Water and electricity installation engineering pipe gallery fixing frame
By designing a hydraulic and power installation engineering pipeline fixing frame with side support plates, hooking blocks and sliding blocks, the problem of difficulty in adjusting the height and disassembling of the fixing frame in the existing technology is solved, and the flexible installation and safety and collision avoidance of the pipeline corridor are achieved. .
Patent Information
- Application Number
- CN202421182053.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-28
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2034-05-28
AI Technical Summary
The existing water and electricity installation project pipeline fixing frame structure is fixed, making it difficult to flexibly adjust the installation stack height, and it is troublesome to disassemble and install.
A fixing frame including mounting base, side support plate, mounting block, sliding block and warning light is designed. Through the coordination of threaded holes and plug-in holes, the fixing of lateral support, stacking, pulling and adjusting pipe gallery is achieved. , easy to install and disassemble.
It realizes flexible height adjustment of the pipe gallery, prevents pouring and facilitates installation and disassembly, and improves installation flexibility and safety.
Smart Images

Figure CN222255361U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hydropower installation, in particular to a pipe gallery fixing frame for a hydropower installation project. Background Art
[0002] Pipeline gallery is the corridor of pipelines. In chemical and related factories, many pipelines are gathered together and arranged along the equipment or outside the factory building. They are usually in the air and supported by brackets to form a corridor-like appearance. In the process of water and electricity installation engineering, it is necessary to use pipeline gallery fixing frames to support the pipelines to ensure the installation of the pipeline gallery and the placement of the pipelines are stable and safe.
[0003] The existing pipe gallery fixing frame for hydropower installation engineering generally has a fixed structure and a large overall structure, which is not convenient for flexible adjustment of the installation stacking height, and the disassembly and installation are also relatively troublesome. Therefore, the utility model provides a pipe gallery fixing frame for hydropower installation engineering. Utility Model Content
[0004] 1. Technical issues to be resolved
[0005] In view of the deficiencies in the prior art, the utility model provides a pipe gallery fixing frame for a hydropower installation project, which solves the problems raised in the above-mentioned background technology.
[0006] (II) Technical solution
[0007] To achieve the above objectives, the utility model provides the following technical solutions: a pipe gallery fixing frame for a hydropower installation project, comprising a mounting base, a first threaded hole is provided on the upper surface of the mounting base, a first fixing bolt is threadedly connected to the first threaded hole, a side support plate is fixedly installed on one side of the mounting base, a second threaded hole is provided on the upper surface of the side support plate, a second fixing bolt is threadedly connected to the second threaded hole, and a first hanging block is fixedly installed on one side of the side support plate.
[0008] Preferably, a first plugging hole is formed on the upper surface of the mounting base, a stacking block is plugged into the first plugging hole, and a second hanging block is fixedly mounted on one side of the stacking block.
[0009] Preferably, a hook spring is inserted into the interior of the first hanging block, and a warning light is arranged on one side of the first hanging block.
[0010] Preferably, a second plug-in hole is provided on the upper surface of the stacking block, a connecting groove is fixedly installed on one side of the stacking block, a support arm is inserted in the connecting groove, a third threaded hole is provided on one side of the connecting groove and the support arm, and a third fixing bolt is connected to the internal thread of the third threaded hole.
[0011] Preferably, a sliding groove is provided on one side of the support arm, a sliding block is connected to one side of the sliding groove, a fourth threaded hole is provided on one side of the sliding block, and a fourth fixing bolt is connected to the internal thread of the fourth threaded hole.
[0012] Preferably, a lower arc plate is fixedly mounted on the upper surface of the sliding block, one side of the lower arc plate is connected to an upper arc plate, one side of the lower arc plate and the upper arc plate are both provided with a fifth threaded hole, and the internal thread of the fifth threaded hole is connected to a fifth fixing bolt.
