Temporary isolation belt for bridge construction

By adopting a combined structure of water horses and unit guardrails in bridge construction, and using pin connections and retractable frames to improve the anti-overturning ability, the stability and efficiency of traditional municipal guardrails in construction are solved, and faster construction and handling are achieved The process reduces traffic congestion time.

CN222101710UActive Publication Date: 2024-12-03RAILWAY NO 5 BUREAU GRP FIRST ENG CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422610617.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-29
Publication Date
2024-12-03
Estimated Expiration
2034-10-29

AI Technical Summary

Technical Problem

Traditional municipal guardrails have problems such as poor anchoring stability, low assembly efficiency, poor connection stability and inconvenient handling in bridge construction, resulting in large construction volume, long time consumption and traffic congestion.

Method used

A temporary isolation belt for bridge construction is designed, using a combined structure of water horses and unit guardrails. It improves overturning resistance through pin connections and telescopic frames, reduces anchoring operations, enhances assembly efficiency, and simplifies the handling process by moving components.

Benefits of technology

It has achieved the reduction of construction time, improved assembly efficiency, enhanced the anti-overturning ability of the isolation belt, simplified the handling and assembly process of unit guardrails, and shortened the traffic congestion time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222101710U_ABST
    Figure CN222101710U_ABST
Patent Text Reader

Abstract

The temporary isolation belt for bridge construction comprises a water horse which is internally provided with a water injection space, and the two ends of the exterior of the water horse are each provided with a first connecting piece; each unit guardrail comprises a plurality of vertical rods arranged in the first direction, a shear type telescopic frame is connected between every two adjacent vertical rods, and the shear type telescopic frames stretch out and draw back in the first direction; the bottoms of the vertical rods are connected with supporting feet. Second connecting pieces are arranged on the vertical rods at the head ends and the tail ends of the unit guardrails correspondingly and located on the sides, away from the shear type telescopic frames, of the vertical rods. The multiple unit guardrails are arranged in the first direction, and a water horse is arranged between every two adjacent unit guardrails. The first plug pin penetrates through the first inserting hole and the second inserting hole to enable the first connecting piece to be connected with the second connecting piece. The anti-overturning capacity of the isolation belt can be ensured without anchoring with a bridge floor, the dismounting time can be shortened, the carrying is more convenient, and the efficiency is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of auxiliary facilities for bridge construction, and in particular to a temporary isolation zone for bridge construction. Background Art

[0002] Bridges are the main roads across rivers in cities. The road surface of a built bridge sometimes needs to be repaired, usually in sections, with half of the road closed with a barrier, and the other half open to traffic, to avoid completely cutting off the road. Traditional barrier strips generally use municipal guardrails, which are composed of vertical poles and guardrail rods.

[0003] During the on-site construction process, on the one hand, it is usually necessary to anchor the vertical poles to the ground to improve the stability of the municipal guardrail, thereby preventing the municipal guardrail from overturning. However, each vertical pole needs to be anchored to the ground, which increases the construction volume and takes too long. Excessive construction time will lead to prolonged bridge congestion.

[0004] On the other hand, it is also necessary to assemble the vertical poles with the guardrail rods. Conventional assembly methods are divided into plug-in and bolt-on methods. The plug-in method generally requires a rectangular socket to be reserved on the side of the vertical pole to insert the guardrail rod into the vertical pole. Since the size of the guardrail rod is fixed, a certain amount of operating space needs to be reserved when the guardrail rod is inserted into the vertical pole. Therefore, it is necessary to insert and assemble the vertical pole with the guardrail rod before anchoring the vertical pole to the ground. As a result, during the construction process, the vertical poles and guardrail rods need to be assembled in sequence according to the extension direction of the isolation belt, and the guardrail rods cannot be installed simultaneously, resulting in low assembly efficiency and long time consumption. In addition, there are usually only two plug-in nodes that are far away from each other, and the connection stability is poor. The bolt-on method requires the ends of the guardrail rods to be bolted to the vertical poles, which will also increase the construction volume and time consumption. Since the size of the guardrail rods is fixed and cannot be folded, and the length of a single section of the guardrail rods is generally long, at least two people are required to cooperate front and back during transportation, which makes the transportation process inconvenient.

[0005] In summary, traditional municipal guardrails not only require the poles to be anchored to the ground to avoid overturning, which increases the construction workload due to a large number of anchoring operations, but also have problems such as long assembly time of unit guardrails and poles, poor connection stability, and difficulty in carrying single-section guardrail rods. Therefore, it is necessary to provide a temporary isolation belt for bridge construction to improve the above problems. Utility Model Content

[0006] Based on this, it is necessary to provide a temporary isolation zone for bridge construction, and its specific technical solution is as follows.

