage tank 110 to the gas scrubber 120 to replenish water for the water electrolysis hydrogen production system.

[0049] In this embodiment, the water replenishment component 130 transports the water in the water storage tank 110 to the gas scrubber 120, and then flows into the gas separator 220 through the overflow pipe, so as to replenish water for the water electrolysis hydrogen production system.

[0050] In this embodiment, the water replenishment assembly 130 may include a first water replenishment pump 131 and a second water replenishment pump 132 connected in parallel.

[0051] Among them, only one of the first water replenishment pump 131 and the second water replenishment pump 132 can be in operation, or the first water replenishment pump 131 and the second water replenishment pump 132 can be in operation at the same time.

[0052] In this embodiment, when the operating power of the water electrolysis hydrogen production system is greater than or equal to the target power threshold, the first water makeup pump 131 is used for fixed frequency operation, and the second water makeup pump 132 is used for variable frequency operation.

[0053] The target power threshold is a pre-set value used to determine whether the operating power of the water electrolysis hydrogen production system exceeds the set limit.

[0054] It can be understood that when the operating power of the water electrolysis hydrogen production system is greater than or equal to the target power threshold, the hydrogen production rate of the water electrolysis hydrogen production system increases, and accordingly, the amount of water consumed in the water electrolysis hydrogen production system also increases. At this time, more water needs to be quickly added to the water electrolysis hydrogen production system to meet the water replenishment demand of the water electrolysis hydrogen production system.

[0055] In this embodiment, the fixed frequency operation is to maintain a certain water replenishment frequency, that is, to maintain a fixed flow rate for pumping water, and the variable frequency operation is to change the water replenishment frequency according to actual conditions, that is, to pump water at a variable flow rate.

[0056] In this embodiment, the second water replenishment pump 132 operates at a variable frequency and can adjust the flow rate to replenish water to the water electrolysis hydrogen production system according to specific circumstances. For example, the flow rate can be adjusted according to the current water consumption of the water electrolysis hydrogen production system so that the water replenishment amount of the second water replenishment pump 132 plus the water replenishment amount of the first water replenishment pump 131 can meet the water replenishment demand of the water electrolysis hydrogen production system.

[0057] In this embodiment, the gases generated by the water electrolysis hydrogen production system are hydrogen and oxygen. Accordingly, the gas scrubber 120 can be a hydrogen scrubber, and the corresponding gas separator 220 can be a hydrogen separator. The gas scrubber 120 can also be an oxygen scrubber, and the corresponding gas separator 220 can be an oxygen separator.

[0058] In this embodiment, when the gas washing device 100 includes a gas scrubber 120, the water electrolysis hydrogen production system can include two gas washing devices 100, one gas washing device 100 can be an oxygen washing device, and the gas scrubber 120 included is an oxygen scrubber for washing oxygen discharged from the oxygen separator and replenishing water for the oxygen separator; the other gas washing device 100 can be a hydrogen washing device, and the gas scrubber 120 included is a hydrogen scrubber for washing hydrogen discharged from the hydrogen separator and replenishing water for the hydrogen separator.

[0059] When the gas washing device 100 includes two gas washers 120, the water electrolysis hydrogen production system can include a gas washing device 100, including two gas washers 120, one is an oxygen washer, and the other is a hydrogen washer. The oxygen washer is used to wash the oxygen discharged from the oxygen separator, and the hydrogen washer is used to wash the hydrogen discharged from the hydrogen separator. The gas washing device 100 can replenish water for the oxygen separator through the oxygen washer, and replenish water for the hydrogen separator through the hydrogen washer.

[0060] In the related art, a variable flow pump is usually used to achieve continuous water replenishment of the water electrolysis hydrogen production system. However, with the development of water electrolysis hydrogen production technology, the operating power of the water electrolysis hydrogen production system has a large range of variation. Using only a variable flow pump for water replenishment cannot meet the operating power requirements of the water electrolysis hydrogen production system.

