Channel structure suitable for pipe pressure concrete pump pipe installation
By designing a channel structure suitable for pipe-pressed concrete pump pipes in the construction of super-large bridge arch bridges, the problems of difficulty and high temperature of pump pipe installation in high altitude operations are solved, and the safe and stable installation and efficient construction of pump pipes are achieved, avoiding pipe blockage Phenomenon.
Patent Information
- Application Number
- CN202420688932.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-07
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2034-04-07
AI Technical Summary
During the construction of the arch bridge of the super-large bridge, due to the steep terrain and high altitude operation risk, the existing technology is difficult to meet the safety and stability requirements of concrete pump pipes. At the same time, the installation efficiency is low, and the high temperature has a great impact on the concrete performance, making it easy to cause blockage. Control phenomenon.
A channel structure consisting of vertical channels, transverse channels and pump pipe fixing devices is designed, and the vertically arranged passage is adapted to the pump pipe arranged at 90°, providing a bottom support system and guardrail, combining a U-shaped card and rubber pad , ensure the stable installation of the pump pipe, and facilitate the construction personnel to operate and cool inspection through the steering channel pedals and steps.
It improves the installation safety and stability of concrete pump pipes, enhances construction efficiency, avoids the occurrence of pipe blockage, and facilitates construction personnel to check the status of the pump pipe.
Smart Images

Figure CN222251769U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of concrete pouring construction in arch ribs of arch bridges, and in particular relates to a channel structure suitable for installing a pipe-pressure concrete pump pipe. Background Art
[0002] A super-large bridge refers to a bridge with a total span of more than 1000m or a single span of more than 150m. Due to the large span, it is difficult to build. Take the Shuangbao super-large bridge as an example. The Shuangbao super-large bridge is located between mountains and valleys. The terrain is steep. It continuously crosses the Dadong River and the small river ditch. The transportation is inconvenient and the construction is difficult. The calculated span of a single arch is 380m (the upper structure is 405m), the rise is 80m, and the rise-span ratio is 1 / 4.75; the arch axis adopts a catenary, and the arch axis coefficient is 1.55. The main arch ring adopts a variable-height space truss of steel tube concrete, a four-limb lattice structure, a tube diameter of 1.4m, and the tube is filled with C70 self-compacting micro-expansive concrete.
[0003] As Shuangbao Bridge is located in a steep terrain and is the world's largest cross-border double-arch bridge, high-altitude operations are extremely dangerous. The main arch ring adopts a variable-height space truss of steel tube concrete and a four-limb lattice structure, which results in the arch rib grouting holes being arranged at 90° to the pump pipe, thus placing higher requirements on the installation of the concrete delivery pump pipe, in order to improve the installation efficiency while ensuring the safety and stability of the pump pipe. Utility Model Content
[0004] The purpose of the utility model is to provide a channel structure suitable for installing a pipe pressure concrete pump pipe, so as to overcome the above-mentioned technical problems existing in the prior art.
[0005] To this end, the technical solution provided by the utility model is as follows:
[0006] A channel structure suitable for installing a pipe-pressure concrete pump pipe comprises a vertical channel, a transverse channel and a pump pipe fixing device. The vertical channel and the transverse channel are perpendicular and fixedly connected. The pump pipe fixing device is fixedly arranged at one end of the vertical channel close to the transverse channel.
[0007] The vertical channel includes a bottom support system and a vertical channel guardrail, and the vertical channel guardrail is fixed on the bottom support system and the two are perpendicular.
[0008] The transverse channel comprises a turning channel ladder beam and a transverse channel guardrail. The transverse channel guardrail is arranged on the top of the turning channel ladder beam. A turning channel pedal is arranged between the turning channel ladder beams.
[0009] The pump pipe fixing device includes a U-shaped card and a U-shaped card closing steel plate. The U-shaped card closing steel plate is arranged at the opening of the U-shaped card. The lower end of the U-shaped card is connected to the bottom support system. A pad is arranged in the U-shaped card. The pad is used to support the concrete pump pipe. A rubber pad is arranged between the concrete pump pipe and the U-shaped card closing steel plate.