[0007] A temporary isolation zone for bridge construction, comprising:

[0008] A water barrier, with a water injection space inside and first connecting members respectively disposed at two ends of the outside; the first connecting member comprises a plurality of first extension bodies extending in a direction away from the water barrier; the plurality of first extension bodies are arranged in a vertical direction, and a first gap is formed between adjacent first extension bodies, and each first extension body is respectively provided with a first plugging hole extending in a vertical direction and arranged coaxially; the first extension body is provided with at least two first plugging holes;

[0009] The unit guardrail comprises a plurality of vertical poles arranged in a first direction, a scissor-type telescopic frame is connected between adjacent vertical poles, and the scissor-type telescopic frame is telescopic in the first direction; a support foot is connected to the bottom of the vertical pole; a second connecting member is respectively provided on the vertical poles at the head end and the tail end of the unit guardrail, and the second connecting member is located on the side of the vertical pole away from the scissor-type telescopic frame; a plurality of unit guardrails are arranged in the first direction, and a water barrier is provided between adjacent unit guardrails; the second connecting member comprises a plurality of second extension bodies extending in a direction away from the scissor-type telescopic frame; a plurality of second extension bodies are arranged in a vertical direction, and a second gap is formed between adjacent second extension bodies, and each second extension body is respectively provided with a second gap along the vertical direction. A second plug hole extending in the direction and coaxially arranged; the first extension body is inserted into the second gap, the second extension body is inserted into the first gap, and the first plug hole is aligned with the second plug hole; the first pin passes through the first plug hole and the second plug hole to connect the first connecting member to the second connecting member; the second extension body is provided with a second plug hole corresponding to the first plug hole one by one; the support leg includes a support plate and a diagonal support plate; the support plate is connected to the bottom of the vertical pole, and the support plate extends horizontally toward the second direction, and the second direction is perpendicular to the first direction; the diagonal support plate is arranged obliquely, and one end of the diagonal support plate is connected to the end of the support plate, and the other end is connected to the vertical pole.

[0010] Furthermore, a slide groove extending in the vertical direction is provided at the end of the second extension body; a positioning plate sliding in the vertical direction is provided in the slide groove, one end of the positioning plate is connected to the bottom wall of the slide groove through a spring, and the other end extends out of the slide groove; a positioning groove for accommodating the insertion of the positioning plate is provided on the first extension body.

[0011] Furthermore, a movable assembly is provided on the side of the vertical pole; the movable assembly includes a connecting ear plate, a screw rod and a universal wheel; the connecting ear plate is connected to the vertical pole, and a threaded sleeve extending in the vertical direction is provided on the connecting ear plate; the screw rod is connected to the threaded sleeve and is connected to the universal wheel after passing through the threaded sleeve.

[0012] Furthermore, a rotating handle is provided at one end of the screw rod away from the universal wheel.

[0013] Furthermore, two groups of movable components arranged along the second direction are provided on one side of the vertical pole.

[0014] Beneficial effects: 1. The temporary isolation belt for bridge construction provided by the utility model can be installed by first moving each water barrier to the approximate position according to the unfolded length of the unit guardrail, and then moving the unit guardrail in a folded state between adjacent water barriers, and then unfolding the unit guardrail so that the first extension body is inserted into the second gap, and the second extension body is inserted into the first gap, and the water barrier and the unit guardrail are relatively fixed by the latch. The counterweight of the isolation belt is increased by the water barrier to prevent the isolation belt from overturning; by arranging support legs on the vertical poles, the support plates and the diagonal support plates improve the anti-overturning ability of the unit guardrail, thereby further improving the anti-overturning ability of the isolation belt, and there is no need to anchor the water barrier to the ground, which reduces the construction workload and shortens the construction time, thereby shortening the traffic congestion time.

[0015] 2. The utility model provides a temporary isolation zone for bridge construction. Since the unit guardrails are retractable, the position error of the water barriers can be compensated. No precise measurement is required before installation and multiple unit guardrails can be assembled synchronously, which greatly improves the assembly efficiency and shortens the assembly time.

[0016] 3. The temporary isolation zone for bridge construction provided by the utility model can be folded up before being transported during the transportation of unit guardrails, thereby reducing the size of the unit guardrails, making transportation more convenient and more efficient.