[0061] In the embodiment of the present application, a first water replenishment pump 131 and a second water replenishment pump 132 are connected in parallel in the water replenishment component 130. When the operating power of the water electrolysis hydrogen production system is greater than or equal to the target power threshold, the first water replenishment pump 131 operates at a fixed frequency, and the second water replenishment pump 132 operates at a variable frequency. The water replenishment flow rate is adjustable. The two water replenishment pumps operate simultaneously to replenish more water for the water electrolysis hydrogen production system, which can meet the water replenishment demand of the water electrolysis hydrogen production system with a large operating power and continuously replenish water for the water electrolysis hydrogen production system.

[0062] According to the gas washing device 100 provided in the embodiment of the present application, by arranging a first water replenishment pump 131 running at a fixed frequency and a second water replenishment pump 132 running at a variable frequency in parallel in the water replenishment component 130, when the operating power of the water electrolysis hydrogen production system is greater than or equal to the target power threshold, the first water replenishment pump 131 and the second water replenishment pump 132 can replenish water for the water electrolysis hydrogen production system at the same time to meet the operating power requirement of the water electrolysis hydrogen production system.

[0063] In some embodiments, the ratio of the rated flow of the first water replenishment pump 131 to the maximum required flow of the gas separator 220 is 50%-70%, and the ratio of the rated flow of the second water replenishment pump 132 to the maximum required flow of the gas separator 220 is 50%-70%.

[0064] Among them, the rated flow of the first water replenishment pump 131 is the maximum flow of the first water replenishment pump 131, and the rated flow of the second water replenishment pump 132 is the maximum flow of the second water replenishment pump 132, that is, the flow of the first water replenishment pump 131 does not exceed the rated flow of the first water replenishment pump 131, and the flow of the second water replenishment pump 132 does not exceed the rated flow of the second water replenishment pump 132.

[0065] The maximum required flow rate of the gas separator 220 is the maximum flow rate at which the gas separator 220 needs to replenish water, that is, the flow rate at which the gas separator 220 needs to replenish water does not exceed the maximum required flow rate.

[0066] In this embodiment, the ratio of the rated flow of the first water replenishment pump 131 to the maximum required flow of the gas separator 220 may be 60%, and the ratio of the rated flow of the second water replenishment pump 132 to the maximum required flow of the gas separator 220 may be 60%.

[0067] In this embodiment, the rated flow rate of the water replenishment assembly 130 including the first water replenishment pump 131 and the second water replenishment pump 132 connected in parallel may be the rated flow rate of the first water replenishment pump 131 plus the rated flow rate of the second water replenishment pump 132 .

[0068] For example, the ratio of the rated flow of the first water replenishment pump 131 to the maximum required flow of the gas separator 220 is 60%, and the ratio of the rated flow of the second water replenishment pump 132 to the maximum required flow of the gas separator 220 is 60%. Then the rated flow of the water replenishment component 130 is 60% of the rated flow of the first water replenishment pump 131 plus 60% of the rated flow of the second water replenishment pump 132, which is 120%.

[0069] In this embodiment, the water replenishment flow rate of the first water replenishment pump 131 and the second water replenishment pump 132 does not exceed the rated flow rate, and the water replenishment flow rate range of the water replenishment component 130 can be determined according to the water replenishment flow rate range of the first water replenishment pump 131 and the second water replenishment pump 132.

[0070] For example, the water replenishment flow range of the first water replenishment pump 131 is 6%-60% of the maximum required flow rate of the gas separator 220, and the water replenishment flow range of the second water replenishment pump 132 is 6%-60% of the maximum required flow rate of the gas separator 220. When one water replenishment pump is enabled, the water replenishment flow range of the water replenishment component 130 is 6%-60% of the maximum required flow rate of the gas separator 220. When the first water replenishment pump 131 and the second water replenishment pump 132 are turned on at the same time, the water replenishment flow range of the water replenishment component 130 is 12%-120% of the maximum required flow rate of the gas separator 220.

[0071] In some embodiments, the first water replenishment pump 131 and the second water replenishment pump 132 are variable frequency pumps.

