Directly-buried heat supply pipeline

By designing a scientific replenishment structure and leakage monitoring device in the direct buried heating pipeline, the problems of poor replenishment quality and difficulty in leak detection of traditional direct buried heating pipelines are solved, and efficient medium transportation and low-cost construction are achieved. Improve economic benefits and environmental protection.

CN222122598UActive Publication Date: 2024-12-06SHANXI WUJIAN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420563982.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-12-06
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

The insulating layer repair structure of the traditional direct buried heating pipeline is simple, which makes it difficult to guarantee the quality of the repair, is prone to water seepage, and lacks leakage monitoring functions, resulting in the shutdown of the pipeline transportation system and high detection costs.

Method used

A direct buried heating pipeline including steel pipe sections, thermal insulation material layer, PE outer guard pipe section, electric heat melt sleeve, rubber and plastic sponge sleeve and heat shrink sleeve were designed, and a leakage monitoring device was added to each steel pipe section, including Electronic leak detectors, detection probes and alarm modules realize intelligent operation monitoring and precise leakage detection.

Benefits of technology

Improve the quality of the replenishment, avoid water seepage problems, ensure the stability of the temperature of the conveying medium, reduce the shutdown and emergency repair of the pipe and transportation system, realize timely and accurate leakage detection, reduce construction costs, and improve the efficiency of the heating process. and environmentally friendly.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222122598U_ABST
    Figure CN222122598U_ABST
Patent Text Reader

Abstract

The utility model relates to a direct burial heat supply pipeline, and belongs to the technical field of municipal construction. The steel pipe joint comprises steel pipe joints which are welded in pairs and wrapped by heat preservation material layers, PE outer protection pipe joints are wrapped on the portions, corresponding to the steel pipe joints, of the outer portions of the heat preservation material layers, an electric hot melting sleeve is wrapped in a gap between every two adjacent PE outer protection pipe joints in a sealed mode, a rubber and plastic sponge sleeve is wrapped outside each electric hot melting sleeve, and a heat shrinkage sleeve is wrapped outside each rubber and plastic sponge sleeve in a sealed mode. The joint coating structure of the direct burial heat supply pipeline is scientific in design, reasonable in structure, simple in construction and good in protection effect, joint coating quality is improved qualitatively, and the problem that water is prone to seeping at the joint coating position is solved, so that the temperature of a conveying medium is effectively guaranteed, shutdown or first-aid repair of a pipeline conveying system is avoided, construction cost is saved, and construction efficiency is improved. And the economic benefit is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of municipal construction, in particular to the construction of thermal pipelines, in particular to a directly buried heating pipeline. Background Art

[0002] With the rapid development of urban modernization, the requirements for municipal pipeline construction are increasing. At present, most of the direct buried heating pipelines used in my country's cities and towns are plastic-sheathed steel structures, that is, a high-density polyethylene plastic outer protective pipe is sheathed outside the steel pipe, and the annular space formed between the outer wall of the steel pipe and the high-density polyethylene plastic outer protective pipe is filled with polyurethane foam for insulation. When constructing the steel pipe patching, generally the two sections of the steel pipe are welded and polished first, and then the outer sheath is put on the interface, and then polyurethane foam is injected into the inner side of the outer sheath through the injection hole on the outer sheath for insulation, and then the sealing block is hot-melted to block the injection port, and finally, the two sides of the outer sheath are hot-melted with the original high-density polyethylene plastic outer protective pipe of the pipeline to complete the pipeline patching construction.

[0003] The direct buried heating pipeline using the traditional patching method has the following main problems:

[0004] 1) Due to the simple structure of the traditional insulation layer patch, the quality of the patch is difficult to guarantee, which easily causes water seepage at the insulation layer patch and water ingress into the polyurethane foam, which not only has a great impact on the temperature of the conveying medium, but also causes the pipeline system to shut down or repair, resulting in great economic losses.

[0005] 2) The existing direct buried heating pipelines do not have a leakage monitoring function and cannot detect external leakage faults caused by groundwater infiltration into the insulation layer. The detection of medium leakage faults basically relies on very inefficient and backward methods such as boosting pressure and closing valves in sections to find the leaking pipe section, and then use relevant instruments, listening rods, ultrasonic detectors, etc. to find the leakage point. These traditional detection methods require a certain operating pressure in the pipeline system, and can only detect some fault points with serious medium leakage. Minor leaks or external leakage faults are basically undetectable. During the maintenance and troubleshooting of the pipeline network in summer, the system needs to be pressurized to detect leakage points, and the detection cost is high. Summary of the invention

[0006] The utility model aims to solve the problem of poor patching quality of traditional thermal insulation layer patching due to its simple structure, and to provide a directly buried heating pipeline with a completely new patching structure design.

