Wall construction device for green construction

By using a combination of hydraulic telescopic rods and injection tubes in the green construction wall construction device, the precise control of the insulation material coating on the concrete surface is achieved, the problems of material waste and high cost are solved, and through hinge seats and telescopic retraction The design of the rod ensures stability of the support.

CN222253153UActive Publication Date: 2024-12-27THIRD CONSTR (GUIZHOU) ENG CONSTR CO LTD OF XIAN CONSTR ENG GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420790522.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-17
Publication Date
2024-12-27
Estimated Expiration
2034-04-17

AI Technical Summary

Technical Problem

It is difficult to accurately control the amount of insulation materials during the pouring process of existing green construction wall construction, resulting in waste of materials, high construction costs, and unstable support.

Method used

A device including a panel set, a hydraulic telescopic rod, a syringe tube and a hinge base is designed to drive the casting plate movement through the hydraulic telescopic rod to accurately coat the insulation material, and ensure the stability of the support through the hinge base and the telescopic rod.

Benefits of technology

Accurate control of the amount of insulation material is achieved, resource waste and construction costs are reduced, while improving the stability of support and the convenience of adjustment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222253153U_ABST
    Figure CN222253153U_ABST
Patent Text Reader

Abstract

The utility model discloses a wall body construction device for green construction, relates to the technical field of green wall bodies, solves the problems that an existing device is high in construction cost and unstable in supporting, and adopts the following scheme that a hydraulic telescopic rod is fixedly installed on the rear side of an inner wall plate. Through the arrangement of a pouring plate, a hydraulic telescopic rod and an injection pipe, the hydraulic telescopic rod drives the pouring plate to move, so that a gap is formed between the pouring plate and concrete, then the surface of the concrete is coated with a heat preservation layer through the injection pipe, injection can be stopped when the gap is filled, and the amount of heat preservation materials can be accurately controlled; meanwhile, through arrangement of mounting holes, hinge seats A, supporting plates and connecting seats, the two sets of telescopic rods B are connected through the connecting seats, the integrity of the adjusting device is guaranteed, the positions of the supporting plates and the telescopic rods A are adjusted, the positions of the two sets of telescopic rods B can be adjusted at the same time, the adjusting device is simple and convenient to use, and supporting is stable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of green walls, in particular to a wall construction device for green construction. Background Art

[0002] Usually when constructing the walls of an apartment or a building, the inner wall formwork and the outer wall formwork are often arranged apart in a state where they are facing each other. In order to maintain the interval in the separated state, many connecting parts are often used to fix them, and then cement or concrete is poured, which wastes a lot of materials and is costly, and therefore does not meet the requirements of green construction in engineering construction.

[0003] After searching, the application with patent announcement number CN116446557B discloses a wall construction device for green construction, including a vertical panel group, which is composed of two groups of axially symmetrical vertical panel mechanisms. The vertical panel mechanisms are continuously installed in the horizontal direction. The vertical panel mechanisms include a base plate, a controllable sliding component and an insulation casting component. During the wall construction, the whole frame is simply installed to minimize the number of accessories, improve green construction, and reduce construction costs.

[0004] However, due to the setting of casting the inner side plate and the columnar connecting pipe, the insulation material is placed in the cabinet, and then the valve is opened to coat the outer surface of the concrete with the insulation material. The amount of insulation material placed in the cabinet and the amount required for coating cannot be accurately controlled, resulting in the inability to accurately control the use of the insulation material, which easily leads to waste of insulation material and increases the cost of construction. At the same time, due to the setting of the cross bar and the fixed rod, the two groups of separate fixed rods support the vertical panel vertically, which need to be adjusted in turn, which is inconvenient to adjust and the fixed rod support is unstable.

[0005] Therefore, we proposed a wall construction device for green construction. Utility Model Content

[0006] In view of the deficiencies of the prior art, the utility model provides a wall construction device for green construction, which solves the problems of high construction cost and unstable support of the prior art devices.

[0007] To achieve the above objectives, the utility model is implemented through the following technical solutions: a wall construction device for green construction, including a panel group, the main body of which is composed of an outer wall panel, an inner wall panel and a side panel;

[0008] Four sets of hydraulic telescopic rods in opposite positions are fixedly installed on the rear side of the inner wall panel, and a casting plate that matches the specifications of the inner wall panel is fixedly installed on the telescopic end of the hydraulic telescopic rod. The rear side of the casting plate is coated with an oil layer, and an injection pipe is fixedly installed on the front side of the casting plate. The injection pipe is slidably connected to the outer wall panel and the inner wall panel, and an injection hole connected to the injection pipe is opened on the rear side of the casting plate;

[0009] The outer wall of the side panel is provided with three groups of mounting holes in opposite positions, and bolts and nuts of matching specifications are installed in the mounting holes. The panel groups are placed horizontally in sequence, and the rear side of the casting plate is in contact with the concrete. The front side of the exterior wall panel is provided with a hinge seat A through a fixing plate, and a support plate is fixedly installed on the outer wall of the hinge seat A. The front side of the interior wall panel is hinged with a telescopic rod A that runs through the exterior wall panel through a hinge seat B, and the telescopic rod A is connected to the support plate through a connecting seat, and a telescopic rod B is fixedly installed on the outer wall of the connecting seat.

