Hanging basket device and engineering trolley
By designing a hanging basket device with articulated bracket assembly and telescopic mechanism, the problem of difficulty in retracting and releasing the ceiling in the prior art is solved, the automatic operation of the ceiling is realized, safety and operation efficiency are improved, and various operation needs are adapted to.
Patent Information
- Application Number
- CN202420908911.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-28
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-28
AI Technical Summary
It is difficult for existing hanging basket mechanisms to collect and place the ceiling according to operating needs, and there are safety risks when disassembling in high altitude environments.
A hanging basket device is designed, including a hinged bracket assembly and a telescopic mechanism, and the second support frame and ceiling are driven to rotate simultaneously by the telescopic mechanism, thereby realizing automatic retraction and release of the ceiling, avoiding visual obstruction, and automatically unfolding when needed.
It realizes the convenience, safety and automation of the ceiling, improves operational efficiency, and adapts to different operating needs.
Smart Images

Figure CN222099503U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of engineering machinery, and in particular to a hanging basket device and an engineering trolley. Background Art
[0002] The hanging basket is a commonly used mechanism on the tunnel construction trolley. It can be used for arch erection construction of the arch frame trolley, charging of rock drilling trolleys, anchor bolting construction, etc.
[0003] Existing hanging basket mechanisms often need to be provided with a protective ceiling. Sometimes the ceiling is not needed. At this time, in order to avoid the problem of the ceiling interfering with the line of sight, it is troublesome to fold or remove the ceiling, and there are safety hazards in dismantling the ceiling at high altitudes. Therefore, the existing hanging basket mechanism has the disadvantage that it is difficult to fold and unfold the ceiling according to the work requirements. Utility Model Content
[0004] The main purpose of the present application is to provide a hanging basket device and an engineering trolley, aiming to solve the technical problem that the existing hanging basket mechanism is difficult to retract and extend the ceiling according to the operation requirements.
[0005] To achieve the above-mentioned objectives, the present application provides a hanging basket device, including a load-bearing platform, a support assembly, a ceiling, a flipping assembly and a telescopic mechanism, the support assembly including a first support frame, the first support frame being arranged on one side of the load-bearing platform, the top of the first support frame being hinged to a second support frame, the ceiling being connected to the top of the second support frame, the flipping assembly being hinged to the first support frame and the second support frame at the same time on a side away from the load-bearing platform, the telescopic mechanism being located on one side of the first support frame, the top of the telescopic mechanism being hinged to the flipping assembly, and the telescopic mechanism being used to rotate the flipping assembly to drive the second support frame to rotate.
[0006] Optionally, the flip assembly includes a first connecting frame, a second connecting frame and a first hinge axis, the first connecting frame is hinged to one side of the first support frame, the second connecting frame is hinged to one side of the second support frame, the first hinge axis is movably connected to the other end of the first connecting frame and the second connecting frame, and the top telescopic end of the telescopic mechanism is hinged to the first hinge axis.
[0007] Optionally, a top telescopic end of the telescopic mechanism is connected with a connecting sleeve, the connecting sleeve is movably sleeved on the first hinge shaft, and the bottom of the telescopic mechanism is hinged on the bearing platform or the first support frame.
[0008] Optionally, the first connecting frame includes a second hinge shaft and two first connecting rods, the second hinge shaft is movably connected to the first support frame, one end of the two first connecting rods are movably mounted on the second hinge shaft, and the other ends of the two first connecting rods are movably mounted on the first hinge shaft.
[0009] Optionally, the second connecting frame includes a third hinge shaft and two second connecting rods, the third hinge shaft is movably connected to the second support frame, one end of the two second connecting rods are movably mounted on the third hinge shaft, and the other ends of the two second connecting rods are movably mounted on the first hinge shaft.
[0010] Optionally, the second support frame includes a flip frame and a connecting ear, one end of the flip frame is hinged to the first support frame, the other end of the flip frame is connected to the ceiling, the connecting ear is connected to the side of the flip frame away from the bearing platform, and the third hinge axis movably passes through the connecting ear.
[0011] Optionally, a fourth hinge axis movably passes through the first support frame and the second support frame.
[0012] Optionally, the fourth hinge shaft has the same structure as the third hinge shaft, and the fourth hinge shaft includes a rotating shaft and a limit head. A mounting hole is opened at one end of the rotating shaft, and the mounting hole is used to install the limit member. The limit head is connected to the other end of the rotating shaft, and the diameter of the limit head is larger than the diameter of the rotating shaft.
[0013] Optionally, the structures of the first hinge shaft and the second hinge shaft are the same as the structure of the fourth hinge shaft.
