Full-automatic prefabricated intelligent lifting pump station

The fully automatic prefabricated intelligent lifting pump station addresses sludge-induced blockages by adjusting the sewage pump suction port and incorporating a secondary pumping system with a filter and rotating joint, ensuring reliable operation and efficient sludge and gas discharge.

CN222120474UActive Publication Date: 2024-12-06SHANDONG GUOZHILIN MACHINERY TECHNOLOGY CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420793559.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-17
Publication Date
2024-12-06
Estimated Expiration
2034-04-17

AI Technical Summary

Technical Problem

Existing prefabricated sewage pump stations face issues with the fixed water inlet position, leading to blockages and potential damage due to sludge accumulation, which affects the reliability and functionality of the equipment.

Method used

A fully automatic prefabricated intelligent lifting pump station with adjustable sewage pump suction port, utilizing a secondary pumping pipe and steel cable system, along with a filter and rotating joint, to maintain air tightness and lift the suction port away from sludge, combined with a collecting bucket and auger for sludge and floating object removal, and a metal pipe for gas discharge.

Benefits of technology

Enhances the reliability of the pump station by preventing blockages and damage, enabling efficient sludge and floating object removal, and improving gas discharge efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222120474U_ABST
    Figure CN222120474U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of lifting pump stations, in particular to a full-automatic prefabricated intelligent lifting pump station which can lift the height of a water pumping opening of a sewage pump, prevent the sewage pump from being blocked and damaged by sludge and improve the reliability of equipment. Comprising a prefabricated pump station body, a water inlet pipe, a working platform and a sewage pump, the water inlet pipe is installed on the side wall of the prefabricated pump station body, the working platform is horizontally arranged in the prefabricated pump station body, the sewage pump is installed on the working platform, and a drainage pipe of the sewage pump extends out of the prefabricated pump station body; the prefabricated pump station further comprises a first-stage water pumping pipe, a second-stage water pumping pipe, a winding machine and a steel cable, the output end of the first-stage water pumping pipe is connected with a water pumping opening of the sewage pump, the input end of the first-stage water pumping pipe is slidably connected with the output end of the second-stage water pumping pipe in an inserted mode, the input end of the second-stage water pumping pipe extends into the bottom of the prefabricated pump station body, and the winding machine is installed on the working platform. The upper end of the steel cable is wound on the winding machine, and the lower end of the steel cable is connected with the second-stage water pumping pipe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of lift pump stations, in particular to a fully automatic prefabricated intelligent lift pump station. Background Art

[0002] A prefabricated lifting pump station is a new type of pump station that uses prefabricated structural parts as the main body and is used to lift sewage. The Chinese utility model patent with the prior art publication number CN218437450U proposes a sewage prefabricated lifting pump station. The prefabricated lifting pump station, through the design of the prefabricated pump station cylinder, sludge pump, suction pipe and discharge pipe, can make the prefabricated lifting pump station accumulate a lot of sludge impurities at the bottom after long-term use or standing still. The accumulated sludge impurities can be extracted to the outside through the sludge pump, thereby avoiding affecting the working effect of the pump station.

[0003] However, the position of the water inlet of the above-mentioned existing sewage pump is fixed and the height cannot be adjusted. When the sludge is deposited deeply, it is easy for the water inlet to be in the sludge, causing the sewage pump to be blocked, resulting in sewage discharge failure or even damage to the sewage pump. Utility Model Content

[0004] In order to solve the above technical problems, the utility model provides a fully automatic prefabricated intelligent lifting pump station which can increase the height of the sewage pump suction port, avoid the sewage pump being blocked and damaged by sludge, and improve the reliability of the equipment.

