Fabricated joint of perforated steel reinforced concrete beam wall with cantilever beam section
Through the design of the prefabricated nodes of the open-hole steel concrete beam wall with cantilever beam section, the problems of complex construction of traditional wall beam connections and difficult to guarantee welding quality are solved, and the effect of simplifying construction and improving quality and efficiency is achieved.
Patent Information
- Application Number
- CN202420580765.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-03-25
AI Technical Summary
Traditional wall beam connection nodes have complex construction, long construction period, large material investment, and large labor consumption. The welding method is difficult to ensure the quality of the weld, which is easy to cause stress concentration.
The wall prefabricated node of the cantilever beam section is adopted. The prefabricated H-shaped steel cantilever beam and the open-shaped steel beam are inserted horizontally and fixed by bolts. The supporting bell leg supports and post-pouring concrete can avoid welding connections and simplifies Node construction.
It reduces the on-site construction workload, ensures structural quality, shortens construction period, reduces construction cost, avoids stress concentration caused by welds, and improves the reliability and construction efficiency of node connections.
Smart Images

Figure CN222120490U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete wall beam node construction, in particular to an assembled steel concrete beam-wall node with a cantilever beam section and an opening. Background Art
[0002] Traditional wall-beam connection nodes use on-site formwork, pouring, and maintenance. The construction is complex and takes a long time. It requires a large amount of material input, has a low turnover rate, and requires a large amount of labor. It also generates a large amount of dust, sewage, and construction waste on site, causing significant damage to the surrounding environment. Modern prefabricated buildings are generally constructed by factory prefabrication and on-site assembly, which can not only effectively avoid the above situation, but also significantly improve the quality of components. However, it places high demands on the construction of nodes. At present, welding is generally used to connect the wall beams of steel structures. The quality of the welds is difficult to guarantee and it is easy to cause stress concentration.
[0003] Therefore, it is necessary to design a new node structure to overcome the above problems. Summary of the invention
[0004] The utility model aims to provide a cantilever beam section perforated steel concrete beam-wall assembled node to solve the problem that the quality of the weld is difficult to guarantee and stress concentration is easily caused when the wall beams of the steel structure are connected by welding.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0006] An assembled steel-concrete beam-wall node with cantilever beam sections and perforated steel beams, the node comprising an H-shaped steel cantilever beam and a perforated steel beam prefabricated on the wall, the H-shaped steel cantilever beam and the perforated steel beam being transversely plugged and fixed by bolts;
[0007] The bottoms of the H-shaped steel cantilever beam and the open-hole steel beam are supported by supporting corbels, and the supporting corbels are prefabricated on the sides of the wall.
[0008] Further, the H-shaped steel cantilever beam comprises an outwardly extending upper flange, an outwardly extending lower flange and a first web;
[0009] The far wall ends of the outwardly extending upper flange and the outwardly extending lower flange further outwardly extend to the outside of the first web.
[0010] Furthermore, the perforated steel beam comprises an upper flange, a lower flange and a second web, and the second web is provided with openings.
[0011] Furthermore, the perforated steel beam is inserted into the H-shaped steel cantilever beam from the outside of the H-shaped steel cantilever beam, the extended upper flange and the upper flange are overlapped up and down, the extended lower flange and the lower flange are overlapped up and down, and the first web and the second web are transversely butted.
[0012] Furthermore, the far wall ends of the outwardly extending upper flange and the outwardly extending lower flange are provided with vertical first bolt holes, and the near wall ends of the upper flange and the lower flange are provided with vertical second bolt holes;
[0013] When the outwardly extending upper flange and the upper flange are stacked up and down, and when the outwardly extending lower flange and the lower flange are stacked up and down, they are both fixedly connected by bolts.
[0014] Further, a horizontal first bolt hole is provided at the far wall end of the first web, and a horizontal second bolt hole is provided at the near wall end of the second web;
[0015] When the first web and the second web are butted laterally, connecting steel plates with bolt holes are provided on both sides and are fixedly connected by bolts.
[0016] Furthermore, the openings arranged on the second web are regular polygonal or circular.
[0017] Furthermore, the far wall end of the perforated steel beam is a perforated steel composite plate.
