Pre-tensioned prestressed steel pipe UHPC component unit and hybrid tower wind power structure

By applying pretension prestressing in the factory construction of wind power towers and using a combined joint of large-diameter fully connected grouting UHPC sleeves and anchored steel bars, the problems of vibration, corrosion and high maintenance costs of wind power tower structure are solved. An efficient and stable tower structure design is achieved.

CN222102191UActive Publication Date: 2024-12-03GUANGXI UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420946986.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-06
Publication Date
2024-12-03
Estimated Expiration
2034-05-06

AI Technical Summary

Technical Problem

When the height increases, the existing wind power tower structure faces problems such as structural vibration, easy corrosion, high maintenance costs, high manufacturing accuracy requirements, and difficult transportation and lifting, especially the complexity of post-tension prestressing construction and long construction cycle in the later stage.

Method used

The UHPC component unit of the pre-tensioned prestressed steel pipe is used to simplify the node connection by applying prestress in factory construction, combining large-diameter fully connected grouting UHPC sleeve and anchored steel bars, and a combined joint with stiffened ribs and internal steel pipes. , reduce construction difficulty and improve fatigue resistance.

Benefits of technology

It realizes the completion of prestressing application in factory construction, simplifies the construction process, improves the axle pulling load capacity and fatigue resistance of the nodes, reduces maintenance costs and transportation weight, and improves the stability and adaptability of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222102191U_ABST
    Figure CN222102191U_ABST
Patent Text Reader

Abstract

The utility model discloses a pre-tensioned prestressed steel pipe UHPC (Ultra High Performance Concrete) component unit and a hybrid tower wind power structure, which comprise a main column, the main column is divided into a main column at the upper end and a main column at the lower end, and UHPC is filled in the main column; the large-diameter full-connection grouting UHPC sleeve is arranged in the main column at the lower end of the large-diameter full-connection grouting UHPC sleeve, and the large-diameter full-connection grouting UHPC sleeve is matched with the anchoring steel bars; one section of the anchoring steel bar is arranged on the main column at the upper end, and the other section of the anchoring steel bar is arranged in the large-diameter full-connection grouting UHPC sleeve in a penetrating manner; the prestressed steel strand is arranged in the main column at the lower end; wherein the anchoring steel bars are inserted into the large-diameter full-connection grouting UHPC sleeves and are matched with the reinforcing outer flanges to connect the stand columns at the upper end and the stand columns at the lower end. Post-tensioning pre-stress construction which is not needed in the later period of conventional nodes is achieved; corrosion is not prone to occurring, and the maintenance cost is low.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of mechanical manufacturing and onshore and offshore wind power generation, and in particular to a pre-tensioned prestressed steel pipe UHPC component unit and a hybrid tower wind power structure. Background Art

[0002] At present, my country has abundant reserves of wind energy resources, and the potential for the development and utilization of wind energy resources is huge. With the continuous increase in my country's demand for renewable energy, wind power generation has gradually become an important part of the domestic energy development plan. New trends in the development of wind turbines include: the trend of large-scale single-unit capacity, the trend of intelligent and sustainable development of wind turbines, and the significant growth of floating offshore wind power. The increase in the capacity of a single wind turbine unit depends on the large-scale of the single unit and the improvement of power generation efficiency, and the height of the wind turbine has a significant impact on the power generation efficiency. The increase in the height of the wind turbine has put forward higher requirements on the stress of the tower structure, construction convenience and engineering economy.

[0003] In order to improve the structural safety and transportation convenience of ultra-high wind turbine tower components, high-performance materials are used to form high-strength and lightweight structures, and the size and weight of each prefabricated unit that can be hoisted are reduced. Road transportation and low-cost hoisting are the future development direction of ultra-high wind turbine towers. At present, for ultra-high wind turbine towers, hollow sandwich steel tube concrete towers, prestressed steel-concrete hybrid towers, prestressed steel tube concrete lattice towers, prefabricated steel-concrete towers and UHPC wind power hybrid towers have appeared.

[0004] At present, the mainstream tower types of wind turbines include: steel tower, segmented steel tower, steel-NC hybrid tower and UHPC wind power hybrid tower. As the height of the tower increases, the diameter of the steel tower gradually increases, exposing problems such as structural vibration, easy corrosion, and high maintenance costs. In addition, there are many limitations in the transportation and hoisting of steel towers. For example, for wind turbines with a height of less than 110m, the steel tower hoisting mostly adopts a combination of crawler cranes and truck cranes; if the wind turbine tower height is higher than 110m, the tower adopts a steel-concrete hybrid tower. First, the structure has high requirements for manufacturing precision, and the investment in molds and tooling is large; secondly, the transportation of large-diameter precast concrete or steel-concrete towers is not convenient, and the difficulty of on-site hoisting is greatly increased; thirdly, for UHPC hybrid high towers of 140m and above, crawler cranes of 1,000 tons or above must be used for hoisting, and there are also problems such as long construction period, overall cost greatly affected by material price fluctuations, and high equipment use costs.