[0013] (III) Beneficial effects
[0014] Compared with the prior art, the utility model provides a pipe gallery fixing frame for hydropower installation engineering, which has the following beneficial effects:
[0015] The pipe gallery fixing frame for the hydropower installation project is provided by the cooperation of the side support plate, the second threaded hole and the second threaded hole. When in use, the second threaded hole is screwed into the second threaded hole, and then the side support plate is fixed to the ground. The side support plate provides lateral support to the installation base, thereby preventing the base from tipping over. When in use, the stacking blocks are inserted into the plug-in holes for stacking, and are stacked according to the required fixed height of the pipe gallery, thereby achieving the effect of flexible installation and height adjustment. When in use, the first hanging block, the second hanging block and the hook spring are provided by the cooperation. When in use, the hook spring is hung on the first hanging block and the second hanging block, and the hook spring is used to The elastic force pulls the different stacking blocks and the mounting base together, thereby preventing the stacking structure from tipping over. Through the setting of the warning light, the warning light is connected to an external power supply when in use, thereby playing a warning and anti-collision role. Through the matching setting of the connecting groove, the support arm, the third threaded hole and the third fixing bolt, the third threaded hole is screwed into the third fixing bolt when in use, and the connecting groove and the support arm are fixed, thereby facilitating installation and disassembly. Through the matching setting of the sliding block, the fourth threaded hole and the fourth fixing bolt, the sliding block is pushed to a suitable installation position when in use, and then the fourth fixing bolt is screwed into the fourth threaded hole, thereby playing a role in adjusting the installation position of the pipeline gallery. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the structure of the utility model;
[0017] Figure 2 This is a structural breakdown diagram of the utility model.
[0018] In the figure: 1, mounting base 2, first threaded hole 3, first fixing bolt 4, side support plate 5, second threaded hole 6, second threaded hole 7, first hanging block 8, first plug-in hole 9, superposition block 10, second hanging block 11, hook spring 12, warning light 13, second plug-in hole 14, connecting groove 15, support arm 16, third threaded hole 17, third fixing bolt 18, sliding groove 19, sliding block 20, fourth threaded hole 21, fourth fixing bolt 22, lower arc plate 23, upper arc plate 24, fifth threaded hole 25, fifth fixing bolt. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] See also Figure 1-2The utility model provides a technical solution: it includes a mounting base 1, a first threaded hole 2 is provided on the upper surface of the mounting base 1, a first fixing bolt 3 is connected to the inner thread of the first threaded hole 2, a side support plate 4 is fixedly installed on one side of the mounting base 1, a second threaded hole 5 is provided on the upper surface of the side support plate 4, a second fixing bolt 6 is connected to the inner thread of the second threaded hole 5, through the matching arrangement of the side support plate 4, the second threaded hole 5 and the second threaded hole 6, the second threaded hole 6 is screwed into the second threaded hole 5 during use, and then the side support plate 4 is fixed to the ground, the side support plate 4 performs lateral support on the mounting base 1, thereby preventing the base from tipping over, a first hanging block 7 is fixedly installed on one side of the side support plate 4, a second threaded hole 5 is provided on the upper surface of the mounting base 1 A plug-in hole 8, a stacking block 9 is plugged into the first plug-in hole 8, and through the matching setting of the plug-in hole 8 and the stacking block 9, the stacking block 9 is inserted into the plug-in hole 8 for stacking when in use, and is stacked according to the required fixed height of the pipeline gallery, thereby playing a role in flexible installation and height adjustment. A second hanging block 10 is fixedly installed on one side of the stacking block 9, and a hook spring 11 is plugged into the inside of the first hanging block 7. Through the matching setting of the first hanging block 7, the second hanging block 10 and the hook spring 11, the hook spring 11 is hung on the first hanging block 7 and the second hanging block 10 when in use, and the elastic force of the hook spring 11 is used to pull and close different stacking blocks 9 and the mounting base 1, thereby playing a role in preventing the stacking structure from tipping over. One side of the first hanging block 7 is set There is a warning light 12. Through the setting of the warning light 12, the warning light 12 is connected to an external power source when in use, thereby playing a role of warning and anti-collision. A second plug hole 13 is provided on the upper surface of the stacking block 9, and a connecting groove 14 is fixedly installed on one side of the stacking block 9. A support arm 15 is inserted in the connecting groove 14. A third threaded hole 16 is provided on one side of the connecting groove 14 and the support arm 15. Through the matching setting of the connecting groove 14, the support arm 15, the third threaded hole 16 and the third fixing bolt 17, the third threaded hole 16 is screwed into the third fixing bolt 17 when in use, and the connecting groove 14 and the support arm 15 are fixed, thereby playing a role of facilitating installation and disassembly. The inner thread of the third threaded hole 16 is connected to the third fixing bolt 17, and one side of the support arm 15 is provided with a A sliding groove 18, one side of the sliding groove 18 is connected to a sliding block 19, one side of the sliding block 19 is provided with a fourth threaded hole 20, through the matching arrangement of the sliding block 19, the fourth threaded hole 20 and the fourth fixing bolt 21, when in use, the sliding block 19 is pushed to a suitable installation position, and then the fourth fixing bolt 21 is screwed into the fourth threaded hole 20, thereby playing a role in adjusting the installation position of the pipeline gallery, the internal thread of the fourth threaded hole 20 is connected to the fourth fixing bolt 21, the upper surface of the sliding block 19 is fixedly installed with a lower arc plate 22, one side of the lower arc plate 22 is connected to an upper arc plate 23, and one side of the lower arc plate 22 and the upper arc plate 23 are provided with a fifth threaded hole 24, and the internal thread of the fifth threaded hole 24 is connected to the fifth fixing bolt 25.
