Traction device for laying large-caliber water conveying pipeline
By designing the traction device of the bracket, connecting rod and lifting mechanism, the weight and deviation problems in the laying of large-diameter water supply pipelines are solved, and more time-saving traction and higher quality interface connection are achieved.
Patent Information
- Application Number
- CN202420733358.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-10
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-10
AI Technical Summary
During the laying process of large-diameter water supply pipelines, due to the large weight and the center line are prone to deviation, it is difficult to artificial traction, which affects the construction quality of the interface connection.
A traction device including two brackets, connecting rods, sleeves and lifting mechanisms is designed. The water supply pipe is supported by a strap, and the lifting mechanism is used to realize the traction of the pipe, which improves the overall stability and traction convenience.
Through the design of brackets and connecting rods, the device improves the stability of the water supply pipeline, simplifies the traction process, reduces construction difficulty, and improves the accuracy and efficiency of interface connections.
Smart Images

Figure CN222099464U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipeline construction, in particular to a traction device for laying large-diameter water pipelines. Background Art
[0002] A water pipeline refers to a pipe that delivers water from a reservoir, a surge tank, or a forebay to a turbine or from a water pump to a higher place, as well as a pipe buried at the bottom of an earth-rock dam, underground, or in the open air. It can be used for irrigation, hydropower generation, urban water supply, drainage, sediment discharge, reservoir emptying, construction diversion, and flood discharge through spillways. When laying a water pipeline, the pipeline needs to be hoisted into the excavated trench for preliminary alignment and positioning. When the interface is connected, manual traction is required for precise alignment. For large-diameter water pipelines, due to the large diameter of the pipeline (often above 1600mm) and the heavy overall weight, it is difficult to rely on manual traction, and the center line of the pipeline is prone to deviation, which in turn affects the quality of the interface connection construction. Utility Model Content
[0003] The utility model aims to provide a traction device for laying a large-diameter water pipeline to solve the problems existing in the prior art.
[0004] To achieve the above-mentioned purpose, the utility model provides the following solution: The utility model provides a traction device for laying a large-diameter water pipeline, comprising:
[0005] Two brackets, two connecting rods are arranged between the two brackets, the two connecting rods are respectively located on both sides of the water pipeline, sleeves are respectively arranged on the two connecting rods, the sleeves slide relative to the connecting rods, lifting mechanisms are respectively arranged on the opposite surfaces of the two sleeves, a plurality of straps are arranged between the two lifting mechanisms, the plurality of straps are located below the water pipeline and abut against the outer wall of the bottom of the water pipeline, the two ends of the straps are respectively engaged with the two lifting mechanisms, and the straps are lifted and lowered by the two lifting mechanisms so as to support the water pipeline, and the water pipeline slides relative to the brackets through the sleeves.
[0006] Preferably, the lifting mechanism comprises:
[0007] A lifting frame, the lifting frame is fixedly connected to the side wall of the sleeve, a lifting block is arranged in the lifting frame, guide columns are fixedly connected to both sides of the lifting frame, the guide column tube passes through the lifting block and is in sliding contact with the lifting block, a threaded column is rotatably connected to the middle part of the lifting frame, the threaded column passes through the lifting block and is connected to the lifting block by threads, and the top of the threaded column passes through the lifting frame and is fixed with a rotating handle.
[0008] Preferably, a clamping hole is provided at the end of the lifting block, and clamping plates are respectively fixedly connected to both ends of the binding strap. The clamping plates pass through the clamping hole and abut against the top surface of the lifting block.
[0009] Preferably, the top surface of the sleeve is respectively provided with a strip hole, and a plurality of pulleys are rotatably connected in the two strip holes respectively, the plurality of pulleys located at the top of the sleeve are in rolling contact with the top surface of the connecting rod, and the plurality of pulleys located at the bottom of the sleeve are in rolling contact with the bottom surface of the connecting rod.
[0010] Preferably, the cross-section of the connecting rod is set to a rectangular structure, and the two opposite inner walls of the sleeve are in sliding contact with the two opposite outer walls of the connecting rod respectively.
