Hot forging alloy material processing device
By designing a purification mechanism in the hot-forged alloy material processing device, and using a fan and a dispersing plate to stir harmful gases and limestone sprays in the purification box, the problem of insufficient gas reaction time in the prior art is solved, and the purification effect and efficiency are improved.
Patent Information
- Application Number
- CN202420702536.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2024-12-24
- Estimated Expiration
- 2034-04-08
AI Technical Summary
In the existing hot forged alloy material processing equipment, harmful gases need to wait for a time to react after being mixed with limestone spray, resulting in a reduction in purification effect and efficiency.
A purification mechanism is designed to inhale harmful gases through a fan and stir and mix them with limestone spray in the purification box, which improves the reaction time and efficiency of gas and limestone.
The purification effect and efficiency of harmful gases are significantly improved and the processing capacity of the purification device is enhanced.
Smart Images

Figure CN222219145U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of processing devices, in particular to a hot forging alloy material processing device. Background Art
[0002] The forging process performed above the metal recrystallization temperature is called hot forging. Hot forging is also called hot die forging. During forging, the deformed metal flows violently and the forging is in contact with the die for a long time. Therefore, the die material is required to have high thermal stability, high temperature strength and hardness, impact toughness, thermal fatigue resistance and wear resistance, and be easy to process. Hot forging dies with lighter workloads can be made of low alloy steel.
[0003] According to Chinese patent CN 216758007 U, a hot forging alloy material processing device is disclosed, which relates to the field of hot forging processing technology. The utility model includes a processing chamber, a forging furnace, a cooling water trough and a bottom plate. The processing chamber is located above the forging furnace, the cooling water trough and the bottom plate. The forging furnace and the bottom plate are respectively located at the two ends of the cooling water trough. Storage chambers are provided on both sides of the processing chamber. A limestone box is installed inside the storage chamber. An atomizer is installed at one end of the limestone box. The atomizer is connected to the limestone box. A spiral conveying chamber is installed between the two storage chambers. The utility model treats harmful gases generated during the forging process by arranging an atomizer to atomize the limestone liquid in the limestone box and spray it between the storage chambers. At the same time, the spiral conveying chamber is provided to increase the internal retention time of harmful gases, thereby increasing the reaction time between the harmful gases and the limestone spray, and improving the purification effect.
[0004] Although this patent can increase the internal retention time of harmful gases by setting up a spiral conveying chamber, since the harmful gases need to wait for a certain period of time before reacting after mixing with the limestone spray, this may lead to a reduction in the purification effect and efficiency.
[0005] Therefore, it is necessary to provide a new hot forging alloy material processing device to solve the above technical problems. Utility Model Content
[0006] In order to solve the above technical problems, the utility model provides a hot forging alloy material processing device.
[0007] The utility model provides a hot forging alloy material processing device, comprising a platform, a processing assembly for processing hot forging alloy materials is installed at the bottom of the platform, a purification mechanism for purifying harmful gases generated by the processing assembly and an exhaust assembly for exhausting gases are installed on the top of the platform, and the purification mechanism includes:
[0008] A purification box is fixed on the top of the platform, and a lime box is symmetrically fixed on the inner side of the purification box. Nozzles are equidistantly fixed on the side where two lime boxes are close to each other. Four rotating rods are symmetrically connected to the inner side of the purification box through bearings, and three breaking plates are equidistantly fixed on the outer wall of each rotating rod. A driving assembly for driving the four rotating rods to rotate simultaneously is installed at one end of one of the rotating rods.
[0009] Preferably, the driving assembly includes a rotating rod with a sprocket fixed at one end away from the scattering plate, the outer wall of the sprocket is connected to a chain through a transmission, a motor is fixed on the top of the platform, and the output end of the motor is fixed to one end of one of the rotating rods.
[0010] Preferably, the processing assembly includes a forging table arranged at the bottom of the platform, a forging plate is fixed on the top of the forging table, a forging furnace is arranged at the bottom of the platform, and a cooling water tank is arranged on the side where the forging furnace and the forging table are close to each other.