[0072] Among them, the variable frequency pump is a pump that can change the water replenishment frequency according to actual conditions, that is, a pump that pumps water at a variable flow rate.

[0073] In actual implementation, the motor speed can be adjusted to achieve control of the output power, thereby pumping water at a variable flow rate.

[0074] It should be noted that the variable frequency pump can operate at variable frequency or fixed frequency.

[0075] In this embodiment, when the operating power of the water electrolysis hydrogen production system is greater than or equal to the target power threshold, the first water makeup pump 131 is used for fixed frequency operation, and the second water makeup pump 132 is used for variable frequency operation.

[0076] In some embodiments, the frequency modulation range of the first water replenishment pump 131 and the second water replenishment pump 132 is 5 Hz-50 Hz.

[0077] In this embodiment, the frequency modulation range of the first water replenishment pump 131 and the second water replenishment pump 132 is that the operating frequencies of the motors of the first water replenishment pump 131 and the second water replenishment pump 132 can be adjusted within a range, that is, within the frequency modulation range.

[0078] In this embodiment, the operating frequency of the motors of the first water replenishment pump 131 and the second water replenishment pump 132 can change the rotation speed of the motors.

[0079] When the operating frequency increases, the speed of the motor increases, and the flow rates of the first water replenishment pump 131 and the second water replenishment pump 132 also increase; conversely, when the operating frequency decreases, the speed of the motor decreases, and the flow rates of the first water replenishment pump 131 and the second water replenishment pump 132 also decrease accordingly.

[0080] In some embodiments, when the operating power of the water electrolysis hydrogen production system is less than the target power threshold, the first water makeup pump 131 stops working, and the second water makeup pump 132 is used for variable frequency operation.

[0081] The target power threshold is a pre-set value used to determine whether the operating power of the water electrolysis hydrogen production system exceeds the set limit.

[0082] In this embodiment, when the operating power of the water electrolysis hydrogen production system is less than the target power threshold, the hydrogen production rate of the water electrolysis hydrogen production system decreases, and accordingly, the amount of water consumed in the water electrolysis hydrogen production system is also less. At this time, there is no need to quickly add more water to the water electrolysis hydrogen production system. Only the second water replenishment pump 132 can meet the water replenishment demand of the water electrolysis hydrogen production system, and the first water replenishment pump 131 can stop working to save energy consumption and extend the life of the first water replenishment pump 131.

[0083] In this embodiment, the second water replenishment pump 132 operates at a variable frequency and can adjust the flow rate to replenish water to the water electrolysis hydrogen production system according to specific circumstances. For example, the flow rate can be adjusted according to the current water consumption of the gas separator 220 so that the water replenishment amount of the second water replenishment pump 132 can meet the water electrolysis hydrogen production system.

[0084] In some embodiments, the gas scrubbing device 100 further includes:

[0085] A flow meter 140, which is disposed between the water supply assembly 130 and the gas scrubber 120;

[0086] The first controller 310 is electrically connected to the flow meter 140, the first water replenishment pump 131 and the second water replenishment pump 132. The input signal of the first controller 310 includes the flow signal of the flow meter 140. The output signal of the first controller 310 is output to the first water replenishment pump 131 and the second water replenishment pump 132. The set value of the first controller 310 is determined based on the target operating power of the water electrolysis hydrogen production system.

[0087] The flow meter 140 is a device that can detect the liquid flow in real time, and the flow meter 140 can transmit the detected liquid flow result to a controller or other device.

[0088] In this embodiment, the flow meter 140 is disposed between the water replenishment component 130 and the gas scrubber 120 , and the flow signal of the flow meter 140 may be the water replenishment flow input from the water replenishment component 130 to the gas scrubber 120 detected in real time by the flow meter 140 .

[0089] In this embodiment, the first controller 310 may be a proportional-integral-derivative (PID) controller, which may control the first water replenishment pump 131 and the second water replenishment pump 132 through an output signal, for example, controlling the water replenishment frequency of the second water replenishment pump 132 .

