Vertical construction joint structure of stress pier wall

By adopting side-by-side slurry inlet pipes and slurry return pipes, keyways, stressed steel bars and slurry stoppers in the vertical construction joints of the pier wall, combined with the pipe extraction and hole grouting method, the pier wall in the existing technology is solved. The complexity and construction difficulties of vertical construction joint grouting methods have improved construction quality and construction period benefits.

CN222101171UActive Publication Date: 2024-12-03CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323406467.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2024-12-03
Estimated Expiration
2033-12-13

AI Technical Summary

Technical Problem

In the prior art, the grouting method of vertical construction joints of pier walls is complicated and difficult to construct, and the construction quality is not easy to ensure, resulting in delays in construction periods and impacts on power generation benefits.

Method used

A force pier including a slurry inlet and slurry return tube arranged side by side, a keyway along the length direction of the vertical construction joint, a stressed steel bar and a slurry stop sheet arranged outside the joint, and a force-receiving pier arranged in parallel. The vertical construction joint structure of the wall adopts the method of pulling out the pipe and retaining holes, which increases the reliability of the joint surface treatment.

Benefits of technology

It reduces the construction period and improves the power generation efficiency. It allows concrete on one side to be poured first and then poured on the other side after the equipment is installed, which enhances the reliability of the joint surface and applies keyway + grouting technology to pier wall structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222101171U_ABST
    Figure CN222101171U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of water conservancy and hydropower engineering, in particular to a vertical construction joint structure of a stressed pier wall, which comprises a slurry inlet pipe and a slurry return pipe which are arranged side by side, a key groove arranged along the length direction of a vertical construction joint, a stressed steel bar arranged on the periphery of the vertical construction joint, and a slurry stop sheet arranged on the stressed steel bar. Compared with the prior art, the pier wall stress structure has the advantages that the parting area of the vertical construction joints is small, a large number of steel bars are arranged on the two sides, and the requirement for joint surface treatment reliability is high. Concrete on one side can be poured firstly, concrete on the other side is poured after equipment is installed, and the equipment can be installed without waiting for all the concrete to be poured. The key groove and grouting adopted by the longitudinal joint of the gravity dam are optimized and improved, so that the longitudinal joint of the gravity dam can be applied to a stressed pier wall structure of a power station workshop, the technical adaptability is good, and the joint surface reliability is high. Therefore, the technical problems that the grouting mode of the construction joint is complex in process and difficult to construct can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy and hydropower engineering, in particular to a vertical construction joint structure of a load-bearing pier wall. Background Art

[0002] The structure size of large and medium-sized power station buildings is large, with many pier wall structures. The thickness of the pier wall structure is not large, and the load of external forces such as water pressure is large. It is often necessary to set vertical construction joints to divide the structure into multiple blocks for pouring to prevent temperature cracks in the concrete. The "Design Code for Hydropower Station Buildings" clearly states that staggered construction joints should be used. Staggered construction is simple and is used in most cases. However, staggered joints require the pier wall structure to rise synchronously in layers. The installation of electromechanical equipment often affects the pouring of the pier wall, resulting in delays in the construction period, delayed power generation time, and affected power generation benefits.

[0003] In order to solve the construction period problem, the existing technology generally adopts the method of wide groove backfilling or opening key grooves first and then grouting when pouring pier wall structures. Regarding the wide groove backfilling method, a 1-2m gap is left at the pier wall joint position, and after the concrete shrinkage on both sides stabilizes, the gap concrete is backfilled in the low temperature season. The disadvantages of wide groove backfilling are complicated procedures, difficult construction, and difficult to ensure construction quality. The method of opening key grooves first and then grouting is generally applicable to the longitudinal joints of gravity dams, that is, key grooves are set on the joint surface, and grouting equipment such as grouting plates and grouting pipes are set in the surrounding areas of the joint surface. After the joint surface shrinks, the joint surface is filled with cement slurry. However, this grouting method is mostly suitable for longitudinal construction joints, and is not suitable for vertical construction joints. Utility Model Content

[0004] The utility model aims to provide a vertical construction joint structure of a load-bearing pier wall, which can solve the technical problems of complex construction joint grouting procedures, difficult construction and difficult to ensure construction quality in the prior art.