[0007] The utility model is realized through the following technical solutions

[0008] A direct-buried heating pipeline comprises a plurality of steel pipe sections, which are welded in sequence to form an integral pipeline. The exterior of the integral pipeline is wrapped with a thermal insulation material layer, and the portion of the thermal insulation material layer corresponding to each steel pipe section is wrapped with a PE outer protective pipe section. A gap is formed between two adjacent PE outer protective pipe sections, and the gap is located at the weld where the two adjacent steel pipe sections are welded together. The thermal insulation material layer extends to fill the gap. The gap between two adjacent PE outer protective pipe sections is sealed and wrapped with an electric hot-melt sleeve, and the electric hot-melt sleeve is wrapped with a rubber-plastic sponge sleeve, and the rubber-plastic sponge sleeve is sealed and wrapped with a heat shrink sleeve.

[0009] As a preferred technical solution, the end of the heat shrink sleeve is tied and fixed by stainless steel wire and PET packing tape.

[0010] The present invention also provides a further technical solution, which is to add a leakage monitoring function on the basis of the above-mentioned direct buried heating pipeline to realize intelligent operation monitoring and precise leakage detection of the heating pipeline network. That is: the above-mentioned direct buried heating pipeline also includes a leakage monitoring device, which includes an electronic leak detector, a detection probe and an alarm module, and the detection probe and the alarm module are respectively connected to the electronic leak detector through wires; the detection probe is arranged in the insulation material layer, and the electronic leak detector and the alarm module are arranged outside the PE outer protective pipe section.

[0011] As a preferred technical solution, the electronic leak detector adopts the KT model electronic leak detector, and the alarm module adopts the RS211 model alarm module.

[0012] As a preferred technical solution, each steel pipe section is provided with a corresponding leakage monitoring device.

[0013] The patching structure of the utility model direct buried heating pipeline is scientifically designed, reasonably structured, simple to construct, and has good protective effect. The patching quality has been qualitatively improved, and the problem of easy water seepage at the patching point has been solved, so that the temperature of the conveying medium is effectively guaranteed, and the shutdown or emergency repair of the pipeline system is avoided, which saves construction costs and improves economic benefits. Furthermore, the leakage monitoring device added to the utility model direct buried heating pipeline realizes the function of timely and accurate monitoring of the leakage points of the pipeline network, while also ensuring the effectiveness of the insulation layer of the heating pipeline network, reducing the heat loss during the heating process, and being low-carbon and environmentally friendly. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The drawings herein are used to provide further description of the present invention and constitute a part of the present application. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0015] Figure 1 It is a schematic diagram of the cross-sectional structure of the direct buried heating pipeline of the utility model.

[0016] In the figure: 1-steel pipe section, 2-insulation material layer, 3-PE outer protective pipe section, 4-weld, 5-electric hot melt sleeve, 6-rubber and plastic sponge sleeve, 7-heat shrink sleeve, 8-stainless steel wire, 9-PET packing tape, 10-electronic leak detector, 11-detection probe, 12-alarm module. DETAILED DESCRIPTION

[0017] In order to make those skilled in the art better understand the present invention, the present invention is further explained in detail below with reference to the accompanying drawings and embodiments. It should be noted that the features in the embodiments and embodiments of the present application can be combined with each other without conflict. Example 1

[0018] A direct buried heating pipeline, such as Figure 1 As shown, it includes a plurality of steel pipe sections 1, which are welded in sequence to form an integral pipeline. The exterior of the integral pipeline is wrapped with a thermal insulation material layer 2, and the portion of the thermal insulation material layer 2 corresponding to each steel pipe section 1 is wrapped with a PE outer protective pipe section 3. A gap is formed between two adjacent PE outer protective pipe sections 3, and the gap is located at the weld 4 where the two adjacent steel pipe sections 1 are welded, and the thermal insulation material layer 2 extends to fill the gap; the gap between the two adjacent PE outer protective pipe sections 3 is sealed with an electric hot melt sleeve 5, and the electric hot melt sleeve 5 is wrapped with a rubber-plastic sponge sleeve 6, and the rubber-plastic sponge sleeve 6 is sealed with a heat shrink sleeve 7, and the two ends of the heat shrink sleeve 7 are respectively overlapped with the PE outer protective pipe sections 3 on both sides, and the overlap is tied and fixed by a stainless steel wire 8 and a PET packing tape 9.

