By adopting sliding components and hinged rod gripper structure in the large-diameter steel pipe lifting device, the problem of unstable lifting of long steel pipes is solved, and the stable lifting and stability improvement of steel pipes when the length of steel pipes is long is achieved.

CN222118659UActive Publication Date: 2024-12-06NINGBO KEXIN CORROSION CONTROL ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420947176.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2024-12-06
Estimated Expiration
2034-04-30

AI Technical Summary

Technical Problem

The existing large-diameter steel pipe lifting device is unstable when the steel pipe length exceeds 200 meters, and it is difficult to effectively clamp the steel pipe, resulting in difficulty in lifting.

Method used

A sliding structure including lifting assembly and gripping assembly is designed. Through a linear guide rail and a slider, the gripping arm can slide to the center position of the steel pipe according to the length of the steel pipe. The hinge rod and gripper design ensures the stable clamp of the steel pipe. hold.

Benefits of technology

It can be lifted firmly when the steel pipe is long, improving the stability and safety of lifting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222118659U_ABST
    Figure CN222118659U_ABST
Patent Text Reader

Abstract

The utility model relates to a large-diameter steel pipe hoisting tool and belongs to the technical field of steel pipe production equipment. The large-diameter steel pipe hoisting tool comprises a hoisting assembly and a grabbing assembly, a sliding assembly is arranged between the hoisting assembly and the grabbing assembly, and the grabbing assembly is in sliding connection with the hoisting assembly through the sliding assembly; the sliding assembly comprises a linear guide rail connected with the lifting assembly, a pair of sliding blocks are oppositely arranged on the linear guide rail, the grabbing assembly comprises a pair of grabbing arms, and the grabbing arms are connected with the sliding blocks. The large-diameter steel pipe hoisting device has the effect of stably hoisting large-diameter steel pipes with too long lengths.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of steel pipe production equipment, and in particular to a large-diameter steel pipe lifting tool. Background Art

[0002] Large-diameter steel pipes need to be hoisted during the production process. Since the diameter of large-diameter steel pipes is relatively large and the length is relatively long, large-diameter steel pipes are usually about 20 meters long and about 200 meters long.

[0003] In the related art, for example, a Chinese utility model patent with publication number CN215287661U discloses a large-diameter steel pipe lifting device, including a horizontal lifting beam, wherein the left side of the horizontal lifting beam has a left inclined surface, the left inclined surface is welded to a left inclined hanging plate, the left inclined hanging plate is welded to a left inclined beam, the right side of the horizontal lifting beam has a right inclined surface, the right inclined surface is welded to a right inclined hanging plate, the right inclined hanging plate is welded to a right inclined beam, a front clamping plate and a rear clamping plate are clamped between the left inclined beam and the right inclined beam, and the The bottom of the front plywood and the rear plywood are connected through a bottom plate, and the bottom plate is attached to the top of the horizontal lifting beam. The front plywood and the top of the rear plywood are provided with the same lifting holes, and the lifting holes are connected to the lifting hook of the electric hoist, and the electric hoist is connected to the top fixed beam slideway. The electric hoist slides on the top fixed beam slideway, the left oblique hanging plate is connected to the left hook, and the right oblique hanging plate is connected to the right hook, and the left hook and the right hook are hooked to lift the large-diameter steel pipe.

[0004] With respect to the above-mentioned related technologies, the following defects are found: the left side of the large-diameter steel pipe is hooked by the left front hook and the left rear hook, the right side of the large-diameter steel pipe is hooked by the right front hook and the right rear hook, and the electric hoist is started to lift the large-diameter steel pipe. However, this structure is more suitable for steel pipes that are not very long. When the length of the steel pipe is about 200 meters, the distance between the left front hook and the left rear hook and the right front hook and the right rear hook is often less than 200 meters. It is not easy to hook the left front hook and the left rear hook on the left side of the large-diameter steel pipe, and it is not easy to hook the right front hook and the right rear hook on the right side of the large-diameter steel pipe. Therefore, if the length of the large-diameter steel pipe is too long, it may be difficult to lift the large-diameter steel pipe stably. Utility Model Content

[0005] In order to stably lift a large-diameter steel pipe that is too long, the present application provides a large-diameter steel pipe lifting tool.

[0006] The present application provides a large-diameter steel pipe lifting tool, which adopts the following technical solution:

[0007] A large-diameter steel pipe lifting tool comprises a lifting assembly and a grabbing assembly, a sliding assembly is provided between the lifting assembly and the grabbing assembly, the grabbing assembly is slidably connected to the lifting assembly through the sliding assembly, the sliding assembly comprises a linear guide rail connected to the lifting assembly, a pair of sliders are relatively provided on the linear guide rail, and the grabbing assembly comprises a pair of grabbing arms, and the grabbing arms are connected to the sliders.