[0017] 4. The utility model provides a temporary isolation zone for bridge construction, in which the first extension body is inserted into the second gap between the water barrier and the unit guardrail, the second extension body is inserted into the first gap, and then fixed with a pin. Multiple first extension bodies and multiple second extension bodies are connected into a whole with stronger stability. It is not only easy to operate, but also can improve the stability of the connection between the unit guardrail and the water barrier. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 This is a schematic diagram of the overall structure of the temporary isolation zone;

[0020] Figure 2 It is a structural schematic diagram of the pole at the edge position;

[0021] Figure 3 is a schematic diagram of the connection between the first connecting member and the second connecting member;

[0022] Figure 4 is a partial cross-sectional view after the first connecting member is connected to the second connecting member;

[0023] Figure 5 for Figure 2 A magnified schematic diagram of the middle A area;

[0024] Figure 6 This is a schematic diagram of the structure of the middle position pole.

[0025] Description of reference numerals: 1. Water barrier; 2. Unit guardrail; 3. Mobile assembly;

[0026] 11. first connecting member; 12. first latch; 13. positioning groove; 14. guiding inclined surface;

[0027] 21. Vertical pole; 22. Scissor-type telescopic frame; 23. Support foot; 24. Second connecting piece; 25. Support plate; 26. Diagonal support plate; 27. Slide; 28. Positioning plate; 29. ​​Spring;

[0028] 31. Connecting ear plate; 32. Screw; 33. Universal wheel; 34. Threaded sleeve; 35. Turning handle. DETAILED DESCRIPTION

[0029] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.

[0030] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0031] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0032] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0033] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0034] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only implementation method.

[0035] Example

[0036] Reference Figure 1 As shown, this embodiment provides a temporary isolation zone for bridge construction, including a plurality of water barriers 1 and a plurality of unit guardrails 2. A water injection space is provided inside the water barriers 1, and first connecting members 11 are provided at both ends of the water barriers 1. By injecting water into the water barriers 1, the anti-overturning ability of the isolation zone is improved.

[0037] Specifically, refer to Figure 1 As shown, the unit guardrail 2 includes a plurality of vertical poles 21 arranged along a first direction. Specifically, the number of the vertical poles 21 can be two or three or more. A scissor-type telescopic frame 22 is connected between adjacent vertical poles 21. Specifically, the vertical poles 21 at the edge position are provided with a second connecting member 24. Figure 6As shown, the vertical pole 21 in the middle position is only connected to the scissor-type telescopic frame 22, and the second connecting member 24 is not provided. The first direction is the length direction of the temporary isolation zone. The scissor-type telescopic frame 22 is telescopic along the first direction, and the length of the unit guardrail 2 can be changed by the telescopic movement of the scissor-type telescopic frame 22. When transporting the unit guardrail 2, the unit guardrail 2 can be folded before transporting, and the unit guardrail 2 can be unfolded when assembling the isolation zone, and the unfolded length of the unit guardrail 2 can be adjusted according to the spacing between adjacent water barriers 1.

[0038] The bottom of the vertical pole 21 is connected with a support leg 23, and the vertical poles 21 at the head and tail ends of the unit guardrail 2 are respectively provided with second connecting members 24, and the second connecting member 24 is located on the side of the vertical pole 21 away from the scissor-type telescopic frame 22. The connection between the water barrier 1 and the unit guardrail 2 can be achieved by connecting the first connecting member 11 with the second connecting member 24.

[0039] In this embodiment, multiple unit guardrails 2 are arranged along a first direction, and water barriers 1 are provided between adjacent unit guardrails 2. The first connecting member 11 is connected to the second connecting member 24, so that each unit guardrail 2 is respectively connected to the water barrier 1 to form a complete temporary isolation zone. The water barrier 1 increases the counterweight of the temporary isolation zone and improves its anti-overturning ability.

[0040] When setting up the isolation zone, the unfilled water barriers 1 can be placed according to the approximate position first, the unit guardrails 2 can be moved between the adjacent water barriers 1 in a folded state, the unit guardrails 2 can be extended and connected to the water barriers 1, and then water can be injected into the water barriers 1. When the unit guardrails 2 are extended, the extended length can be adjusted according to the spacing between the adjacent water barriers 1. At the same time, the water barriers 1 can also be easily adjusted in position when they are not filled with water. Therefore, there is no need to accurately measure the spacing and position before arranging the water barriers 1, which can save a lot of time. Multiple unit guardrails 2 can be installed at the same time, which can also improve the installation efficiency and shorten the time.