[0018] Furthermore, the perforated steel composite plate comprises a top plate, a bottom plate and a web plate, side plates are arranged between the top plate and the bottom plate on both sides of the web plate, and openings are arranged on the web plate.
[0019] Furthermore, the H-shaped steel cantilever beam and the perforated steel beam are externally poured with post-cast concrete.
[0020] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0021] The utility model provides a cantilever beam section perforated steel concrete beam wall assembly node, the node structure is simple, can greatly reduce the workload of on-site construction, ensure the quality of the overall structure, used in assembly building construction, has the advantages of shortening the construction period and reducing the cost. In addition, the node structure avoids excessive welds formed by welding connection, prevents the generation of stress concentration, and effectively ensures the reliability of the node connection. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, drawings of other embodiments can be obtained based on these drawings without paying creative work.
[0023] Figure 1 It is a structural exploded view of the utility model.
[0024] Figure 2 It is a structural diagram of the utility model.
[0025] Figure 3 It is the structural diagram of the open-hole steel beam.
[0026] Figure 4 It is a structural diagram of the utility model after post-poured concrete.
[0027] The symbols in the figure are:
[0028] 1- wall, 2- H-shaped steel cantilever beam, 3- perforated steel beam, 4- connecting steel plate, 5- bolt, 6- perforated steel composite plate, 7- supporting corbel, 8- post-cast concrete;
[0029] 21-extended upper flange, 22-extended lower flange, 23-first web, 24-first bolt hole;
[0030] 31 - upper flange, 32 - lower flange, 33 - second web, 34 - second bolt hole. DETAILED DESCRIPTION
[0031] In order to facilitate the understanding of the present invention, the present invention will be described more comprehensively with reference to the relevant drawings. The drawings provide preferred embodiments of the present invention. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thoroughly and comprehensively understood.
[0032] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0033] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection", "setting" and the like should be understood in a broad sense, for example, they can be fixedly connected or set, or detachably connected or set, or integrally connected or set. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0034] Meanwhile, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance. Of course, such objects can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than that illustrated or described herein.
[0035] In a specific implementation, Figure 4 The direction from top to bottom is defined as vertical, and the direction from left to right is defined as horizontal.
[0036] The utility model provides a steel concrete beam-wall assembled node with cantilever beam sections and openings. The node is an embedded wall-beam node, and both the wall body and the beam body are factory prefabricated components.
[0037] like Figure 1-4 The node includes an H-shaped steel cantilever beam 2 and a perforated steel beam 3 prefabricated on the wall 1. The H-shaped steel cantilever beam 2 and the perforated steel beam 3 are transversely plugged and fixed by bolts. The steel materials used for the H-shaped steel cantilever beam 2 and the perforated steel beam 3 are both high-strength steel.
[0038] The H-shaped steel cantilever beam 2 is horizontally arranged on the side of the wall 1. One end of the H-shaped steel cantilever beam 2 is prefabricated in the wall 1, and the other end is exposed. A supporting corbel 7 is also prefabricated on the side of the wall 1. The supporting corbel 7 is located below the H-shaped steel cantilever beam 2 and plays a supporting role. The supporting corbel 7 is cast together with the wall 1. The material used is the same as that of the wall 1. For example, high-performance concrete can be used. The cross-sectional form can be determined according to actual conditions. The H-shaped steel cantilever beam 2 includes an extended upper flange 21, an extended lower flange 22 and a first web 23. The far wall ends of the extended upper flange 21 and the extended lower flange 22 further extend to the outside of the first web 23, so that the far wall end of the H-shaped steel cantilever beam 2 is concave inward, that is, the flange extends out of the web for a certain length to reserve space for plug-in.
[0039] The perforated steel beam 3 is horizontally arranged at the end of the perforated steel composite plate 6. The perforated steel composite plate 6 includes a top plate, a bottom plate and a web plate. Side plates are arranged between the top plate and the bottom plate on both sides of the web plate. The web plate is provided with openings. The perforated steel beam 3 includes an upper flange 31, a lower flange 32 and a second web plate 33. The second web plate 33 is provided with openings. The openings arranged on the second web plate 33 are regular polygonal or circular. This prevents stress concentration and reduces deadweight. At the same time, a connection can be formed on both sides of the second web plate 33 after concrete is poured. Figure 1 In this embodiment, the opening is a regular hexagon, which is a honeycomb steel. The opening steel beam 3 is an end extension of the opening steel composite plate 6.