[0005] The utility model discloses a fully automatic prefabricated intelligent lifting pump station, comprising a prefabricated pump station body, a water inlet pipe, a working platform and a sewage pump, wherein the water inlet pipe is mounted on the side wall of the prefabricated pump station body, the working platform is horizontally arranged inside the prefabricated pump station body, the sewage pump is mounted on the working platform, and the drainage pipe of the sewage pump extends out of the outside of the prefabricated pump station body; the utility model also comprises a primary pumping pipe, a secondary pumping pipe, a reel and a steel cable, the output end of the primary pumping pipe is connected to the water suction port of the sewage pump, the input end of the primary pumping pipe is slidably plugged with the output end of the secondary pumping pipe, the input end of the secondary pumping pipe extends into the bottom of the prefabricated pump station body, the reel is mounted on the working platform, the upper end of the steel cable is reeled on the reel, and the lower end of the steel cable is connected to the secondary pumping pipe; the staff operates the sewage pump on the working platform , multiple working platforms are set according to the size of the pumping station, and an intelligent control cabinet is installed on the working platform. The intelligent control cabinet controls the automatic operation of the sewage pump and the winder. The sewage is input into the bottom of the prefabricated pumping station body through the water inlet pipe. The sewage pump is running, so that the sewage is input into the sewage pump through the secondary pumping pipe and the primary pumping pipe, and is discharged to the outside of the prefabricated pumping station body through the drainage pipe of the sewage pump. When the sludge layer deposited at the bottom of the prefabricated pumping station body approaches the input end of the secondary pumping pipe, the winder winds up the steel cable, and the steel cable lifts the secondary pumping pipe upward along the primary pumping pipe. The sealing ring between the primary pumping pipe and the secondary pumping pipe ensures air tightness, so that the input end of the secondary pumping pipe is away from the sludge, avoiding the input end of the secondary pumping pipe being blocked by the sludge, and at the same time avoiding damage to the sewage pump, thereby improving the reliability of the equipment.

[0006] Preferably, a filter is also included, and the filter is installed at the input end of the secondary pumping pipe; the filter intercepts and filters large particles of impurities in the sewage to avoid damage to the sewage pump and improve the reliability of the equipment.

[0007] Preferably, it also includes a rotating joint. A rotating joint is arranged at the output end of the first-level pumping pipe, the rotating joint is perpendicular to the first-level pumping pipe, and the rotating joint is rotatably connected to the water suction port of the sewage pump. The sealing ring between the rotating joint and the water suction port of the sewage pump ensures air tightness. When the secondary pumping pipe is lifted to the upper end limit of the first-level pumping pipe by the steel cable, the steel cable continues to lift the secondary pumping pipe, so that the secondary pumping pipe and the first-level pumping pipe rotate around the water suction port of the sewage pump under the action of the rotating joint, further making the input end of the secondary pumping pipe away from the sludge at the bottom of the prefabricated pumping station body, increasing the adjustment stroke of the input end of the secondary pumping pipe, and improving reliability.

[0008] Preferably, it also includes a collecting bucket, a receiving hopper and an auger. The collecting bucket is bucket-shaped, and the filter is installed in the collecting bucket. The side plate of the collecting bucket surrounds the filter. The receiving hopper is installed in the prefabricated pump station body. When the secondary pumping pipe drives the collecting bucket to rise, the receiving hopper is located below the collecting bucket. The auger is installed in the prefabricated pump station body, and the input end of the auger extends into the receiving hopper, and the output end of the auger extends out of the outside of the prefabricated pump station body. The sewage enters the collecting bucket through the upper edge of the collecting bucket and is pumped away through the secondary pumping pipe. A large amount of floating objects will accumulate in the collecting bucket. When the secondary pumping pipe is lifted to the upper limit position by the steel cable and rotated, the secondary pumping pipe drives the collecting bucket to the top of the receiving hopper through the filter, and pours the floating objects in the collecting bucket into the receiving hopper. The auger is operated to discharge the floating objects out of the prefabricated pump station body, thereby realizing the cleaning of floating objects in the sewage.

[0009] Preferably, a baffle is further included, and an opening is arranged on the side wall of the collecting bucket. The upper end of the baffle is hinged to the upper edge of the opening, and the baffle blocks the opening from the inside of the collecting bucket. When the sewage is discharged, the sewage pushes the baffle inward, so that the sewage enters the collecting bucket through the opening, so that the sewage at a lower position can also be pumped away. When the collecting bucket is tilted, the pressure of the sewage in the collecting bucket presses the baffle against the side wall of the collecting bucket, thereby preventing floating objects in the collecting bucket from leaking through the opening, thereby improving practicality.

