Hemisphere and steel pipe combined structure

By setting up components such as I-steel, positioning columns and positioning rings on the steel pipes and hemispheres, rapid spot welding and fixing are solved, and the problems of changing welding positions and the use of fixtures are improved, welding efficiency and structural stability are reduced, and production costs are reduced. .

CN222227545UActive Publication Date: 2024-12-24JIANGSU HENGZHI HEAVY IND MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420996987.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-09
Publication Date
2024-12-24
Estimated Expiration
2034-05-09

AI Technical Summary

Technical Problem

There is a rolling problem in the welding fixation of steel pipes and hemispheres, which leads to changes in the welding position and is difficult to ensure the fixed position of the hemispheres. Various fixtures are required to fix, which affects production speed and cost.

Method used

The combination structure of hemisphere and steel pipe is adopted, and through components such as I-steel, positioning columns, positioning holes, positioning rings and casing, rapid spot welding and fixing are achieved, reducing the use of fixtures, and improving welding efficiency.

Benefits of technology

No need to use fixtures for welding and fixing, which improves the welding efficiency between the steel pipe and the hemisphere, reduces production costs, and enhances the stability and economic benefits of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222227545U_ABST
    Figure CN222227545U_ABST
Patent Text Reader

Abstract

The utility model discloses a hemisphere and steel pipe combined structure in the technical field of steel structures, which comprises a hemisphere, a first steel pipe and a second steel pipe, I-shaped steel is arranged at the lower part between the first steel pipe and the second steel pipe, a support plate is arranged in the hemisphere, and a positioning ring is arranged on the outer surface of the hemisphere. Mounting grooves are formed in the left ends in the first steel pipe and the second steel pipe, sleeves are arranged in the first steel pipe and the second steel pipe, positioning columns are arranged on the outer surface of the hemisphere, positioning holes are formed in the surfaces of the opposite sides of the first steel pipe and the second steel pipe, and positioning columns are arranged at the upper end and the lower end of the I-shaped steel. And when the positioning ring is mounted in the mounting groove formed in the end part of the first steel pipe, the hemisphere is preliminarily fixed, so that the hemisphere is welded with the first steel pipe and the second steel pipe without using a clamp, and meanwhile, the welding efficiency between the steel pipes and the hemisphere is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel structures, in particular to a hemisphere and steel pipe combined structure. Background Art

[0002] The connection and fixation of the steel pipe and the hemispherical support are usually fixed by welding, but the hemisphere and the steel pipe are spherical and round. If the steel pipe and the hemisphere are directly welded, the hemisphere and the steel pipe are prone to rolling, and the steel pipe needs to be continuously supported. Once the hemisphere and the steel pipe are displaced, the position of the steel pipe welded on the hemisphere will change. Welding multiple groups of steel pipes on the surface of the hemisphere cannot ensure the fixed position of the hemisphere, resulting in the inability to assemble the connection structure between the hemisphere and the steel pipe during use. If a clamp is used to fix the steel pipe and the hemisphere, the steel pipe needs at least three fixing points during welding. Only by forming a triangular support can the hemisphere and the steel pipe be fixed firmly. The hemisphere cannot be fixed well even if a clamp is used, but the volume of the clamp itself affects the welding speed between the steel pipe and the hemisphere, and at the same time, the steel pipe and the hemisphere connection support also need to be welded with other components, and the remaining auxiliary components also need to be fixed, resulting in an increase in the types and quantities of fixing clamps used. Multiple numbers of clamps need to be operated and fixed, which will seriously affect the production speed of the hemisphere and steel pipe connection support. At the same time, the use of multiple numbers of clamps increases the production cost of the hemisphere and steel pipe connection support, and the economic benefits are low.

[0003] To this end, we propose a combined structure of a hemisphere and steel tube. Utility Model Content

[0004] The purpose of the utility model is to provide a hemisphere and steel pipe combined structure to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a hemisphere and steel pipe combination structure, comprising a hemisphere, a first steel pipe and a second steel pipe, an I-beam is arranged at the lower part between the first steel pipe and the second steel pipe, a support plate is arranged in the hemisphere, a positioning ring is arranged on the outer surface of the hemisphere, an installation groove is arranged on the left end of the first steel pipe and the second steel pipe, a sleeve is arranged in the first steel pipe and the second steel pipe, a positioning column is arranged on the outer surface of the hemisphere, positioning holes are arranged on the surfaces of the opposite sides of the first steel pipe and the second steel pipe, and positioning columns are arranged on the upper and lower ends of the I-beam.