[0041] Reference Figure 3As shown, the first connector 11 includes a plurality of first extension bodies extending in a direction away from the water barrier 1; the plurality of first extension bodies are arranged in a vertical direction, and a first gap is formed between adjacent first extension bodies, and each first extension body is provided with a first plug hole extending in a vertical direction and arranged coaxially; the second connector 24 includes a plurality of second extension bodies extending in a direction away from the scissor-type telescopic frame 22; the plurality of second extension bodies are arranged in a vertical direction, and a second gap is formed between adjacent second extension bodies, and each second extension body is provided with a second plug hole extending in a vertical direction and arranged coaxially; the first extension body is inserted into the second gap, and the second extension body is inserted into the first gap, and the first plug hole is aligned with the second plug hole; the first plug pin 12 passes through the first plug hole and the second plug hole to connect the first connector 11 with the second connector 24. The connection between the water barrier 1 and the unit guardrail 2 is achieved by plugging the first extension body into the second extension body and connecting the first extension body and the second extension body with the plug pin.

[0042] The first extension body is provided with at least two first plug holes; the second extension body is provided with second plug holes corresponding to the first plug holes. By providing at least two first plug holes and second plug holes, two first plug pins 12 are provided correspondingly to ensure the stability of the unit guardrail 2 after being connected to the water barrier 1, and avoid the possibility that the water barrier 1 and the vertical pole 21 may rotate relative to each other when only one first plug pin 12 is provided.

[0043] Specifically, refer to Figure 5 As shown, the support leg 23 includes a support plate 25 and an inclined support plate 26; the support plate 25 is connected to the bottom of the vertical pole 21, and the support plate 25 extends horizontally toward the second direction, and the second direction is perpendicular to the first direction; the inclined support plate 26 is arranged obliquely, and one end of the inclined support plate 26 is connected to the end of the support plate 25, and the other end is connected to the vertical pole 21. The second direction is a horizontal direction perpendicular to the first direction. By arranging the support plate 25 and the inclined support plate 26 extending horizontally along the second direction, the anti-overturning ability of the unit guardrail 2 is improved.

[0044] The temporary isolation belt for bridge construction provided in this embodiment can be installed by moving each water barrier 1 to a rough position and then installing each unit guardrail 2 simultaneously. The water barrier 1 increases the weight of the isolation belt to prevent the isolation belt from overturning. By setting a support foot 23 on the vertical pole 21, the support plate 25 and the diagonal support plate 26 improve the anti-overturning ability of the unit guardrail 2, thereby further improving the anti-overturning ability of the isolation belt; there is no need to anchor the water barrier 1 to the ground, which reduces the construction workload and shortens the construction time, thereby shortening the traffic congestion time.

[0045] Since the unit guardrail 2 can be extended, the position error of the water barrier 1 can be compensated. No precise measurement is required before installation, and each unit guardrail 2 can be assembled synchronously, which can greatly improve the efficiency of disassembly and assembly, shorten the time of disassembly and assembly, and thus shorten the time of traffic congestion. In addition, during the transportation process of the unit guardrail 2, it can be folded before transportation, reducing the size of the unit guardrail 2, making transportation more convenient and efficient.

[0046] The first extension body is inserted into the second gap between the water barrier 1 and the unit guardrail 2, the second extension body is inserted into the first gap, and then fixed with a pin. Multiple first extension bodies and multiple second extension bodies are connected into a whole with stronger stability. It is not only convenient to operate, but also can improve the stability of the connection between the unit guardrail 2 and the water barrier 1.

[0047] Specifically, refer to Figure 4 As shown, the end of the second extension body is provided with a slide groove 27 extending in the vertical direction; a positioning plate 28 sliding in the vertical direction is provided in the slide groove 27, one end of the positioning plate 28 is connected to the bottom wall of the slide groove 27 through a spring 29, and the other end extends out of the slide groove 27; the first extension body is provided with a positioning groove 13 for accommodating the positioning plate 28. When the second extension body is inserted into the first gap, that is, when the first connecting member 11 and the second connecting member 24 are docked, when the positioning plate 28 moves to the position of the positioning groove 13, the positioning plate 28 moves upward under the action of the spring 29 and is inserted into the positioning groove 13, so that the first connecting member 11 and the second connecting member 24 are temporarily fixed and relatively positioned, so that the first plug hole is aligned with the second plug hole, which is convenient for the operator to directly pass the first latch 12 through each of the first extension body and the second extension body, thereby making the operation of connecting the water barrier 1 and the vertical pole 21 easier.

[0048] Specifically, in order to facilitate the insertion of the first connecting member 11 and the second connecting member 24, a guiding slope 14 is further provided at the end of the first extension body to facilitate the positioning plate 28 to enter the first gap and compress the spring 29 during the movement.