[0008] By adopting the above technical solution, a sliding assembly is provided between the lifting assembly and the grabbing assembly, so that the grabbing assembly can slide on the lifting assembly through the sliding assembly. Specifically, a linear guide rail is connected to the lifting assembly, and a pair of sliders are relatively provided on the linear guide rail to connect the grabbing arm with the slider. The pair of grabbing arms corresponds to the pair of sliders one by one, so that the grabbing arm can slide to an appropriate position according to the length of the steel pipe. When the steel pipe is not very long, the pair of sliders slide relative to each other to move the grabbing arm to a position closer to the center of the steel pipe relative to both ends of the steel pipe, which is beneficial to improve the stability when lifting the steel pipe. When the steel pipe is longer, the pair of sliders slide in opposite directions to move the grabbing arm to a position closer to the center of the steel pipe relative to both ends of the steel pipe, so that the steel pipe can be stably lifted even when the steel pipe is longer.

[0009] Optionally, the grabbing arm comprises a first articulated rod and a second articulated rod, one end of the first articulated rod and the second articulated rod are hinged, the end of the first articulated rod facing away from the end articulated with the second articulated rod is hinged with a third articulated rod, the end of the second articulated rod facing away from the end articulated with the first articulated rod is hinged with a fourth articulated rod, the end of the third articulated rod facing away from the end articulated with the first articulated rod is hinged with an end of the fourth articulated rod facing away from the end articulated with the second articulated rod, the end of the third articulated rod hinged to the fourth articulated rod is provided with a first gripper, and the end of the fourth articulated rod hinged to the third articulated rod is provided with a second gripper.

[0010] By adopting the above technical scheme, one end of the first hinged rod and the second hinged rod are hinged, the third hinged rod is connected to the end of the first hinged rod away from the hinged rod, the fourth hinged rod is hinged to the end of the second hinged rod away from the hinged rod, the end of the third hinged rod away from the hinged rod and the end of the fourth hinged rod away from the hinged rod, a first gripper is provided at the end where the third hinged rod and the fourth hinged rod are hinged, and a second gripper is provided at the end where the fourth hinged rod and the third hinged rod are hinged, so that when the first gripper and the second gripper are aligned with the steel pipe and the first hinged rod and the second hinged rod are lifted and moved in a direction away from the steel pipe, the first gripper and the second gripper can gradually hold the steel pipe, which is conducive to the first gripper and the second gripper to clamp the steel pipe.

[0011] Optionally, the grabbing arm further includes a connecting block, the connecting block being located at one end where the first hinge block and the second hinge block are hinged, and a connecting rod is provided at one end of the connecting block away from the extension direction of the first gripper and the second gripper, and the connecting rod is movably arranged on the slider.

[0012] By adopting the above technical scheme, a connecting block is provided at one end where the first hinge block and the second hinge block are hinged, and a connecting rod is provided at one end of the connecting block away from the extension direction of the first gripper and the second gripper, and the connecting rod is movably penetrated on the slider, so that the connecting rod slides through the slider, thereby driving the first gripper and the second gripper to move to appropriate positions of the steel pipe, and when the lifting assembly moves toward the direction of the steel pipe, the first gripper and the second gripper abut against the steel pipe, and at this time the connecting rod can move in a direction away from the steel pipe, so that the distance between the first gripper and the second gripper becomes farther and farther, so that they can be located on both sides of the steel pipe respectively, and when the lifting assembly moves in a direction away from the steel pipe, the first gripper and the second gripper can gradually hold the steel pipe tightly.

[0013] Optionally, the connecting rod passes through one end of the sliding block and is threadedly connected to a limiting block, and a diameter of the limiting block is greater than a diameter of the connecting rod.

[0014] By adopting the above technical solution, a limiting block is threadedly connected to one end of the connecting rod passing through the slider, and the diameter of the limiting block is larger than the diameter of the connecting rod, so that when the lifting assembly moves in a direction away from the steel pipe, the connecting rod can be easily separated from the slider due to the setting of the limiting block.

[0015] Optionally, the widths of the first gripper and the second gripper are both greater than the widths of the first hinged rod, the second hinged rod, the third hinged rod, and the fourth hinged rod.

[0016] By adopting the above technical solution, the widths of the first gripper and the second gripper are set to be larger than the widths of the first hinged rod, the second hinged rod, the third hinged rod and the fourth hinged rod, which is beneficial to improving the stability of grasping the steel pipe.