[0005] In summary, there is at least one of the following technical problems:

[0006] Conventional nodes will also undergo post-tensioning construction in the later stages;

[0007] Structural vibration, easy corrosion, high maintenance cost;

[0008] The manufacturing precision is high and the investment in molds and tooling is large. Utility Model Content

[0009] The main purpose of the utility model is to provide a pre-tensioned prestressed steel pipe UHPC component unit and a hybrid tower wind power structure to solve at least one of the technical problems in the prior art that conventional nodes need to undergo post-tensioned prestressing construction in the later stage; structural vibration, easy corrosion, high maintenance cost; high manufacturing precision requirements, and large mold and tooling investment.

[0010] In order to achieve the above-mentioned object, according to one aspect of the utility model, a pre-tensioned prestressed steel pipe UHPC component unit is provided, comprising:

[0011] A main column, wherein the main column is divided into an upper main column and a lower main column, and the inside of the main column is filled with UHPC;

[0012] A large-diameter fully connected grouting UHPC sleeve, wherein the large-diameter fully connected grouting UHPC sleeve is arranged in the main column at the lower end, and the large-diameter fully connected grouting UHPC sleeve cooperates with the anchor steel bar;

[0013] Anchor steel bars, one section of which is arranged on the main column at the upper end, and the other section is inserted into a large-diameter fully connected grouting UHPC sleeve;

[0014] Prestressed steel strands, the prestressed steel strands being arranged in the main column at the lower end;

[0015] Among them, the anchor steel bars are inserted into the large-diameter fully connected grouting UHPC sleeve and matched with the reinforced external flange to connect the upper and lower columns.

[0016] Preferably, when the main column of the lattice tower is small in size, the main column is a solid steel tube UHPC column.

[0017] Preferably, when the main column of the lattice tower is relatively large in size, the main column is a hollow sandwich steel tube UHPC column.

[0018] Preferably, a UHPC coating layer is provided in the mortar-sealing sleeve, and the anchor steel bars are coated with UHPC.

[0019] Preferably, the prestressed steel strands include a plurality of prestressed steel strands, which are evenly arranged in a ring shape in the main column at the lower end.

[0020] Preferably, the anchoring steel bars include a plurality of anchoring steel bars, and the plurality of anchoring steel bars are arranged in a ring shape on the main column at the upper end.

[0021] Preferably, the large-diameter fully-connected grouting UHPC sleeves include a plurality of large-diameter fully-connected grouting UHPC sleeves, which are evenly arranged in a ring shape in the main column at the lower end, and the positions of the large-diameter fully-connected grouting UHPC sleeves correspond one-to-one to the anchor steel bars.

[0022] Preferably, an inner steel pipe is provided at the central axis position of the hollow sandwich steel pipe UHPC column.

[0023] Preferably, a section of anchor steel bars of the main column at the upper end is connected to the anchor steel bars of the main column at the lower end via a large-diameter fully connected grouting UHPC sleeve.

[0024] A hybrid tower wind power structure comprises: a pre-tensioned prestressed steel pipe UHPC component unit, a hybrid tower transition structure, a steel tower and a wind turbine.

[0025] The application of the technical solution of the utility model has the following technical effects:

[0026] Pre-stressing is applied to the pre-stressed steel pipe UHPC standardized component unit during factory construction, avoiding the post-stressing construction of conventional nodes in the later stage. The combined joint of the outer flange with stiffening ribs and the large-diameter fully connected grouting UHPC sleeve inside the steel pipe can improve the axial tensile bearing capacity of the node under the action of alternating tension and compression loads; secondly, the construction of the large-diameter fully connected grouting UHPC sleeve combined joint is relatively simple, and does not require special equipment and technology. It only requires UHPC grouting of the lower main column sleeve and insertion of the upper main column steel bar to achieve the connection between the upper and lower main columns, which reduces the construction difficulty and is also a more economical and practical structural connection method; finally, the UHPC matrix and steel fibers of the upper and lower main columns at the node are discontinuous, and the combined joint of the outer flange with stiffening ribs and the large-diameter fully connected grouting UHPC sleeve is used. Due to the connection of high-strength bolts and ordinary steel bars, the strength, stiffness and fatigue resistance of the node connection can be effectively guaranteed. The pre-stressed steel tube UHPC lattice hybrid tower has the technical effects of good stability, high bearing capacity and good fatigue resistance. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0028] Figure 1 A schematic structural diagram of a pre-tensioned prestressed steel pipe UHPC component unit according to the utility model is shown;

[0029] Figure 2 The overall schematic diagram of the pure lattice tower structure of the hybrid tower wind power structure is shown;

[0030] Figure 3 Shows Figure 1 Schematic diagram of the structure of the small-sized upper and lower main column connection of the pre-tensioned prestressed steel tube UHPC component unit;