[0005] To achieve the above-mentioned purpose, the utility model is designed to provide a vertical construction joint structure of a load-bearing pier wall, including a slurry inlet pipe and a slurry return pipe arranged side by side, a key slot arranged along the length direction of the vertical construction joint, and also includes load-bearing steel bars arranged on the periphery of the vertical construction joint, a slurry stop plate arranged on the load-bearing steel bars, and a slurry lifting hole arranged parallel to the key slot, wherein the slurry lifting hole is perpendicular to the slurry inlet pipe.

[0006] As a preferred embodiment, the stressed steel bars include horizontal steel bars and two vertical steel bars arranged side by side along the length direction of the vertical construction joint. The horizontal steel bars are vertically arranged between the two vertical steel bars, and the stop grouting plates are fixed on the vertical steel bars.

[0007] As a preferred solution, there are multiple groups of stress-bearing steel bars, and the width of the grout-stopping plate is equal to the spacing between two adjacent groups of vertical steel bars.

[0008] As a preferred solution, the width of the horizontal steel bars is less than 0.5 mm.

[0009] As a preferred solution, the thickness of the concrete surrounding the stop plate is greater than or equal to 10 cm.

[0010] As a preferred solution, it also includes a grouting groove and an exhaust groove, wherein the grouting groove is arranged on one side of the vertical construction joint, and the exhaust groove is arranged on the other side of the vertical construction joint.

[0011] As a preferred solution, the return slurry pipe includes a return slurry pipe for a lifting hole and an exhaust return slurry pipe. The return slurry pipe for a lifting hole is arranged on one side of the grouting trough, and the return slurry pipe for a lifting hole is connected to the lifting hole. The exhaust return slurry pipe is arranged on one side of the exhaust trough, and the exhaust return slurry pipe is connected to the exhaust trough.

[0012] As a preferred solution, there are multiple pulp lifting holes and key slots, and each key slot is arranged between two adjacent pulp lifting holes.

[0013] Beneficial effects of the utility model:

[0014] Compared with the prior art, the pier wall load-bearing structure of the utility model has a small vertical construction joint area, a large number of steel bars are arranged on both sides, and the reliability of the joint surface treatment is required to be high. It saves construction time and improves power generation efficiency: concrete on one side can be poured first, and concrete on the other side can be poured after the equipment is installed, without waiting for all the concrete to be poured before installing the equipment. The utility model optimizes and improves the keyway + grouting used in the longitudinal joint of the gravity dam, so that it can be applied to the pier wall structure of the power plant building, with good technical adaptability and high joint surface reliability.

[0015] Therefore, the utility model can solve the technical problems in the prior art that the construction joint grouting method has complex procedures, difficult construction, and difficult to ensure construction quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the seam surface arrangement of the longitudinal seam of the gravity dam in the prior art.

[0017] Figure 2 It is a schematic diagram of the seam surface arrangement of the present utility model.

[0018] Figure 3 for Figure 2 Schematic diagram of the longitudinal section of the seam surface.

[0019] Figure 4 for Figure 2 Schematic diagram of the cross-section of the seam surface.

[0020] Description of reference numerals:

[0021] 1. Slurry stop plate; 2. Keyway; 3. Slurry inlet pipe; 4. Slurry return pipe; 5. Exhaust groove; 6. Slurry lifting pipe; 7. Horizontal pipe; 8. Slurry outlet box; 11. Horizontal steel bars; 12. Vertical steel bars; 14. Slurry return pipe of slurry lifting hole; 15. Exhaust slurry return pipe; 16. Grouting groove; 17. Slurry lifting hole; 18. First cast block; 19. Later cast block. DETAILED DESCRIPTION

[0022] In order to make the technical problems solved by the present invention, the technical solutions adopted and the technical effects achieved clearer, the technical solutions of the present invention are further described below in conjunction with the accompanying drawings and through specific implementation methods. It is understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for the convenience of description, only the parts related to the present invention are shown in the accompanying drawings, rather than all of them.

[0023] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance. Among them, the terms "first position" and "second position" are two different positions.