[0017] Optionally, the lifting assembly includes a first lifting rod and a second lifting rod, the first lifting rod and the second lifting rod are used to be connected to the linear guide rail, and the first lifting rod, the second lifting rod and the linear guide rail are combined into a triangular shape.

[0018] By adopting the above technical solution, the first lifting rod and the second lifting rod are used to connect with the linear guide rail, and the first lifting rod, the second lifting rod and the linear guide rail form a triangular shape, which is beneficial to improve the stability of the lifting assembly.

[0019] Optionally, a cross reinforcement rib is provided inside the triangle formed by the first lifting rod, the second lifting rod and the linear guide rail.

[0020] By adopting the above technical solution, a cross reinforcement rib is arranged inside the triangle formed by the first lifting rod, the second lifting rod and the linear guide rail, which is beneficial to further improve the stability of the lifting assembly.

[0021] Optionally, a lifting hole is provided at one end of the first lifting rod connected to the second lifting rod.

[0022] By adopting the above technical solution, a lifting hole is provided at one end where the first lifting rod and the second lifting rod are connected, which is conducive to realizing the detachable setting of the lifting tooling.

[0023] In summary, the present application includes at least one of the following beneficial technical effects:

[0024] A sliding assembly is provided between the lifting assembly and the grabbing assembly, so that the grabbing assembly can slide on the lifting assembly through the sliding assembly. Specifically, a linear guide rail is connected to the lifting assembly, and a pair of sliders are relatively provided on the linear guide rail to connect the grabbing arm with the slider. The pair of grabbing arms corresponds to the pair of sliders one by one, so that the grabbing arm can slide to an appropriate position according to the length of the steel pipe. When the steel pipe is not very long, the pair of sliders slide relatively to move the grabbing arm to a position closer to the center of the steel pipe relative to the two ends of the steel pipe, which is conducive to improving the stability when lifting the steel pipe. When the length of the steel pipe is long, the pair of sliders slide in opposite directions to move the grabbing arm to a position closer to the center of the steel pipe relative to the two ends of the steel pipe, so that when the length of the steel pipe is long, the steel pipe can be stably lifted;

[0025] The first hinge rod and the second hinge rod are hinged at one end, and the third hinge rod is connected at one end of the first hinge rod away from the hinged end of the second hinge rod, and the fourth hinge rod is hinged at one end of the second hinge rod away from the hinged end of the first hinge rod, and the first gripper is arranged at one end of the third hinge rod and the fourth hinge rod, and the second gripper is arranged at one end of the fourth hinge rod and the third hinge rod, so that when the first gripper and the second gripper are aligned with the steel pipe, when the first hinge rod and the second hinge rod are lifted and moved in the direction away from the steel pipe, the first gripper and the second gripper can gradually hold the steel pipe tightly, which is conducive to the first gripper and the second gripper to clamp the steel pipe;

[0026] A connecting block is provided at one end where the first hinge block and the second hinge block are hinged, and a connecting rod is provided at one end of the connecting block away from the extension direction of the first gripper and the second gripper, and the connecting rod is movably inserted into the slider, so that the connecting rod slides through the slider, thereby driving the first gripper and the second gripper to move to appropriate positions of the steel pipe, and when the lifting assembly moves toward the direction of the steel pipe, the first gripper and the second gripper abut against the steel pipe, and at this time the connecting rod can move in a direction away from the steel pipe, so that the distance between the first gripper and the second gripper becomes farther and farther, so that they can be located on both sides of the steel pipe respectively, and when the lifting assembly moves in a direction away from the steel pipe, the first gripper and the second gripper can gradually hold the steel pipe tightly. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a structural diagram of the overall structure in the embodiment of the present application.

[0028] Figure 2 It is a schematic diagram of the structure of the grabbing component in the embodiment of the present application.

[0029] Explanation of the accompanying drawings: 1. Lifting assembly; 11. First lifting rod; 111. First connecting part; 12. Second lifting rod; 121. Second connecting part; 13. Lifting hole; 14. Cross reinforcement rib; 2. Sliding assembly; 21. Linear guide rail; 22. Sliding block; 3. Grabbing assembly; 31. Grabbing arm; 311. First articulated rod; 312. Second articulated rod; 313. Third articulated rod; 3131. First gripper; 314. Fourth articulated rod; 3141. Second gripper; 32. Connecting block; 33. Connecting rod; 331. Limiting block. DETAILED DESCRIPTION

[0030] The following is combined with Figure 1-2 This application is described in further detail.