[0031] Figure 4 Shows Figure 1 The cross-sectional view of the small-sized upper and lower main column connections of the prestressed steel tube UHPC component unit;

[0032] Figure 5 Shows Figure 1 Schematic diagram of the structure of the large-size upper and lower main column connection of the pre-tensioned steel tube UHPC component unit;

[0033] Figure 6 Shows Figure 1 The cross-sectional view of the large-size upper and lower main column connections of the prestressed steel tube UHPC component unit;

[0034] Figure 7 Shows Figure 1 The structure diagram of the large-diameter fully connected grouting UHPC sleeve of the pre-tensioned prestressed steel pipe UHPC component unit;

[0035] Figure 8 An external schematic diagram of a hybrid tower transfer structure of a hybrid tower wind power structure is shown;

[0036] Fig. 9 The longitudinal section of the hybrid tower transfer structure limb of the hybrid tower wind power structure is shown;

[0037] Fig.10 Shows Fig. 9 Cross-sectional views of hybrid tower transfer structures 1-1 and 2-2 of the hybrid tower wind turbine structure.

[0038] The above drawings include the following reference numerals:

[0039] Lattice tower 1; hybrid tower transition structure 2; steel tower 3; wind turbine 4; main column 5; connecting rod 6; prestressed steel strand 7; stiffening rib outer flange 8; large-diameter fully connected grouting UHPC sleeve 9; inner steel pipe 10; grouting sleeve 11; anchor steel bar 12; UHPC coating 13; connecting plate 14; bolt 15; eight limbs 16; steel plate 17; UHPC layer 18; steel mesh 19; stud 20; limb steel shell 21; inner flange 22. DETAILED DESCRIPTION

[0040] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present utility model will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0041] like Figures 1 to 10 As shown, an embodiment of the utility model provides a prestressed steel pipe UHPC component unit, including: a main column 5, which is divided into an upper main column 5 and a lower main column 5, and UHPC is poured inside the main column 5; a large-diameter fully connected grouting UHPC sleeve 9, which is arranged in the main column 5 at the lower end, and the large-diameter fully connected grouting UHPC sleeve 9 is matched with an anchoring steel bar 12; an anchoring steel bar 12, wherein one section of the anchoring steel bar 12 is arranged on the main column 5 at the upper end, and the other section is passed through the large-diameter fully connected grouting UHPC sleeve 9; a prestressed steel strand 7, which is arranged in the main column 5 at the lower end; wherein the anchoring steel bar 12 is inserted into the large-diameter fully connected grouting UHPC sleeve 9 and cooperates with the reinforcing outer flange to connect the upper column and the lower column.

[0042] In this embodiment, the main column 5 is divided into an upper main column 5 and a lower main column 5, and the main column 5 is filled with UHPC; when the main column 5 of the lattice tower 1 is small in size, the main column 5 adopts a solid steel tube UHPC column. When the main column 5 of the lattice tower 1 is large in size, the main column 5 adopts a hollow sandwich steel tube UHPC column. An inner steel pipe 10 is provided at the central axis position of the hollow sandwich steel tube UHPC column. A section of anchor steel bar 12 of the main column 5 at the upper end is connected to the anchor steel bar 12 of the main column 5 at the lower end through a large-diameter fully connected grouting UHPC sleeve 9.

[0043] In this embodiment, a large-diameter fully connected grouting UHPC sleeve 9 is provided in the main column 5 at the lower end, and the large-diameter fully connected grouting UHPC sleeve 9 cooperates with the anchoring steel bar 12; a UHPC coating layer 13 is provided in the grouting sleeve 11, and the anchoring steel bar 12 is coated with UHPC. The large-diameter fully connected grouting UHPC sleeve 9 includes a plurality of large-diameter fully connected grouting UHPC sleeves 9, which are evenly arranged in a ring shape in the main column 5 at the lower end, and the positions of the large-diameter fully connected grouting UHPC sleeves 9 correspond one by one to the anchoring steel bar 12.

[0044] In this embodiment, the anchor steel bar 12, one section of the anchor steel bar 12 is arranged on the main column 5 at the upper end, and the other section is passed through the large-diameter fully connected grouting UHPC sleeve 9; the anchor steel bar 12 includes a plurality of anchor steel bars 12, and the plurality of anchor steel bars 12 are arranged in a ring shape on the main column 5 at the upper end.

[0045] In this embodiment, the prestressed steel strand 7 is arranged in the main column 5 at the lower end; wherein the anchor steel bar 12 is inserted in the large-diameter fully connected grouting UHPC sleeve 9 and cooperates with the reinforced outer flange to connect the upper column and the lower column. The prestressed steel strand 7 includes a plurality of strands, and the plurality of prestressed steel strands 7 are evenly arranged in a ring shape in the main column 5 at the lower end.