[0010] Preferably, the input end of the auger passes through the material receiving hopper and extends into the bottom of the prefabricated pump station body, and the auger is provided with a second input port in the material receiving hopper; through the above arrangement, the auger can discharge the sludge at the bottom of the prefabricated pump station body through the input end, and at the same time can discharge the floating objects in the material receiving hopper through the second input port, thereby improving practicality.

[0011] Preferably, it also includes a metal tube and a lower barrel, the metal tube is vertically inserted on the top of the prefabricated pump station body, the lower end of the metal tube extends into the interior of the prefabricated pump station body, a black heat-absorbing coating is provided on the surface of the metal tube, the lower barrel is installed on the top wall of the prefabricated pump station body, the lower end of the metal tube extends into the lower barrel, and a plurality of air holes are provided on the upper side wall of the lower barrel; the temperature of the metal tube rises in the sun, so that the air inside the metal tube is heated, and after the hot air rises, negative pressure is formed in the metal tube, so that the exhaust gas in the prefabricated pump station body is drawn into the metal tube through the plurality of air holes of the lower barrel for discharge, thereby improving the exhaust gas discharge efficiency, the lower end of the metal tube extends into the lower barrel, and the lower barrel catches the debris falling through the metal tube, thereby preventing the flammable debris from directly falling into the prefabricated pump station body and causing greater harm to the pump station.

[0012] Compared with the prior art, the beneficial effects of the utility model are as follows: the staff operates the sewage pump on the working platform, and multiple working platforms are arranged according to the size of the pumping station. An intelligent control cabinet is installed on the working platform, and the intelligent control cabinet controls the automatic operation of the sewage pump and the winder, and the sewage is input into the bottom of the prefabricated pumping station body through the water inlet pipe. When the sewage pump is running, the sewage is input into the sewage pump through the secondary pumping pipe and the primary pumping pipe, and is discharged to the outside of the prefabricated pumping station body through the drainage pipe of the sewage pump. When the sludge layer deposited at the bottom of the prefabricated pumping station body approaches the input end of the secondary pumping pipe, the winder winds up the steel cable, and the steel cable lifts the secondary pumping pipe upward along the primary pumping pipe. The sealing ring between the primary pumping pipe and the secondary pumping pipe ensures air tightness, so that the input end of the secondary pumping pipe is away from the sludge, avoiding the input end of the secondary pumping pipe being blocked by the sludge, and at the same time avoiding damage to the sewage pump, thereby improving the reliability of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a front sectional structural schematic diagram of the utility model;

[0014] Figure 2 It is a partial cross-sectional structural schematic diagram of the utility model;

[0015] Figure 3 It is a front cutaway axonometric structural schematic diagram of the utility model;

[0016] Figure 4 It is a schematic diagram of the structure of the working platform, sewage pump, primary pumping pipe, secondary pumping pipe and winder;

[0017] Figure 5 It is a schematic diagram of the structure of the collecting bucket, baffle and other structures;

[0018] Figure 6 It is a structural diagram of the receiving hopper and auger;

[0019] Figure 7 It is a structural diagram of the metal pipe, lower barrel and other structures.

[0020] Markings in the attached figure: 1. Prefabricated pump station body; 2. Water inlet pipe; 3. Working platform; 4. Sewage pump; 5. Primary pumping pipe; 6. Secondary pumping pipe; 7. Winder; 8. Steel cable; 9. Filter; 10. Rotary joint; 11. Collecting bucket; 12. Receiving hopper; 13. Auger; 14. Baffle; 15. Metal pipe; 16. Lower bucket. DETAILED DESCRIPTION

[0021] In order to facilitate the understanding of the utility model, the utility model will be described more comprehensively below with reference to the relevant drawings. The utility model can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the utility model more thorough and comprehensive. Example 1