[0010] The bottom support system includes a bottom transverse load-bearing beam, a ladder beam and steps. The ladder beam is fixed on the top of the bottom transverse load-bearing beam and the two are perpendicular. The vertical channel guardrail is fixed on the ladder beam and the two are perpendicular. The ladder beams are divided into two groups, and the steps are divided into multiple groups and are evenly spaced between the two groups of ladder beams.
[0011] The vertical channel guardrail includes a vertical pole and a horizontal pole. The vertical pole is arranged in several groups at equal distances along the ladder beam, and the horizontal pole is arranged in at least two groups at equal distances from top to bottom.
[0012] The beneficial effects of the utility model are:
[0013] The channel structure suitable for installing a pipe-pressure concrete pump pipe provided by the utility model is adapted to the 90° arrangement of the arch rib grouting holes and the pump pipe through the vertically arranged vertical channels and transverse channels, thereby meeting the concrete pump pipe installation requirements of super-large bridges.
[0014] The vertical channel of the channel structure supports the vertical channel guardrail through the bottom support system, and the transverse channel is connected to the transverse channel guardrail through the turning channel ladder beam. One end of the turning channel ladder beam is connected to the arch rib chord tube, and the other end is connected to one end of the ladder beam of the vertical channel. It is not only easy to install, but also has high safety and stability in installing the pump pipe.
[0015] The utility model provides steps and turning channel pedals in the vertical channel and the horizontal channel respectively, which not only supports the pump pipe, but also makes it convenient for construction workers to sprinkle water for cooling and avoid "pipe blocking" when pouring pipe-pressure concrete, because the arch rib will generate a lot of heat when pouring pipe-pressure concrete. High temperature has a great influence on the performance of concrete. It is convenient for construction workers to check the status of the pump pipe when pouring pipe-pressure concrete. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the vertical channel elevation structure in one embodiment of the utility model;
[0017] Figure 2 is a top view of a vertical channel in one embodiment of the utility model;
[0018] Figure 3 This is a schematic diagram of the elevation structure of a transverse channel in one embodiment of the utility model;
[0019] Figure 4This is a schematic diagram of the pump tube installation structure in one embodiment of the utility model.
[0020] In the figure: 1. Bottom horizontal load-bearing beam; 2. Support pad; 3. Step; 4. Ladder beam; 5. Vertical pole 1; 6. Cross bar 1; 7. Cross bar 2; 8. Vertical pole 2; 9. Pump pipe; 10. Steering channel ladder beam; 11. Steering channel pedal; 12. Arch rib flat connecting pipe; 13. Arch rib chord pipe; 14. Rubber pad; 15. U-shaped clip; 16. U-shaped clip closing steel plate; 17. Cushion block; 18. Steel bar. DETAILED DESCRIPTION
[0021] The following is an explanation of the implementation of the present invention by means of specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0022] The exemplary embodiments of the present invention are now introduced with reference to the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to disclose the present invention in detail and completely and to fully convey the scope of the present invention to those skilled in the art. The terms in the exemplary embodiments shown in the accompanying drawings are not intended to limit the present invention. In the accompanying drawings, the same units / elements are marked with the same reference numerals.
[0023] Unless otherwise specified, the terms (including technical terms) used herein have the commonly understood meanings to those skilled in the art. In addition, it is understood that the terms defined in commonly used dictionaries should be understood to have the same meanings as those in the context of the relevant fields, and should not be understood as idealized or overly formal meanings.
[0024] Example 1
[0025] This embodiment provides a channel structure suitable for installing a pipe-pressure concrete pump pipe, including a vertical channel, a transverse channel and a pump pipe 9 fixing device. The vertical channel and the transverse channel are vertical and fixedly connected, and the pump pipe 9 fixing device is fixedly arranged at one end of the vertical channel close to the transverse channel.
