Modularized test reactor
The modularly designed reactor, utilizing a bottom support platform, top connecting plate, and intermediate support rod, solves the problem of unstable reactor assembly, achieving a stable and convenient installation process. It is suitable for high-voltage switchgear in GIS equipment.
Patent Information
- Application Number
- CN202323337428.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-08
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2033-12-08
AI Technical Summary
Existing reactors are not stable enough during assembly, making efficient installation and fixation difficult.
It adopts a modular design, using a combination of structures such as a bottom support platform, a top connecting plate and a middle support rod, and is stably assembled by threaded connections and welding. It is also equipped with lifting components to facilitate hoisting.
It achieves stable assembly of the reactor, improves the stability and convenience of installation, and is suitable for high-voltage switchgear in GIS equipment.
Smart Images

Figure CN222088371U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a reactor, in particular to a modular test reactor. Background Art
[0002] GIS, the full name of which is enclosed high-voltage combined electrical appliances, is an important component of the power transmission and distribution network of the power grid. It integrates the primary equipment of the substation except the transformer, including circuit breakers, disconnectors, grounding switches, voltage transformers, current transformers, lightning arresters, busbars, cable terminals, and outlet bushings into a whole. It greatly reduces the volume, realizes miniaturization and integration, and before GIS is put into operation, its performance needs to be tested. The withstand voltage test on the construction site is an important link, and it is an important indicator for assessing whether it can operate safely and stably for a long time. Reactors are set in high-voltage combined electrical appliances, and the use of reactors requires consideration of the assembly environment and assembly position of the reactors.
[0003] In the prior art: CN200620127629.3 Automatically controlled air-cooled smoothing reactor, the utility model discloses an automatically controlled air-cooled smoothing reactor, including a reactor body and a fan arranged thereon, wherein it has a temperature sensor arranged in the reactor body; the temperature sensor is connected with a temperature controller arranged thereto for starting the fan. It is simple to use and flexible to install, and the fan is controlled to run or stop by the temperature value set by the temperature controller, which effectively increases the service life of the fan and reduces the reactive power loss caused by the long-term operation of the fan.
[0004] Although the reactor in the prior art can rely on the temperature sensor to control the temperature, so that the service life of the reactor becomes longer, the reactor in the prior art cannot be assembled efficiently and the assembly is not stable enough. Utility Model Content
[0005] In order to overcome the deficiencies of the prior art, the utility model provides a modular test reactor.
[0006] The utility model is implemented by the following technical scheme: a modular test reactor is provided with a reactor body, a bottom support platform is provided on the reactor body, a support rod is provided at the lower part of the bottom support platform, an assembly tube is provided on the bottom support platform, the support rod is assembled on the assembly tube, the support rod and the assembly tube are assembled by means of threads, a top connecting plate is provided on the top of the reactor body, the top connecting plate and the reactor body are connected by welding, an intermediate support rod is provided on the top connecting plate, the intermediate support rod is distributed on the outer surface of the top connecting plate, and a center connecting plate is provided on the top connecting plate.
[0007] An assembly round tube is arranged in the central connecting plate, an assembly thread is arranged on the inner wall of the assembly round tube, and a side vertical plate is arranged on the top connecting plate.
[0008] An assembly space is arranged between the side upright plate and the central connecting plate, an intermediate support rod is welded in the assembly space, and a threaded hole is arranged on the intermediate support rod.
[0009] The top connecting plate is provided with a hoisting component, the hoisting component is a hoisting platform, and a hoisting ring is welded on the hoisting platform.