[0014] Optionally, the bearing platform includes a bearing plate and a guardrail, the first support frame is connected to the bearing plate, the telescopic mechanism is hinged to the bearing plate, and the guardrail is arranged around the bearing plate.
[0015] An engineering trolley comprises the above-mentioned hanging basket device.
[0016] The beneficial effects that this application can achieve are as follows:
[0017] The present application designs the bracket assembly into a first support frame and a second support frame that are hinged to each other, so that the first support frame and the second support frame form a foldable structure. Therefore, under the telescopic action of the telescopic mechanism, the flip assembly can be driven to move, thereby driving the second support frame and the ceiling to rotate synchronously, so that the ceiling is flipped to the side away from the area above the load-bearing platform, avoiding obstruction of the line of sight above the load-bearing platform, thereby achieving temporary folding of the ceiling. When it needs to be unfolded, the telescopic mechanism drives the flip assembly to flip the second support frame to a vertical state. The folding and unfolding process of the ceiling is all automated and does not require manual operation. Therefore, the ceiling can be conveniently folded and unfolded according to operational requirements, with high operating efficiency and high safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the specific embodiments of the present application or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the prior art description. In all drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn according to the actual scale.
[0019] Figure 1 This is a structural schematic diagram of a hanging basket device in an embodiment of the present application (when unfolded);
[0020] Figure 2 This is a schematic diagram of the structure of another state of a hanging basket device in an embodiment of the present application (when folded);
[0021] Figure 3 For the corresponding Figure 2 A structural diagram of the main view;
[0022] Figure 4 It is a schematic diagram of the structure of the flip assembly in the embodiment of the present application;
[0023] Figure 5 This is a schematic diagram of the connection structure between the second support frame and the ceiling in the embodiment of the present application;
[0024] Figure 6 It is a schematic structural diagram of the fourth hinge axis in the embodiment of the present application.
[0025] Reference numerals:
[0026] 100-bearing platform, 110-bearing plate, 120-guardrail, 200-bracket assembly, 210-first supporting frame, 220-second supporting frame, 221-flip frame, 222-connecting ear, 300-ceiling, 400-flip assembly, 410-first connecting frame, 411-second hinge axis, 412-first connecting rod, 420-second connecting frame, 421-third hinge axis, 422-second connecting rod, 430-first hinge axis, 500-telescopic mechanism, 600-connecting sleeve, 700-fourth hinge axis, 710-rotating axis, 711-mounting hole, 720-limiting head.
[0027] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0029] It should be noted that all directional indications in the embodiments of the present application (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.
[0030] In this application, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0031] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present application, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in the field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by this application.
[0032] Example 1
[0033] Reference Figure 1-Figure 6 The present embodiment provides a hanging basket device, including a load-bearing platform 100, a support assembly 200, a ceiling 300, a flip assembly 400 and a telescopic mechanism 500. The support assembly 200 includes a first support frame 210, the first support frame 210 is arranged on one side of the load-bearing platform 100, the top of the first support frame 210 is hinged with a second support frame 220, the ceiling 300 is connected to the top of the second support frame 220, the flip assembly 400 is hinged to the first support frame 210 and the second support frame 220 away from the load-bearing platform 100 at the same time, the telescopic mechanism 500 is located on one side of the first support frame 210, the top of the telescopic mechanism 500 is hinged to the flip assembly 400, and the telescopic mechanism 500 is used to rotate the flip assembly 400 to drive the second support frame 220 to rotate.
[0034] In this embodiment, the support assembly 200 is designed to be a first support frame 210 and a second support frame 220 that are hinged to each other, so that the first support frame 210 and the second support frame 220 form a foldable structure. Therefore, under the telescopic action of the telescopic mechanism 500, the flip assembly 400 can be driven to move, thereby driving the second support frame 220 and the ceiling 300 to rotate synchronously, so that the ceiling 300 is flipped to the side away from the area above the load-bearing platform 100, avoiding obstruction of the line of sight above the load-bearing platform 100, thereby realizing temporary folding of the ceiling 300. When it needs to be unfolded, the telescopic mechanism 500 drives the flip assembly 400 to flip the second support frame 220 to a vertical state. The folding and unfolding process of the ceiling 300 is all automated and does not require manual operation. Therefore, the ceiling 300 can be conveniently folded and unfolded according to operational requirements, with high operating efficiency and high safety.
[0035] As an optional embodiment, the flip assembly 400 includes a first connecting frame 410, a second connecting frame 420 and a first hinge shaft 430. The first connecting frame 410 is hinged to one side of the first support frame 210, the second connecting frame 420 is hinged to one side of the second support frame 220, and the first hinge shaft 430 is movably connected to the other end of the first connecting frame 410 and the second connecting frame 420 at the same time. The top telescopic end of the telescopic mechanism 500 is hinged to the first hinge shaft 430.