[0026] The channel structure suitable for installing a pipe-pressure concrete pump pipe provided by the utility model is adapted to the 90° arrangement of the arch rib grouting holes and the pump pipe 9 through the vertically arranged vertical channels and transverse channels, thereby meeting the installation requirements of the concrete pump pipe 9 for super-large bridges.
[0027] Example 2
[0028] Based on Example 1, this example provides a channel structure suitable for installing a pipe-pressure concrete pump pipe, wherein the vertical channel includes a bottom support system and a vertical channel guardrail, and the vertical channel guardrail is fixed on the bottom support system and the two are perpendicular.
[0029] The pump pipe 9 is arranged along the vertical channel and supported by a bottom support system, and the vertical channel guardrails on both sides ensure the safety of construction workers.
[0030] Example 3
[0031] Based on Example 1, this example provides a channel structure suitable for installing a pipe-pressure concrete pump pipe, wherein the transverse channel includes a turning channel ladder beam 10 and a transverse channel guardrail, wherein the transverse channel guardrail is arranged on the top of the turning channel ladder beam 10, and a turning channel pedal 11 is arranged between the turning channel ladder beams 10.
[0032] like Figure 3 As shown, in this embodiment, two groups of turning channel ladder beams 10 are arranged at equal distances. Since the pump pipe 9 is installed on the arch rib, one end of the turning channel ladder beam 10 is connected to the arch rib chord tube 13, and the other end is connected to one end of the ladder beam 4 of the vertical channel, and the turning channel ladder is arranged on the arch rib flat connecting tube 12.
[0033] Among them, the horizontal channel guardrail includes two vertical poles 8 and two horizontal poles 7. The vertical poles 8 are arranged in two groups at equal distances, and the horizontal pole 7 is arranged in one group, which is arranged at the top of the vertical pole 5.
[0034] Example 4
[0035] Based on Example 2, this example provides a channel structure suitable for installing a pipe pressure concrete pump pipe, such as Figure 4 As shown, the pump pipe 9 fixing device includes a U-shaped card 15 and a U-shaped card closing steel plate 16, the U-shaped card closing steel plate 16 is arranged at the opening of the U-shaped card 15, the lower end of the U-shaped card 15 is connected to the bottom support system, a cushion block 17 is arranged in the U-shaped card 15, the cushion block 17 is used to support the pump pipe 9 for concrete, and a rubber pad 14 is arranged between the pump pipe 9 for concrete and the U-shaped card closing steel plate 16.
[0036] In order to prevent the lower end of the pump pipe 9 from moving along the channel direction due to the high concrete flow rate during pouring, causing friction damage, a cushion block 17 is provided, and a rubber cushion 14 is similarly provided at the upper end to reduce the wear of the pump pipe 9.
[0037] In order to prevent the pump pipe 9 from moving during the pipe pressure concrete pouring, multiple sets of U-shaped clamps 15 and U-shaped clamp sealing steel plates 16 are arranged at equal intervals to fix the pump pipe 9, such as Figure 4 shown.
[0038] Example 5
[0039] Based on Example 2, this embodiment provides a channel structure suitable for the installation of a pipe-pressure concrete pump pipe, wherein the bottom support system includes a bottom transverse load-bearing beam 1, a ladder beam 4 and a step 3, wherein the ladder beam 4 is fixedly mounted on the top of the bottom transverse load-bearing beam 1 and the two are perpendicular, and the vertical channel guardrail is fixedly mounted on the ladder beam 4 and the two are perpendicular, the ladder beam 4 is divided into two groups, and the step 3 is divided into multiple groups and is evenly spaced between the two groups of ladder beams 4.
[0040] like Figure 1 , Figure 2 As shown, the transverse load-bearing beam is formed by welding two I-beams, and several groups of transverse load-bearing beams are arranged at equal intervals. Two groups of ladder beams 4 are welded on the top surface of the transverse load-bearing beam, and several groups of steps 3 are welded at equal intervals between the two groups of ladder beams 4. The steps 3 are steel bars 18. A support pad 2 is also provided on the ladder beam 4 to pad the pump pipe 9.