[0046] A hybrid tower wind power structure includes a lattice tower 1, which is an assembled structure. The lattice tower 1 includes a plurality of main columns 5 and connecting rods 6. UHPC is poured inside the main columns 5, and prestressed tendons 7 are arranged in the UHPC. The main columns 5 are spliced ​​at a joint using an outer flange 8 with stiffening ribs and a large-diameter fully connected grouted UHPC sleeve 9; a hybrid tower transition structure 2, which is arranged at the upper end of the lattice tower 1, and is a steel pipe-outerwrapped UHPC composite structure, and is connected to the main columns 5; a steel tower 3, which is arranged at the upper end of the hybrid tower transition structure 2; and a wind turbine 4, which is arranged at the upper end of the steel tower 3.

[0047] The hybrid tower wind power structure mainly includes a lattice tower 1, a tower transition structure, a steel tower 3, a wind turbine 4, etc. The lattice tower 1 is an assembled structure, which is composed of a plurality of main columns 5 using standardized component units of pre-stressed steel pipe UHPC. The nodes at the connection of the upper and lower unit main columns 5 adopt a joint combined structure form of an external flange 8 with stiffening ribs and a large-diameter fully connected grouting UHPC sleeve 9 inside the steel pipe; the horizontal and oblique connecting rods 6 between the pre-stressed steel pipe UHPC component units in the lattice tower 1 are hollow steel pipes, and the connecting plates 14 are connected by bolts 15 or flanges; the tower transition structure is a steel pipe-UHPC composite structure, which is connected to the main column 5 of the steel pipe-UHPC component unit of the lattice tower 1; the lower end of the steel tower 3 is connected to the tower transition structure; and the wind turbine 4 is arranged at the upper end of the steel tower 3.

[0048] In this embodiment, the lattice tower 1 is an assembled structure, and the lattice tower 1 includes a plurality of main columns 5 and connecting rods 6. The main columns 5 are filled with UHPC, and the prestressed tendons 7 of the prestressing method are arranged in the UHPC. The main columns 5 are spliced ​​with an outer flange 8 with stiffening ribs and a large-diameter fully connected grouting UHPC sleeve 9. The connecting rods 6 in the lattice tower 1 are arranged horizontally and obliquely, and the connecting rods 6 are hollow steel pipes. When the main columns 5 of the lattice tower 1 are small in size, the main columns 5 are solid steel pipe UHPC columns, and the main columns 5 are connected to the large-diameter fully connected grouting UHPC sleeves 9 uniformly arranged in an internal annular shape through the outer flange 8 with stiffening ribs. When the main columns 5 of the lattice tower 1 are large in size, the main columns 5 are hollow sandwich steel pipe UHPC columns, and the main columns 5 are connected to the large-diameter fully connected grouting sleeves uniformly arranged in an internal annular shape through the outer flange 8 with stiffening ribs. A mortar sleeve 11 is embedded in the main column 5 at the lower end, and an anchor steel bar 12 is embedded in the column at the upper end. The anchor steel bar 12 extends from the end of the main column 5 at the upper end and is inserted into the mortar sleeve 11. A UHPC coating layer 13 is provided in the mortar sleeve 11, and the anchor steel bar 12 is coated with UHPC, and the anchor steel bar 12 is connected to the mortar sleeve 11.

[0049] In this embodiment, the connection node of the upper and lower standardized prefabricated units pre-tensioned prestressed steel tube UHPC main column 5 is a key part of the lattice steel tube UHPC wind power tower structure. Since the main column 5 is required to be subjected to alternating tension and compression, the existing steel tube concrete main column 5 node connection technology and construction procedures are relatively complicated. It is generally connected by high-strength bolts 15 on the outer flange of the steel tube concrete main column 5, or a combined connection form of tensioning the full-length prestress between the outer flange of the main column 5 and the internal reserved channel. Compared with other node forms, this technical solution has the following characteristics: First, the prestressed steel pipe UHPC standardized component unit is prestressed during factory construction, avoiding the post-stressed construction of conventional nodes in the later stage. The combined joint of the outer flange 8 with stiffening ribs and the large-diameter fully connected grouting UHPC sleeve 9 inside the steel pipe can improve the axial tensile bearing capacity of the node under the action of alternating tension and compression loads; secondly, the construction of the large-diameter fully connected grouting UHPC sleeve 9 combined joint is relatively simple, and does not require special equipment and technology. It only needs to perform UHPC grouting of the sleeve of the lower main column 5 and insert the steel bars of the upper main column 5 to achieve the connection of the upper and lower main columns 5, which reduces the construction difficulty and is also a more economical and practical structural connection method; finally, the UHPC matrix and steel fibers of the upper and lower main columns 5 are discontinuous at the node. The combined joint of the outer flange 8 with stiffening ribs and the large-diameter fully connected grouting UHPC sleeve 9 is used. Due to the connection of high-strength bolts 15 and ordinary steel bars, the stiffness and fatigue resistance of the node connection can be effectively improved. The pre-stressed steel tube UHPC lattice hybrid tower has the advantages of good stability, high bearing capacity and good fatigue resistance.