[0011] Preferably, the discharge assembly includes support rods symmetrically fixed on the top of the platform, a discharge box is fixed on the top of the support rods, four discharge pipes are equidistantly arranged on the top of the discharge box, and the bottom of the discharge box is fixed to the top of the purification box through a pipeline.
[0012] Preferably, grooves are symmetrically provided on the top of the platform, a fan is installed inside the groove, and a filter plate is fixed on the top of the groove.
[0013] Preferably, two supporting feet are symmetrically fixed to the bottom of the platform.
[0014] Compared with the related art, the hot forging alloy material processing device provided by the utility model has the following beneficial effects:
[0015] Since harmful gases need to wait for a certain amount of time to react after mixing with limestone spray, this may lead to reduced purification effect and efficiency. The purification mechanism can use a scattering plate to stir and mix the harmful gases and limestone spray while spraying limestone spray when the fan sucks the harmful gases into the purification box, which not only improves the purification effect but also improves the purification efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 This is a schematic diagram of the structure of the discharge assembly of the utility model;
[0018] Figure 3 It is a schematic diagram of the purification mechanism of the utility model;
[0019] Figure 4 This is a schematic diagram of the fan structure of the utility model;
[0020] Figure 5 This is a schematic diagram of the structure of the drive assembly of the utility model.
[0021] Numbers in the figure: 1. Platform; 2. Processing assembly; 101. Forging table; 102. Forging plate; 103. Forging furnace; 104. Cooling water tank; 3. Purification mechanism; 201. Purification box; 202. Lime box; 203. Nozzle; 204. Rotating rod; 205. Breaking plate; 4. Driving assembly; 301. Sprocket; 302. Chain; 303. Motor; 5. Discharge assembly; 401. Support rod; 402. Discharge box; 403. Discharge pipe; 6. Groove; 7. Fan; 8. Filter plate; 9. Support foot. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0023] The specific implementation of the present utility model is described in detail below in conjunction with specific embodiments.
[0024] See also Figures 1 to 5 The embodiment of the utility model provides a hot forging alloy material processing device, comprising a platform 1, a processing assembly 2 for processing hot forging alloy materials is installed at the bottom of the platform 1, a purification mechanism 3 for purifying harmful gases generated by the processing assembly 2 and an exhaust assembly 5 for exhausting gases are installed on the top of the platform 1, and the purification mechanism 3 includes:
[0025] A purification box 201 is fixed on the top of the platform 1, and a lime box 202 is symmetrically fixed on the inner side of the purification box 201. A nozzle 203 is equidistantly fixed on the side where two lime boxes 202 are close to each other. Four rotating rods 204 are symmetrically connected to the inner side of the purification box 201 through bearings, and three breaking plates 205 are equidistantly fixed on the outer wall of each rotating rod 204. A driving component 4 for driving the four rotating rods 204 to rotate simultaneously is installed at one end of one of the rotating rods 204.
[0026] In this embodiment, the driving assembly 4 includes a rotating rod 204 with a sprocket 301 fixed at one end away from the breaking plate 205, the outer wall of the sprocket 301 is connected to a chain 302 through a transmission, and a motor 303 is fixed on the top of the platform 1, and the output end of the motor 303 is fixed to one end of one of the rotating rods 204.
[0027] Compared with the reference document, the present application can use the purification mechanism 3 to suck the harmful gas into the purification box 201 when the fan 7 sucks the harmful gas, and uses the scattering plate 205 to stir and mix the harmful gas and the limestone spray while spraying the limestone spray, which not only improves the purification effect but also improves the purification efficiency.
[0028] In this embodiment, the processing component 2 includes a forging table 101 arranged at the bottom of the platform 1, a forging plate 102 is fixed on the top of the forging table 101, a forging furnace 103 is arranged at the bottom of the platform 1, and a cooling water tank 104 is arranged on the side where the forging furnace 103 and the forging table 101 are close to each other.
