Top-loading material distributing device

By installing annular tracks and rotating mechanisms on the building platform, the inverted transport of concrete is achieved, which solves the limitations and weight problems of the installation position of the traditional fabric machine bracket, and improves the flexibility and working efficiency of the fabric machine.

CN222253164UActive Publication Date: 2024-12-27CHINA STATE CONSTR HAILONG TECH CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420824874.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-20
Publication Date
2024-12-27
Estimated Expiration
2034-04-20

AI Technical Summary

Technical Problem

The bracket installation position of the traditional concrete fabric machine is difficult to pour at the bottom, there are blind spots in the fabric, and the balance blocks increase the overall weight, affecting the flexibility and working efficiency of the fabric machine.

Method used

The ring track and first-level rotary mechanism are used to fix it to the ceiling of the building platform. The concrete is upside down installation and rotary conveying through the first-level and second-level conveying arms, which reduces the dependence on the top of the building machine, avoids opening fabrics, and passes through The annular track and the rotary mechanism share the weight, reducing the overhanging force of the conveyor arm.

Benefits of technology

It realizes direct fabric work inside the building machine, improves the flexibility and working efficiency of the fabric machine, reduces the overall weight, eliminates the blind spots of the fabric, and improves the convenience of operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222253164U_ABST
    Figure CN222253164U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of concrete distribution, and particularly relates to a top-loading distribution device. An annular rail in the material distributing device is fixed to a ceiling of a building platform. A fixed rotating part in the first-stage rotating mechanism is fixed to a building platform ceiling, the first end of a supporting plate fixedly sleeves the outer side of a first-stage rotating bearing of the fixed rotating part, and the second end of the supporting plate is in sliding connection with the annular rail; a pumping pipe is arranged in the fixed rotating part, one end of the first-stage conveying arm is bent upwards to form a first connecting end, the lower end of the pumping pipe is communicated with the first connecting end through a first-stage rotating bearing, and the first-stage conveying arm is fixed below the supporting plate. Therefore, the material distributing device is directly hung upside down on the ceiling of the building platform, and the weight of the material distributing device is jointly borne by the annular track and the first-stage rotating mechanism which are connected with the ceiling, so that the two-point supporting stress is better, a balance block does not need to be added to adjust the gravity center of the material distributing device, and the overall weight of the material distributing device is lighter.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of concrete distribution, and in particular relates to a top-mounted distribution device. Background Art

[0002] The concrete placing boom is the terminal equipment for pumping concrete when the building machine is placing concrete. It is mainly used to transport the pumped concrete through the delivery pipe to the formwork where the components need to be cast. The placing device of the traditional placing boom is supported by a bracket. The placing device includes two parts of the placing pipe. The combined movement of the two parts of the placing pipe can cover all the placing points within the placing radius. However, since the cantilever length of the placing pipe is relatively long, it is necessary to add a balance block to the rear end of the placing device to balance the force. In addition, since the bracket has a certain height, the placing boom needs to be set above the ceiling of the building machine to obtain enough space to accommodate the placing boom. When placing concrete, it is necessary to extend the discharge end of the placing pipe from the hole on the roof to place concrete in the formwork. After the concrete reaches the limit range, it is pulled out from the hole and continues to extend from other holes.

[0003] However, the repeated action of extending and pulling out the discharge end greatly affects the flexibility and working efficiency of the concrete placing boom. In addition, the bottom of the bracket installation position is difficult to cast, and there is a dead angle for placing the concrete. The setting of the balance block increases the overall weight, further affecting the flexibility of the concrete placing boom. Utility Model Content

[0004] 1. Technical issues to be resolved

[0005] In view of the above-mentioned shortcomings and deficiencies of the prior art, the utility model provides a top-mounted material distribution device, thereby solving the technical problems that the bottom of the bracket installation position is difficult to cast, there are dead corners for material distribution, and the setting of the balance block increases the overall weight and affects the flexibility of the material distribution machine.

[0006] (II) Technical solution

[0007] In order to achieve the above-mentioned purpose, the main technical solutions adopted by the utility model include:

[0008] An embodiment of the utility model provides a top-mounted material distribution device for transporting concrete in a concrete pump, comprising an annular track, a primary rotating mechanism and a primary conveying arm, wherein the annular track is fixed to the ceiling of a building platform; the primary rotating mechanism comprises a fixed rotating part and a support plate, the fixed rotating part is located at the center of the annular track and is fixed to the ceiling of the building platform, the fixed rotating part comprises a primary rotating bearing, the first end of the support plate is fixedly sleeved on the outside of the primary rotating bearing, and the second end of the support plate is slidably connected to the annular track; a pumping pipe is provided in the fixed rotating part, the upper end of the pumping pipe is upwardly penetrated through the ceiling of the building platform and connected to the concrete pump, one end of the primary conveying arm is bent upward to form a first connecting end, the lower end of the pumping pipe is connected to the first connecting end through the primary rotating bearing, and the primary conveying arm is fixed below the support plate.