[0011] Preferably, the support comprises:
[0012] Two support columns, the top surfaces of the two support columns are fixedly connected by an arc rod, and the bottom surface of the support frame is fixedly connected with a support foot;
[0013] The two brackets are located on the same side and the two support columns are fixedly connected by the connecting rod.
[0014] The utility model discloses the following technical effects: the two brackets provided in the utility model are connected by a connecting rod, which can improve the overall stability. When the utility model is used, the two brackets are first placed on the outside of the water pipeline, and then a plurality of straps are passed through the bottom of the water pipeline, and the two ends of the straps are respectively clamped with two lifting mechanisms, and the lifting mechanisms are driven to drive the straps to move upward, thereby supporting the water pipeline. When the sleeve is moved, the utility model can make pipeline traction more convenient and construction more time-saving and labor-saving. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 This is a schematic structural diagram of a traction device for laying a large-diameter water pipeline according to the utility model;
[0017] Figure 2 It is a schematic diagram of the structure of the binding strap in the utility model;
[0018] Among them, 1. connecting rod; 2. sleeve; 3. binding strap; 4. lifting frame; 5. lifting block; 6. guide column; 7. threaded column; 8. rotating handle; 9. clamping plate; 10. pulley; 11. supporting column; 12. arc rod; 13. supporting foot. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0021] Reference Figure 1-Figure 2 The utility model provides a traction device for laying a large-diameter water pipeline, comprising:
[0022] Two brackets, two connecting rods 1 are arranged between the two brackets, the two connecting rods 1 are respectively located on both sides of the water pipeline, sleeves 2 are respectively arranged on the two connecting rods 1, the sleeves 2 slide relative to the connecting rods 1, lifting mechanisms are respectively arranged on the opposite surfaces of the two sleeves 2, and a plurality of straps 3 are arranged between the two lifting mechanisms, the plurality of straps 3 are located below the water pipeline and abut against the outer wall of the bottom of the water pipeline, the two ends of the straps 3 are respectively clamped with the two lifting mechanisms, and the straps 3 are lifted and lowered by the two lifting mechanisms, so that the water pipeline is supported, and the water pipeline slides relative to the bracket through the sleeves 2.
[0023] The two brackets are connected by a connecting rod 1, which can improve the overall stability. When the utility model is used, the two brackets are first placed outside the water pipe, and then a plurality of straps 3 are passed through the bottom of the water pipe, and the two ends of the straps 3 are respectively connected to the two lifting mechanisms, and the lifting mechanisms are driven to drive the straps 3 to move upward, thereby supporting the water pipe. When the sleeve 2 is moved, the utility model can make the pipe traction more convenient and the construction more time-saving and labor-saving.
[0024] To further optimize the solution, the lifting mechanism includes:
[0025] The lifting frame 4 is fixedly connected to the side wall of the sleeve 2. A lifting block 5 is arranged in the lifting frame 4. Guide columns 6 are fixedly connected to both sides of the lifting frame 4. The guide column 6 tube passes through the lifting block 5 and is in sliding contact with the lifting block 5. The middle part of the lifting frame 4 is rotatably connected with a threaded column 7. The threaded column 7 passes through the lifting block 5 and is connected to the lifting block 5 by threads. The top of the threaded column 7 passes through the lifting frame 4 and is fixed with a rotating handle 8.
[0026] According to a further optimized solution, a clamping hole is provided at the end of the lifting block 5 , and clamping plates 9 are respectively fixed to both ends of the binding belt 3 . The clamping plates 9 pass through the clamping hole and abut against the top surface of the lifting block 5 .
[0027] The clamping plates 9 are fixedly connected to both ends of the binding belt 3, which not only facilitates driving the clamping plates 9 to pass through the bottom of the water pipe and the strip hole, but also enables clamping with the top opening of the strip hole after passing through the strip hole.