[0029] In this embodiment, the discharge assembly 5 includes a support rod 401 symmetrically fixed on the top of the platform 1, a discharge box 402 is fixed on the top of the support rod 401, four discharge pipes 403 are equidistantly arranged on the top of the discharge box 402, and the bottom of the discharge box 402 is fixed to the top of the purification box 201 through a pipeline.
[0030] In this embodiment, a groove 6 is symmetrically opened on the top of the platform 1 , a fan 7 is installed inside the groove 6 , and a filter plate 8 is fixed on the top of the groove 6 .
[0031] In this embodiment, two supporting feet 9 are symmetrically fixed to the bottom of the platform 1 .
[0032] The working principle of a hot forging alloy material processing device provided by the utility model is as follows:
[0033] First, during forging, the fan 7 is started to suck the harmful gas into the purification box 201, and then the lime spray is sprayed through the nozzle 203 on the lime box 202, and then the motor 303 is started to drive one of the rotating rods 204 to rotate, and then one of the rotating rods 204 drives one of the sprockets 301 to rotate, and then one of the sprockets 301 drives the other three sprockets 301 to rotate synchronously through the chain 302, and then drives the other three rotating rods 204 to rotate synchronously, and then drives the breaking plate 205 to rotate, and then after the breaking is completed, it enters the discharge box 402 through the pipeline, and then the purified gas is discharged through the discharge pipe 403.
[0034] The circuits and controls involved in the present invention are all prior art and will not be described in detail here.
[0035] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A hot forging alloy material processing device, characterized in that: The invention comprises a platform (1), wherein a processing assembly (2) for processing hot forged alloy materials is installed at the bottom of the platform (1), and a purification mechanism (3) for purifying harmful gases generated by the processing assembly (2) and an exhaust assembly (5) for exhausting gases are installed at the top of the platform (1), wherein the purification mechanism (3) comprises: A purification box (201) is fixed on the top of the platform (1), a lime box (202) is symmetrically fixed on the inner side of the purification box (201), a nozzle (203) is equidistantly fixed on the side where the two lime boxes (202) are close to each other, and four rotating rods (204) are symmetrically connected to the inner side of the purification box (201) through bearings, and three breaking plates (205) are equidistantly fixed on the outer wall of each rotating rod (204), and a driving component (4) for driving the four rotating rods (204) to rotate simultaneously is installed at one end of one of the rotating rods (204).
2. A hot forging alloy material processing device according to claim 1, characterized in that: The driving assembly (4) comprises a rotating rod (204) having a sprocket (301) fixed at one end away from the scattering plate (205), the outer wall of the sprocket (301) being connected to a chain (302) via a transmission, and a motor (303) being fixed at the top of the platform (1), the output end of the motor (303) being fixed to one end of one of the rotating rods (204).
3. A hot forging alloy material processing device according to claim 1, characterized in that: The processing assembly (2) comprises a forging table (101) arranged at the bottom of the platform (1), a forging plate (102) is fixed on the top of the forging table (101), a forging furnace (103) is arranged at the bottom of the platform (1), and a cooling water tank (104) is arranged on the side where the forging furnace (103) and the forging table (101) are close to each other.
4. A hot forging alloy material processing device according to claim 1, characterized in that: The discharge assembly (5) includes a support rod (401) symmetrically fixed on the top of the platform (1), a discharge box (402) fixed on the top of the support rod (401), four discharge pipes (403) equidistantly arranged on the top of the discharge box (402), and the bottom of the discharge box (402) is fixed to the top of the purification box (201) through a pipeline.
5. The hot forging alloy material processing device according to claim 1, characterized in that: A groove (6) is symmetrically provided on the top of the platform (1), a fan (7) is installed inside the groove (6), and a filter plate (8) is fixed on the top of the groove (6).
6. A hot forging alloy material processing device according to claim 1, characterized in that: Two supporting feet (9) are symmetrically fixed to the bottom of the platform (1).
Citation Information
Patent Citations
Hot forging alloy material processing device
CN216758007U