[0090] The output signal may be calculated based on the flow signal received by the flow meter 140 .

[0091] In this embodiment, the target operating power of the water electrolysis hydrogen production system is the hydrogen production power of the water electrolysis hydrogen production system under normal conditions.

[0092] In this embodiment, the required water replenishment flow rate of the water electrolysis hydrogen production system can be calculated based on the target operating power, and the required water replenishment flow rate is used as the set value of the first controller 310, that is, the first controller 310 controls the water replenishment flow rates of the first water replenishment pump 131 and the second water replenishment pump 132 to meet the required water replenishment flow rate of the water electrolysis hydrogen production system.

[0093] In this embodiment, if Figure 3 As shown, the first controller 310 can obtain the water replenishment flow of the first water replenishment pump 131 and the second water replenishment pump 132 according to the flow signal, calculate the deviation between the water replenishment flow of the first water replenishment pump 131 and the second water replenishment pump 132 and the required water replenishment flow of the water electrolysis hydrogen production system, and perform PID calculation on the deviation to obtain an output signal to control the first water replenishment pump 131 and the second water replenishment pump 132 of the water replenishment component 130.

[0094] In this embodiment, the output signal of the first controller 310 is output to the first water replenishment pump 131 and the second water replenishment pump 132. The second water replenishment pump 132 can adjust the water replenishment frequency based on the output signal of the first controller 310, thereby adjusting the water replenishment flow of the second water replenishment pump 132, so that the water replenishment flow of the first water replenishment pump 131 and the second water replenishment pump 132 meets the required water replenishment flow of the water electrolysis hydrogen production system.

[0095] The embodiment of the present application also provides a water electrolysis hydrogen production system.

[0096] like Figure 2 As shown, the water electrolysis hydrogen production system includes an electrolyzer 210, two gas separators 220 and at least one of the above-mentioned gas washing devices 100.

[0097] The fourth input end of the gas separator 220 is connected to the gas output end of the electrolyzer 210;

[0098] The first input end of the gas scrubber 120 of the gas scrubbing device 100 is connected to the first output end of the gas separator 220 , and the second output end of the gas scrubber 120 is connected to the third input end of the gas separator 220 .

[0099] The fourth input end of the gas separator 220 can input the gas-liquid mixture output from the gas output end of the electrolytic cell 210 .

[0100] In this embodiment, the electrolytic cell 210 is a device for decomposing water into hydrogen and oxygen. It may include a cathode and an anode with a thin film between them. When current passes through the electrolytic cell 210, water will undergo a chemical reaction at the cathode to generate hydrogen; at the same time, oxygen will be formed at the anode.

[0101] In this embodiment, the two gas separators 220 may be a hydrogen separator and an oxygen separator, and the fourth input ends of the two gas separators 220 are respectively connected to the gas output ends of the electrolyzer 210 .

[0102] In this embodiment, the electrolyzer 210 can decompose water into hydrogen and oxygen, and output a mixture of hydrogen and alkaline solution and a mixture of oxygen and alkaline solution.

[0103] The mixture of hydrogen and alkali solution can be input into the hydrogen separator through the gas input end of the electrolyzer 210, and the hydrogen separator can separate the mixture of hydrogen and alkali solution.

[0104] The mixture of oxygen and alkali solution can be input into the oxygen separator through the gas input end of the electrolytic cell 210, and the oxygen separator can separate the mixture of oxygen and alkali solution.

[0105] In this embodiment, a first input end of the gas scrubber 120 of the gas scrubbing device 100 is connected to a first output end of the gas separator 220, and the gas scrubber 120 can scrub alkaline mist entrained in the gas discharged from the gas separator 220 to obtain high-purity gas.

[0106] In this embodiment, the second output end of the gas scrubber 120 is connected to the third input end of the gas separator 220, and the water in the gas scrubber 120 can flow into the gas separator 220 through the overflow pipe to replenish water for the water electrolysis hydrogen production system.