[0022] like Figures 1 to 4 As shown, a fully automatic prefabricated intelligent lifting pump station includes a prefabricated pump station body 1, a water inlet pipe 2, a working platform 3 and a sewage pump 4, the water inlet pipe 2 is installed on the side wall of the prefabricated pump station body 1, the working platform 3 is horizontally arranged inside the prefabricated pump station body 1, the sewage pump 4 is installed on the working platform 3, and the drainage pipe of the sewage pump 4 extends out of the outside of the prefabricated pump station body 1; it also includes a primary pumping pipe 5, a secondary pumping pipe 6, a winder 7 and a steel cable 8, the output end of the primary pumping pipe 5 is connected to the water suction port of the sewage pump 4, the input end of the primary pumping pipe 5 is slidably plugged with the output end of the secondary pumping pipe 6, the input end of the secondary pumping pipe 6 extends into the bottom of the prefabricated pump station body 1, the winder 7 is installed on the working platform 3, the upper end of the steel cable 8 is wound on the winder 7, and the lower end of the steel cable 8 is connected to the secondary pumping pipe 6; it also includes a filter 9, which is installed at the input end of the secondary pumping pipe 6.

[0023] The staff operates the sewage pump 4 on the working platform 3. There are multiple working platforms 3 according to the size of the pumping station. An intelligent control cabinet is installed on the working platform 3. The intelligent control cabinet controls the automatic operation of the sewage pump 4 and the winder 7. The sewage is input into the bottom of the prefabricated pumping station body 1 through the water inlet pipe 2. The sewage pump 4 is running, so that the sewage is input into the sewage pump 4 through the secondary pumping pipe 6 and the primary pumping pipe 5, and is discharged to the outside of the prefabricated pumping station body 1 through the drainage pipe of the sewage pump 4. When the sludge layer deposited at the bottom of the prefabricated pumping station body 1 approaches the input end of the secondary pumping pipe 6, the winder 7 winds up the steel cable 8, and the steel cable 8 lifts the secondary pumping pipe 6 upward along the primary pumping pipe 5. The sealing ring between the primary pumping pipe 5 and the secondary pumping pipe 6 ensures air tightness, so that the input end of the secondary pumping pipe 6 is away from the sludge, avoiding the input end of the secondary pumping pipe 6 being blocked by the sludge, and avoiding damage to the sewage pump 4. The filter 9 intercepts and filters large particles of impurities in the sewage, avoiding damage to the sewage pump 4, and improving the reliability of the equipment. Example 2

[0024] like Figures 1 to 6As shown, on the basis of embodiment 1, it also includes a rotary joint 10, a rotary joint 10 is set at the output end of the primary water pumping pipe 5, the rotary joint 10 is perpendicular to the primary water pumping pipe 5, and the rotary joint 10 is rotatably connected to the water pumping port of the sewage pump 4; it also includes a collecting bucket 11, a receiving bucket 12 and a screw dragon 13, the collecting bucket 11 is a bucket shape, the filter 9 is installed in the collecting bucket 11, the side plate of the collecting bucket 11 surrounds the filter 9, and the receiving bucket 12 is installed in the prefabricated pump station body 1, when the secondary water pumping pipe 6 drives the collecting bucket 11 to rise in height, the receiving bucket 12 2 is located below the collecting hopper 11, the auger 13 is installed in the prefabricated pump station body 1, the input end of the auger 13 extends into the receiving hopper 12, and the output end of the auger 13 extends out of the outside of the prefabricated pump station body 1; it also includes a baffle 14, an opening is set on the side wall of the collecting hopper 11, the upper end of the baffle 14 is hinged to the upper edge of the opening, and the baffle 14 blocks the opening from the inside of the collecting hopper 11; the input end of the auger 13 passes through the receiving hopper 12 and extends into the bottom of the prefabricated pump station body 1, and the auger 13 is provided with a second input port in the receiving hopper 12.