[0024] Figure 1 It is a schematic diagram of the joint surface arrangement of the longitudinal joint of the gravity dam in the prior art. The method of opening the keyway first and then grouting is adopted. The joint surface is a longitudinal construction joint, and the setting direction is parallel to the grouting direction. The side of the longitudinal joint structure of the gravity dam is provided with a grouting pipe 3 and a grouting pipe 4 parallel to the construction joint, a keyway 2 is provided on the joint surface, and grouting equipment such as a grouting stop plate 1, a grouting pipe 6 and a grouting pipe are provided in the surrounding area of ​​the joint surface. A horizontal pipe 7 is provided inside the longitudinal joint along the construction joint direction, and a plurality of grouting boxes 8 are provided on the horizontal pipe 7. An exhaust groove 5 parallel to the construction joint is provided on the top of the joint surface. After the joint surface shrinks, the joint surface is filled with cement slurry.

[0025] In order to apply the longitudinal seam keyway + grouting scheme of the gravity dam to the load-bearing pier wall, the utility model proposes an improvement. The main scheme is: a grouting plate 1 is set on the outside of the load-bearing steel bar. To avoid the concrete around the grouting plate 1 from being damaged, the thickness of the concrete around the grouting plate 1 should be greater than or equal to 10 cm. The width of the grouting plate 1 is equal to the spacing between the horizontal steel bars 11, and it can be directly fixed on two adjacent groups of vertical steel bars 12.

[0026] like Figures 2 to 4As shown, the utility model provides a vertical construction joint structure of a load-bearing pier wall, including a slurry inlet pipe 3 and a slurry return pipe 4 arranged side by side, and a keyway 2 arranged along the length direction of the vertical construction joint. It also includes load-bearing steel bars arranged on the periphery of the vertical construction joint, a slurry stop plate 1 arranged on the load-bearing steel bars, and a slurry lifting hole 17 arranged parallel to the keyway 2, and the slurry lifting hole 17 is perpendicular to the slurry inlet pipe 3.

[0027] The stress-bearing steel bars include a horizontal steel bar 11 and two vertical steel bars 12 arranged side by side along the length direction of the vertical construction joint. The horizontal steel bar 11 is vertically arranged between the two vertical steel bars 12, and the stop grouting plate 1 is fixed on the vertical steel bars 12. There are multiple groups of stress-bearing steel bars, and the width of the stop grouting plate 1 is equal to the spacing between two adjacent groups of vertical steel bars 12. The width of the horizontal steel bar 11 is less than 0.5 mm. The thickness of the concrete outside the stop grouting plate 1 is greater than or equal to 10 cm.

[0028] The vertical construction joint structure of the load-bearing pier wall further includes a grouting groove 16 and an exhaust groove 5. The grouting groove 16 is arranged on one side of the vertical construction joint, and the exhaust groove 5 is arranged on the other side of the vertical construction joint.

[0029] The return slurry pipe 4 includes a return slurry pipe 14 for a slurry lifting hole and an exhaust return slurry pipe 15. The return slurry pipe 14 for a slurry lifting hole is arranged on one side of a grouting groove 16, and is communicated with the return slurry pipe 14 for a slurry lifting hole 17. The exhaust return slurry pipe 15 is arranged on one side of an exhaust groove 5, and is communicated with the exhaust groove 5.

[0030] There are multiple pulp lifting holes 17 and key slots 2 , and each key slot 2 is arranged between two adjacent pulp lifting holes 17 .

[0031] The utility model optimizes and improves the keyway + grouting method used in the original longitudinal joints of the gravity dam, so that it can be applied to the pier wall structure under stress in the power plant building. Compared with the prior art, the pier wall stress structure of the utility model adopts the method of pulling out the pipe and leaving a hole for grouting, so the vertical construction joint has a small area, a large number of steel bars are arranged on both sides, and the reliability of the seam surface treatment is required to be high. The original longitudinal joints of the gravity dam adopt the grouting box to grout from point to surface, and the utility model adopts the method of pulling out the pipe and making a hole for grouting, and grouting is carried out from line to surface, avoiding the influence of the construction on the grouting box, so the grouting effect is better. Due to the influence of the stressed steel bars passing through the seam, the width of the horizontal steel bar is less than 0.5mm, that is, the seam surface width is less than 0.5mm, and cement slurry cannot be poured, only epoxy resin can be poured.