[0010] Preferably, evenly distributed partitions are fixedly installed between the outer wall panels and the inner wall panels, which can reduce the weight and material of the panel group, thereby reducing the production cost and improving green environmental protection performance.

[0011] Preferably, a placement cavity is provided between the partitions, so that the heat-insulating material can be placed in the placement cavity.

[0012] Preferably, a blocking rod of matching specifications is slidably connected to the inner wall of the injection tube, so that the injection tube can be blocked when pouring concrete to prevent concrete from entering the injection tube.

[0013] Preferably, a groove opposite to the position of the telescopic rod A is formed on the front side of the exterior wall panel, so that the telescopic rod A can be easily moved up and down.

[0014] Preferably, a cone head made of steel is fixedly mounted on the telescopic end of the telescopic rod B, so that the telescopic rod B can be easily in contact with the ground and the stability is improved.

[0015] 1. This green wall construction device is equipped with a casting plate, a hydraulic telescopic rod and an injection pipe. After the concrete is poured, the hydraulic telescopic rod drives the casting plate to move, thereby creating a gap between the casting plate and the concrete. Then, an insulation layer is applied to the concrete surface through the injection pipe. When the gap is filled, the injection can be stopped. The amount of insulation material can be accurately controlled, reducing the waste of resources and the cost of construction.

[0016] 2. At the same time, through the setting of the mounting holes, hinge seat A, support plate and connecting seat, the mounting holes are convenient for fixing adjacent panel groups together, and then the two groups of telescopic rods B are connected through the connecting seat to ensure the integrity of the adjustment device. By adjusting the position of the support plate and the telescopic rod A, the position of the two groups of telescopic rods B can be adjusted at the same time, which is simple and convenient, and the support is stable. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0018] Figure 2 It is a structural schematic diagram of the telescopic rod of the utility model;

[0019] Figure 3 It is a structural schematic diagram of the casting plate of the utility model;

[0020] Figure 4 It is a structural schematic diagram of the injection tube of the utility model.

[0021] In the figure: 1. exterior wall panel; 2. interior wall panel; 3. side panel; 4. partition; 5. placement cavity; 6. mounting hole; 7. hydraulic telescopic rod; 8. casting plate; 9. injection tube; 10. injection hole; 11. blocking rod; 12. hinge seat A; 13. support plate; 14. telescopic rod A; 15. connecting seat; 16. telescopic rod B; 17. groove. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] Embodiment 1:

[0024] like Figure 1-4As shown: four groups of hydraulic telescopic rods 7 are fixedly installed on the rear side of the inner wall panel 2 in opposite positions, and a casting plate 8 that matches the specifications of the inner wall panel 2 is fixedly installed on the telescopic end of the hydraulic telescopic rod 7. The rear side of the casting plate 8 is coated with an oil layer, and an injection tube 9 is fixedly installed on the front side of the casting plate 8. The injection tube 9 is slidably connected to the outer wall panel 1 and the inner wall panel 2. An injection hole 10 connected to the injection tube 9 is opened on the rear side of the casting plate 8. Through the arrangement of the casting plate 8, the hydraulic telescopic rod 7 and the injection tube 9, after the concrete pouring is completed, the hydraulic telescopic rod 7 drives the casting plate 8 to move, thereby generating a gap between the casting plate 8 and the concrete, and then the insulation layer is coated on the concrete surface through the injection tube 9. When the gap is filled, the injection can be stopped, so that the amount of insulation material can be accurately controlled to reduce the waste of resources and the cost of construction.