[0049] Specifically, a movable component 3 is provided on the side of the vertical pole 21; the movable component 3 includes a connecting ear plate 31, a screw rod 32 and a universal wheel 33; the connecting ear plate 31 is connected to the vertical pole 21, and a threaded sleeve 34 extending along the vertical direction is provided on the connecting ear plate 31; the screw rod 32 is connected to the threaded sleeve 34 and is connected to the universal wheel 33 after passing through the threaded sleeve 34.

[0050] The height of the universal wheel 33 can be adjusted by rotating the screw rod 32, thereby switching the state of the unit guardrail 2. For example, when carrying the unit guardrail 2, the screw rod 32 can be rotated to move the universal wheel 33 downward so that the support leg 23 is separated from the ground, and the unit guardrail 2 is supported by the universal wheel 33, which facilitates the movement of the unit guardrail 2. When the unit guardrail 2 is unfolded, the screw rod 32 can be rotated in the opposite direction so that the support leg 23 contacts the ground and the unit guardrail 2 is supported by the support leg 23.

[0051] Specifically, a rotating handle 35 is provided at one end of the screw rod 32 away from the universal wheel 33, so as to facilitate rotating the screw rod 32 and adjusting the height of the universal wheel 33.

[0052] Specifically, two groups of moving components 3 arranged along the second direction are provided on one side of the vertical pole 21. By providing two groups of moving components 3, the stability of the unit guardrail 2 during the movement process is maintained.

[0053] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0054] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.

Claims

1. A temporary isolation zone for bridge construction, characterized in that: include: A water barrier, with a water injection space inside and first connecting members respectively disposed at two ends of the outside; the first connecting member comprises a plurality of first extension bodies extending in a direction away from the water barrier; the plurality of first extension bodies are arranged in a vertical direction, and a first gap is formed between adjacent first extension bodies, and each first extension body is respectively provided with a first plugging hole extending in a vertical direction and arranged coaxially; the first extension body is provided with at least two first plugging holes; The unit guardrail comprises a plurality of vertical poles arranged in a first direction, a scissor-type telescopic frame is connected between adjacent vertical poles, and the scissor-type telescopic frame is telescopic in the first direction; a support foot is connected to the bottom of the vertical pole; a second connecting member is respectively provided on the vertical poles at the head end and the tail end of the unit guardrail, and the second connecting member is located on the side of the vertical pole away from the scissor-type telescopic frame; a plurality of unit guardrails are arranged in the first direction, and a water barrier is provided between adjacent unit guardrails; the second connecting member comprises a plurality of second extension bodies extending in a direction away from the scissor-type telescopic frame; a plurality of second extension bodies are arranged in a vertical direction, and a second gap is formed between adjacent second extension bodies, and each second extension body is respectively provided with a second gap along the vertical direction. A second plug hole extending in the direction and coaxially arranged; the first extension body is inserted into the second gap, the second extension body is inserted into the first gap, and the first plug hole is aligned with the second plug hole; the first pin passes through the first plug hole and the second plug hole to connect the first connecting member to the second connecting member; the second extension body is provided with a second plug hole corresponding to the first plug hole one by one; the support leg includes a support plate and a diagonal support plate; the support plate is connected to the bottom of the vertical pole, and the support plate extends horizontally toward the second direction, and the second direction is perpendicular to the first direction; the diagonal support plate is arranged obliquely, and one end of the diagonal support plate is connected to the end of the support plate, and the other end is connected to the vertical pole.

2. A temporary isolation zone for bridge construction according to claim 1, characterized in that: A slide groove extending in the vertical direction is provided at the end of the second extension body; a positioning plate sliding in the vertical direction is provided in the slide groove, one end of the positioning plate is connected to the bottom wall of the slide groove through a spring, and the other end extends out of the slide groove; a positioning groove for accommodating the insertion of the positioning plate is provided on the first extension body.

3. A temporary isolation zone for bridge construction according to claim 1, characterized in that: A movable assembly is provided on the side of the vertical pole; the movable assembly includes a connecting ear plate, a screw rod and a universal wheel; the connecting ear plate is connected to the vertical pole, and a threaded sleeve extending in the vertical direction is provided on the connecting ear plate; the screw rod is connected to the threaded sleeve and is connected to the universal wheel after passing through the threaded sleeve.

4. A temporary isolation zone for bridge construction according to claim 3, characterized in that: A rotating handle is provided at one end of the screw rod away from the universal wheel.

5. The temporary isolation zone for bridge construction according to claim 3, characterized in that: Two groups of moving components arranged along the second direction are arranged on one side of the vertical pole.