[0009] Furthermore, a plurality of track connecting plates are arranged on the circular track, a plurality of mounting holes are pre-buried in the ceiling of the building platform, the plurality of track connecting plates correspond to the plurality of mounting holes one by one, and the circular track is installed in the mounting holes and fixed to the ceiling of the building platform through the plurality of track connecting plates.

[0010] Furthermore, the fixed rotating part also includes a flange, which is located above the primary rotating bearing, and the primary rotating mechanism is fixed to the ceiling of the building platform through the flange.

[0011] Furthermore, a first driving device is fixed above the second end of the support plate, and the first driving device includes a first driving motor and a driving wheel connected to the output end of the first driving motor. The driving wheel is adapted to be slidably connected to the circular track, and the first driving motor drives the driving wheel to rotate on the circular track so that the support plate drives the primary conveying arm to rotate around the first connection end.

[0012] Furthermore, a secondary rotating mechanism is arranged below the second end of the support plate, and the secondary rotating mechanism includes a secondary rotating bearing and a second driving device; the other end of the primary conveying arm is bent downward to form a second connecting end, and the top-mounted material distribution device also includes a secondary conveying arm, and one end of the secondary conveying arm is bent upward to form a third connecting end, and the second connecting end is connected to the third connecting end through the secondary rotating bearing; the second driving device includes a second driving motor, a driving gear and a driven gear meshing therewith, the driving gear is connected to the output end of the second driving motor, and the driven gear is fixedly sleeved on the third connecting end, and the second driving motor drives the driving gear to drive the driven gear to rotate so that the secondary conveying arm rotates with the third connecting end as the axis.

[0013] Furthermore, the other end of the secondary conveying arm is bent downward to form a fourth connecting end, and the fourth connecting end is connected to a discharge pipe, which is a hose.

[0014] Furthermore, a rotating shaft is provided at the second end of the support plate, and the rotating shaft is coaxial with the third connecting end; a pull ring is provided on the rotating shaft, and three lifting ears are provided on the secondary conveying arm, and the three lifting ears are all connected to the pull ring through steel cables, and the three steel cables are all in a tensioned state.

[0015] Furthermore, the length of the primary conveying arm is consistent with the length of the supporting plate.

[0016] Furthermore, the primary conveying arm is fixed to the support plate through a plurality of pipe clamps.

[0017] Furthermore, the first end of the support plate is thicker than the second end of the support plate.

[0018] (III) Beneficial effects

[0019] The beneficial effects of the utility model are:

[0020] The utility model provides a top-mounted material distributing device, which is provided with an annular track and a primary rotating mechanism that can be fixed on the ceiling of the building platform. Therefore, the top-mounted material distributing device does not need to be supported by a bracket, but can be directly installed upside down on the ceiling of the building platform. There is no need to open a hole in the top of the building machine to distribute the material, and the material distribution work can be carried out directly inside the building machine. Moreover, since the weight of the material distributing device is jointly borne by the annular track and the primary rotating mechanism connected to the ceiling, the two-point support has better force, which reduces the cantilever force of the first-level conveying arm, and there is no need to add a balance block to adjust the center of gravity of the material distributing device, thereby making the overall weight of the material distributing device lighter. In addition, there is no obstruction directly below the material distributing device, and material distributing can be carried out, which makes the material distributing more flexible and convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the structure of the top-loading material distribution device;

[0022] Figure 2 for Figure 1 A is a partial enlarged schematic diagram;

[0023] Figure 3 for Figure 1 A partial enlarged schematic diagram of B in the middle;

[0024] Figure 4 It is a front view of the top-loading material distribution device;

[0025] Figure 5 for Figure 4 A partial enlarged schematic diagram of C in the middle;

[0026] Figure 6 for Figure 4 A partial enlarged schematic diagram of D in the middle.

[0027] [Description of Reference Numerals]

[0028] 1: circular track; 11: track connecting plate;

[0029] 2: primary rotating mechanism; 21: fixed rotating part; 212: flange; 211: primary rotating bearing; 22: support plate; 221: rotating shaft; 222: pull ring; 23: first driving device; 231: first driving motor; 232: driving wheel;

[0030] 3: primary conveying arm; 4: pumping pipe;

[0031] 5: secondary rotating mechanism; 51: secondary rotating bearing; 52: second driving device; 521: second driving motor; 522: driving gear; 523: driven gear;

[0032] 6: Secondary conveying arm; 61: Lifting lug;

[0033] 7: Discharge pipe; 8: Steel cable; 9: Pipe clamp. DETAILED DESCRIPTION

[0034] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.