[0050] In this embodiment, a hybrid tower transition structure 2 is arranged at the upper end of the lattice tower 1, and the hybrid tower transition structure 2 is a steel tube-wrapped UHPC composite structure, and the hybrid tower transition structure 2 is connected to the main column 5; the hybrid tower transition structure 2 includes eight limbs 16, and the eight limbs 16 are connected to the main column 5 of the lattice tower 1 through a stiffening rib outer flange 8; the steel tube-wrapped UHPC composite structure has a steel plate 17, a UHPC layer 18, a steel mesh 19 and a bolt 20, wherein the steel plate 17 in the steel tube-wrapped UHPC composite structure is inserted along the incision reserved at the upper part of the eight limbs 16, and the steel plate 17 is welded to the limb steel shell 20 after insertion; the end of the steel mesh 19 is welded to the limb steel shell 20; the bolt 20 is arranged at the junction of the steel plate 17 and the UHPC layer 18. The bottom of the eight-legged foot 16 is a lattice tower layer 1, and a transverse connecting rod is provided on the eight-legged foot 16; the embedded anchor steel bar 12 of the large-diameter connection grouting UHPC sleeve located at the connection between the eight-legged foot 16 and the main column 5 of the lattice tower 1 extends upward. The steel plate 17 extends upward, and an inner flange 22 is provided on the top of the steel plate 17, and the steel plate 17 connects the hybrid tower transition structure 2 with the steel tower tube 3.

[0051] In this embodiment, the transition device between the steel-concrete tower frame and the upper steel tower 3 is crucial to the stress performance of the hybrid tower. The number of steel bar bolts 20 in the traditional steel-concrete transition ring is large, the arrangement is complex, and the processing and manufacturing is difficult. In addition, the steel-concrete transition ring has a large structure and high lifting requirements. The new steel pipe outsourcing UHPC composite structure is an embedded structure. This structure makes the transition of the stiffness from the lattice tower 1 to the steel tower 3 smoother, effectively reducing the discontinuity between the structures. Smooth transition helps to reduce stress concentration and improve the stability of the overall structure. In the transition area, through the embedded design, the distribution of structural stiffness can be better controlled, and the structural deformation caused by inconsistent stiffness can be reduced, thereby maintaining the overall integrity of the structure and improving the overall performance. Under the action of external loads, the connecting section can more effectively transmit force and reduce the stress concentration of the structure. At the same time, the structure has strong adaptability, can flexibly meet the stiffness requirements of different parts, and reduce the requirements and costs of the foundation. In this embodiment, the steel tower 3 is arranged at the upper end of the hybrid tower transition structure 2; in this embodiment, the fan 4 is arranged at the upper end of the steel tower 3.

[0052] In this embodiment, the main column 5 in the lattice tower 1 is a standardized steel pipe UHPC component prestressed by the pre-tensioning method. The upper and lower unit main columns 5 are connected by a combined connection method of a steel plate 17 stiffened outer flange and a large-diameter fully connected grouting UHPC sleeve 9 in the steel pipe UHPC column. The left and right unit main columns 5 are connected by horizontal and oblique hollow steel pipes. The tower transition structure is a steel pipe outer UHPC composite structure. A transition section tower with a height of 1m is arranged under the eight legs. The cross-section of the transition section tower connection is the same as that of the main column 5. The middle section is composed of a steel plate 17, a UHPC layer 18, a steel mesh 19, and bolts 20. Specifically, the lattice tower 11 is composed of a main column 55 and a connecting rod 66. The main column 5 is a steel tube UHPC column or a hollow sandwich steel tube UHPC column with an outer diameter of 400mm, filled with UHPC, and prestressed tendons 7 arranged in the UHPC; the connecting rod 6 is a hollow steel tube with an outer diameter of 150mm and a tube wall thickness of 10mm; the steel strength grade of the main column 5 is Q345, and the steel strength grade of the connecting rod 6 is Q235. Figure 4 As shown, when the size of the main column 5 of the lattice tower 1 is small, a solid steel pipe-UHPC column is used, and the main columns 5 are connected to 8 large-diameter fully connected grouting UHPC sleeves 99 uniformly arranged in an inner ring and 1 centrally arranged through the stiffening rib outer flange 8. Figure 5-6 As shown, when the size of the main column 5 of the lattice tower 1 is large, a hollow sandwich steel tube UHPC column is used. The main column 5 is connected to 8 large-diameter fully connected grouted UHPC sleeves 9 that are evenly arranged in an internal ring through a stiffening rib outer flange 8, and the inner steel pipe 10 serves as a mold and a constraint for the UHPC.