[0040] The perforated steel beam 3 is inserted into the H-shaped steel cantilever beam 2 from the outside of the H-shaped steel cantilever beam 2, the extended upper flange 21 and the upper flange 31 are stacked up and down, the extended lower flange 22 and the lower flange 32 are stacked up and down, and the first web 23 and the second web 33 are butted transversely. The far wall ends of the extended upper flange 21 and the extended lower flange 22 are provided with vertical first bolt holes 24, and the near wall ends of the upper flange 31 and the lower flange 32 are provided with vertical second bolt holes 34; when the extended upper flange 21 and the upper flange 31 are stacked up and down, and when the extended lower flange 22 and the lower flange 32 are stacked up and down, they are fixedly connected by bolts 5. The far wall end of the first web 23 is provided with a horizontal first bolt hole 24, and the near wall end of the second web 33 is provided with a horizontal second bolt hole 34; when the first web 23 and the second web 33 are butted transversely, connecting steel plates 4 with bolt holes are provided on both sides, and they are fixedly connected by bolts 5. The outwardly extending flange of the H-shaped steel cantilever beam 2 is used as a positioning lug, and the perforated steel beam 3 is horizontally pushed into the outwardly extending flange to achieve insertion.
[0041] After the H-shaped steel cantilever beam 2 and the perforated steel beam 3 are plugged in, the bottom is supported by the supporting corbel 7, and the post-cast concrete 8 is poured outside the H-shaped steel cantilever beam 2 and the perforated steel beam 3 to form a whole with the wall 1, the supporting corbel 7 and the perforated steel composite plate 6.
[0042] In the utility model, large components are all prefabricated in the factory, and the prefabricated structural components are directly connected on the construction site before pouring concrete. Compared with the traditional structure, there is no need to tie steel bars, support formwork, dismantle formwork, and set up temporary supports under the beams on site. The on-site construction process, construction materials, and construction hours are greatly reduced, and the construction site environment is significantly improved. After reasonable design, the construction efficiency will be greatly improved.
[0043] In the traditional construction process, the pouring of concrete has strict requirements on the surrounding environment, and the conditions for outdoor maintenance are poor. Therefore, it is not suitable to use high-performance concrete during on-site operations. The surrounding environment of the components of the utility model can be controlled when they are prefabricated in the factory, so high-performance concrete can be used. Ordinary concrete is used for the cast-in-place part, and the concrete properties of the two can be designed to be different types. The components are all prefabricated in the factory, and the quality of the components is guaranteed. Therefore, in actual engineering applications, the selection of wall and slab concrete can be free from the limitation of concrete strength, and various types of concrete with different characteristics can be selected to effectively improve the functional requirements of the structure.
[0044] The node of the utility model adopts a steel-concrete composite structure, which can effectively reduce the cross-sectional size of the component, reduce the overall amount of concrete and steel, and reduce the cost of the structure. The assembled construction method is adopted, and the factory prefabrication and on-site assembly method is used to reduce the workload and labor intensity of the construction site personnel, effectively reduce the construction cost, and save construction funds.
[0045] The construction method of the above-mentioned steel-concrete beam-column assembled node with cantilever beam sections and openings comprises the following steps:
[0046] S1: prefabricate wall 1, prefabricate supporting corbel 7 on the side of wall 1, and prefabricate one end of H-shaped steel vertically inside wall 1, and the other end of H-shaped steel is exposed H-shaped steel cantilever beam 2;
[0047] S2: prefabricate a perforated steel composite plate 6, and prefabricate a perforated steel beam 3 at one end of the perforated steel composite plate 6;
[0048] S3: transport the wall 1 and the perforated steel composite plate 6 to the site, insert the perforated steel beam 3 transversely into the end of the H-shaped steel cantilever beam 2, and fix them to each other by bolts 5;
[0049] S4: Install the connecting steel plates 4 on both sides of the first web 23 and the second web 33 and fix them to each other through bolts 5;
[0050] S5: The perforated steel beam 3 and the H-shaped steel cantilever beam 2 are both located above the supporting corbel 7, concrete is poured within the range of the perforated steel beam 3 and the H-shaped steel cantilever beam 2, and then the node is covered and maintained.