[0006] Furthermore, the hemisphere is fixedly connected to the top ends of the first steel pipe and the second steel pipe, and the support plate is welded inside the hemisphere.

[0007] Furthermore, three groups of sleeves are respectively arranged in the first steel pipe and the second steel pipe, and the three groups of sleeves are welded to the inner walls of the first steel pipe and the second steel pipe.

[0008] Furthermore, the upper portion of the positioning column is configured to be in a truncated cone shape.

[0009] Furthermore, the fixed ring is only provided with three quarters of the circumference of the inner wall of the first steel tube.

[0010] Compared with the prior art, the beneficial effects of the utility model are as follows: a positioning column is provided at the end of the I-beam, and the positioning column is installed into the positioning hole to quickly position the I-beam and install it on the first steel pipe and the second steel pipe, and the I-beam and the first steel pipe and the second steel pipe are spot-welded and fixed, and the positioning rod provided on the hemisphere is installed into the sleeve to position the hemisphere, and a positioning ring is provided on the surface of the hemisphere. When the positioning ring is installed into the installation groove provided at the end of the first steel pipe, the hemisphere is preliminarily fixed, so that the welding between the hemisphere and the first steel pipe and the second steel pipe will not require the use of a clamp, and at the same time, the welding efficiency between the steel pipe and the hemisphere is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;

[0012] Figure 2 This is a schematic diagram of the steel pipe structure of the utility model;

[0013] Figure 3 This is an enlarged view of point A of the utility model;

[0014] Figure 4 It is an enlarged view of point B of the utility model;

[0015] Figure 5 This is a schematic diagram of the installation structure of the positioning ring of the utility model.

[0016] In the figure: 1. hemisphere; 2. first steel pipe; 3. second steel pipe; 4. I-beam; 5. support plate; 6. positioning ring; 7. mounting groove; 8. sleeve; 9. positioning rod; 10. positioning hole; 11. positioning column. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0018] See also Figure 1-5The utility model provides a technical solution: a hemisphere and steel pipe combined structure, including a hemisphere 1, a first steel pipe 2 and a second steel pipe 3, an I-beam 4 is arranged at the lower part between the first steel pipe 2 and the second steel pipe 3, a support plate 5 is arranged in the hemisphere 1, a positioning ring 6 is arranged on the surface of the hemisphere 1, a mounting groove 7 is arranged at the left end of the first steel pipe 2 and the second steel pipe 3, a sleeve 8 is arranged in the first steel pipe 2 and the second steel pipe 3, a positioning rod 9 is arranged on the outer surface of the hemisphere 1, positioning holes 10 are arranged on the surfaces of the opposite sides of the first steel pipe 2 and the second steel pipe 3, and positioning columns 11 are arranged at the upper and lower ends of the I-beam 4. The first steel pipe 2 and the second steel pipe 3 are welded to the hemisphere, and the I-beam 4 is first installed between the first steel pipe 2 and the second steel pipe 3, and the first steel pipe 2 and the second steel pipe 3 are both provided with positioning holes 10, and the end of the I-beam 4 is provided with a positioning column 1 1, install the positioning column 11 into the positioning hole 10, quickly position the I-beam 4 and install it in the first steel pipe 2 and the second steel pipe 3, spot-weld the I-beam 4 and the first steel pipe 2 and the second steel pipe 3, the other ends of the first steel pipe 2 and the second steel pipe 3 are in contact, and spot-weld is also performed to fix it, the hemisphere 1 is installed at one end of the first steel pipe 2 and the second steel pipe 3, the positioning rod 9 provided on the hemisphere 1 is installed into the sleeve 8, the hemisphere 1 is positioned, and a positioning ring 6 is provided on the surface of the hemisphere 1. When the positioning ring 6 is installed into the mounting groove 7 provided at the end of the first steel pipe 3, the hemisphere 1 is initially fixed, and the hemisphere 1 will not be separated from the first steel pipe 2 and the second steel pipe 3 without external force, which is convenient for spot-welding the hemisphere 1 and the first steel pipe 2 and the second steel pipe 3. After the spot-welding between the steel pipe and the hemisphere is fixed, full welding can be performed.

