Gas pipeline hot melting connection conveying device

By designing a hot melt connection conveying device for gas pipelines, the push and pulling movement of the pipeline is achieved using zigzag steel plates and rollers, the problem of two people in the prior art is solved, and a single person is able to quickly construct and reduce labor The effect of investment.

CN222097057UActive Publication Date: 2024-12-03THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420485569.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2024-12-03
Estimated Expiration
2034-03-13

AI Technical Summary

Technical Problem

During the hot melt connection process, two people need to assist in the handling of the outdoor 200mmPE gas pipeline, resulting in large labor investment and low work efficiency, which affects the construction progress.

Method used

A hot melt connection and conveying device for gas pipelines is designed, including zigzag steel plates, rollers, galvanized screws and channel steel. The push and pull movement of the pipeline is realized through the rollers and reduce manpower investment.

Benefits of technology

It has achieved rapid construction of hot melt connections of gas pipelines by a single person, reduced labor and financial investment, and improved construction efficiency and economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222097057U_ABST
    Figure CN222097057U_ABST
Patent Text Reader

Abstract

The utility model provides a hot melting connection conveying device for a gas pipeline. The hot melting connection conveying device comprises a steel plate, rollers, a galvanized lead screw and channel steel, the steel plates are cut into a sawtooth shape through a cutting machine, a plurality of clamping grooves with different heights are formed, the rolling wheel is installed between the two steel plates through the square bearing, and the galvanized lead screw is bent into a U shape and fixed to the outer sides of the steel plates to serve as a lifting handle of the conveying device. The four steel channels are welded to form a rectangular base, and the steel plates and the galvanized lead screws are welded and fixed to the base. According to the utility model, two conveying devices are arranged below each pipe section, and the push-pull movement of the pipeline can be realized through the rollers, so that the quick construction of the hot melting connection of the gas pipeline can be completed by a worker, the operation is more convenient and quick, the construction quality is ensured, the investment of labor force is reduced, the time and labor are saved, and the working efficiency is improved. And the operation is very convenient, the use cost is low, manpower and financial resources are greatly reduced, and the economic and technical benefits are remarkable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of pipeline connection, and in particular relates to a gas pipeline hot-melt connection and delivery device. Background Art

[0002] When hot-melt connection is used for outdoor 200mmPE gas pipelines, it is necessary to manually carry the pipelines to assist the hot-melt connection. Each section of the pipeline needs to be carried by two people at the same time to ensure the quality of the hot-melt connection. This construction method is relatively traditional, with high labor input and consumption, low work efficiency, and is not conducive to the construction progress of the outdoor pipeline network. In order to solve the above technical problems, the utility model designs a new type of gas pipeline hot-melt connection and delivery device. Utility Model Content

[0003] In view of the deficiencies in the prior art, the utility model provides a gas pipeline hot-melt connection and conveying device, which can quickly and conveniently realize the push-pull movement of the pipeline during the hot-melt connection process, saving time and effort.

[0004] The utility model achieves the above technical objectives through the following technical means.

[0005] A gas pipeline hot-melt connection and conveying device comprises a steel plate, a roller, a galvanized wire rod and a channel steel. The steel plate is cut into a zigzag shape by a cutting machine to form a plurality of slots of different heights for installing the roller. The roller is installed between two steel plates through a square bearing. A galvanized wire rod bent into a U shape is welded to the outside of each steel plate, and the galvanized wire rod serves as a handle for the conveying device. A plurality of channel steels are welded to each other to form a rectangular base, and the steel plate and the galvanized wire rod are welded and fixed to the base.

[0006] Furthermore, two galvanized wire rods are welded and fixed to the outer side of each steel plate, and the cross parts of the two galvanized wire rods are welded and connected.

[0007] Furthermore, the surface of the base is painted with anti-rust paint.

[0008] Furthermore, the diameter of the galvanized wire rod is 8 mm, the diameter of the roller is 100 mm, and the thickness of the steel plate is 5 mm.

[0009] The utility model has the following beneficial effects:

[0010] By using the utility model, two pipeline conveying devices are arranged under each pipe section, and the push-pull movement of the pipeline is achieved by rollers, so that the rapid construction of hot-melt connection of the gas pipeline can be completed by one operator, which is more convenient and quicker. While ensuring the construction quality, the labor input is reduced, time and effort are saved, and the operation is very convenient and the use cost is low, which greatly reduces manpower and financial resources and has significant economic and technical benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 This is a left view of the gas pipeline hot-melt connection and delivery device of the utility model;

[0012] Figure 2 This is a front view of the gas pipeline hot-melt connection and delivery device of the utility model in use;

[0013] Figure 3 It is a top view of the gas pipeline hot-melt connection and delivery device of the utility model in the use state;

[0014] In the figure: 1- steel plate; 2- roller; 3- galvanized screw rod; 4- channel steel; 5- pipe; 6- square bearing. DETAILED DESCRIPTION

[0015] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but the protection scope of the present invention is not limited thereto.