[0051] The node of the utility model meets the requirements of building assembly construction, can improve on-site construction efficiency, reduce the workload of on-site construction personnel, shorten the construction period, and the factory production of components avoids the cumbersome on-site pouring process, greatly improves the quality of components and construction efficiency, and ensures the quality of the overall structure. In addition, the node has a clear load transfer path, a simple mechanical model, reliable node connection, avoids a large number of welds, and effectively prevents stress concentration, meets strength requirements and has good seismic resistance. After being put into use, it can obtain good economic benefits.
[0052] The above specific examples are used to illustrate the present invention, which are only used to help understand the present invention and are not intended to limit the present invention. For those skilled in the art of the present invention, some simple deductions, deformations or substitutions can be made based on the idea of the present invention.
Claims
1. A steel-concrete beam-wall assembly node with cantilever beam sections and openings, characterized in that: The node comprises an H-shaped steel cantilever beam (2) and a perforated steel beam (3) prefabricated on the wall (1); the H-shaped steel cantilever beam (2) and the perforated steel beam (3) are transversely plugged and fixed by bolts; The bottoms of the H-shaped steel cantilever beam (2) and the perforated steel beam (3) are supported by supporting brackets (7), and the supporting brackets (7) are prefabricated on the side of the wall (1).
2. The steel-concrete beam-wall assembled node with cantilever beam section opening according to claim 1, characterized in that: The H-shaped steel cantilever beam (2) comprises an outwardly extending upper flange (21), an outwardly extending lower flange (22) and a first web (23); The far wall ends of the outwardly extending upper flange (21) and the outwardly extending lower flange (22) further extend outwardly to the outside of the first web (23).
3. The steel-concrete beam-wall assembled node with cantilever beam section opening according to claim 2, characterized in that: The perforated steel beam (3) comprises an upper flange (31), a lower flange (32) and a second web (33), wherein the second web (33) is provided with an opening.
4. The steel-concrete beam-wall assembled node with cantilever beam section opening according to claim 3, characterized in that: The perforated steel beam (3) is inserted into the H-shaped steel cantilever beam (2) from the outside of the H-shaped steel cantilever beam (2), the extended upper flange (21) and the upper flange (31) are stacked up and down, the extended lower flange (22) and the lower flange (32) are stacked up and down, and the first web (23) and the second web (33) are transversely butted.
5. The steel-concrete beam-wall assembled node with cantilever beam section opening according to claim 4, characterized in that: The ends of the extended upper flange (21) and the extended lower flange (22) far from the wall are provided with vertical first bolt holes (24), and the ends of the upper flange (31) and the lower flange (32) near the wall are provided with vertical second bolt holes (34); When the outwardly extending upper flange (21) and the upper flange (31) are stacked up and down, and when the outwardly extending lower flange (22) and the lower flange (32) are stacked up and down, they are fixedly connected by bolts (5).
6. The steel-concrete beam-wall assembled node with cantilever beam section opening according to claim 5, characterized in that: A horizontal first bolt hole (24) is arranged at the end far from the wall of the first web (23), and a horizontal second bolt hole (34) is arranged at the end near the wall of the second web (33); When the first web (23) and the second web (33) are butt-jointed laterally, connecting steel plates (4) with bolt holes are provided on both sides and are fixedly connected by bolts (5).
7. The steel-concrete beam-wall assembled node with cantilever beam section opening according to claim 6, characterized in that: The openings arranged on the second web (33) are regular polygonal or circular.
8. The steel-concrete beam-wall assembled node with cantilever beam section opening according to claim 7, characterized in that: The far wall end of the perforated steel beam (3) is a perforated steel composite plate (6).
9. The steel-concrete beam-wall assembled node with cantilever beam section opening according to claim 8, characterized in that: The perforated steel composite plate (6) comprises a top plate, a bottom plate and a web plate, side plates are arranged between the top plate and the bottom plate on both sides of the web plate, and openings are arranged on the web plate.
10. The steel-concrete beam-wall assembled node with cantilever beam section opening according to claim 9, characterized in that: The H-shaped steel cantilever beam (2) and the perforated steel beam (3) are externally poured with post-cast concrete (8).