[0031] The present application embodiment discloses a large-diameter steel pipe lifting tool. Figure 1 A large-diameter steel pipe lifting tool includes a lifting component 1, a sliding component 2 and a grabbing component 3. The sliding component 2 is connected to the lifting component 1, and the grabbing component 3 is connected to the sliding component 2, so that the grabbing component 3 slides on the lifting component 1 through the sliding component 2.

[0032] Reference Figure 1The lifting assembly 1 includes a first lifting rod 11 and a second lifting rod 12, one end of the first lifting rod 11 is welded to one end of the second lifting rod 12, the welded first lifting rod 11 and the second lifting rod 12 are in an obtuse angle, a lifting hole 13 is welded to one end of the first lifting rod 11 and the second lifting rod 12, a cross reinforcement rib 14 is welded at the inner wall of the first lifting rod 11 and the second lifting rod 12, one end of the cross reinforcement rib 14 not welded to the first lifting rod 11 and the second lifting rod 12 is welded to the peripheral wall of the lifting hole 13, a first connecting portion 111 is integrally formed at one end of the first lifting rod 11 away from the welding with the second lifting rod 12, and a second connecting portion 121 is integrally formed at one end of the second lifting rod 12 away from the welding with the first lifting rod 11, and the first connecting portion 111 and the second connecting portion 121 are used to connect with the sliding assembly 2.

[0033] Reference Figure 1 The sliding assembly 2 includes a linear guide 21 and a pair of sliders 22. The pair of sliders 22 are relatively arranged on the linear guide 21. The linear guide 21 is placed between the first connecting part 111 and the second connecting part 121. The two ends of the linear guide 21 are respectively fixed to the first connecting part 111 and the second connecting part 121 by bolts, so that the first lifting rod 11, the second lifting rod 12 and the linear guide 21 are combined into a triangular shape, and the end of the cross reinforcement rib 14 that is away from being welded to the surrounding wall of the lifting hole 13 is welded to the linear guide 21.

[0034] Reference Figure 1 and Figure 2 The grabbing assembly 3 includes a pair of grabbing arms 31, a connecting block 32 and a connecting rod 33. The pair of grabbing arms 31 correspond to the pair of sliders 22 one by one. The grabbing arm 31 includes a first hinged rod 311, a second hinged rod 312, a third hinged rod 313 and a fourth hinged rod 314. One end of the first hinged rod 311 is hinged to one end of the second hinged rod 312, and one end of the first hinged rod 311 away from the hinged to the second hinged rod 312 is hinged to the third hinged rod 313. The end of the second hinged rod 312 away from the hinged to the first hinged rod 311 is hinged to the fourth hinged rod 314, so that the first hinged rod 311, the second hinged rod 312, the third hinged rod 313 and the fourth hinged rod 314 form a deformable quadrilateral.

[0035] Reference Figure 1 and Figure 2A first gripper 3131 is welded to one end of the third hinged rod 313 which is away from the first hinged rod 311, and a second gripper 3141 is welded to one end of the fourth hinged rod 314 which is away from the second hinged rod 312, so that the first gripper 3131 and the second gripper 3141 can hold and release the steel pipe under the deformation of the first hinged rod 311, the second hinged rod 312, the third hinged rod 313 and the fourth hinged rod 314, and the width of the first gripper 3131 and the second gripper 3141 are both greater than the width of the first hinged rod 311, the second hinged rod 312, the third hinged rod 313 and the fourth hinged rod 314.

[0036] Reference Figure 1 and Figure 2 The connecting block 32 is arranged at the hinged position between the first hinge rod 311 and the second hinge rod 312, and in order to improve the stability of clamping the steel pipe, a grabbing arm 31 is also arranged at the end of the connecting block 32 away from the first hinge rod 311, so two grabbing arms 31 are connected to one connecting block 32.

[0037] Reference Figure 1 and Figure 2 The connecting rod 33 is welded to one end of the connecting block 32 which is away from the extending direction of the first gripper 3131 and the second gripper 3141. In order to improve the stability of the grabbing arm 31, two connecting rods 33 are welded on the connecting block 32. Both connecting rods 33 are arranged through the slider 22. The two connecting rods 33 are respectively located on both sides of the linear guide rail 21, and the connecting rod 33 can move in the up and down directions on the slider 22. In order to prevent the connecting rod 33 from easily detaching from the slider 22, a limit block 331 is threadedly connected to one end of the connecting rod 33 which passes through the slider 22, and the diameter of the limit block 331 is larger than the diameter of the connecting rod 33.