[0036] In this embodiment, when the roof 300 needs to be folded and folded, the telescopic mechanism 500 contracts to drive the first connecting frame 410 to rotate around one side of the first support frame 210. At the same time, the telescopic mechanism 500 pulls the first hinge shaft 430, so that the second connecting frame 420 also rotates accordingly. The second connecting frame 420 can pull the second support frame 220 to rotate, thereby realizing the transmission function of the flip assembly 400. The structure is simple and the assembly difficulty is low.
[0037] As an optional embodiment, the top telescopic end of the telescopic mechanism 500 is connected to a connecting sleeve 600, and the connecting sleeve 600 is movably mounted on the first hinge shaft 430. The bottom of the telescopic mechanism 500 is hinged to the supporting platform 100 or the first support frame 210, so that the relative rotation between the end of the telescopic mechanism 500 and the first hinge shaft 430 is coordinated by the connecting sleeve 600. Here, the connecting sleeve 600 can adopt a ball bearing. When the telescopic mechanism 500 is extended and retracted, it can rotate adaptively to cooperate with the movement trajectory of the flip assembly 400.
[0038] It should be noted that the telescopic mechanism 500 here can adopt a telescopic cylinder, a telescopic oil cylinder or an electric push rod, and can also adopt other devices that can realize automatic telescopic effect.
[0039] As an optional embodiment, the first connecting frame 410 includes a second hinge shaft 411 and two first connecting rods 412, the second hinge shaft 411 is movably connected to the first support frame 210, one end of the two first connecting rods 412 are movably mounted on the second hinge shaft 411, and the other ends of the two first connecting rods 412 are movably mounted on the first hinge shaft 430.
[0040] In this embodiment, when the first connecting frame 410 rotates, it can rotate around the second hinge shaft 411 through the first connecting rod 412. The first connecting rod 412 and the second hinge shaft 411 play both a rotation cooperation role and a supporting role.
[0041] As an optional embodiment, the second connecting frame 420 includes a third hinge shaft 421 and two second connecting rods 422. The third hinge shaft 421 is movably connected to the second support frame 220, one end of the two second connecting rods 422 is movably mounted on the third hinge shaft 421, and the other ends of the two second connecting rods 422 are movably mounted on the first hinge shaft 430.
[0042] In this embodiment, similarly, when the second connecting frame 420 rotates, one end of the second connecting rod 422 can rotate around the third hinge shaft 421, and the other end of the second connecting rod 422 can rotate around the first hinge shaft 430, thereby cooperating with the rotation of the first connecting frame 410, and at the same time generating a pulling force or a pushing force on the second supporting frame 220 to retract or unfold the ceiling 300. The structural design is ingenious and meets the compactness requirements.
[0043] As an optional embodiment, the second support frame 220 includes a flip frame 221 and a connecting ear 222, one end of the flip frame 221 is hinged to the first support frame 210, the other end of the flip frame 221 is connected to the ceiling 300, the connecting ear 222 is connected to the side of the flip frame 221 away from the supporting platform 100, and the third hinge axis 421 movably passes through the connecting ear 222.
[0044] In this embodiment, the connecting ear 222 allows a certain distance between the hinged position of the second connecting rod 422 and the flip frame 221, thereby leaving a certain rotation space, and the structural design is reasonable and easy to assemble.
[0045] As an optional implementation, a fourth hinge shaft 700 movably passes through the first support frame 210 and the second support frame 220 , and the first support frame 210 and the second support frame 220 can be hinged via the fourth hinge shaft 700 .
[0046] As an optional embodiment, the fourth hinge shaft 700 has the same structure as the third hinge shaft 421, and the fourth hinge shaft 700 includes a rotating shaft 710 and a limit head 720. A mounting hole 711 is opened at one end of the rotating shaft 710, and the mounting hole 711 is used to install a limit member (not shown in the figure). The limit head 720 is connected to the other end of the rotating shaft 710, and the diameter of the limit head 720 is larger than the diameter of the rotating shaft 710.
[0047] In this embodiment, the fourth hinge shaft 700 can play a limiting role through the limit heads 720 and the limit members on both sides to prevent the fourth hinge shaft 700 from falling out during the rotation process. Here, the limit member can be removed from the mounting hole 711, so that the rotating shaft 710 can be pulled out from the other side to achieve a detachable effect, and the connection between the first support frame 210 and the second support frame 220 can be released. Similarly, the third hinge shaft 421 can also be removed and removed to release the connection between the second connecting rod 422 and the second support frame 220. Therefore, the second support frame 220 can be removed separately, that is, the ceiling 300 can be removed separately, which is suitable for the situation where the ceiling 300 is not used for a long time. It is more flexible to use. When it needs to be used, the ceiling 300 and the second support frame 220 can be assembled back as a whole, and the assembly is convenient and quick.