[0025] The sealing ring between the rotary joint 10 and the water inlet of the sewage pump 4 ensures air tightness. When the secondary water pumping pipe 6 is lifted to the upper end limit of the primary water pumping pipe 5 by the steel cable 8, the steel cable 8 continues to lift the secondary water pumping pipe 6, so that the secondary water pumping pipe 6 and the primary water pumping pipe 5 rotate around the water inlet of the sewage pump 4 under the action of the rotary joint 10, further making the input end of the secondary water pumping pipe 6 away from the sludge at the bottom of the prefabricated pump station body 1, increasing the adjustment stroke of the input end of the secondary water pumping pipe 6, and the sewage pushes the baffle 14 inward, so that the sewage passes through the opening The sewage in the collecting bucket 11 is sucked out through the secondary pumping pipe 6, so that the sewage in the lower place can also be sucked out. A large amount of floating objects will accumulate in the collecting bucket 11. When the secondary pumping pipe 6 is lifted to the upper limit position by the steel cable 8 and rotated, the secondary pumping pipe 6 drives the collecting bucket 11 to the top of the receiving bucket 12 through the filter 9, and pours the floating objects in the collecting bucket 11 into the receiving bucket 12. The auger 13 runs through the input end to discharge the sludge at the bottom of the prefabricated pump station body 1, and at the same time discharges the floating objects in the receiving bucket 12 through the second input port. Example 3

[0026] like Figure 1 , Figure 2 and Figure 7As shown, on the basis of Example 1, it also includes a metal pipe 15 and a lower barrel 16, the metal pipe 15 is vertically inserted into the top of the prefabricated pump station body 1, the lower end of the metal pipe 15 extends into the interior of the prefabricated pump station body 1, the surface of the metal pipe 15 is provided with a black heat-absorbing coating, the lower barrel 16 is installed on the top wall of the prefabricated pump station body 1, the lower end of the metal pipe 15 extends into the lower barrel 16, and a plurality of air holes are provided on the upper side wall of the lower barrel 16; the temperature of the metal pipe 15 rises in the sun, so that the air inside the metal pipe 15 is heated, and after the hot air rises, a negative pressure is formed in the metal pipe 15, so that the exhaust gas in the prefabricated pump station body 1 is drawn into the metal pipe 15 through the plurality of air holes of the lower barrel 16 for discharge, thereby improving the exhaust gas discharge efficiency, the lower end of the metal pipe 15 extends into the lower barrel 16, and the lower barrel 16 catches the debris falling through the metal pipe 15, so as to prevent the flammable debris from directly falling into the prefabricated pump station body 1, causing greater harm to the pump station.

[0027] like Figures 1 to 7 As shown, the utility model is a fully automatic prefabricated intelligent lifting pump station. When it is working, the sewage is first input into the bottom of the prefabricated pump station body 1 through the water inlet pipe 2, the sewage pump 4 is running, and the filter 9 intercepts and filters the large particles of impurities in the sewage, so that the sewage is input into the sewage pump 4 through the secondary pumping pipe 6 and the primary pumping pipe 5, and is discharged to the outside of the prefabricated pump station body 1 through the drainage pipe of the sewage pump 4. Afterwards, when the sludge layer deposited at the bottom of the prefabricated pump station body 1 approaches the input end of the secondary pumping pipe 6, the reel 7 reels the steel cable 8, and the steel cable 8 pulls the secondary pumping pipe 6 along the The primary pumping pipe 5 is lifted upward, and then when the secondary pumping pipe 6 is lifted to the upper end limit of the primary pumping pipe 5 by the steel cable 8, the steel cable 8 continues to lift the secondary pumping pipe 6, so that the secondary pumping pipe 6 and the primary pumping pipe 5 rotate around the water suction port of the sewage pump 4 under the action of the rotary joint 10, so that the input end of the secondary pumping pipe 6 is away from the sludge, and finally the floating objects in the collecting bucket 11 are poured into the receiving bucket 12, and the auger 13 is operated to discharge the floating objects and the sludge at the bottom of the prefabricated pumping station main body 1 out of the prefabricated pumping station main body 1, and the exhaust gas in the prefabricated pumping station main body 1 can be discharged through the metal pipe 15.

[0028] The main functions achieved by this utility model are:

[0029] 1. It can raise the height of the sewage pump suction port to prevent the sewage pump from being blocked and damaged by sludge, thus improving the reliability of the equipment;

[0030] 2. Able to discharge floating objects and sludge;

[0031] 3. Able to discharge waste gas.