[0032] Grouting method:

[0033] according to Figures 2 to 4Horizontal steel bars 11 and vertical steel bars 12 are arranged in the same direction, wherein the horizontal steel bars 11 are arranged on the inside and the vertical steel bars 12 are arranged on the outside, and the two are perpendicular to each other; vertical triangular key grooves 2 and stop grouting plates 1 are arranged on the seam surface, and the stop grouting plates 1 are fixedly connected to the vertical steel bars 12. Before pouring the first block 18, a semicircular wooden strip is buried in the grouting hole 17 to block the grouting hole 17, and then concrete is poured on the first block 18. After a period of time after the pouring of the first block 18 is completed, the post-cast block 19 is poured. Before pouring the post-cast block 19, the semicircular wooden strip in the grouting hole 17 is removed, and a plastic hose is embedded and inflated and pressurized. After pouring, the air is deflated and the pressure is released to separate the hose from the concrete to achieve tube pulling and hole forming. After the post-cast block 19 is poured, grouting is performed in the low temperature season after the concrete cools down. Since the force-bearing structure of the pier wall is constrained by the horizontal steel bars 11, the width of the horizontal steel bars 11 is less than 0.5 mm, and the seam opening is small, epoxy resin slurry needs to be poured.

[0034] The above-mentioned embodiments only express several implementation methods of the utility model, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the utility model, and these all belong to the protection scope of the utility model. Therefore, the protection scope of the utility model patent shall be based on the attached claims.

Claims

1. A vertical construction joint structure of a load-bearing pier wall, comprising a slurry inlet pipe (3) and a slurry return pipe (4) arranged side by side, and a keyway (2) arranged along the length direction of the vertical construction joint, characterized in that: It also includes stressed steel bars arranged on the periphery of the vertical construction joint, grout-stopping plates (1) arranged on the stressed steel bars, and grout-raising holes (17) arranged parallel to the key slots (2), wherein the grout-raising holes (17) are perpendicular to the grout-inlet pipe (3).

2. The vertical construction joint structure of the load-bearing pier wall according to claim 1, characterized in that: The stressed steel bars include a horizontal steel bar (11) and two vertical steel bars (12) arranged side by side along the length direction of the vertical construction joint; the horizontal steel bar (11) is vertically arranged between the two vertical steel bars (12); and the stop grouting sheet (1) is fixed on the vertical steel bars (12).

3. The vertical construction joint structure of the load-bearing pier wall according to claim 2, characterized in that: There are multiple groups of stress-bearing steel bars, and the width of the grout-stopping plate (1) is equal to the spacing between two adjacent groups of vertical steel bars (12).

4. The vertical construction joint structure of the load-bearing pier wall according to claim 3 is characterized in that: The width of the horizontal steel bar (11) is less than 0.5 mm.

5. The vertical construction joint structure of the load-bearing pier wall according to claim 1, characterized in that: The thickness of the concrete surrounding the stop plate (1) is greater than or equal to 10 cm.

6. The vertical construction joint structure of the load-bearing pier wall according to claim 1, characterized in that: It also comprises a grouting groove (16) and an exhaust groove (5), wherein the grouting groove (16) is arranged on one side of the vertical construction joint, and the exhaust groove (5) is arranged on the other side of the vertical construction joint.

7. The vertical construction joint structure of the load-bearing pier wall according to claim 6, characterized in that: The slurry return pipe (4) comprises a slurry return pipe (14) for a slurry lifting hole and an exhaust slurry return pipe (15); the slurry return pipe (14) for a slurry lifting hole is arranged on one side of a grouting groove (16); the slurry return pipe (14) for a slurry lifting hole is communicated with the slurry lifting hole (17); the exhaust slurry return pipe (15) is arranged on one side of an exhaust groove (5); and the exhaust slurry return pipe (15) is communicated with the exhaust groove (5).

8. The vertical construction joint structure of the load-bearing pier wall according to any one of claims 1 to 7, characterized in that: There are a plurality of pulp raising holes (17) and key slots (2), and each key slot (2) is arranged between two adjacent pulp raising holes (17).