[0048] It should be noted that the limiting member here may be a bolt or a pin, and the limiting member is installed on the rotating shaft 710 radially toward the rotating shaft 710 to ensure the limiting effect.
[0049] As an optional embodiment, the structures of the first hinge shaft 430 and the second hinge shaft 411 are the same as the structure of the fourth hinge shaft 700. Similarly, the first hinge shaft 430 and the second hinge shaft 411 are both detachable structures, that is, the first connecting rod 412 and the second connecting rod 422 can be removed separately for easy assembly.
[0050] As an optional embodiment, the carrying platform 100 includes a carrying plate 110 and a guardrail 120, the first support frame 210 is connected to the carrying plate 110, the telescopic mechanism 500 is hinged to the carrying plate 110, and the guardrail 120 is arranged around the carrying plate 110. The carrying plate 110 is used to carry staff, and the guardrail 120 plays a protective role.
[0051] Example 2
[0052] The present embodiment provides an engineering trolley, comprising the above-mentioned hanging basket device. The engineering trolley in the present embodiment is based on the hanging basket device and the engineering trolley described in Example 1. The ceiling can be flexibly folded and unfolded according to construction scenarios such as arch construction, drilling trolley charging, and anchor construction, so as to adapt to more usage scenarios and improve versatility.
[0053] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A hanging basket device, characterized in that: include: Carrying platform; A support assembly, the support assembly comprising a first support frame, the first support frame is arranged on one side of the carrying platform, and a second support frame is hinged on the top of the first support frame; A ceiling connected to the top of the second support frame; A flip assembly, the flip assembly being hinged to the first support frame and the second support frame at a side away from the carrying platform; A telescopic mechanism, the telescopic mechanism is located on one side of the first support frame, the top of the telescopic mechanism is hinged to the flip assembly, and the telescopic mechanism is used to rotate the flip assembly to drive the second support frame to rotate.
2. A hanging basket device as claimed in claim 1, characterized in that: The flip assembly comprises: A first connecting frame, wherein the first connecting frame is hinged to one side of the first supporting frame; A second connecting frame, wherein the second connecting frame is hinged to one side of the second supporting frame; A first hinge shaft, wherein the first hinge shaft is movably connected to the first connecting frame and the other end of the second connecting frame at the same time, and the top telescopic end of the telescopic mechanism is hinged on the first hinge shaft.
3. A hanging basket device as claimed in claim 2, characterized in that: The top telescopic end of the telescopic mechanism is connected with a connecting sleeve, and the connecting sleeve is movably sleeved on the first hinge shaft. The bottom of the telescopic mechanism is hinged on the bearing platform or the first support frame.
4. A hanging basket device as claimed in claim 2, characterized in that: The first connecting frame comprises: a second hinge shaft, the second hinge shaft being movably connected to the first support frame; Two first connecting rods, one end of the two first connecting rods is movably sleeved on the second hinge shaft, and the other end of the two first connecting rods is movably sleeved on the first hinge shaft.
5. A hanging basket device as claimed in claim 4, characterized in that: The second connecting frame comprises: a third hinge shaft, the third hinge shaft being movably connected to the second support frame; Two second connecting rods, one end of the two second connecting rods is movably sleeved on the third hinge shaft, and the other end of the two second connecting rods is movably sleeved on the first hinge shaft.
6. A hanging basket device as claimed in claim 5, characterized in that: The second support frame comprises: A turning frame, one end of which is hinged to the first supporting frame, and the other end of which is connected to the ceiling; A connecting ear is connected to a side of the flip frame away from the carrying platform, and the third hinge shaft movably passes through the connecting ear.
7. A hanging basket device as claimed in claim 5 or 6, characterized in that: A fourth hinge shaft movably passes through the first supporting frame and the second supporting frame.
8. A hanging basket device as claimed in claim 7, characterized in that: The fourth hinge shaft has the same structure as the third hinge shaft, and the fourth hinge shaft includes: A rotating shaft, one end of which is provided with a mounting hole, and the mounting hole is used for mounting a limiting member; A limit head is connected to the other end of the rotating shaft, and a diameter of the limit head is larger than a diameter of the rotating shaft.
9. A hanging basket device as claimed in claim 8, characterized in that: The structures of the first hinge shaft and the second hinge shaft are the same as the structure of the fourth hinge shaft.
10. An engineering trolley, characterized in that: It comprises a hanging basket device as described in any one of claims 1-9.