[0010] Compared with the prior art, when the utility model is in use, the bottom support platform can be relied on to better provide bottom support for the reactor body, making the assembly of the reactor body more stable. At the same time, a top connecting plate is provided on the reactor body, and the top connecting plate can be relied on to allow the reactor to be better assembled with other high-voltage components, making the assembly more stable. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the structure of the utility model;
[0012] Figure 2 It is a top view of the utility model;
[0013] In the figure: 1 is the reactor body, 2 is the bottom supporting platform, 3 is the supporting rod, 4 is the assembly tube, 5 is the top connecting plate, 6 is the middle supporting rod, 7 is the center connecting plate, 71 is the assembly circular tube, 72 is the side plate, and 51 is the lifting ring. DETAILED DESCRIPTION
[0014] The present invention is further described below in conjunction with the accompanying drawings and specific implementation methods. It should be noted that, under the premise of no conflict, the various embodiments or technical features described below can be arbitrarily combined to form a new embodiment.
[0015] A modular test reactor is provided with a reactor body 1, a bottom support platform 2 is provided on the reactor body 1, a support rod 3 is provided at the lower part of the bottom support platform 2, an assembly tube 4 is provided on the bottom support platform 2, the support rod 3 is assembled on the assembly tube 4, the support rod 3 and the assembly tube 4 are assembled by threads, a top connecting plate 5 is provided on the top of the reactor body 1, the top connecting plate 5 and the reactor body 1 are connected by welding, an intermediate support rod 6 is provided on the top connecting plate 5, the intermediate support rod 6 is distributed on the outer surface of the top connecting plate 5, and a center connecting plate 7 is provided on the top connecting plate 5.
[0016] When the reactor is installed, the reactor body 1 can be installed on the bottom support platform 2 for assembly. The reactor body assembled on the bottom support platform 2 can obtain good bottom support, which meets the assembly needs of the reactor body 1 and is more stably assembled. At the same time, a top connecting plate 5 is arranged on the top of the reactor body 1, and the top connecting plate 5 can facilitate the top assembly of the reactor. An assembly circular tube 71 is arranged in the center connecting plate 7, and an assembly thread is arranged on the inner wall of the assembly circular tube 71. A side plate 72 is arranged on the top connecting plate 5, and an assembly space is arranged between the side plate 72 and the center connecting plate 7. An intermediate support rod 6 is welded in the assembly space, and a threaded hole is arranged on the intermediate support rod 6.
[0017] In order to further facilitate the lifting operation of the reactor, a lifting component for lifting can be provided on the top connecting plate 5. The lifting operation of the reactor can be facilitated by relying on the lifting component, and the lifting is more convenient and efficient lifting can be performed. A lifting component is provided on the top connecting plate 5, and the lifting component is a lifting platform, on which a lifting ring 51 is welded.
[0018] The above-mentioned implementation modes are only preferred implementation modes of the present invention, and cannot be used to limit the protection scope of the present invention. Any non-substantial changes and substitutions made by technicians in this field on the basis of the present invention shall fall within the scope of protection required by the present invention.
Claims
1. A modular test reactor is provided with a reactor body, a bottom support platform is provided on the reactor body, a support rod is provided at the lower part of the bottom support platform, an assembly tube is provided on the bottom support platform, a support rod is assembled on the assembly tube, the support rod and the assembly tube are assembled by threads, and a top connection plate is provided on the top of the reactor body, characterized in that: The top connection plate and the reactor body are connected by welding. The top connection plate is provided with an intermediate support rod, which is distributed on the outer surface of the top connection plate. A center connection plate is provided on the top connection plate.
2. The modular test reactor according to claim 1, characterized in that: An assembly round tube is arranged in the central connecting plate, an assembly thread is arranged on the inner wall of the assembly round tube, and a side vertical plate is arranged on the top connecting plate.
3. The modular test reactor according to claim 2, characterized in that: An assembly space is arranged between the side upright plate and the central connecting plate, an intermediate support rod is welded in the assembly space, and a threaded hole is arranged on the intermediate support rod.
4. The modular test reactor according to claim 3, characterized in that: The top connecting plate is provided with a hoisting component, which is a hoisting platform, and a hoisting ring is welded on the hoisting platform.