[0053] In this embodiment, Figure 7 As shown, the connection method of the large-diameter fully connected grouting UHPC sleeve 9 is as follows: a grouting sleeve 11 is pre-embedded in the lower main column 5, and an anchoring steel bar 12 is pre-embedded in the upper main column 5. One end of the anchoring steel bar 12 extends from the end of the upper main column 5 and is inserted into the grouting sleeve 11. A UHPC coating layer 13 is provided in the grouting sleeve 11. The anchoring steel bar 12 is coated with UHPC grouting, and the anchoring steel bar 12 is connected and fixed to the grouting sleeve 11. Figure 8-10 As shown, the eight-legged foot 16 of the hybrid tower transition structure 2 is connected to the main column 5 of the lattice tower 1 by an external flange 8 with stiffening ribs; the main body of the hybrid tower transition structure 2 adopts a new steel tube outsourcing UHPC composite structure to ensure structural stability. The new steel tube outsourcing UHPC composite structure includes a steel plate 17, a UHPC layer 18, a steel mesh 19, and a bolt 20; the eight-legged foot 16 is 2.05 meters high, and the bottom 1m is the lattice tower 1 layer, and a transverse connecting rod 6 is set at a height of 50cm; the embedded anchor steel bar 12 of the large-diameter fully connected grouting UHPC sleeve 9 at the connection between the eight-legged foot 16 and the main column 5 of the lattice tower 1 extends upward to 1 meter long; the new steel tube outsourcing UHPC composite structure is a steel plate 17, a UHPC layer 18, a steel mesh 19, and a bolt 20; the eight-legged foot 16 is 2.05 meters high, and the bottom 1m is the lattice tower 1 layer, and a transverse connecting rod 6 is set at a height of 50cm; the embedded anchor steel bar 12 of the large-diameter fully connected grouting UHPC sleeve 9 at the connection between the eight-legged foot 16 and the main column 5 of the lattice tower 1 extends upward to 1 meter long; The steel plate 17 in the C composite structure is inserted along the 0.55m high and 2cm wide cutout reserved at the top of the eight limbs. After the steel plate 17 is inserted, it is welded to the limb steel shell 20. Considering the small cross-section of the limb, the M16*7@120 bolts 20 are welded to the position of the steel plate 17 in the limb. The UHPC layer 18 is provided with a 60*60 reinforced steel mesh 19, and the end of the steel mesh 19 is welded to the limb steel shell 20 in the area with the eight limbs 16. And M25*100@150 bolts 20 are set at the junction of the steel plate 17 and the UHPC layer 18; the height of the new steel pipe outer UHPC composite structure is 2.5m, the steel plate 17 is 2cm thick, and the UHPC layer 18 is 12cm thick; in addition to forming a composite structure with the UHPC layer 18, the steel plate 17 continues to extend upward by 50cm and a 20cm high inner flange 22 is set at its top to connect the hybrid tower transition structure 2 with the steel tower 3.

[0054] In another embodiment of the present invention, a method for assembling a prestressed steel pipe UHPC component unit is provided, comprising the following steps:

[0055] Step 1: pour the main column 5 in the factory, use the pre-tensioning method to tension the prestressed tendons 7, and pre-embed the mortar sleeve 11 and the anchor steel bar 12;

[0056] Step 2: Complete the welding work between the connecting rod 6 and the main column 5, between the main column 5 and the outer flange 8 of the stiffening rib, and between the connecting rod 6 and the outer flange 8 of the stiffening rib;

[0057] Step 3: Weld the studs 20 and the steel mesh 19 to the steel plate 17 of the transition section of the steel tower 3 and pour UHPC;

[0058] Step 4: hoisting the main column 5 and the connecting rod 6 of the lattice tower 1 and connecting them;

[0059] Step 5: After the installation of the lattice tower 1 is completed, the hybrid tower transition structure 2 is hoisted, and the hybrid tower transition structure 2 is connected to the main column 5 by bolts 15;

[0060] Step 6: Then hoist the steel tower 3, align the inner flange 22 at the bottom of the steel tower 3 with the flange of the hybrid tower adapter structure 2, and then connect them with bolts 15;

[0061] Step 7: Finally, install the wind turbine 4 on the top of the steel tower 3.

[0062] From the above description, it can be seen that the above embodiments of the utility model achieve the following technical effects:

[0063] The utility model adopts a multi-limb column prestressed steel pipe-UHPC standardized component unit, a combined joint consisting of an outer flange 8 with stiffening ribs and a large-diameter fully connected grouted UHPC sleeve 9 inside the steel pipe, and a new steel pipe-wrapped UHPC combined tower transition structure. It has the technical effects of more uniform stress on the overall structure, good durability, low creep coefficient, transportable prefabricated units, low hoisting weight, convenient construction, low maintenance cost, smooth transition of stress and stiffness in the connection section, and stable force transmission method.