[0107] It is understandable that the electrolyzer 210 of the water electrolysis hydrogen production system is a device that consumes water, and can replenish water to the gas separator 220. The water in the gas separator 220 can be input into the electrolyzer 210 through the circulation system.

[0108] According to the water electrolysis hydrogen production system provided in the embodiment of the present application, by providing a first water replenishment pump 131 running at a fixed frequency and a second water replenishment pump 132 running at a variable frequency in parallel in the water replenishment component 130, when the operating power of the water electrolysis hydrogen production system is greater than or equal to the target power threshold, the first water replenishment pump 131 and the second water replenishment pump 132 can replenish water for the water electrolysis hydrogen production system at the same time to meet the operating power requirement of the water electrolysis hydrogen production system.

[0109] In some embodiments, the water electrolysis hydrogen production system further comprises:

[0110] Two first liquid level gauges 230, the two first liquid level gauges 230 are respectively disposed at the two gas separators 220;

[0111] The second controller 320 is electrically connected to the two first liquid level meters 230 and the first controller 310 of the gas scrubbing device 100 . The input signal of the second controller 320 includes the liquid level signal of the first liquid level meter 230 , and the output signal of the second controller 320 is output to the first controller 310 .

[0112] The first liquid level meter 230 can detect the height or liquid level of the liquid in the container.

[0113] In this embodiment, the two first liquid level meters 230 are respectively disposed in the two gas separators 220 , and the two first liquid level meters 230 can respectively detect the liquid levels of water in the two gas separators 220 .

[0114] In this embodiment, if Figure 3 As shown, the second controller 320 can be a PID controller. The input signal of the second controller 320 includes the liquid level signal of the first liquid level meter 230. The second controller 320 can compare the liquid level signal with the set liquid level to obtain the deviation between the liquid level signal and the set liquid level, obtain the output signal according to the deviation, and output the output signal to the first controller 310.

[0115] In this embodiment, if Figure 3 As shown, the first controller 310 can obtain a corresponding output signal based on the output signal of the second controller 320 to control the first water replenishment pump 131 and the second water replenishment pump 132 in the water replenishment component 130. For example, the water replenishment frequency of the second water replenishment pump 132 can be adjusted based on the output signal of the second controller 320.

[0116] In some embodiments, when the liquid level signal of the first liquid level meter 230 is within the target liquid level range, the first controller 310 is used to control the first make-up water pump 131 and the second make-up water pump 132 of the gas washing device 100; when the liquid level signal of the first liquid level meter 230 is beyond the target liquid level range, the second controller 320 is used to control the second make-up water pump 132 through the first controller 310.

[0117] The target liquid level range is a preset liquid level range of water in the gas separator 220 . The second controller 320 can obtain different output signals when the liquid level of water in the gas separator 220 is within the target liquid level range or not.

[0118] In this embodiment, the second controller 320 can receive a liquid level signal, and when it is determined that the liquid level signal of the first liquid level meter 230 is within the target liquid level range, the output signal is output to the first controller 310. At this time, the output signal can control the first controller 310 to control the first water replenishment pump 131 and the second water replenishment pump 132 of the gas washing device 100, that is, the first controller 310 obtains an output signal based on the flow signal and the water replenishment flow of the first water replenishment pump 131 and the second water replenishment pump 132. The second water replenishment pump 132 can adjust the water replenishment frequency based on the output signal of the first controller 310, so that the water replenishment flow of the first water replenishment pump 131 and the second water replenishment pump 132 meets the required water replenishment flow of the water electrolysis hydrogen production system.

[0119] In this embodiment, when the second controller 320 determines that the liquid level signal of the first liquid level meter 230 exceeds the target liquid level range, it outputs an output signal to the first controller 310 . At this time, the output signal can control the water replenishment frequency of the second water replenishment pump 132 through the first controller 310 .

[0120] It should be noted that the liquid level within the target liquid level range may not include the liquid levels at the two end points of the target liquid level range.