[0019] Among them, the hemisphere 1 is fixedly connected to the top of the first steel pipe 2 and the second steel pipe 3, and the support plate 5 is welded inside the hemisphere 1. The support plate 5 is welded inside the hemisphere 1, and the support plate 5 supports the hemisphere to increase the force strength of the hemisphere 1, thereby making the strength of the steel structure higher;

[0020] Three sets of sleeves 8 are respectively arranged in the first steel tube 2 and the second steel tube 3, and the three sets of sleeves 8 are welded on the inner walls of the first steel tube 2 and the second steel tube 3, so that the hemisphere 1 is better positioned and installed on the first steel tube 2 and the second steel tube 3, so that the hemisphere 1 will not be separated from the first steel tube 2 and the second steel tube 3 when no external force is applied, and the sleeves 8 can be fixed in the first steel tube 2 and the second steel tube 3 by spot welding;

[0021] The upper portion of the positioning column 11 is configured to be truncated cone-shaped so that the top diameter of the positioning column 11 is much smaller than the diameter of the positioning hole 10 , which facilitates faster installation of the positioning column 11 into the positioning hole 10 , thereby quickly positioning and installing the I-beam 4 .

[0022] The positioning ring 6 is only provided on three quarters of the inner wall of the first steel tube 2. The first steel tube 2 and the second steel tube 3 are connected to one end of the hemisphere. The first steel tube 2 and the second steel tube 3 are in contact. The positioning ring 6 is only provided on three quarters of the inner wall of the first steel tube 2, which will not affect the positioning and installation of the hemisphere.

[0023] Working principle: To weld the first steel tube 2, the second steel tube 3 and the hemisphere, first install the I-beam 4 between the first steel tube 2 and the second steel tube 3. The first steel tube 2 and the second steel tube 3 are both provided with positioning holes 10. The ends of the I-beam 4 are provided with positioning columns 11. The positioning columns 11 are installed into the positioning holes 10. The I-beam 4 is quickly positioned and installed in the first steel tube 2 and the second steel tube 3. The I-beam 4 is spot-welded and fixed to the first steel tube 2 and the second steel tube 3. The other ends of the first steel tube 2 and the second steel tube 3 are in contact, and spot welding is also performed. Fix, install the hemisphere 1 at one end of the first steel pipe 2 and the second steel pipe 3, install the positioning rod 9 provided on the hemisphere 1 into the sleeve 8 to position the hemisphere 1, and at the same time, a positioning ring 6 is provided on the surface of the hemisphere 1. When the positioning ring 6 is installed into the mounting groove 7 provided at the end of the first steel pipe 3, the hemisphere 1 is initially fixed. The hemisphere 1 will not separate from the first steel pipe 2 and the second steel pipe 3 without external force, which is convenient for spot welding and fixing between the hemisphere 1 and the first steel pipe 2 and the second steel pipe 3. After spot welding and fixing between the steel pipe and the hemisphere, full welding and fixing can be performed.

[0024] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A hemisphere and steel tube combined structure, comprising a hemisphere (1), a first steel tube (2) and a second steel tube (3), characterized in that: An I-beam (4) is arranged at the lower part between the first steel tube (2) and the second steel tube (3), a support plate (5) is arranged in the hemisphere (1), a positioning ring (6) is arranged on the outer surface of the hemisphere (1), a mounting groove (7) is arranged at the left end of the first steel tube (2) and the second steel tube (3), a sleeve (8) is arranged in the first steel tube (2) and the second steel tube (3), a positioning rod (9) is arranged on the outer surface of the hemisphere (1), positioning holes (10) are arranged on the surfaces of the first steel tube (2) and the second steel tube (3) on the opposite side, and positioning columns (11) are arranged at the upper and lower ends of the I-beam (4).

2. The hemisphere and steel pipe combined structure according to claim 1, characterized in that: The hemisphere (1) is fixedly connected to the top ends of the first steel tube (2) and the second steel tube (3), and the support plate (5) is welded inside the hemisphere (1).

3. The hemisphere and steel pipe combined structure according to claim 1, characterized in that: Three groups of sleeves (8) are respectively arranged inside the first steel pipe (2) and the second steel pipe (3), and the three groups of sleeves (8) are welded to the inner walls of the first steel pipe (2) and the second steel pipe (3).

4. The hemisphere and steel pipe combined structure according to claim 1, characterized in that: The upper part of the positioning column (11) is configured in a truncated cone shape.

5. The hemisphere and steel pipe combined structure according to claim 1, characterized in that: The positioning ring (6) is only provided on three quarters of the circumference of the inner wall of the first steel pipe (2).