Box girder vertical prestressed pipeline grouting device
By setting up a stop valve and galvanized steel pipe in the vertical prestressed pipeline grouting device of the box beam, combining the steel pipe sleeve and spiral rib structure, the problem of grouting in the existing technology is solved, and more efficient construction and The longer-life grouting equipment improves the durability of the bridge structure.
Patent Information
- Application Number
- CN202420549080.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-20
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-20
AI Technical Summary
In the construction of large span bridges, the existing prestressed pipeline grouting device is prone to cause slurry to flow out after the grouting is finished, resulting in the problem of untightening grouting and affecting the durability of the bridge structure.
Design a box beam vertical prestressed pipeline grouting device. By setting a stop valve between the grouting pipe and the grouting hose, combining the galvanized steel pipe and steel pipe sleeve structure, the grouting is ensured to be compact and added through the spiral ribs. Friction resistance to prevent damage to the rebar.
It effectively reduces the slurry flows out after the grouting is finished, reduces material losses, shortens construction time, and improves the service life of the grouting pipes and exhaust pipes, improves the construction efficiency and durability of the bridge structure.
Smart Images

Figure CN222100628U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of grouting equipment, and in particular to a grouting device for vertical prestressed pipes of box girders. Background Art
[0002] At present, in the construction process of long-span bridges, vertical fine-rolled threaded steel bars are usually set on the web of the box girder as prestressed tendons to ensure the safety of the bridge structure. However, due to the large number of prestressed holes in the bridge, the quality of grouting often affects the durability of the bridge structure. Therefore, it is necessary to adopt a reliable and simple vertical prestressed hole grouting technology to increase the construction speed and ensure the durability of the bridge structure.
[0003] In the related art, a prestressed pipe grouting device is disclosed, including a bellows, one side of the bellows is connected to a grouting nozzle, the end of the grouting nozzle away from the bellows is arranged outside the box girder, and grouting is performed toward the bellows through the grouting nozzle.
[0004] In actual production work, when the above-mentioned prestressed pipe grouting device is used and grouting through the grouting nozzle is stopped after grouting is completed, a part of the slurry will flow out of the grouting pipe through the grouting nozzle, which will lead to the problem of loose grouting. Utility Model Content
[0005] In order to improve the problem that part of the slurry flows out through the grouting nozzle after the grouting is completed, resulting in loose grouting, the present application provides a box girder vertical prestressed pipe grouting device.
[0006] The present application provides a box girder vertical prestressed pipe grouting device, which adopts the following technical solution:
[0007] A box girder vertical prestressed pipe grouting device comprises a corrugated pipe, threaded steel bars, a grouting pipe and an exhaust pipe, wherein the threaded steel bars are inserted into the corrugated pipe, one end of the grouting pipe is connected to the lower side of the corrugated pipe, one end of the exhaust pipe is connected to the upper side of the corrugated pipe, the other side of the grouting pipe is connected to a grouting hose, and a stop valve is connected between the grouting pipe and the grouting hose.
[0008] By adopting the above technical solution, a stop valve is set between the grouting pipe and the grouting hose. The stop valve can effectively reduce the occurrence of slurry flowing out of the grouting port after the grouting is completed, thereby reducing material loss. At the same time, after the grouting is completed, the grouting hose can be cut off, shortening the construction time.
[0009] Preferably, the grouting pipe is a galvanized steel pipe.
[0010] By adopting the above technical solution, the galvanized steel pipe has excellent high temperature resistance and is not easily damaged by welding slag, thereby improving the service life of the grouting pipe.
[0011] Preferably, a first anchor plate and a second anchor plate are respectively provided at both ends of the corrugated pipe, a first steel pipe sleeve is provided on a side of the first anchor plate close to the corrugated pipe, and the first steel pipe sleeve is sleeved on the threaded steel bar;
[0012] A second steel pipe sleeve is provided on a side of the second anchor plate close to the corrugated pipe, and the second steel pipe sleeve is sleeved on the threaded steel bar;
[0013] The first steel pipe sleeve and the second steel pipe sleeve are both arranged between the corrugated pipe and the threaded steel bar.
[0014] By adopting the above technical solution, during the construction process, the first steel pipe sleeve and the second steel pipe sleeve can effectively reduce the influence of high-temperature welding slag on the tail of the threaded steel bar.
[0015] Preferably, the first steel pipe sleeve is welded to the first anchor plate, and an end of the first steel pipe sleeve away from the first anchor plate is provided with an opening;
[0016] The second steel pipe sleeve is welded to the second anchor plate, and an opening is provided at one end of the second steel pipe sleeve away from the second anchor plate.