[0064] Pre-stressing is applied during factory construction through the pre-stressed steel pipe UHPC standardized component unit, avoiding the post-stressing construction of conventional nodes in the later stage. The combined joint of the outer flange 8 with stiffening ribs and the large-diameter fully connected grouting UHPC sleeve 9 inside the steel pipe can improve the axial tensile bearing capacity of the node under the action of alternating tension and compression loads; secondly, the construction of the large-diameter fully connected grouting UHPC sleeve 9 combined joint is relatively simple, and does not require special equipment and technology. It only needs to perform UHPC grouting of the sleeve of the lower main column 5 and insert the steel bars of the upper main column 5 to achieve the connection between the upper and lower main columns 5, which reduces the construction difficulty and is also a more economical and practical structural connection method; finally, the UHPC matrix and steel fibers of the upper and lower main columns 5 are discontinuous at the node. The combined joint of the outer flange 8 with stiffening ribs and the large-diameter fully connected grouting UHPC sleeve 9 is used. Due to the connection of high-strength bolts 15 and ordinary steel bars, the stiffness and fatigue resistance of the node connection can be effectively improved. The pre-stressed steel tube UHPC lattice hybrid tower has the technical effects of good stability, high bearing capacity and good fatigue resistance.

[0065] The transition device between the steel-concrete tower frame and the upper steel tower 3 of the utility model is crucial to the stress performance of the hybrid tower. The number of steel bar bolts 20 in the traditional steel-concrete transition ring is large, the arrangement is complex, and the processing and manufacturing is difficult. In addition, the steel-concrete transition ring has a large structure and high lifting requirements. The new steel pipe outsourcing UHPC composite structure is an embedded structure. This structure makes the transition of stiffness from the lattice tower 1 to the steel tower 3 smoother, effectively reducing the discontinuity between the structures. Smooth transition helps to reduce stress concentration and improve the stability of the overall structure. In the transition area, through the embedded design, the distribution of structural stiffness can be better controlled, and the structural deformation caused by inconsistent stiffness can be reduced, thereby maintaining the overall integrity of the structure and improving the overall performance. Under the action of external loads, the connecting section can more effectively transmit force and reduce the stress concentration of the structure. At the same time, the structure has strong adaptability, can flexibly meet the stiffness requirements of different parts, and reduces the technical effects of foundation requirements and costs.

[0066] This utility model patent adopts a multi-column tower structure, which makes the overall force more uniform and dispersed, and maintains the stability of the force form. This effectively solves the problem of complex and changeable force transmission methods in parallel and diagonal directions caused by traditional three-column or four-column lattice wind turbine towers when facing uncertain wind load directions, and the disassembled components of the multi-column tower structure can meet the transportation size requirements.

[0067] This utility model patent adopts a steel-ultra-high performance concrete UHPC composite structure. By making full use of the excellent tensile strength of UHPC, the utility model cooperates with the steel pipe to bear part of the tensile force. Such a design enables the structure to effectively cope with the problem of repeated tension and compression of the structure under the condition of variable wind load direction. At the same time, due to the low creep coefficient of the steel-UHPC structure, the stability of the structure is improved, reducing the risk of instability caused by deformation. In addition, the low creep coefficient helps to reduce structural vibration, especially when the fan 4 is subjected to wind load. This design is particularly critical for maintaining the overall performance and durability of the structure, and can effectively extend the service life of the structure. Considering that the fan 4 structure is usually a tall structure with high maintenance difficulty and cost, the low deformation characteristics of the structure mean less maintenance and repair requirements, thereby reducing maintenance costs. This has significant benefits for ensuring the economy and long-term operation of the structure.

[0068] Each rod in the patented structure of the utility model is of standardized size, fully realizing factory prefabrication; high-performance materials are used to form a high-strength and lightweight structure, effectively reducing the unit size and the lifting weight, and the disassembled components can meet the transportation size requirements, realizing low-cost and high-efficiency road transportation; the tower transfer structure and the lattice tower 1 and the steel tower 3 are connected by high-strength bolts 15, which improves the efficiency of on-site construction and ensures the quality of on-site construction. The design advantage of this structural assembly makes the entire construction process smoother and more efficient.

[0069] This utility model patent improves the tensile performance and rigidity of the structure, making the overall structure more stable. In addition, the expansion of the structural cross-section becomes more convenient, so that it can more flexibly adapt to wind power tower structures of greater heights. This innovative design not only helps to improve the overall performance of the structure, but also provides greater applicability and scalability for future engineering applications.

[0070] The utility model patented pre-stressed steel pipe UHPC standardized component can realize the prefabrication of the overall structure, avoiding the problem of poor control of stress horizontal tendons in high-altitude tensioning of external bundle prestressing. At the same time, the steel in the pre-stressed steel pipe UHPC standardized component can be made of corrosion-resistant materials. In this way, there is no need to replace materials during the entire life cycle, avoiding the later maintenance and high-altitude replacement caused by the easy corrosion of the external bundle prestressing tendons 7, which increases the overall cost of the project; the internal prestress offsets part of the external load. Due to the presence of prestressed parts, the concrete is in a compressed state and has a pressure reserve, which effectively reduces the risk of concrete cracking and improves the safety of steel pipe concrete components; the pre-stressed component unit can achieve lightweight transportation and installation. Compared with the traditional large-diameter tower structure, the patented structure is more conducive to road transportation.