[0019] The construction steps of the above-mentioned direct buried heating pipeline include:

[0020] 1) Before welding the steel pipe segment 1, first put the PE outer protective pipe segment 3 on the installed steel pipe segment 1, keep the original packaging of the PE outer protective pipe segment 3 and cover it with certain protective materials;

[0021] 2) Carry out the hoisting, jointing and assembly welding of adjacent steel pipe sections 1;

[0022] 3) Carry out the construction of the electric hot melt sleeve 5;

[0023] 4) Carry out on-site foaming;

[0024] 5) Install the heat shrink sleeve 7. When installing, first cover the electric hot melt sleeve 5 with the rubber-plastic sponge sleeve 6, and use the special rubber-plastic tape to bond and shape it, and then install the heat shrink sleeve 7 in place;

[0025] 6) Lift the heat shrink sleeve 7 upwards, bake the overlapped position of the heat shrink sleeve 7 and the PE outer protective pipe section 3 from bottom to top, and ensure uniform shrinkage; after baking is completed, check whether there are bubbles on the entire heated surface, and further bake the places with bubbles to ensure that the gas is discharged;

[0026] 7) To reinforce the seal, first wrap a circle of PET packing tape 9 at 80 mm from both ends of the heat shrink sleeve 7, use a baler to tighten and weld the joints; then wrap 2 circles of 304 stainless steel wire 8 at 50 mm from both ends of the heat shrink sleeve 7, without crossing in the circumferential direction, use a tensioning device to tighten, and fix the 304 stainless steel wire 8 with a locker. The tightened 304 stainless steel wire 8 is slightly embedded in the surface of the heat shrink sleeve 7 and cannot move laterally. Example 2

[0027] A direct buried heating pipeline as described in Example 1 further includes a leakage monitoring device, which includes an electronic leak detector 10, a detection probe 11 and an alarm module 12. Figure 1 A simple connection diagram of the leakage monitoring device is shown in the figure. The detection probe 11 and the alarm module 12 are respectively connected to the electronic leak detector 10 through wires, wherein the electronic leak detector 10 adopts the KT model electronic leak detector 10, and the alarm module 12 adopts the RS211 model alarm module 12; the detection probe 11 is arranged in the thermal insulation material layer 2, and the electronic leak detector 10 and the alarm module 12 are arranged outside the PE outer protective pipe section 3, wherein the wire connecting the detection probe 11 passes through the thermal insulation material layer 2, the electric hot melt sleeve 5, the rubber and plastic sponge sleeve 6, and the heat shrink sleeve 7 in sequence and then is connected to the electronic leak detector 10, and the wire passes through the position of the electric hot melt sleeve 5 and the heat shrink sleeve 7 for sealing.

[0028] During specific implementation, each steel pipe section 1 is provided with a corresponding leakage monitoring device, so as to achieve the purpose of accurate leakage detection.

[0029] During detection, if a direct-buried heating pipe leaks, the leaked water will enter the insulation material layer 2. After the detection probe 11 in the insulation material layer 2 detects the signal, it is transmitted to the electronic leak detector 10. The electronic leak detector 10 controls the alarm module 12 to sound an alarm. After receiving the alarm signal, the technician can immediately inspect and repair the leaking steel pipe section 1.

[0030] The above-mentioned embodiment only expresses one implementation method of the utility model, and its description is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model.

Claims

1. A direct buried heating pipeline, comprising a plurality of steel pipe sections, which are sequentially welded together to form an integral pipeline, the exterior of which is wrapped with a thermal insulation material layer, characterized in that: The portion of the outside of the insulation material layer corresponding to each steel pipe section is wrapped with a PE outer protective pipe section, and a gap is formed between two adjacent PE outer protective pipe sections. The gap is located at the weld where the two adjacent steel pipe sections are welded, and the insulation material layer extends to fill the gap; the gap between two adjacent PE outer protective pipe sections is sealed and wrapped with an electric hot melt sleeve, the outside of the electric hot melt sleeve is wrapped with a rubber-plastic sponge sleeve, and the outside of the rubber-plastic sponge sleeve is sealed and wrapped with a heat shrink sleeve.

2. A direct buried heating pipeline according to claim 1, characterized in that: The ends of the heat shrink sleeve are tied and fixed by stainless steel wire and PET packing tape.

3. A direct buried heating pipeline according to claim 1 or 2, characterized in that: It also includes a leakage monitoring device, which includes an electronic leak detector, a detection probe and an alarm module. The detection probe and the alarm module are respectively connected to the electronic leak detector through wires; the detection probe is arranged in the insulation material layer, and the electronic leak detector and the alarm module are arranged outside the PE outer protective pipe section.

4. A direct buried heating pipeline according to claim 3, characterized in that: The electronic leak detector adopts the KT model electronic leak detector, and the alarm module adopts the RS211 model alarm module.

5. A direct buried heating pipeline according to claim 4, characterized in that: Each steel pipe section is equipped with a corresponding leakage monitoring device.