[0032] The utility model is a fully automatic prefabricated intelligent lifting pump station, and its installation method, connection method or setting method are all common mechanical methods, which can be implemented as long as they can achieve their beneficial effects; the prefabricated pump station body 1, water inlet pipe 2, working platform 3, sewage pump 4, winder 7, steel cable 8, filter 9, rotary joint 10, auger 13, and metal pipe 15 of the fully automatic prefabricated intelligent lifting pump station of the utility model are purchased on the market, and technical personnel in the industry only need to install and operate them according to the accompanying instruction manual, without the need for technical personnel in this field to pay creative labor.

[0033] All technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more of the related listed items.

[0034] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.

Claims

1. A fully automatic prefabricated intelligent lifting pump station, comprising a prefabricated pump station body (1), a water inlet pipe (2), a working platform (3) and a sewage pump (4), wherein the water inlet pipe (2) is installed on the side wall of the prefabricated pump station body (1), the working platform (3) is horizontally arranged inside the prefabricated pump station body (1), the sewage pump (4) is installed on the working platform (3), and the drainage pipe of the sewage pump (4) extends out of the prefabricated pump station body (1); It is characterized in that It also includes a primary pumping pipe (5), a secondary pumping pipe (6), a reel (7) and a steel cable (8), wherein the output end of the primary pumping pipe (5) is connected to the pumping port of the sewage pump (4), the input end of the primary pumping pipe (5) is slidably plugged into the output end of the secondary pumping pipe (6), the input end of the secondary pumping pipe (6) extends into the bottom of the prefabricated pump station body (1), the reel (7) is installed on the working platform (3), the upper end of the steel cable (8) is reeled on the reel (7), and the lower end of the steel cable (8) is connected to the secondary pumping pipe (6).

2. A fully automatic prefabricated intelligent lifting pump station as claimed in claim 1, It is characterized in that It also includes a filter (9), which is installed at the input end of the secondary water pumping pipe (6).

3. A fully automatic prefabricated intelligent lifting pump station as claimed in claim 1, It is characterized in that It also comprises a rotating joint (10), the output end of the primary water pumping pipe (5) is provided with the rotating joint (10), the rotating joint (10) is perpendicular to the primary water pumping pipe (5), and the rotating joint (10) is rotatably connected to the water pumping port of the sewage pump (4).

4. A fully automatic prefabricated intelligent lifting pump station as claimed in claim 3, It is characterized in that The invention also comprises a collecting hopper (11), a material receiving hopper (12) and an auger (13). The collecting hopper (11) is hopper-shaped. The filter (9) is installed in the collecting hopper (11). The side plate of the collecting hopper (11) surrounds the filter (9). The material receiving hopper (12) is installed in the prefabricated pump station body (1). When the secondary pumping pipe (6) drives the collecting hopper (11) to rise in height, the material receiving hopper (12) is located below the collecting hopper (11). The auger (13) is installed in the prefabricated pump station body (1). The input end of the auger (13) extends into the material receiving hopper (12), and the output end of the auger (13) extends out of the outside of the prefabricated pump station body (1).

5. A fully automatic prefabricated intelligent lifting pump station as claimed in claim 4, It is characterized in that It also comprises a baffle (14); an opening is arranged on the side wall of the collecting bucket (11); the upper end of the baffle (14) is hinged to the upper edge of the opening; the baffle (14) shields the opening from the inside of the collecting bucket (11).

6. A fully automatic prefabricated intelligent lifting pump station as claimed in claim 3, It is characterized in that The input end of the auger (13) passes through the material receiving hopper (12) and extends into the bottom of the prefabricated pump station body (1), and the auger (13) is provided with a second input port in the material receiving hopper (12).

7. A fully automatic prefabricated intelligent lifting pump station as claimed in claim 1, It is characterized in that The invention also comprises a metal tube (15) and a lower barrel (16), wherein the metal tube (15) is vertically inserted into the top of the prefabricated pump station body (1), the lower end of the metal tube (15) extends into the interior of the prefabricated pump station body (1), a black heat-absorbing coating is provided on the surface of the metal tube (15), the lower barrel (16) is installed on the top wall of the prefabricated pump station body (1), the lower end of the metal tube (15) extends into the lower barrel (16), and a plurality of air holes are provided on the upper side wall of the lower barrel (16).

Citation Information

Patent Citations

  • Prefabricated sewage lifting pump station

    CN218437450U