[0025] Embodiment 2:

[0026] like Figure 2-4 As shown: three groups of mounting holes 6 with opposite positions are provided on the outer wall of the side panel 3, and bolts and nuts with matching specifications are installed in the mounting holes 6. The panel groups are placed horizontally in sequence, and the rear side of the casting plate 8 is in contact with the concrete. The front side of the exterior wall panel 1 is equipped with a hinge seat A12 through a fixing plate, and a support plate 13 is fixedly installed on the outer wall of the hinge seat A12. The front side of the interior wall panel 2 is hinged with a telescopic rod A14 running through the exterior wall panel 1 through a hinge seat B, and the telescopic rod A14 is connected to the support plate 13 through a connecting seat 15, and a telescopic rod B16 is fixedly installed on the outer wall of the connecting seat 15. Through the arrangement of the mounting holes 6, the hinge seat A12, the support plate 13 and the connecting seat 15, the mounting holes 6 are convenient for fixing adjacent panel groups together, and then the two groups of telescopic rods B16 are connected through the connecting seat 15 to ensure the integrity of the adjusting device. By adjusting the positions of the support plate 13 and the telescopic rod A14, the positions of the two groups of telescopic rods B16 can be adjusted at the same time, which is simple and convenient, and the support is stable.

[0027] Embodiment 3:

[0028] like Figure 2-3 As shown: evenly distributed partitions 4 are fixedly installed between the outer wall panel 1 and the inner wall panel 2, which can reduce the weight and material of the panel group, thereby reducing the production cost and improving the green environmental protection performance.

[0029] The working principle and use process of the utility model are as follows: when the device is needed to work, the panel group is first placed in a suitable position, and then the adjacent panel groups are fixed together through the mounting holes 6, and then the two groups of telescopic rods B16 are connected through the connecting seat 15 to ensure the integrity of the adjustment device, and the positions of the support plate 13 and the telescopic rod A14 can be adjusted at the same time. The position of the two groups of telescopic rods B16 can be adjusted, which is simple and convenient, and the support is stable. Then the concrete is poured. After the pouring is completed, the hydraulic telescopic rod 7 drives the pouring plate 8 to move, thereby generating a gap between the pouring plate 8 and the concrete, and then the insulation layer is coated on the concrete surface through the injection tube 9. When the gap is filled, the injection can be stopped, and the amount of insulation material can be accurately controlled.

[0030] The above shows and describes the basic principles and main features of the utility model and the advantages of the utility model. For those skilled in the art, it is obvious that the utility model is not limited to the details of the above exemplary embodiments, and can be implemented in other specific forms without departing from the spirit or basic features of the utility model. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the utility model is limited by the attached claims rather than the above description, and it is intended to include all changes within the meaning and scope of the equivalent elements of the claims. Any figure mark in the claims should not be regarded as limiting the claims involved.

[0031] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A wall construction device for green construction, comprising a panel group, wherein the main body of the panel group is composed of an outer wall panel (1), an inner wall panel (2) and a side panel (3); Features: Four sets of hydraulic telescopic rods (7) in opposite positions are fixedly installed on the rear side of the inner wall panel (2); a casting plate (8) matching the specifications of the inner wall panel (2) is fixedly installed on the telescopic end of the hydraulic telescopic rod (7); the rear side of the casting plate (8) is coated with an oil layer; an injection tube (9) is fixedly installed on the front side of the casting plate (8); the injection tube (9) is slidably connected to the outer wall panel (1) and the inner wall panel (2); and an injection hole (10) connected to the injection tube (9) is opened on the rear side of the casting plate (8); The outer wall of the side panel (3) is provided with three groups of mounting holes (6) in opposite positions, and bolts and nuts of matching specifications are installed in the mounting holes (6). The panel groups are placed horizontally in sequence, and the rear side of the casting plate (8) is in contact with the concrete. The front side of the outer wall panel (1) is provided with a hinge seat A (12) through a fixing plate, and a support plate (13) is fixedly installed on the outer wall of the hinge seat A (12). The front side of the inner wall panel (2) is hinged with a telescopic rod A (14) passing through the outer wall panel (1) through a hinge seat B. The telescopic rod A (14) is connected to the support plate (13) through a connecting seat (15), and a telescopic rod B (16) is fixedly installed on the outer wall of the connecting seat (15).

2. A green construction wall construction device according to claim 1, characterized in that: Evenly distributed partitions (4) are fixedly installed between the outer wall panel (1) and the inner wall panel (2).

3. A green construction wall construction device according to claim 2, characterized in that: A placement cavity (5) is provided between the partitions (4).

4. A green construction wall construction device according to claim 1, characterized in that: A blocking rod (11) of matching specifications is slidably connected to the inner wall of the injection tube (9).

5. A green construction wall construction device according to claim 1, characterized in that: The front side of the exterior wall panel (1) is provided with a groove (17) which is opposite to the telescopic rod A (14).

6. A green construction wall construction device according to claim 1, characterized in that: A cone head made of steel is fixedly mounted on the telescopic end of the telescopic rod B (16).