[0017] By adopting the above technical solution, the first steel pipe sleeve and the second steel pipe sleeve can increase the friction resistance in the concrete by welding, so that the threaded steel bar is not easily broken. At the same time, an opening is opened on the steel sleeve, and the slurry enters the steel sleeve through the opening, which effectively improves the grouting effect.
[0018] Preferably, one end of the grouting pipe passes through the corrugated pipe and is welded to one side of the first steel pipe sleeve, and the grouting pipe is connected to the first steel pipe sleeve.
[0019] By adopting the above technical solution, direct welding of the grouting pipe to the corrugated pipe is avoided, and grouting can be performed from the inside of the first steel casing first, avoiding the problem of looseness caused by grouting from the outside of the first steel casing first.
[0020] Preferably, one end of the exhaust pipe passes through the corrugated pipe and is welded to one side of the second steel pipe sleeve, and the exhaust pipe is communicated with the second steel pipe sleeve.
[0021] By adopting the above technical solution, direct welding of the exhaust pipe to the bellows is avoided, and at the same time it can ensure that the second steel casing is filled before being discharged from the exhaust pipe, further improving the density of the grouting.
[0022] Preferably, the exhaust pipe is a galvanized steel pipe.
[0023] By adopting the above technical solution, the galvanized steel pipe has excellent high temperature resistance and is not easily damaged by welding slag, thereby increasing the service life of the exhaust pipe.
[0024] Preferably, a first spiral rib is welded on a side of the first anchor plate close to the corrugated tube, and a second spiral rib is welded on a side of the second anchor plate close to the corrugated tube. Both the first spiral rib and the second spiral rib are sleeved outside the corrugated tube.
[0025] By adopting the above technical solution, during tensioning, the first spiral reinforcement and the second spiral reinforcement can convert the tension into elastic potential energy, thereby reducing the occurrence of the threaded steel bar being damaged.
[0026] In summary, this application includes the following beneficial technical effects:
[0027] 1. By setting a stop valve between the grouting pipe and the grouting hose, the stop valve can effectively reduce the occurrence of slurry flowing out of the grouting port after the grouting is completed, reducing material loss. At the same time, after the grouting is completed, the grouting hose can be cut off, shortening the construction time. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 This is a schematic diagram mainly showing the overall structure of the grouting device in this embodiment.
[0029] Figure numerals: 1. threaded steel bar; 2. corrugated pipe; 3. grouting pipe; 4. grouting hose; 5. stop valve; 6. first anchor plate; 7. second anchor plate; 8. first steel pipe sleeve; 9. second steel pipe sleeve; 10. exhaust pipe; 11. first spiral rib; 12. second spiral rib. DETAILED DESCRIPTION
[0030] The present application is further described in detail below in conjunction with the accompanying drawings.
[0031] An embodiment of the present application discloses a box girder vertical prestressed pipe grouting device.
[0032] Reference Figure 1 The vertical prestressed pipe grouting device of the box girder includes a threaded steel bar 1 and a corrugated pipe 2. The two ends of the corrugated pipe 2 are respectively fixedly connected with a first anchor plate 6 and a second anchor plate 7. A first steel pipe sleeve 8 is welded to the side of the first anchor plate 6 close to the corrugated pipe 2. A grouting pipe 3 is welded to the outer surface of the first steel pipe sleeve 8, and the grouting pipe 3 is connected to the first steel pipe sleeve 8. A grouting hose is connected to the end of the grouting pipe 3 away from the first steel pipe sleeve 8, and a stop valve 5 is provided between the grouting hose and the grouting pipe 3.
[0033] In this embodiment, the stop valve 5 can be a micro stop valve, which can be better arranged between the grouting hose and the grouting pipe 3.
[0034] Reference Figure 1A second steel pipe sleeve 9 is welded to the side of the second anchor plate 7 close to the corrugated pipe 2, an exhaust pipe 10 is welded to the outer surface of the second steel pipe sleeve 9, and the exhaust pipe 10 is connected to the second steel pipe sleeve 9, and an exhaust hose is connected to the end of the exhaust pipe 10 away from the second steel pipe sleeve 9.
[0035] Reference Figure 1 The exhaust pipe 10 and the grouting pipe 3 are both galvanized steel pipes, which have good high temperature resistance and are not easily damaged by welding slag, thereby improving the service life of the exhaust pipe 10 and the grouting pipe 3.