[0038] The implementation principle of a large-diameter steel pipe lifting tool in the embodiment of the present application is as follows: hang the lifting hole 13 on the mechanical arm, adjust the distance between a pair of sliders 22 according to the length of the steel pipe, and move the lifting tool toward the direction of the steel pipe. After the first gripper 3131 and the second gripper 3141 are in contact with the steel pipe, as the mechanical arm continues to move toward the direction of the steel pipe, the connecting rod 33 moves toward the direction of the lifting hole 13. At this time, the hinged end of the first hinged rod 311 and the second hinged rod 312 is close to the hinged end of the third hinged rod 313 and the fourth hinged rod 314, and the hinged end of the first hinged rod 311 and the third hinged rod 313 is close to the hinged end of the second hinged rod 312 and the fourth hinged rod 314, thereby driving the first gripper 3131 and the second gripper 3141 to separate, so that the first gripper 3131 and the second gripper 3141 are placed on both sides of the steel pipe as the mechanical arm moves;

[0039] Pull the lifting hole 13 of the robotic arm in the opposite direction as mentioned above, so that the end where the first hinged rod 311 and the second hinged rod 312 are hinged is separated from the end where the third hinged rod 313 and the fourth hinged rod 314 are hinged, and the end where the first hinged rod 311 and the third hinged rod 313 are hinged is close to the end where the second hinged rod 312 and the fourth hinged rod 314 are hinged. At this time, the first gripper 3131 and the second gripper 3141 can hold the steel pipe tightly and lift it.

[0040] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A large-diameter steel pipe lifting tool, Features: The invention comprises a lifting component (1) and a grabbing component (3), wherein a sliding component (2) is arranged between the lifting component (1) and the grabbing component (3), wherein the grabbing component (3) is slidably connected to the lifting component (1) via the sliding component (2), wherein the sliding component (2) comprises a linear guide rail (21) connected to the lifting component (1), wherein a pair of sliders (22) are arranged on the linear guide rail (21) in opposite directions, and wherein the grabbing component (3) comprises a pair of grabbing arms (31), wherein the grabbing arms (31) are connected to the sliders (22).

2. A large-diameter steel pipe lifting tool according to claim 1, Features: The grabbing arm (31) comprises a first hinged rod (311) and a second hinged rod (312); one end of the first hinged rod (311) and the second hinged rod (312) are hinged to each other; one end of the first hinged rod (311) away from the hinged rod (312) is hinged to a third hinged rod (313); and one end of the second hinged rod (312) away from the hinged rod (311) is hinged to a fourth hinged rod (314). ), the end of the third hinged rod (313) which is away from the end hinged to the first hinged rod (311) is hinged to the end of the fourth hinged rod (314) which is away from the end hinged to the second hinged rod (312), the end of the third hinged rod (313) which is hinged to the fourth hinged rod (314) is provided with a first gripper (3131), and the end of the fourth hinged rod (314) which is hinged to the third hinged rod (313) is provided with a second gripper (3141).

3. A large-diameter steel pipe lifting tool according to claim 2, Features: The grabbing arm (31) further comprises a connecting block (32), wherein the connecting block (32) is located at one end where the first hinged rod (311) and the second hinged rod (312) are hinged, and a connecting rod (33) is provided at one end of the connecting block (32) which is away from the extension direction of the first gripper (3131) and the second gripper (3141), and the connecting rod (33) is movably arranged on the slider (22).

4. A large-diameter steel pipe lifting tool according to claim 3, Features: The connecting rod (33) passes through one end of the sliding block (22) and is threadedly connected to a limiting block (331); the diameter of the limiting block (331) is greater than the diameter of the connecting rod (33).

5. A large-diameter steel pipe lifting tool according to claim 2, Features: The widths of the first gripper (3131) and the second gripper (3141) are both greater than the widths of the first hinged rod (311), the second hinged rod (312), the third hinged rod (313) and the fourth hinged rod (314).

6. A large-diameter steel pipe lifting tool according to claim 1, Features: The lifting assembly (1) comprises a first lifting rod (11) and a second lifting rod (12); the first lifting rod (11) and the second lifting rod (12) are used to be connected to the linear guide rail (21); the first lifting rod (11), the second lifting rod (12) and the linear guide rail (21) are combined to form a triangle shape.

7. A large-diameter steel pipe lifting tool according to claim 6, Features: A cross reinforcing rib (14) is provided inside a triangle formed by the first lifting rod (11), the second lifting rod (12) and the linear guide rail (21).

8. A large-diameter steel pipe lifting tool according to claim 7, Features: One end of the first lifting rod (11) connected to the second lifting rod (12) is provided with a lifting hole (13).