[0016] like Figure 1 As shown, the gas pipeline hot-melt connection and conveying device of the utility model comprises two steel plates 1, a roller 2, a galvanized screw rod 3, and a channel steel 4.

[0017] like Figure 1 As shown, the steel plate 1 is 5 mm thick and is cut into a sawtooth shape by a cutting machine to form a plurality of slots of different heights to meet the transportation requirements of pipelines with different diameters.

[0018] like Figures 1 to 3 As shown, the roller 2 has a diameter of 100 mm and is installed between two steel plates 1 through a square bearing 6 to ensure that the square bearing 6 does not move and the roller 2 can rotate.

[0019] like Figures 1 to 3 As shown, the galvanized wire rod 3 is bent into a U shape, and two galvanized wire rods 3 are welded and fixed on the outside of each steel plate 1, and the cross parts of the two galvanized wire rods 3 are firmly welded to each other to enhance the rigidity and prevent deformation. The galvanized wire rod 3 is used as a handle of the conveying device to facilitate the rapid transportation of the conveying device; the diameter of the galvanized wire rod 3 is 8 mm.

[0020] like Figures 1 to 3 As shown, four channel steels 4 are welded to each other to form a rectangular base, and the surface of the base is painted with anti-rust paint; the steel plate 1 and the galvanized wire rod 3 are welded and fixed to the base to form a whole; the channel steel 4 is 8# channel steel 4.

[0021] When hot-melt connection is performed on the gas pipeline, first adjust the installation height of the roller 3 according to different pipe diameters, and place the roller 3 in the slot of the steel plate 1 at different heights. Then place one end of the gas pipeline 5 above the roller 3 of the first conveying device, and push (pull) the pipeline 5 longitudinally at an angle to complete the conveying of the pipeline 5; transport it to the roller 3 of the second conveying device, and then push (pull) the pipeline 5 longitudinally horizontally to complete the conveying of the pipeline 5. Two pipe sections are placed on both sides of the welding machine, and two conveying devices are set under each pipe section. The pipeline 5 is conveyed during the hot-melt welding process by pushing (pulling) the pipeline 5 longitudinally. The conveying devices on both sides closer to the welding machine can be used as the supporting structure of the pipeline 5. The pipeline 5 can be adjusted to a suitable height by adjusting the height of the roller 3, and the height of the base of the conveying device can also be adjusted to complete the hot-melt connection of the pipeline 5.

[0022] Use a fixed hot-melt welding machine. First, clamp the two sections of the pipe with the clamps at both ends. Then, power on the hot-melt cake in the middle of the hot-melt welding machine to heat it. Then, place the two sections of the pipe towards the hot-melt cake to melt it. Then, lift up the hot-melt cake. Finally, pressurize the two sections of the pipe to connect them.

[0023] The embodiments are preferred implementations of the present invention, but the present invention is not limited to the above-mentioned implementations. Any obvious improvements, substitutions or modifications that can be made by those skilled in the art without departing from the essential content of the present invention belong to the protection scope of the present invention.

Claims

1. A gas pipeline hot-melt connection and delivery device, characterized in that: The invention comprises a steel plate (1), a roller (2), a galvanized wire rod (3), and a channel steel (4). The steel plate (1) is cut into a sawtooth shape by a cutting machine to form a plurality of slots of different heights for mounting the roller (2). The roller (2) is mounted between two steel plates (1) via a square bearing (6). A galvanized wire rod (3) bent into a U shape is welded to the outside of each steel plate (1). The galvanized wire rod (3) serves as a handle for the conveying device. A plurality of channel steels (4) are welded to each other to form a rectangular base. The steel plate (1) and the galvanized wire rod (3) are welded and fixed to the base.

2. The gas pipeline hot-melt connection and delivery device according to claim 1, characterized in that: Two galvanized wire rods (3) are welded and fixed to the outside of each steel plate (1), and the cross parts of the two galvanized wire rods (3) are welded and connected.

3. The gas pipeline hot-melt connection and delivery device according to claim 1, characterized in that: The surface of the base is painted with anti-rust paint.

4. The gas pipeline hot-melt connection and delivery device according to claim 1, characterized in that: The diameter of the galvanized wire rod (3) is 8 mm.

5. The gas pipeline hot-melt connection and delivery device according to claim 1, characterized in that: The roller (2) has a diameter of 100 mm.

6. The gas pipeline hot-melt connection and delivery device according to claim 1, characterized in that: The thickness of the steel plate (1) is 5 mm.