[0041] This channel structure suitable for the installation of a pipe-pressure concrete pump pipe improves the safety and stability of the installation of the pump pipe 9 while speeding up the construction and installation efficiency of the pump pipe 9 on the arch rib; it also provides beneficial effects in the subsequent pouring of pipe-pressure concrete. Since the arch rib will generate a large amount of heat when pouring pipe-pressure concrete, high temperature has a great influence on the performance of concrete. The utility model can facilitate construction workers to sprinkle water for cooling and avoid the occurrence of "pipe blockage"; and it is convenient for construction workers to check the status of the pump pipe 9 when pouring pipe-pressure concrete.
[0042] Example 6
[0043] Based on Example 5, this embodiment provides a channel structure suitable for the installation of a pipe-pressure concrete pump pipe, wherein the vertical channel guardrail includes a vertical pole 5 and a horizontal pole 6, wherein several groups of the vertical poles 5 are equidistantly arranged along the ladder beam 4, and at least two groups of the horizontal poles 6 are equidistantly arranged from top to bottom.
[0044] In this embodiment, the vertical bars 5 of the vertical channel guardrail are arranged in several groups at equal intervals, and the horizontal bars 6 are arranged in two groups at equal intervals from top to bottom.
[0045] During on-site construction, in order to facilitate the construction workers to install the pump pipe 9, first prepare the assembly materials and then start welding. After welding is completed, the welded pump pipe 9 installation channel is transferred to the arch rib chord tube 13 by a truck crane, and then welded and fixed. Before pouring pipe-pressed concrete, the pump pipe 9 is transported to the construction area and fixed on the pump pipe 9 installation channel.
[0046] The above examples are merely illustrative of the present invention and do not constitute a limitation on the protection scope of the present invention. All designs that are identical or similar to the present invention fall within the protection scope of the present invention.
Claims
1. A channel structure suitable for installing a pipe pressure concrete pump pipe, characterized in that: It includes a vertical channel, a transverse channel and a pump pipe fixing device, wherein the vertical channel and the transverse channel are perpendicular and fixedly connected, and the pump pipe fixing device is fixedly arranged at one end of the vertical channel close to the transverse channel; The vertical channel includes a bottom support system and a vertical channel guardrail, and the vertical channel guardrail is fixed on the bottom support system and the two are perpendicular; The pump pipe fixing device includes a U-shaped card and a U-shaped card closing steel plate. The U-shaped card closing steel plate is arranged at the opening of the U-shaped card. The lower end of the U-shaped card is connected to the bottom support system. A pad is arranged in the U-shaped card. The pad is used to support the concrete pump pipe. A rubber pad is arranged between the concrete pump pipe and the U-shaped card closing steel plate.
2. A channel structure suitable for installing a pipe pressure concrete pump pipe according to claim 1, characterized in that: The transverse channel comprises a turning channel ladder beam and a transverse channel guardrail. The transverse channel guardrail is arranged on the top of the turning channel ladder beam. A turning channel pedal is arranged between the turning channel ladder beams.
3. A channel structure suitable for installing a pipe pressure concrete pump pipe according to claim 1, characterized in that: The bottom support system includes a bottom transverse load-bearing beam, a ladder beam and steps. The ladder beam is fixed on the top of the bottom transverse load-bearing beam and the two are perpendicular. The vertical channel guardrail is fixed on the ladder beam and the two are perpendicular. The ladder beams are divided into two groups, and the steps are divided into multiple groups and are evenly spaced between the two groups of ladder beams.
4. A channel structure suitable for installing a pipe pressure concrete pump pipe according to claim 3, characterized in that: The vertical channel guardrail includes a vertical pole and a horizontal pole. The vertical pole is arranged in several groups at equal distances along the ladder beam, and the horizontal pole is arranged in at least two groups at equal distances from top to bottom.