[0028] A further optimized solution is that the top surface of the sleeve 2 is respectively provided with strip holes, and a plurality of pulleys 10 are rotatably connected in the two strip holes. The plurality of pulleys 10 located at the top of the sleeve 2 are in rolling contact with the top surface of the connecting rod 1, and the plurality of pulleys 10 located at the bottom of the sleeve 2 are in rolling contact with the bottom surface of the connecting rod 1.
[0029] By providing the pulley 10, the lateral movement of the sleeve 2 is smoother and more labor-saving.
[0030] According to a further optimized solution, the cross section of the connecting rod 1 is set to a rectangular structure, and the two opposite inner walls of the sleeve 2 are in sliding contact with the two opposite outer walls of the connecting rod 1 respectively.
[0031] To further optimize the solution, the bracket includes:
[0032] Two support columns 11, the top surfaces of the two support columns 11 are fixedly connected by an arc rod 12, and the bottom surface of the support frame is fixedly connected with a support foot 13;
[0033] The two brackets are located on the same side and the two support columns 11 are fixedly connected by a connecting rod 1 .
[0034] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0035] The embodiments described above are only descriptions of the preferred methods of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should fall within the protection scope determined by the claims of the present invention.
Claims
1. A traction device for laying large-diameter water pipelines, It is characterized in that include: Two brackets, two connecting rods (1) are arranged between the two brackets, the two connecting rods (1) are respectively located on both sides of the water pipeline, sleeves (2) are respectively arranged on the two connecting rods (1), the sleeves (2) slide relative to the connecting rods (1), lifting mechanisms are respectively arranged on the opposite surfaces of the two sleeves (2), a plurality of straps (3) are arranged between the two lifting mechanisms, the plurality of straps (3) are located below the water pipeline and abut against the outer wall of the bottom of the water pipeline, the two ends of the straps (3) are respectively engaged with the two lifting mechanisms, and the straps (3) are lifted and lowered by the two lifting mechanisms so as to support the water pipeline, and the water pipeline slides relative to the bracket through the sleeves (2).
2. A traction device for laying a large-diameter water pipeline according to claim 1, It is characterized in that The lifting mechanism comprises: A lifting frame (4) is fixedly connected to the side wall of the sleeve (2); a lifting block (5) is arranged in the lifting frame (4); guide columns (6) are fixedly connected to both sides of the lifting frame (4); the guide columns (6) pass through the lifting block (5) and are in sliding contact with the lifting block (5); a threaded column (7) is rotatably connected to the middle of the lifting frame (4); the threaded column (7) passes through the lifting block (5) and is connected to the lifting block (5) by threads; the top of the threaded column (7) passes through the lifting frame (4) and is fixedly connected to a rotating handle (8).
3. A traction device for laying a large-diameter water pipeline according to claim 2, Features: A clamping hole is provided at the end of the lifting block (5), and clamping plates (9) are respectively fixedly connected to the two ends of the binding belt (3). The clamping plates (9) pass through the clamping hole and abut against the top surface of the lifting block (5).
4. A traction device for laying a large-diameter water pipeline according to claim 1, Features: The top surface of the sleeve (2) is respectively provided with strip holes, and a plurality of pulleys (10) are rotatably connected in the two strip holes. The plurality of pulleys (10) located at the top of the sleeve (2) are in rolling contact with the top surface of the connecting rod (1), and the plurality of pulleys (10) located at the bottom of the sleeve (2) are in rolling contact with the bottom surface of the connecting rod (1).
5. A traction device for laying a large-diameter water pipeline according to claim 4, Features: The cross section of the connecting rod (1) is arranged to be a rectangular structure, and the two opposite inner walls of the sleeve (2) are in sliding contact with the two opposite outer walls of the connecting rod (1) respectively.
6. A traction device for laying a large-diameter water pipeline according to claim 1, It is characterized in that The support comprises: Two support columns (11), the top surfaces of the two support columns (11) are fixedly connected via an arc-shaped rod (12), and the bottom surfaces of the support columns are fixedly connected with support feet (13); The two brackets are located on the same side and the two support columns (11) are fixedly connected via the connecting rod (1).