[0121] For example, when the liquid level signal of the first liquid level meter 230 reaches the upper limit of the target liquid level range, the first controller 310 can control the second water replenishment pump 132 to replenish water at a minimum flow rate; when the liquid level signal of the first liquid level meter 230 reaches the lower limit of the target liquid level range, the first controller 310 can control the second water replenishment pump 132 to replenish water at a maximum flow rate.

[0122] For example, the gas separator 220 is provided with a low liquid level limit, a middle liquid level limit and a high liquid level limit. The range between the low liquid level limit and the high liquid level limit is the target liquid level range. The low liquid level limit is the lower limit of the target liquid level range, and the high liquid level limit is the upper limit of the target liquid level range. Under normal circumstances, the liquid level of the gas separator 220 is near the middle liquid level limit.

[0123] When the liquid level of the gas separator 220 reaches the low liquid level limit of the gas separator 220, that is, reaches the lower limit of the target liquid level range, the second controller 320 can control the second water replenishment pump 132 to replenish water at a maximum flow rate through the first controller 310 until the liquid level of the gas separator 220 reaches the middle liquid level limit.

[0124] When the liquid level of the gas separator 220 reaches the high liquid level limit of the gas separator 220, that is, reaches the upper limit of the target liquid level range, the second controller 320 can control the second water replenishment pump 132 to replenish water at a minimum flow rate through the first controller 310 until the liquid level of the gas separator 220 reaches the middle liquid level limit.

[0125] When the liquid level of the gas separator 220 returns to the middle liquid level limit of the gas separator 220, the second controller 320 can determine that the liquid level signal of the first liquid level meter 230 is within the target liquid level range, and the first controller 310 controls the first water replenishment pump 131 and the second water replenishment pump 132 of the gas washing device 100, so that the water replenishment flow of the first water replenishment pump 131 and the second water replenishment pump 132 meets the required water replenishment flow of the water electrolysis hydrogen production system.

[0126] When the liquid level of the gas separator 220 reaches the low liquid level limit or the high liquid level limit again, the second controller 320 may determine that the liquid level signal of the first liquid level meter 230 is beyond the target liquid level range, and thus perform corresponding control operations.

[0127] In some embodiments, the water electrolysis hydrogen production system includes two gas washing devices 100, each gas washing device 100 includes a gas scrubber 120, and the two gas scrubbers 120 are respectively connected to two gas separators 220; or, the water electrolysis hydrogen production system includes a gas washing device 100, the gas washing device 100 includes two gas scrubbers 120, and the two gas scrubbers 120 are respectively connected to two gas separators 220.

[0128] In this embodiment, when the water electrolysis hydrogen production system includes two gas washing devices 100, one gas washing device 100 can be an oxygen washing device, and the gas scrubber 120 included is an oxygen scrubber for washing oxygen discharged from the oxygen separator and replenishing water for the oxygen separator; the other gas washing device 100 can be a hydrogen washing device, and the gas scrubber 120 included is a hydrogen scrubber for washing hydrogen discharged from the hydrogen separator and replenishing water for the hydrogen separator.

[0129] In this embodiment, when the water electrolysis hydrogen production system includes a gas washing device 100, the gas washing device 100 includes two gas washers 120, one is an oxygen washer, and the other is a hydrogen washer. The oxygen washer is used to wash the oxygen discharged from the oxygen separator, and the hydrogen washer is used to wash the hydrogen discharged from the hydrogen separator. The gas washing device 100 can replenish water for the oxygen separator through the oxygen washer, and replenish water for the hydrogen separator through the hydrogen washer.

[0130] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.

[0131] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0132] In the description of this application, "first feature" or "second feature" may include one or more of the features.

[0133] In the description of the present application, “plurality” means two or more.

[0134] In the description of the present application, a first feature being “on” or “under” a second feature may include that the first and second features are directly in contact with each other, or may include that the first and second features are not in direct contact with each other but are in contact with each other via another feature therebetween.

[0135] In the description of the present application, “above”, “over” and “above” a first feature to a second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is horizontally higher than the second feature.