[0035] like Figure 1-6 As shown, the utility model provides a top-mounted material distribution device, which is installed on the ceiling of a building platform and is used to transport concrete in a concrete pump, including a circular track 1, a primary rotating mechanism 2, a primary conveying arm 3, a secondary rotating mechanism 5 and a secondary conveying arm 6. Figure 1 As shown, a plurality of track connecting plates 11 are arranged on the circular track 1, a plurality of mounting holes are pre-buried in the ceiling of the building platform, and the plurality of track connecting plates 11 correspond one to one with the plurality of mounting holes. The circular track 1 is installed in the mounting holes and fixed to the ceiling of the building platform through the plurality of track connecting plates 11.

[0036] like Figure 1 , Figure 2 , Figure 4 As shown, the primary rotating mechanism 2 includes a fixed rotating part 21 and a support plate 22. The fixed rotating part 21 is located at the center of the circular track 1 and fixed to the ceiling of the building platform. The fixed rotating part 21 includes a primary rotating bearing 211 and a flange 212. The flange 212 is located above the primary rotating bearing 211. The primary rotating mechanism 2 is fixed to the ceiling of the building platform through the flange 212. The first end of the support plate 22 is fixedly sleeved on the outside of the primary rotating bearing 211, and the second end of the support plate 22 is slidably connected to the circular track 1.

[0037] A pumping pipe 4 is arranged in the fixed rotating part 21, and the upper end of the pumping pipe 4 is passed upward through the ceiling of the building platform and connected to a concrete pump (not shown in the figure). Figure 4As shown, one end of the primary conveying arm 3 is bent upward to form a first connecting end, the lower end of the pumping pipe 4 is connected to the first connecting end through a primary rotating bearing 211, and the primary conveying arm 3 is fixed under the support plate 22 through a plurality of pipe clamps 9.

[0038] like Figure 1 , Figure 3 , Figure 4 As shown, a first driving device 23 is fixed above the second end of the support plate 22. The first driving device 23 includes a first driving motor 231 and a driving wheel 232 connected to the output end of the first driving motor 231. The driving wheel 232 is adapted to be slidably connected to the circular track 1. The first driving motor 231 drives the driving wheel 232 to rotate on the circular track 1 so that the support plate 22 drives the primary conveying arm 3 to rotate with the first connection end as the axis.

[0039] The secondary rotating mechanism 5 is arranged below the second end of the support plate 22, and includes a secondary rotating bearing 51 and a second driving device 52. The other end of the primary conveying arm 3 is bent downward to form a second connecting end, and one end of the secondary conveying arm 6 is bent upward to form a third connecting end, and the second connecting end is connected to the third connecting end through the secondary rotating bearing 51.

[0040] like Figure 1 , Figure 4 , Figure 5 As shown, the second driving device 52 includes a second driving motor 521, a driving gear 522 and a driven gear 523 meshing therewith, the driving gear 522 is connected to the output end of the second driving motor 521, and the driven gear 523 is fixedly sleeved on the third connecting end. The second driving motor 521 drives the driving gear 522 to drive the driven gear 523 to rotate so that the secondary conveying arm 6 rotates with the third connecting end as the axis.

[0041] like Figure 1 , Figure 4 , Figure 6 As shown, in order to share the gravity of the secondary conveying arm 6 on the secondary rotating mechanism 5, a rotating shaft 221 is provided at the second end of the support plate 22. The rotating shaft 221 is coaxial with the third connecting end and can rotate around the axis with the secondary conveying arm 6. A pull ring 222 is provided on the rotating shaft 221, and three lifting ears 61 are provided on the secondary conveying arm 6. The three lifting ears 61 are connected to the pull ring 222 through steel cables 8. The three steel cables 8 are all in tension to support the secondary conveying arm 6.

[0042] like Figure 1 , Figure 4 As shown, the other end of the secondary conveying arm 6 is bent downward to form a fourth connecting end, and the fourth connecting end is connected to a discharge pipe 7, which is a hose.

[0043] During operation, the concrete is pumped by the concrete pumping machine through the pumping pipe 4, the primary conveying arm 3, the secondary conveying arm 6 in sequence to the discharge pipe 7 for distribution.

[0044] In order to make the support plate 22 better support the primary conveying arm 3 without taking up extra space, the length of the primary conveying arm 3 is set to be consistent with the length of the support plate 22 and the first end of the support plate 22 is made thicker than the second end of the support plate 22.