[0021] In summary, the pipe gallery fixing frame for the hydropower installation project is arranged by the cooperation of the side support plate 4, the second threaded hole 5 and the second threaded hole 6. When in use, the second threaded hole 6 is screwed into the second threaded hole 5, and then the side support plate 4 is fixed to the ground. The side support plate 4 provides lateral support to the installation base 1, thereby preventing the base from tipping over. By the cooperation of the plug-in hole 8 and the stacking block 9, when in use, the stacking block 9 is inserted into the plug-in hole 8 for stacking, and the stacking is performed according to the required fixed height of the pipe gallery, thereby playing a role in flexible installation and height adjustment. By the cooperation of the first hanging block 7, the second hanging block 10 and the hook spring 11, when in use, the hook spring 11 is hung on the first hanging block 7 and the second hanging block 10, and the elastic force of the hook spring 11 The different stacking blocks 9 and the mounting base 1 are pulled together to prevent the stacking structure from tipping over. The warning light 12 is set so that the warning light 12 is connected to an external power source when in use, thereby playing a warning and anti-collision role. The connecting groove 14, the support arm 15, the third threaded hole 16 and the third fixing bolt 17 are matched to each other. When in use, the third threaded hole 16 is screwed into the third fixing bolt 17 to fix the connecting groove 14 and the support arm 15, thereby facilitating installation and disassembly. The sliding block 19, the fourth threaded hole 20 and the fourth fixing bolt 21 are matched to each other. When in use, the sliding block 19 is pushed to a suitable installation position, and then the fourth fixing bolt 21 is screwed into the fourth threaded hole 20, thereby playing a role in adjusting the installation position of the pipeline gallery.
[0022] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0023] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A pipe gallery fixing frame for a hydropower installation project, comprising a mounting base (1), characterized in that: A first threaded hole (2) is provided on the upper surface of the mounting base (1), a first fixing bolt (3) is connected to the inner thread of the first threaded hole (2), a side support plate (4) is fixedly installed on one side of the mounting base (1), a second threaded hole (5) is provided on the upper surface of the side support plate (4), a second fixing bolt (6) is connected to the inner thread of the second threaded hole (5), and a first hanging block (7) is fixedly installed on one side of the side support plate (4).
2. A pipe gallery fixing frame for a hydropower installation project according to claim 1, characterized in that: The upper surface of the mounting base (1) is provided with a first plugging hole (8), a stacking block (9) is plugged into the first plugging hole (8), and a second hanging block (10) is fixedly mounted on one side of the stacking block (9).
3. A pipe gallery fixing frame for a hydropower installation project according to claim 1, characterized in that: A hook spring (11) is inserted into the interior of the first hanging block (7), and a warning light (12) is arranged on one side of the first hanging block (7).
4. A pipe gallery fixing frame for a hydropower installation project according to claim 2, characterized in that: A second plug-in hole (13) is provided on the upper surface of the stacking block (9); a connecting groove (14) is fixedly installed on one side of the stacking block (9); a support arm (15) is inserted into the connecting groove (14); a third threaded hole (16) is provided on one side of the connecting groove (14) and the support arm (15); and a third fixing bolt (17) is connected to the inner thread of the third threaded hole (16).
5. A pipe gallery fixing frame for a hydropower installation project according to claim 4, characterized in that: A sliding groove (18) is provided on one side of the support arm (15), a sliding block (19) is connected to one side of the sliding groove (18), a fourth threaded hole (20) is provided on one side of the sliding block (19), and a fourth fixing bolt (21) is connected to the internal thread of the fourth threaded hole (20).
6. A pipe gallery fixing frame for a hydropower installation project according to claim 5, characterized in that: A lower arc plate (22) is fixedly mounted on the upper surface of the sliding block (19), one side of the lower arc plate (22) is connected to an upper arc plate (23), one side of the lower arc plate (22) and the upper arc plate (23) are both provided with a fifth threaded hole (24), and the inner thread of the fifth threaded hole (24) is connected to a fifth fixing bolt (25).