[0136] Other structures of ... according to the embodiments of the present application, such as ... and ..., and operations are known to ordinary technicians in the field and will not be described in detail here.

[0137] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0138] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.

Claims

1. A gas scrubbing device, characterized in that: The gas washing device is applied to a water electrolysis hydrogen production system, and the gas washing device comprises: A water storage tank, wherein the water storage tank is used to store water; at least one gas scrubber, wherein a first input end of the gas scrubber is connected to a first output end of a gas separator of the water electrolysis hydrogen production system, and a second output end of the gas scrubber is connected to a third input end of the gas separator; A water replenishment component, the water replenishment component comprises a first water replenishment pump and a second water replenishment pump connected in parallel, the liquid output end of the water storage tank is connected to the inlet of the first water replenishment pump and the second water replenishment pump respectively, and the second input end of the gas scrubber is connected to the outlet of the first water replenishment pump and the second water replenishment pump respectively; Wherein, when the operating power of the water electrolysis hydrogen production system is greater than or equal to the target power threshold, the first water makeup pump is used for fixed frequency operation, and the second water makeup pump is used for variable frequency operation.

2. The gas scrubbing device according to claim 1, characterized in that: The ratio of the rated flow of the first water replenishment pump to the maximum required flow of the gas separator is 50%-70%, and the ratio of the rated flow of the second water replenishment pump to the maximum required flow of the gas separator is 50%-70%.

3. The gas scrubbing device according to claim 1, characterized in that: The first water replenishment pump and the second water replenishment pump are variable frequency pumps.

4. The gas scrubbing device according to claim 3, characterized in that: The frequency modulation range of the first water replenishment pump and the second water replenishment pump is 5 Hz-50 Hz.

5. The gas scrubbing device according to any one of claims 1 to 4, characterized in that: When the operating power of the water electrolysis hydrogen production system is less than the target power threshold, the first water makeup pump stops working, and the second water makeup pump is used for variable frequency operation.

6. The gas scrubbing device according to any one of claims 1 to 4, characterized in that: Also includes: A flow meter, the flow meter being arranged between the water replenishment assembly and the gas scrubber; A first controller, wherein the first controller is electrically connected to the flow meter, the first water make-up pump, and the second water make-up pump, an input signal of the first controller includes a flow signal of the flow meter, an output signal of the first controller is output to the first water make-up pump and the second water make-up pump, and a set value of the first controller is determined based on a target operating power of the water electrolysis hydrogen production system.

7. A water electrolysis hydrogen production system, characterized in that: include: Electrolyzer; Two gas separators, wherein the fourth input end of the gas separator is connected to the gas output end of the electrolyzer; At least one gas washing device according to any one of claims 1 to 6, wherein a first input end of a gas scrubber of the gas washing device is connected to a first output end of the gas separator, and a second output end of the gas scrubber is connected to a third input end of the gas separator.

8. The water electrolysis hydrogen production system according to claim 7, characterized in that: Also includes: Two first liquid level gauges, the two first liquid level gauges are respectively arranged at the two gas separators; A second controller, the second controller is electrically connected to the two first liquid level meters and the first controller of the gas scrubbing device, the input signal of the second controller includes the liquid level signal of the first liquid level meter, and the output signal of the second controller is output to the first controller.

9. The water electrolysis hydrogen production system according to claim 8, characterized in that: When the liquid level signal of the first liquid level gauge is within the target liquid level range, the first controller is used to control the first make-up water pump and the second make-up water pump of the gas washing device; when the liquid level signal of the first liquid level gauge exceeds the target liquid level range, the second controller is used to control the second make-up water pump through the first controller.

10. The water electrolysis hydrogen production system according to any one of claims 7 to 9, characterized in that: The water electrolysis hydrogen production system includes two gas washing devices, each of which includes one gas washing device, and the two gas washing devices are respectively connected to the two gas separators; or, the water electrolysis hydrogen production system includes one gas washing device, and the gas washing device includes two gas washing devices, and the two gas washing devices are respectively connected to the two gas separators.