[0036] Reference Figure 1 The first steel pipe sleeve 8 and the second steel pipe sleeve 9 are both located between the corrugated pipe 2 and the threaded steel bar 1. The first spiral rib 11 is welded to the side of the first anchor plate 6 close to the first steel pipe sleeve 8, and the second spiral rib 12 is welded to the side of the second anchor plate 7 close to the second steel pipe sleeve 9. The first spiral rib 11 and the second spiral rib 12 are both sleeved outside the corrugated pipe 2. During tensioning, the first spiral rib 11 and the second spiral rib 12 can convert the tension into elastic potential energy, reducing the occurrence of the threaded steel bar 1 being damaged.
[0037] The implementation principle of the grouting device for the vertical prestressed pipe of a box beam in the embodiment of the present application is as follows: during grouting, the grouting material is input into the first steel pipe sleeve 8 through the grouting hose 4, the stop valve 5 and the grouting pipe, and enters the bellows 2, and the air in the bellows 2 is discharged through the exhaust pipe 10 and the exhaust hose;
[0038] When the grouting material flows out from the upper exhaust hose, it means that the grouting material has been filled up. After the grouting is stopped, the grouting material cannot seep out from the grouting pipe 3 due to the action of the stop valve 5.
[0039] During tensioning, the first spiral tendons 11 and the second spiral tendons 12 can convert the tension into elastic potential energy, while the first steel sleeve and the second steel sleeve 9 can increase the friction resistance to prevent the vertical prestressed tendons from being damaged.
[0040] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A box girder vertical prestressed pipe grouting device, comprising a corrugated pipe (2), a threaded steel bar (1), a grouting pipe (3) and an exhaust pipe (10), wherein the threaded steel bar (1) is arranged in the corrugated pipe (2), one end of the grouting pipe (3) is connected to the lower side of the corrugated pipe (2), one end of the exhaust pipe (10) is connected to the upper side of the corrugated pipe (2), and the other side of the grouting pipe (3) is connected to a grouting hose (4), characterized in that: A stop valve (5) is connected between the grouting pipe (3) and the grouting hose (4).
2. A box girder vertical prestressed pipe grouting device according to claim 1, characterized in that: The grouting pipe (3) is a galvanized steel pipe.
3. The box girder vertical prestressed pipe grouting device according to claim 1 is characterized in that: A first anchor plate (6) and a second anchor plate (7) are respectively provided at both ends of the corrugated pipe (2); a first steel pipe sleeve (8) is provided on a side of the first anchor plate (6) close to the corrugated pipe (2); the first steel pipe sleeve (8) is sleeved on the threaded steel bar (1); A second steel pipe sleeve (9) is provided on a side of the second anchor plate (7) close to the corrugated pipe (2), and the second steel pipe sleeve (9) is sleeved on the threaded steel bar (1); The first steel pipe sleeve (8) and the second steel pipe sleeve (9) are both arranged between the corrugated pipe (2) and the threaded steel bar (1).
4. The box girder vertical prestressed pipe grouting device according to claim 3 is characterized by: The first steel pipe sleeve (8) is welded to the first anchor plate, and an opening is provided at one end of the first steel pipe sleeve (8) away from the first anchor plate; The second steel pipe sleeve (9) is welded to the second anchor plate, and an opening is provided at one end of the second steel pipe sleeve (9) away from the second anchor plate.
5. The box girder vertical prestressed pipe grouting device according to claim 4 is characterized in that: One end of the grouting pipe (3) passes through the corrugated pipe (2) and is welded to one side of the first steel pipe sleeve (8), and the grouting pipe (3) is in communication with the first steel pipe sleeve (8).
6. The box girder vertical prestressed pipe grouting device according to claim 4 is characterized in that: One end of the exhaust pipe (10) passes through the corrugated pipe (2) and is welded to one side of the second steel pipe sleeve (9), and the exhaust pipe (10) is in communication with the second steel pipe sleeve (9).
7. The box girder vertical prestressed pipe grouting device according to claim 6 is characterized by: The exhaust pipe (10) is a galvanized steel pipe.
8. The box girder vertical prestressed pipe grouting device according to claim 4 is characterized by: A first spiral rib (11) is welded to a side of the first anchor plate (6) close to the bellows (2), and a second spiral rib (12) is welded to a side of the second anchor plate (7) close to the bellows (2); the first spiral rib (11) and the second spiral rib (12) are both sleeved outside the bellows (2).