[0045] In the description of the present utility model, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0046] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0047] In the present utility model, unless otherwise clearly specified and limited, when a first feature is “on” or “below” a second feature, it may be that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, when a first feature is “above”, “above” or “above” a second feature, it may be that the first feature is directly above or obliquely above the second feature, or it may simply mean that the first feature is higher in level than the second feature. When a first feature is “below”, “below” or “below” a second feature, it may be that the first feature is directly below or obliquely below the second feature, or it may simply mean that the first feature is lower in level than the second feature.

[0048] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "embodiment", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0049] Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A top-loading material distribution device for conveying concrete in a concrete pump, characterized in that: It comprises a circular track (1), a primary rotating mechanism (2) and a primary conveying arm (3), wherein the circular track (1) is fixed to the ceiling of the building construction platform; The primary rotating mechanism (2) comprises a fixed rotating part (21) and a support plate (22); the fixed rotating part (21) is located at the center of the circular track (1) and is fixed to the ceiling of the building platform; the fixed rotating part (21) comprises a primary rotating bearing (211); a first end of the support plate (22) is fixedly sleeved on the outside of the primary rotating bearing (211); and a second end of the support plate (22) is slidably connected to the circular track (1); A pumping pipe (4) is provided in the fixed rotating part (21), the upper end of the pumping pipe (4) is passed upward through the ceiling of the building platform and connected to the concrete pumping machine, one end of the primary conveying arm (3) is bent upward to form a first connecting end, the lower end of the pumping pipe (4) is connected to the first connecting end via the primary rotating bearing (211), and the primary conveying arm (3) is fixed below the support plate (22).

2. The top-loading material distribution device according to claim 1, characterized in that: A plurality of track connection plates (11) are arranged on the circular track (1), a plurality of mounting holes are pre-buried in the ceiling of the building platform, the plurality of track connection plates (11) correspond to the plurality of mounting holes one by one, and the circular track (1) is installed in the mounting holes and fixed to the ceiling of the building platform via the plurality of track connection plates (11).

3. The top-loading material distribution device according to claim 1, characterized in that: The fixed rotating part (21) further comprises a flange (212), wherein the flange (212) is located above the primary rotating bearing (211), and the primary rotating mechanism (2) is fixed to the ceiling of the building construction platform via the flange (212).

4. The top-loading material distribution device according to claim 1, characterized in that: A first driving device (23) is fixed above the second end of the support plate (22), the first driving device (23) comprising a first driving motor (231) and a driving wheel (232) connected to the output end of the first driving motor (231), the driving wheel (232) being adapted to be slidably connected to the annular track (1), the first driving motor (231) driving the driving wheel (232) to rotate on the annular track (1) so that the support plate (22) drives the primary conveying arm (3) to rotate about the first connection end.

5. The top-loading material distribution device according to claim 1, characterized in that: A secondary rotating mechanism (5) is provided below the second end of the support plate (22), and the secondary rotating mechanism (5) comprises a secondary rotating bearing (51) and a second driving device (52); The other end of the primary conveying arm (3) is bent downward to form a second connecting end, the top-loading material distribution device further comprises a secondary conveying arm (6), one end of the secondary conveying arm (6) is bent upward to form a third connecting end, and the second connecting end is connected to the third connecting end via the secondary rotating bearing (51); The second driving device (52) comprises a second driving motor (521), a driving gear (522) and a driven gear (523) meshing with the second driving motor (521); the driving gear (522) is connected to the output end of the second driving motor (521); the driven gear (523) is fixedly sleeved on the third connecting end; the second driving motor (521) drives the driving gear (522) to drive the driven gear (523) to rotate, so that the secondary conveying arm (6) rotates with the third connecting end as the axis.

6. The top-loading material distribution device according to claim 5, characterized in that: The other end of the secondary conveying arm (6) is bent downward to form a fourth connecting end, and the fourth connecting end is connected to a discharge pipe (7), and the discharge pipe (7) is a hose.

7. The top-loading material distribution device according to claim 5, characterized in that: The second end of the support plate (22) is provided with a rotating shaft (221), and the rotating shaft (221) is coaxial with the third connecting end; A pull ring (222) is provided on the rotating shaft (221), and three lifting ears (61) are provided on the secondary conveying arm (6). The three lifting ears (61) are connected to the pull ring (222) via steel cables (8), and the three steel cables (8) are all in a tensioned state.

8. The top-loading material distribution device according to claim 1, characterized in that: The length of the primary conveying arm (3) is consistent with the length of the supporting plate (22).

9. The top-loading material distribution device according to claim 1, characterized in that: The primary conveying arm (3) is fixed to the support plate (22) via a plurality of pipe clamps (9).

10. The top-loading material distribution device according to claim 1, characterized in that: The first end of the support plate (22) is thicker than the second end of the support plate (22).