[0071] The tower transition structure in the utility model patent structure adopts a new steel pipe outer UHPC composite structure to form an embedded structure. This design makes the transition of the stiffness of the lattice tower 1 to the steel tower 3 smoother, effectively reducing the discontinuity between the structures. Smooth transition helps to reduce stress concentration and improve the stability of the overall structure. In the transition area, through the embedded design, the distribution of structural stiffness can be better controlled, and the structural deformation caused by inconsistent stiffness can be reduced, thereby maintaining the overall integrity of the structure and improving the overall performance. This makes it possible to more effectively transmit force under external loads and reduce the stress concentration of the structure. At the same time, the structure has strong adaptability and can flexibly meet the stiffness requirements of different parts, reducing the requirements and costs of the foundation. This design effectively solves the problems of the large number of steel bar bolts 20 in the traditional steel-concrete transition ring, complex layout, high difficulty in processing and manufacturing, and the large volume of the steel-concrete transition ring structure and high lifting requirements. This makes the utility model structure more feasible and economical.

[0072] The low creep coefficient of the steel-UHPC structure of the utility model improves the stability of the structure. In order to ensure the continuity of force, the current high tower structure needs to be prestressed at high altitudes. The combined joint between the upper and lower unit main columns 5 uses an outer flange 8 with stiffening ribs and a large-diameter fully connected grouting UHPC sleeve 9 in the steel pipe-UHPC column to improve the axial tension bearing capacity of the node under the action of alternating tension and compression loads, avoiding the post-tensioning prestressing construction of conventional nodes in the later stage, and realizing the assembly of the entire structure. The current high tower structure adopts a three-column structure with complex and changeable force transmission methods in the horizontal and diagonal directions. The use of a multi-limb tower structure makes the overall force more uniform and dispersed. At the same time, the form of multi-limb force sharing makes the force borne by the limb column smaller, and the size of the limb column can be appropriately reduced, solving the problem that the structure is difficult to transport in mountainous areas due to its large size.

[0073] The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. For those skilled in the art, the utility model may have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A pre-stressed steel tube UHPC component unit, It is characterized in that include: A main column, wherein the main column is divided into an upper main column and a lower main column, and the inside of the main column is filled with UHPC; A large-diameter fully connected grouting UHPC sleeve, wherein the large-diameter fully connected grouting UHPC sleeve is arranged in the main column at the lower end, and the large-diameter fully connected grouting UHPC sleeve cooperates with the anchor steel bar; Anchor steel bars, one section of which is arranged on the main column at the upper end, and the other section is inserted into a large-diameter fully connected grouting UHPC sleeve; Prestressed steel strands, the prestressed steel strands being arranged in the main column at the lower end; Among them, the anchor steel bars are inserted into the large-diameter fully connected grouting UHPC sleeve and matched with the reinforced external flange to connect the upper and lower columns.

2. The prestressed steel pipe UHPC component unit according to claim 1, It is characterized in that When the size of the main column of the lattice tower is small, the main column adopts a solid steel tube UHPC column.

3. The prestressed steel pipe UHPC component unit according to claim 1, It is characterized in that When the size of the main column of the lattice tower is relatively large, the main column adopts a hollow sandwich steel tube UHPC column.

4. The prestressed steel pipe UHPC component unit according to claim 1, It is characterized in that The prestressed steel strands include a plurality of strands, which are evenly arranged in a ring shape in the main column at the lower end.

5. The prestressed steel pipe UHPC component unit according to claim 1, It is characterized in that The anchoring steel bars include a plurality of anchoring steel bars, which are arranged in a ring shape on the main column at the upper end.

6. The prestressed steel pipe UHPC component unit according to claim 1, It is characterized in that The large-diameter fully connected grouting UHPC sleeves include a plurality of large-diameter fully connected grouting UHPC sleeves, which are evenly arranged in a ring shape in the main column at the lower end, and the positions of the large-diameter fully connected grouting UHPC sleeves correspond one-to-one to the anchor steel bars.

7. The prestressed steel pipe UHPC component unit according to claim 1, It is characterized in that A section of anchor steel bars of the main column at the upper end is connected to the anchor steel bars of the main column at the lower end through a large-diameter fully connected grouting UHPC sleeve.

8. A hybrid tower wind power structure, based on the prestressed steel pipe UHPC component unit according to any one of claims 1 to 7, Features include: Pre-tensioned steel tube UHPC component units, hybrid tower transition structure, steel tower and wind turbine.